The Anonymous Widower

Coming Or Going?

I took the pictures of this lorry carrying concrete staircases in the Balls Pond Road.

I like a good puzzle. So where were these three staircases going on a truck, that was obviously from Cornwall?

  • They look to be very well-made, with a quality finish.
  • Had they been made in Cornwall and were being delivered to a skyscraper in the City?
  • Had they been made in East London and were being taken to Cornwall?

The truck was facing Highbury Corner, so would the second be the most likely?

On the other hand, Google found a company called Cornish Concrete Products at Bissoe, only a few miles from Redruth.

April 9, 2020 Posted by | Transport/Travel | , , , , | Leave a comment

Varamis Plans Electric Freight To Carry Light Goods

The title of this post, is the same as that of an article in Issue 902 of Rail Magazine.

This is the introductory paragraph.

Freight trains using electric multiple units could be operating on the East Coast Main Line by the end of the year, in plans unveiled by Varamis Rail.

This is their promotional video.

From the video and the Rail Magazine article, the following can be ascertained.

The Route

From the video, the basic route is circular and the concept is explained in the article, by Phil Read; the Managing Director of Varamis Rail.

Our vision is to create a circular network around the UK via both the East Coast Main Line and West Coast Main Line, with a stop/go method of service delivery serving major towns and cities en route.

And we could move goods in both directions.

Longer term, there could be extensions to Bristol and South Wales and into East Anglia.

Note.

  1. From the video is looks like the main loop will start and finish in London.
  2. Trains on the main loop will call at Doncaster, Newcastle, Edinburgh, Glasgow, Carlisle, Manchester and Birmingham.
  3. Varamis have said they will stick to electrified lines.

I like the concept of the route.

  • It covers a lot of the country.
  • It can be easily extended.
  • Extra stops could be easily added. Darlington, Leeds, Peterborough, Preston and Reading come to mind.

With dual-voltage trains, it could even be extended South of London.

The Trains And The Organisation

Varamis are certainly looking to keep the operation efficient and low-cost. This is said about the trains.

The plan is to remove all the internal furnishings in the umits we lease utilise them without altering any of the loading or dynamic characteristics that the trains had when formerly used as passenger trains. I’m in discussions with rolling stock leasing companies and the DfT at present to lease the trains.

The DfT owns all 40 Class 365 trains.

In addition, the following is said.

  • Maintenance would be outsourced, with one of two likely companies.
  • Operations Director will be appointed soon.
  • Company headquarters would be in Doncaster.
  • Varamis will employ all their own staff, including drivers, fitters and logistics operators.

A small point is that Phil Read has worked for the Rail Operations Group.

Class 365 Trains

Class 365 trains have the following characteristics.

  • Four cars
  • Up to three trains can be coupled together.
  • 100 mph operating speed.
  • Two pairs of wide double doors on the side of each car.
  • They are not a train with a reputation for unreliability.

This is a picture of a Class 365 train.

Note.

  1. They could probably be converted to dual-voltage, by adding third-rail gear.
  2. The trains could probably be made available at short-notice.

The company talks about an end-on cross-transfer system at their hubs, where goods can be moved through the train.

I will be interested to see what this means, but I suspect it will give a quick and easy transfer of pallets of goods between trains and the trucks doing the local delivery.

Green Logistics

Varamis are marketing their services as Green Logistics.

Conclusion

As someone, who needed this sort of system in the early days of Metier to distribute new copies of the Artemis software, I think the service will fulfil a large need.

I said earlier that I like the concept of the route.

But thinking about it more, I suspect it can be very easily extended.

  • Brighton, Portsmouth and Southampton could be served by dual-voltage trains.
  • Could for instance a hub in Edinburgh, distribute pallets and parcels to and from the North of Scotland?
  • Could bi-mode trains serve the towns and cities on the Midland Main Line?
  • A connection to Heathrow would be very valuable.

A large proportion of the country could be connected.

If it existed now, would it help in the fight against COVID-19?

 

April 6, 2020 Posted by | Transport/Travel | , , , | 4 Comments

Short-Notice Spaghetti Trains Organised To get Pasta Across The Alps

The title of this post is the same as that of this article on Railway Gazette.

This is the introductory paragraph.

DB Schenker has organised the transport of several hundred tonnes of pasta by rail from Italy to Germany, enabling 650 Aldi supermarkets to replenish supplies which had been depleted by customers stocking up during the coronavirus pandemic.

I can’t help feeling that this story pays homage to Richard Dimbleby‘s classic April Fool story about the spaghetti harvest in Switzerland.

April 6, 2020 Posted by | Food, Transport/Travel | , , , , , , , , | 2 Comments

‘Mammoth Task’ Completed As Overground Line Reopens

The title of this post is the same as that of this article on Railnews.

