Could Tram-Trains Be Used To Advantage In Liverpool?
This document discusses the various issues concerning tram, tram-trains and conventional rail in the wider Liverpool area.
It is divided into the following sections.
1. Liverpool Trams And The Merseytram Proposal
2. A Tram-Train To The Airport
3. The Future Of Public Transport In The Wider Liverpool Area
4. Further Electrification In The Merseyrail Network
5. Extensions To The Merseyrail Network
7. Increasing Capacity On The Northern Line Through The City Centre
8. Connecting To Football At Anfield And Goodison Park
9. Capacity Problems At Lime Street
10. There Is A Need For Extra Southern Terminals
11. Upgrading The Halton Curve
12. Expansion Of South Parkway Station
13. The Canada Dock Branch And The Edge Hill Spur
14. The North Mersey Branch To Aintree
16. Electrified and Extended Lines In The North
18. Electrification Between Liverpool to Manchester via Warrington Central
22. Conclusions
Note that all of this post was produced using WordPress with most of the maps from Google Earth.
1. Liverpool Trams And The Merseytram Proposals
Liverpool doesn’t have trams any more, although it does have a legacy of wide dual-carriageways with a wide grass area in the middle, which was where the trams used to run. These would help with on-street running of a modern tram system.
Plans for a system called Merseytram are hanging around.
This map shows the comprehensive nature of the proposal.
In some ways, I’m surprised that Liverpool hasn’t done something to implement a modern system.
Liverpool too, doesn’t have much traffic congestion outside of the city centre and as they’ve just abolished bus lanes without too many protests, it might be assumed, that there is not the need for any more public transport, other than the current extensive buses and trains.
The latter are undergoing more electrification.
2. A Tram-Train To The Airport
However, there is one place, where a tram-train is being proposed in the area. Look at this Google Earth image, showing the area between Liverpool South Parkway station and John Lennon Airport.
I’m not sure of the route and I can’t find anything on the Internet, but an airport to a nearby station is a classic tram-train application, as effectively you’re extending a rail line, by using much more affordable tramway infrastructure. In this type of application, you often have lots of airport infrastructure like secondary terminals and car parks, that need to be connected to both ends of the link. In Liverpool’s case you might even put a stop at Speke Hall. I know the area fairly well and those wide dual-carriageways and spare land alongside the railways will mean that putting in the tracks and stops will not be the most challenging of engineering. It would appear that compared to other schemes proposed for tram-trains it is very affordable, with the major cost being procuring the new tram-trains, which would also be used to run to the city centre and beyond on the existing train lines, giving passengers a one vehicle journey to a large number of places in Liverpool city centre.
What makes this proposal even more sensible in my view, is that Liverpool South Parkway, is served by both the City Line and the Northern Line that go to the city centre. Within a few years both lines will be electrified and would be a route for tram-trains.
This proposal is surely one of several around the country, that will be looked at in great detail, if the Sheffield-Rotherham tram-train trial is a success.
After my experiences in Kassel and Karlruhe, I’m sure that trial will be an outstanding success. If only, because we’ve got all the accumulated knowledge from design and operations of several tram-train systems all round the world.
3. The Future Of Public Transport In The Wider Liverpool Area
Liverpool and Merseyside in general have various plans, problems and decisions to take or solve in the next few years.
4. Further Electrification In The Merseyrail Area
On March the fifth, 2015 the North of England Electrification Task Force published its final report of which lines should be electrified.
The lines are grouped into three tiers and those in the Merseyrail area are.
Tier 1
- Liverpool to Manchester via Warrington Central
- Southport/Kirkby to Salford Crescent
- Chester to Stockport
- Warrington to Chester
Tier 2
- Chester to Crewe
Tier 3
- Ormskirk to Preston
These and other schemes may or may not effect this discussion.
5. Extensions To The Merseyrail Network
This map from Wikipedia shows the current network.
A lot of the lines out of the centre end in areas in need of development, at all places on the price scale. Some of these and other places might be better served by using tram-trains, which run on from the current network and then perhaps could even go on a loop at the end of the line before returning to the city centre.