The article tells the story of one of the worst rail cock-ups of recent years.

A rogue wagon on a freight train ripped up four kilometres of the Gospel Oak to Barking Line on the night of the 23rd of January.

And it was only yesterday, that the line fully reopened.

This is the last sentence of the article.

The cost of the repairs and resulting disruption has not been revealed.

Effectively, four kilometres of new railway don’t come cheap!

February 20, 2020 Posted by | Transport/Travel | , , , | 2 Comments

Government Probe Into How Derailed Freight Train Travelled 2.5 miles Along Overground Line

The title of this post is the same as rgis article on the Ham and High.

This is the introductory paragraph.

The government has launched an investigation into how a derailed freight train travelled 2.5 miles before the problem was flagged up to the driver.

The article gives some more details.

  • The accident happened on Thursday 23rd of January.
  • The train derailed near Wanstead Park station.
  • The train finally stopped between Leyton Midland Road and Walthamstow Queens Road.
  • The train was carrying construction  from Barkingspoil to the landfill site at Calvert in Buckinghamshire.

The derailment caused a lot of damage as pictures and this paragraph in the article show.

Across the two and a half mile stretch, there are 39 new pieces of rail – each 216m long – that require replacing, as well as 5,300 concrete sleepers and 900 wooden sleepers.

Work to replace 10,000 tonnes of ballast will need to take place, as well as putting replacement timber into 10 bridges.

At least, as they have just relaid this section of railway for the Gospel Oak to Barking electrification, there will hopefully be no nasty surprises  in the rebuilding process.

This map from carto.metro.free,fr shows the track layout between South Tottenham station in the West and Blackhorse Road station in the East.

Note the two crossovers either side of South Tottenham station, which are used to reverse the train between the two platforms.

I suspect that London Overground, wish there are crossovers at Blackhorse Road station, so that passengers could use the interchange with the Victoria Line.

But crossovers are expensive can cause operational problems.

At least, there are no crossovers in the section of track destroyed by the freight train.

February 6, 2020 Posted by | Transport/Travel | , , | 4 Comments

Company Hopes To Use Railways To Develop Drone Delivery Corridors

The title of this post, is the same as that of this article on Railway Gazette.

The first two paragraphs explain the idea.

SkyRights Holdings is seeking to partner with Class I railways to make their alignments available for use by drone delivery companies and for ‘urban air mobility’ applications.

The company said the airspace above railways offers ‘a unique solution to address the safety, electric charging infrastructure and liability management challenges when compared to flying delivery drones over populated areas.’

I think this could be very feasible.

January 8, 2020 Posted by | Transport/Travel | , | Leave a comment

Cross City Connect Proposes HS1-HS2 Link

The title of this post is the same as that of an article in the January 2020 Edition of Modern Railways.

The article is only sketchy giving only a few details of the proposal.

  • The link would connect HS2 at Old Oak Common to HS1 at Rainham.
  • HS2 would not connect to Euston.
  • There would be intermediate stations at South Bank Central, Canary Wharf and Barking.

This map, that was posted in the RailUK forums, shows the route.

These are my thoughts on various points of the plan.

The Tunnel Route And South Bank Central Station

The proposed tunnel route is shown in red on the map.

These are my thoughts on the main tunnel.

Western Section – Old Oak Common To South Bank Central Station

This Google Map shows the area of London between Old Oak Common Elizabeth Line Depot and the South Bank.

Note.

  1. The depot is in the North-West corner marked with the red arrow.
  2. The Thames as it curves around the South Bank is in the South East corner of the map.
  3. The Serpentine in Hyde Park can be picked out.

I think that the tunnel would go deep under the West London Line and Hyde Park before cutting away East to the Thames.

Note that when a similar tunnel was dug deep under East London for High Speed One, there wasn’t too much difficulty. But that was twenty-five years ago and tunnelling techniques have surely improved.

There is also all the knowledge, that has been accumulated by the boring of Crossrail and the Thames Tideway Tunnel.

South Bank Central Station

This second Google Map shows the Thames between the London Eye and Blackfriars station.

Blackfriars Bridge, Blackfriarts station, The Hayward Gallery. The National Theatre, The Royal Festival Hall, Waterloo bridge and Waterloo station can all be picked out.

This map from carto.metro.free.fr shows the various lines in the area.

Note.

  1. There seem to be few lines by the Thames on the South Bank, with just the Bakerloo and Northern Lines crossing the area.
  2. The Waterloo & City Line crosses further to the East.
  3. I would suspect, that as most of the buildings in the area of the South Bank have been built since 1950, that detailed plans and surveys exist of the South Bank.
  4. Even Waterloo Bridge was built as recently as the Second World War, which is young for many of the bridges across the Thames.

This leads me to believe that a substantial station could be built under the South Bank.

  • It would have long platforms roughly following the line of the Thames.
  • It could be connected to Waterloo station at the South-Western end.
  • Connections could surely be made to the Bakerloo and Northern Lines and possibly to the Jubilee Line.
  • The Northern Line is being extended to Battersea Power station.
  • The Bakerloo Line could be extended to South East London.
  • There are possible plans to extend Charing Cross station over Hungerford Bridge, which could be connected as well.
  • Could the station be connected to Blackfriars station at the North-Eastern end?
  • Could tunnels be built under the Thames to connect the station to the North Bank?

It seems to me, that there are lots of possibilities to make the proposed Soiuth Bank Central station a very well-connected station.

This Google Map may offer a clue as to where the station could poke its head into the South Bank.

Going from West to East across the map, the following can be seen.

  • The approach road to Waterloo Bridge.
  • The National Theatre
  • The IBM Building.
  • The London Studios

The last is the interesting building, as it has been sold to Mitsuibishi Estates to be developed as luxury housing. It is also a large site of 2.5 acres and there used to be a tower on the site, so I suspect there could be space for a station in the basement and an entrance or two on the surface.

It would certainly be a wonderful location to arrive at in London.

  • Walk to the West and you pass The Nation Theatre, the Hayward Gallery, the Queen Elizabeth Hall and the Festival Hall before arriving at Hungerford Bridge and the footbridges to the North Bank, Charing Cross station and Trafalgar Square.
  • Walk further West and you pass the London Eye and come to Westminster Bridge, with The Palace of Westminster, Westminster Abbey and Parliament Square on the other side of the River.
  • Walk to the East and you pass Blackfriars station, that sits above the river and the Tate Modern, before arriving at the Millenium Bridge that leads to St. Paul’s Cathedral.
  • South Bank Central station could even have a pier for the Thames Clippers.

It would certainly be a Central station, worthy of the name.

In this post entitled Walking Between Blackfriars And Hungerford Railway Bridges, there are a series of pictures I took on the walk.

These pictures show the section around the studios.

Note thaty the river walk is a tree-lined boulevarde and there is an accessible beach.

It should also be noted that the Thames Tideway worksite locations are on the North side of the river at this point of the river, so this could leave space for the Cross City Connect tunnel to be towards the South Bank.

South Bank Central Station And Canary Wharf Station

This Google Map shows the route between the South Bank and Canary Wharf.

Note.

  1. The South Bank is in the North-West corner of the map.
  2. East Enders fans will be able to recognise the O2 at the Eastern side of the map.
  3. Canary Wharf is to the West of the O2 in the bend of the River.

I suspect that the tunnel could be bored roughly along the line of the River before passing under Canary Wharf, where there could be a deep-level station.

Potential Station – Canary Wharf

Canary Wharf station is only labelled as a potential station.

This Google Map shows the Canary Wharf Crossrail station.

Is the design of the station such, that extra lines could be placed alongside or under the Crossrail tracks and connected to the existing station?

There certainly must be a suitable place for a potential station at Canary Wharf, otherwise it wouldn’t have been proposed.

The station would give access to Crossrail, the Docklands Light Railway and the Jubilee Line.

I also expect that the Canary Wharf Group would be very co-operative and could make a contribution to the cost of the station.

Canary Wharf Station To Barking And Rainham

This Google Map shows the final section from Canary Wharf to Rainham.

Note.

  1. Canary Wharf and the O2 at the West of the map.
  2. The London City |Airport to the East of the O2, with the water alongside the runway.
  3. Rainham station marked by a red arrow at the East of the map.

It would appear that the route of the tunnel could be under the River or the runway at the City Airport.

But it should be born in mind, that High Speed One was dug under Barking and there wasn’t too much trouble.

Potential Station – London City Airport

As the Cross City Connect tunnel could pass under the terminal building at the Airport, could a station be built here?

I suspect not!

  • Passengers at the Airport go to many of the destinations of the rail service.
  • I don’t think there will be enough passengers to justify the station.
  • London City Airport is expanding the terminal and they probably wouldn’t want to change things now.

The Airport wants a Crossrail station and that is more likely.

Potential Station – Barking

Barking station is only labelled as a potential station.

The map from carto.metro.free.fr, shows another potential station at Barking.

It is a well-connected station.

Could a two track high speed station with two-platforms per track, be built underneath the current station and connected to it by escalators and lifts?

It would probably not be a much more difficult station to design and build, than Whitechapel station on Crossrail.

CCC-HS1 Interface

This Google Map shows the rail lines and roads around Dagenham Dock station.