- The Skelmersdale branch could be reopened from Ormskirk.
- Could tram-trains run along the coast from Ainsdale, to the north of Southport, to create a tram line serving all of the golf courses and other leisure facilities?
- Could tram-trains help sort out the problems at Kirkby station, by going in a worthwhile loop around the town?
- Edge Hill to Bootle is an important freight line, that runs close to Goodison and Anfield football grounds, Network Rail have stated that this line may be electrified. Would using tram-trains with their simpler infrastructure needs make adding passenger services on this line easier?
- The North Mersey Branch from Bootle to Aintree is another freight line, that also runs close to Aintree racecourse. Like Edge Hill to Bootle, could tram-trains be a more affordable solution to adding passenger services to the line?
- Liverpool have long had aspirations to build an Outer Rail Loop. The route is safeguarded and could tram-trains enable an affordable passenger service?
I suspect that other lines and branches will be added to this list.
It is worth noting that all the tram-trains I’ve seen in Kassel, Karksruhe and Mulhouse, start on one line coming into the city as a train, go through the city centre as a tram and then take another line out of the city as a train. The Sheffield to Rotherham trial will use a version of this model. However in Liverpool, it would appear more likely, that tram-trains will be used to extend the existing rail network.
I don’t think anybody in their right mind, would expect Liverpool to follow convention.
6. Train Replacement
Merseyrail has a current fleet of just under 60, Class 507 and Class 508 three-car electric trains, that work the DC lines and these will need replacement in a few years. At nearly thirty-five years old, they are older than a lot of the dreaded Pacers. But they have certainly worn better.
With all the 25kV AC electrification that is planned for the area, any new trains would have to be dual-voltage, so they wouldn’t be limited in where they ran on the Merseyrail network.
Should some of the replacement trains, be something like Class 399 tram-trains? Some of these may be purchased anyway, if the tram link between Liverpool South Parkway and John Lennon Airport goes ahead.
They also tick all of the boxes of being dual-voltage, low-floor and with main-line performance and crash protection, so they could work the City, Wirral and Northern Lines, without causing problems with faster traffic.
They could probably be easily certified for working in tunnels.
It is worth stating some of the sdvantages I perceived when I saw tram-trains in action, in Kassel, Karlsruhe and Mulhouse.
1. When running as trains on a normal rail line, they fit in with the other traffic just like an electric multiple unit of the same length, taking their power from either overhead line or third-rail at the line’s voltage. Except for testing, you could run a compatible tram-train on many rail lines tomorrow.
2. When running as trams, they trundle around slowly in very much the same manner as trams do in Manchester, Sheffield and Croydon. Stops just need to be shelters with information and possibly a ticket machine. Power would usually come from a simple 750V DC overhead line, like most tramways in the UK and Europe.
3. Tram-trains can also run as trams on say a freight line, which has been electrified with either 25kV AC or 750V DC overhead line. This type of operation is being trialled on a Sheffield to Rotherham freight line to test the applicability of tram-trains to the UK. If the stops are simple affairs and not complete stations, the cost is kept low.
4.One problem that tram-trains might have is the difficulty of maintaining level access to the different platform heights. The new tram-trains in Mulhouse used clever steps to make sure it is easy to get on and off for all passengers.
5. Early tram-trains used to have separate control systems for when they were running as trams and as trains. But I suspect now, that UK trains are being equipped to run under ERTMS, which does away with line-side signals and relys on radio and screens, that this system can be used in tram-mode. This would certainly simplify operation.
In some ways because we are late to look at tram-trains we get the benefit of everybody else’s design and operational mistakes.
We might even be lucky in that a tram-train can be designed and built, that could run on any tram or train line in the country.
7. Increasing Capacity On The Northern Line Through The City Centre
This is mentioned as a problem in the Wikipedia entry for Merseyrail under tram-trains. This is said.
Tram-trains would allow street running, providing an alternative route through Liverpool city centre. It could potentially relieve pressure on the busy underground section of the network.
I don’t think you’d take a route in front of Lime Street station, but you could run along the historic water-front, to much the same route as the iconic Liverpool Overhead Railway. Although, you’d probably run at street level, rather than on a viaduct.