Stand on the London-bound platform and whilst waiting for a c2c train, Eurostars and Javelins speed by behind you.On the map, you can just see the Jigh Speed One tunnel portal to the West of the station.

The two pairs of tracks; c2c and High Speed One run parallel through Rainham station, until they split with the c2c tracks going towards the river and Purfleet and Grays station and High Speed One threading its way through the approaches to the Dartford Crossing and its tunnel under the Thames.

This Google Map shows the area to the South-East of Rainham station, which is in the North-West corner of the map.

Note the A13 road linking East London to the junction with the M25 in the East, which is to the North of the Lakeside Shopping Centre.

This Google Map shows the North Western corner of the previous map.

Note.

  1. Rainham station at the top of the map.
  2. The two c2c tracks running South East from the station.
  3. The two High Speed One alongside the c2c tracks.
  4. The dual carriageway of the A13 road.

There is a large empty triangular area of land between the road and the four railway tracks. As I’ll mention it several times, I’ll call it the Rainham triangular site in future.

I suspect that the Cross City Connect tunnel will break off from High Speed One to the South-East of Rainham station , with a portal in the Rainham triangular site.

A train between Paris and Birmingham or Manchester would do the following.

  • Take High Speed One as now.
  • After stopping as required at Ashford and/or Ebbsfleet stations, it would cross under the Thames.
  • At Rainham it would take the Cross City Connect tunnel.

After stopping as required  at South Bank Central and Old Oak Common stations, it would take High Speed Two for the North.

Boring The Tunnel

The Rainham triangular site could be the place from where to bore the tunnel. Or at least the Eastern part!

  • There is a lot of space.
  • Linings and other heavy materials and equipment, could be brought in by rail using High Speed One.
  • Tunnel spoil could be conveyored to the river and taken away in barges.

Would tunnelling techniques have improved enough to go between Rainham and Old Oak Common in one continuous bore?

Would There Be A Station At Rainham?

All services going through the Cross City Connect tunnel would need to terminate somewhere.

Some would go all the way to the Continent and in the near future they could terminate at some of all of the following destinations.

  • Amsterdam
  • Bordeaux
  • Brussels
  • Cologne
  • Frankfurt
  • Geneva
  • Paris

High Speed Two’s trains would be compatible with the Channel Tunnel, but ridership would be variable along say a Manchester and Paris route.

So some services would need to terminate in the London area.

As the line to Euston would be abandoned in the Cross City Connect plan, a new station will be needed to terminate trains.

There are two possibilities.

  • Old Oak Common, which because of its connections to Crossrail, the Overground and the Great Western Railway will be the place of choice for many to catch High Speed Two.
  • A new station at Rainham.

Both should be built.

Rainham High Speed station would be built in the Rainham triangular site.

  • It has good road access to the UK’s motorway network.
  • c2c services would call to give South Essex access to High Speed services
  • Southeastern Highspeed services would call to give Kent access to High Speed services.
  • Continental services would call to give access to alternative routes to or through London.
  • Some High Speed Two services to and from the North would terminate at the station.

There is probably space for an extensive train depot on the site.

Consider a service between Geneva and Glasgow.

  • Most travellers would fly on this route as it would be in the order of eight hours by train.
  • I suspect though that London and Geneva at possibly six hours could attract more traffic.

A well-planned station at Rainham would probably cater for the masochists who wanted to do the long journey by High Speed Rail in a day.

But the interchange at Rainham would be invaluable for passengers travelling between the Continent and Canary Wharf or Westminster.

  • Canary Wharf is served directly.
  • Westminster is a short walk over the Thames or one stop on the Jubilee Line from South Bank Central station.
  • Try going between St. Pancras International and Canary Wharf or Westminster quickly without changing trains or using a taxi.
  • The proposed Crossrail 2 won’t make these journeys any easier.
  • The Cross City Connect Route would be faster.

As Canary Wharf is connected to Crossrail and Old Oak Common to the Overground, access to the Greater London area would be much improved with a change at Rainham High Speed station.

Cross City Connect, also gives access to these services to places, that will not be served by High Speed Two.

  • South Western Railway services from Waterloo, which will be close to South Bank Central station.
  • Great Western Railway services will be available at Old Oak Common.

Travellers wanting classic service to the North would go as now, via St. Pancras.

The only thing missing is a connection to Crossrail, which would give direct access to Liverpool Street and Paddington.

I think that Rainham High Speed station would become a very important station.

Tunnel Size And Number

High Speed Two is being built to a loading gauge of UIC GC, which is similar to the Channel Tunnel. The Channel Tunnel bores are 7.6 metres in diameter.

The biggest tunnel under London will be the one currently being dug for the Thames Tideway Scheme.

  • It will be 25 kilometres long.
  • The diameter is 7.2 metres.
  • It will be up to seventy metres below the surface.

For much of its route, it follows the Thames in a similar manner to the Cross City Connect tunnel.

Cross City Connect would need one tunnel of this size for each track.

Could two tracks share a single tunnel?

Theoretically, I think they could, but it could cause problems in station design.

Station Design

Would the Cross City Connect need four tracks and platforms at each station?

High Speed One stations at Stratford, Ebbsfleet and Ashford stations effectively have four tracks and platforms, due to the security need of separating domestic and International passengers.

But as all trains these days, including those on Eurostar and the Javelins working suburban services have doors on both sides, surely there is an engineering solution.

  • South Bank Central and any other Central London stations would have platforms on both sides
  • All platforms would have level access between train and platform and platform doors.
  • Platform doors would be designed to work with all trains using the route. I have ideas how this could be done.
  • The domestic platforms would be the two platforms between the two tunnels. This would mean domestic passengers could board and leave the trains with the minimum of fuss. They could also reverse direction if they should need.
  • The International platforms would be on the outside and would have the extra security checks needed.
  • International and domestic services would only open doors to the appropriate platform.

If a solution to the security problem can be found, then two tunnels would be sufficient.

Four tunnels would blow the budget.

Train Operating Speed In The Tunnel

Consider.

  • High Speed Two has been designed with an operating speed of 225 mph.
  • The Chanel Tunnel has a maximum operating speed of 100 mph.
  • The Channel Tunnel track could possibly handle 120 mph.
  • Crossrail has an operating speed of 90 mph.

It should also be noted that the faster the trains go, the greater the pressure on infrastructure like platform edge doors and the passengers waiting on the platforms outside the doors.

I would suspect that the maximum operating speed of trains in the Cross City Connect tunnel would not  be hoigher than 100 mph, but with a possibility of increasing it up to 125 mph in the future.

Train Frequency

Note that the design frequency of High Speed Two is twenty-one trains per hour (tph).

If Thameslink and Crossrail have been planned for twenty-four tph, with an objective of going to thirty tph, I don’t see why, we shouldn’t see twenty-four tph or even thirty tph running through the Cross City Connect tunnel.

Summing Up The Tunnel Route And South Bank Central Station

These are my conclusions on the tunnel route.

  • It uses London’s geography and the tunnelling-friendly clay soil to advantage.
  • The designers of the scheme have found an easy place to build a well-connected station at South Bank Central.
  • It also appears that the Eastern portal at Rainham, is on a site with plenty of space.
  • Could the Eastern portal make a good site from where to build the tunnel.

Overall, it appears to be a very viable project.

Passenger Services

When Phase Two of High Speed Two, these services are currently planned to run into Euston.

  • 3 tph – Birmingham Curzon Street – via Old Oak Common and Birmingham Interchange (2 tph)
  • 2 tph – Liverpool – via Old Oak Common, Stafford (1 tph), Crewe (1 tph) and Runcorn
  • 3 tph – Manchester – via Old Oak Common, Birmingham Interchange and Manchester Airport (2 tph)
  • 1 tph – Preston – via Old Oak Common, Warrington Bank Quay and Wigan North Western
  • 2 tph – Glasgow – via Old Oak Common, Birmingham Interchange (1 tph), Preston and Carstairs
  • 2 tph – Edinburgh – via Old Oak Common, Birmingham Interchange (1 tph), Preston, Carstairs and Edinburgh Haymarket
  • 3 tph – Leeds – via Old Oak Common, Birmingham Interchange, East Midlands Hub (1 tph), Chesterfield (1 tph) and Sheffield Midland (1 tph)
  • 2 tph – Sheffield – via Old Oak Common, Birmingham Interchange, East Midlands Hub and Chesterfield (1 tph)
  • 1 tph – York via Old Oak Common and Birmingham Interchange
  • 2 tph – Newcastle – via Old Oak Common (1 tph) and Birmingham Interchange and York.

Adding these up gives a frquency of twenty-one tph between Old Oak Common and Birmingham Interchange.

The Dutch believe that five trains per day (tpd) will be viable between London and Amsterdam and it looks like this frequency will be running by the end of 2021.

Obviously, passenger numbers will be determined by where passengers want to go, but I think that there should be at least this minimum service between the Continent and the North.

  • 3 tpd – Glasgow
  • 3 tpd – Liverpool
  • 3 tpd – Birmingham Curzon Street
  • 3 tpd – Manchester
  • 3 tpd – Leeds

I believe that High Speed Two and Northern Powerhouse Rail will be combined, as I described in Changes Signalled For HS2 Route In North.

This could result in a service between London and Hull that  called at Old Oak Common, Birmingham Interchange, Crewe, Manchester Airport, Manchester, Huddersfield, Bradford and Leeds.