The line could run up the Mersey starting from Garston, Liverpool South Parkway or even the Airport in the South, going through the gardens along the river at Otterspool and then move away from the river to go on the landward side of the Albert Dock, the Liverpool Arena and the Three Graces. It would go close to the shops at Liverpool One, James Street station, the Mersey Ferries, the Cruise Ship Terminal and the development at Liverpool Waters, before possibly rejoining the Northern Line.
Liverpool are thinking of creating a new station at Vauxhall between Moorfields and Sandhills stations, which could be a good place for the rejoining. Incidentally, the developers are proposing a monorail link to the city centre for this development, so at least transport is being thought about.
This would be World-class transportation for a city making a reputation for itself as a World-class destination.
8. Connecting To Football At Anfield And Goodison Park
When people think about Liverpool, many think about football. I also think there is an increasing trend for football grounds at the top level to be well-served by trains or trams.
Following on from the previous section about increasing capacity on the Northern Line through the city centre, look at this Google Earth image of the area between Sandhills station and Anfield and Goodison Park.
Sandhills is the station, from where connecting buses leave for football and it is indicated by a red arrow. North of Sandhills you can see Bank Hall station on the Southport branch of the Northern Line and Kirkdale station on the Kirkby branch.
Crossing under the two branches of the Northern Line, just south of Bank Hall and Kirkdale, and then curving away initially in a north-easterly direction before turning south-easterly around the Anfield Cemetery is the Edge Hill to Bootle Line or the Canada Dock branch, which is an important route for freight trains in and out of the docks. Merseyrail would like to use this line as a passenger line possibly with a station at Walton and Anfield, which would be about four hundred metres from Goodison Park and another at Breck Road, which would be a little bit further from Anfield. This modified Google Earth image, shows the two football grounds and the stations.
Obviously, Walton and Anfield is shown with a blue circle and Breck Road with a red one. I don’t know the area very well, as I have only been to Anfield once in the last forty years or so, so it might be that there is a possibility of putting a station at Utting Avenue or the north-east corner of the cemetery to serve both grounds. Both possibilities are shown with white circles.
If tram-trains were to be used on this line running as trams, then it might be possible to use a simple standard station design, as all stations are on bridges over roads. The Disused Stations web site has some more information and pictures, about the former Walton and Anfield and Breck Road stations.
As the line curves round to Edge Hill, supporters coming from the South and East could avoid the City Centre.
9. Capacity Problems At Lime Street
Liverpool Lime Street is a station, where capacity is a problem and I’ve read somewhere that Virgin can’t run their longest Pendolinos to the city. Wikipedia says this about work being done to create an extra platform.
The old platform 6A which is located next to platform 7 and is only used as a siding will become the new platform 7 in 2014. Existing platforms 7/8/9 will become new platforms 8/9/10, this will allow new long distance services to start and terminate at Lime Street to Scotland and London starting in 2015 from the new platform 8 & 9 (Virgin Trains).
There is also an idea called the Edge Hill Spur, that has been in the pipeline since the 1970s. This extract from Wikipedia sums it up.
The construction of the Spur would have connected the City Line branches to the east of Liverpool into the electrified Merseyrail network and importantly the underground section in Liverpool’s city centre. An increase in integration and connectivity of the system would be achieved. An additional and substantial benefit was releasing platform space at Lime Street mainline terminus station from urban to mid and long haul mainline routes, as the Spur would divert local urban routes entering the city underground in the city centre.
So everybody would seem to win. Even I would, as one of the proposals now is to have an underground station at my old University of Liverpool.
The accountants certainly win too, as much of the tunnelling required was dug by the Victorians or was enabled when Liverpool sorted out the underground railway in the 1980s.
One of the things that you have to remember as a visitor to Liverpool, is that the city centre slopes down to the Mersey, so it is an easy walk. I can walk up, but those with a lot of purchases in Liverpool One or various movement problems can get a train up from James Street station, a bus or a taxi.