I estimated timings from London to various cities as follows.

  • Birmingham – 49 minutes
  • Liverpool – 66 mins
  • Manchester – 66 mins
  • Leeds – 92 mins
  • Hull – 130 minutes

It looks like there could be a direct service between Paris or Brussels to the North in these times.

  • Birmingham – Under three hours
  • Liverpool – Under four hours
  • Manchester – Under four hours
  • Leeds – Around four hours
  • Hull – Under five hours

Get the design of Rainham High Speed station right and the right timetable and timings would only be a few minutes longer with a cross-platform interchange at Rainham High Speed or Birmingham Interchange station.

The merging of High Speed Two and Northern Powerhouse Rail could enable services with these frequencies.

  • 4 tpd – Paris or Brussels and Birmingham
  • 4 tpd – Paris or Brussels and Glasgow
  • 4 tpd – Paris or Brussels and Manchester, Huddersfield, Leeds and Hull.
  • 4 tpd – Paris or Brussels and Liverpool

Note.

  1. These services would be pairs of trains, eith the two trains would splitting and joining at Lille. One train would go to and from Brussels and the other to and from Paris.
  2. The services would add one tph to traffic through the busy Channel Tunnel and to High Speed Two between Old Oak Common and Birmingham Interchange.
  3. There would be several extra services per day, with a change at Rainham High Speed station.
  4. Birmingham would get four tpd at Birmingham Curzon Street and another twelve tpd at Birmingham Interchange.
  5. The trains from Brussels could have Amsterdam, Cologne and Frankfurt as their terminus.

I could see these services giving the airlines a good kicking.

  • Manchester and Paris has seven flights per day, but the route could have four direct tpd and three tph with a change at Rainham.
  • Glasgow and Paris appears to have just two flights per day.
  • A 200 metre long train could seat over 500, whereas an Airbus A320 seats around 200.

Would you fly between Paris and Birmingham, Liverpool or Manchester, if you could go by train in under four hours?

Freight Services

Why not? Especially at night!

Design the platform edge door correctly and freight trains would be able to pass through the Cross City Connect tunnel.

Much of the container traffic between the UK and Europe should go by rail, and this tunnel makes it possible.

Issues That Must Be Considered

There are a few issues that must be considered.

St. Pancras Station

I think that long-term St. Pancras station will have capacity and access problems for trains and passengers.

  • The six Eurostar platforms are probably not enough, if more services want to use the station.
  • The lounges and passport control need more space.
  • At times, the station concourse is overcrowded.
  • Crossrail 2 and/or better access to the Underground is needed now.
  • Getting from St. Pancras to Canary Wharf, Euston and Westminster is not easy.

You also regularly hear Eurostar passengers moaning and say that they preferred Waterloo as the terminal.

Building Cross City Connect solves all the problems and effectively gives London five stations, that can be used for the Continent at Canary Wharf, Old Oak Common, Rainham, Saint Pancras and South Bank Central.

Southeastern’s HighSpeed Services

Southeastern’s HighSpeed services to and from Kent, only have two London destinations; Stratford and St. Pancras.

  • Cross City Connect seem to be suggesting that some of these services take their new tunnel and go to Birmingham.
  • They would connect the services to the new stations at Canary Wharf and South Bank Central.
  • The current Class 395 trains are only 140 mph trains and might be to slow for the 225 mph High Speed Two.
  • But their speed would be fine on an upgraded West Coast Main Line.

I’m sure that space could be found at Milton Keynes, Tring or Watford Junction for a platform to handle four tph through the Cross City Connect tunnel to Rainham and Kent.

London would get another Crossrail!

And talking of Crossrail, the services could take the Crossrail route to Reading and possibly Oxford.

There is great potential to use some of those paths through the Cross City Connect tunnel to link passengers to the major Continental interchange at Rainham High Speed station.

Stratford International Station

At present this station is really only a domestic station for Southeastern’s HighSpeed services between St. Pancras and Kent.

  • Continental services do not stop.
  • The only connections are to buses and the Docklands Light Railway.
  • It is badly-connected to Crossrail, the Greater Anglia services and the Underground, at the main Stratford station.
  • Underneath the station is the High Meads Loop, which is connected to the West Anglia Main Line and used to be used to terminate Stansted Expresses.

It is a design crime of the worst order.

But it could be so much better.

  • A better connection with a travelator could connect the two Stratford stations.
  • A Lea Valley Metro could be developed using the High Meads Loop as a terminus.
  • Stansted Airport and Cambridge services could also use the High Meads Loop.
  • Platforms could be added to the High Meads Loop, that would connect direct to the International station.

I also feel some Continental services should stop, as this would give them easy access to the important Crossrail.

Stratford could be the station, that ties London, East Anglia and South Essex together and gives them good links to the Continent.

A Future Thames Estuary Airport And Thames Barrier

I feel that in the next three decades, there is at least a fifty percent chance, that London will build an airport in the Thames Estuary.

The Airport would probably be some miles to the East, but the Cross City Connect tunnel and Rainham High Speed station could be valuable parts of the rail system serving that Airport.

Look at the section called Future in the Wikipedia entry for the Thames Barrier.

A new barrier will be needed in the next fifty years.

It could include rail and road crossings.

It could incorporate a large Airport.

There may even be tidal power generation.

As there will be extensive developments on both sides of the Thames, more transport infrastructure will be needed and the Cross City Connect tunnel and the Rainham High Speed station will play their part.

Immigration Control And Security

This could have a large effect on station design, as domestic and International passengers will need to be kept apart.

Cross City Connect are saying that four tracks might be needed; two for domestic services and two for International ones.

However, I believe that a four-platform station with just two tracks (and tunnels!), that kept domestic and International passengers apart could be built.

Earlier I said this.

  • South Bank Central and any other Central London stations would have platforms on both sides
  • All platforms would have level access between train and platform and platform doors.
  • Platform doors would be designed to work with all trains using the route. I have ideas how this could be done.
  • The domestic platforms would be the two platforms between the two tunnels. This would mean domestic passengers could board and leave the trains with the minimum of fuss. They could also reverse direction if they should need.
  • The International platforms would be on the outside and would have the extra security checks needed.
  • International and domestic services would only open doors to the appropriate platform.

I certainly think, there is a solution, that can be used with just two tracks.

Euston Station

If the Cross City Connect route is built, what happens at Euston?

Operationally, Euston may have problems with the number of platforms and their length, as many of London’s terminal stations do.

But Euston’s biggest problem is the connection to the Underground.

  • It is a cramped station.
  • It is not step-free.
  • The Circle, Hammersmith & City and Metropolitan Lines call in the separate Euston Squiare station about two hundred metres away.

I understand that these problems were to be fixed with the rebuilding of the station.

So what happens now?

Will there be more demolition of the station and the surrounding buildings?

Conclusion

There’s more to this project, than meets the eye!

 

January 3, 2020 Posted by | Transport/Travel | , , , , , , , | 12 Comments

Pesa And PKN Orlen To Develop Hydrogen Fuel Cell Trains

The title of this post is the same as that of this article on Railway Gazette.

This is the introductory paragraph.

Rolling stock manufacturer Pesa and energy company PKN Orlen signed a letter of intent to develop hydrogen fuel cell trains on December 12.

I am pleased that Poland appears to be turning to trains that emit less carbon, but I do worry about how the hydrogen is produced.

It appears the Dutch are moving towards green hydrogen, which is produced by the electrolysis of water using electricity produced by offshore wind farms.

But how are the Poles producing their hydrogen?

I did find this article on biznewsalert.com, which is entitled Poland Wants To Be A Hydrogen Kuwait. P2G Can Help.

This is the introductory sentence.

Hydrogen could drive low-carbon transport and also help reduce CO2 emissions. Although it is a distant perspective for now, the production of the element could support onshore wind farms.

It does appear that the Poles are thinking along lines, that will reduce carbon emissions.

What is P2G?

P2G or Power-to-Gas has an informative Wikipedia entry.

This is the first paragraph, which outlines the process.

Power-to-gas (often abbreviated P2G) is a technology that converts electrical power to a gas fuel. When using surplus power from wind generation, the concept is sometimes called windgas. There are currently three methods in use; all use electricity to split water into hydrogen and oxygen by means of electrolysis.

There certainly a lot of activity in the sector.

My Experience Of Polish Transport

Poland is a large country with an extensive rail system. I have travelled long distances across the country and many of the passenger trains are electric.

I can’t remember seeing a freight train, but I do remember large numbers of diesel trucks moving freight across the country.

Conclusion

Hydrogen could be a very important fuel for transport in Poland.

December 18, 2019 Posted by | Transport/Travel | , , , , | Leave a comment

Switching From Lorries To Freight Trains Could Cut Air Pollution By 10%

The title of this post is the same as this article on Rail Technology Magazine. This is the first paragraph.

Making the switch from HGVs to trains for freight travel could lead to 10% less air pollution from NOx across the country, says new research from the Campaign for Better Transport (CBT).

The major problem will be to get freight operators to switch from road to rail.

However, I do feel that this may be hastened by external factors and innovative methods and technology.

Shortages Of Train And Truck Drivers

There are regular news items about shortages of train and truck drivers.

I would think, that both careers will attract the same type of person.

Both careers will have their good and bad points.

But after a search of the Internet, it does appear that the train driver will earn more than the truck driver.

So will a shortage of truck drivers, nudge more freight operators to use rail?

Track Improvements For Rail Freight

Over the last decade or so, there have been several improvements in track layouts, that have been driven by the need to increase the amount of freigt carried by rail.

  • The development of the Great Northern and Great Eastern Joint Line through Lincolnshire as a freight by-pass for the East Coast Main Line.
  • The building of the Bacon Factory Chord to increase capacity to and from the Port of Felixstowe.
  • Electrification of the Gospel Oak to Barking Line will create a second electrified freight route across London.
  • Several passing loops have been lengthened to allow longer freight trains.
  • The Ordsall Chord will help freight through Manchester.

Obviously any general improvements will help freight trains as well as passenger trains.

Air-Pollution Activitists And Politicians

Most long-distance rail-freight is diesel-hauled and increasingly it goes through areas of large cities, where there is electrification. These electrified lines all see diesel-hauled freight trains.

  • The North London Line
  • The West London Line
  • The Gospel Oak to Barking Line
  • The Ordsall Chord
  • The Great Eastern Main Line
  • The West Coast Main Line
  • The East Coast Main Line
  • The Great Western Main Line

It will not be long before air-quality activists set their sites on removing diesel haulage from lines like these.

Will a local politician in North London say, be more likely to get elected, if they say, they will push for a ban on noisy and polluting diesel-powered locomotives running through their constituency.

The Replacement Of Diesel Locomotives With Electro-Diesel Locomotives

If you take a freight route like say Felixstowe to Trafford Park in Manchester via the Great Eastern Main Line, the North London Line and the West Coast Main Line, all of the route except for the two ends is electrified.

Normally, freight on this route would be hauled by a Class 66 diesel-locomotive, which would probably score 2/10 as a friend of the environment.

A modern electro-diesel locomotive, like a Class 88 locomotive  may be able to this and similar routes using electricity in the middle and its onboard diesel engine at both ends of the route.

The various locomotives, used on UK freight trains compare as follows.

  • Class 66 – 65/75 mph – 2.4 MW on diesel
  • Class 68 – Modern diesel to Stage II A emission standards – 100 mph – 2.8 MW on diesel
  • Class 70 – 75 mph – 2.7 MW on diesel
  • Class 86 – 75 mph – 0.7 MW on electricity
  • Class 88 – 100 mph – 4 MW on electricity – 0.7 MW on diesel
  • Class 90 – Electric locomotive – 100 mph – 0.9 MW on electricity
  • Class 92 – Electric locomotive – 87 mph – 5 MW on electricity

As the table shows the  Class 66 locomotives  are slow and less powerful than both the more modern Class 68 or Class 88 locomotives.

Cynically, I would say that the only reason that Class 66 and Class 70 locomotives are still in service is that they are good for the bottom line.

Despite this, I feel we’ll see an increasing number of electro-diesel locomotives like the Class 88 arriving in the UK.

New Electric Locomotives

Judging by some of the strange combinations, I’ve seen on some freight trains, we are short of electric locomotives.

This double-headed train has a Class 90 electric locomotive and a Class 66 diesel locomotive at the front of a long freight train.

Even electric locomotives from the 1960s are being called up for service.

These two Class 86 locomotives were hauling a freight train through Hackney Wick station.

I think we’ll see small numbers of new electric locomotives arriving in the UK.

I suspect too, that freight operators are preparing their bids for the fifteen Class 90 locomotives, that will be released in the next few years by Greater Anglia.

More Electrification

In a couple of years, there will be full electrification from London to Bristol and Cardiff.

Although the Government has put a hold on a lot of electrification,  current schemes like electrification of the Great Western Main Line will increase the use of electric or electro-diesel haulage.

Other smaller schemes might be added to increase the use of electric haulage for freight.

As an example, the lines into the important freight ports of London Gateway and Liverpool Two are not electrified. Electrifying both would probably increase the proportion of electrically-hauled freight.

 

 

 

 

 

 

 

December 2, 2019 Posted by | Transport/Travel | , , , , , , | Leave a comment

Election 2019: DUP Manifesto At A Glance

The title of this post, is the same as that of this article on the BBC.

This is said under Infrastructure.

The infamous bridge from Northern Ireland to Scotland makes an appearance in the manifesto. It has been mooted on a number of occasions, despite a number of potential barriers to its construction.

Not everyone believes those barriers are insurmountable, though.

I don’t and feel strongly, that the bridge should be built and linked to High Speed Two

  • London and Belfast in four hours
  • London and Dublin in five hours.
  • Belfast and Glasgow in under two hours.

Not forgetting, it would become an important freight route..

 

 

December 2, 2019 Posted by | Transport/Travel | , , , , , , , , , , | Leave a comment