There may be a case for running tram-trains as trams past Lime Street station, but I think if the connection at the station to the underground lines is improved and the train frequency around the loop is increased, then there is a lot less need. As it is frequencies to all destinations on the Wirral Line at Lime Street are four trains per hour, so to get to Central or James Street usually means a wait of no more than four minutes.
Once at Central to go North it’s the same fifteen minute frequency to go all destinations, with a train every five minutes. Going south to Hunts Cross there’s a train every fifteen minutes.
New trains with perhaps four cars and ERTMS, drawing on the experience of Crossrail and Thameslink in London, may be able to increase the capacity through the core.
10. There Is A Need For Extra Southern Terminals
If you look at the East London Line in London, which is of a similar layout of a central core with north and south branches, that runs modern trains, this handles sixteen trains per hour through its core section.
I think it is reasonable to expect that the Northern Line should be able to take a similar number of trains. But as the planned frequency in London is twenty-four and ERTMS is coming to both lines, does sixteen trains per hour on the Northern Line look very conservative? .
My scheduling gut-feelings also say that if the number of destinations south of the city centre were increased and this meant that fewer trains were turned back at Liverpool Central, then capacity and frequency would be raised. This section on services at Liverpool Central says that twelve services an hour go north to the various destinations of Southport, Ormskirk and Kirkby and only four go south to Hunts Cross and Liverpool South Parkway. So that means eight per hour have to wait. It’s a similar problem to what used to happen in London at Edgware Road on the Circle Line, except there it was an easy solution. They turned the circle into a spiral.
Trains and drivers seem to be wasting their time sitting in the turn back platform at Liverpool Central, when they could be doing something useful, like perhaps running to Runcorn or Warrington.
The Edge Hill Spur won’t help, as because it joins to the north of Liverpool Central station, if another terminus is not added in the south, this will just add to the problems.
Resources must be balanced, so if from Sandhills to Liverpool Central the frequency is twelve trains per hour, the frequency should be planned to be the same from Liverpool Central to Brunswick.
If the traffic isn’t balanced you get trains in the centre waiting to go back north.
If Merseyrail wants to run traffic to three northern destinations at a frequency of four trains per hour, it would seem that one of the best solutions would be to run trains to three southern destinations at the same frequency. On the East London Line, there are four Southern destinations and two in the north, but each with two platforms.
In Liverpool they’ve already got Hunts Cross and they’re planning to add the Airport as another. I think they need another to balance the line and improve frequency and punctuality.
11. Upgrading The Halton Curve
Funds have been made available to upgrade the Halton Curve, so that trains can reach Chester from Liverpool South Parkway via Runcorn.
The two blue squares indicate the two ends of the current single-track curve. The top one is where the curve leaves the Liverpool branch of the West Coast Main Line south of Runcorn station and the bottom one is where it joins the Chester to Manchester Line east of Frodsham.
The main reason for doing this would be to allow trains from Chester and North Wales better access to Liverpool Lime Street and South Parkway stations, and the John Lennon Airport.
As the Tier Two and Three electrification plans for the North as they effect Merseyside, include full electrification of the lines around Chester, this would mean that an upgraded curve would be electrified.
There are probably good reasons to add an extra track to the curve, which would make it possible for Chester to be a new southern destination of the Northern Line.
12. Expansion Of South Parkway Station
Liverpool South Parkway was built as a transport hub so that travellers to the city,could use the local electric trains to get to all parts of the area, without going into the city centre. This Google Earth image shows how the station is built between the Northern Line and the Liverpool branch of the West Coast Main Line.
The Northern Line platforms are at the bottom, with the ones to the right serving the other lines, so it is effectively two stations and a transport hub.
Liverpool want to get more services running from Liverpool South Parkway station and would like to see some Virgin Trains services stop there, but the platforms are too shirt for Pendelinos.
Tram-trains might help grow traffic, as with the airport connection and perhaps other services using the technology, the station could become a hub from where you could get all over Merseyside.
Other factors will also help.
1. As time progresses, quite a high proportion of services from to and from Liverpool Lime Street will stop at the station, so it could become an alternative station from where to catch long distance trains.
2. Merseyrail wants to fully develop the Halton curve, which will give alternative routes to Chester and North Wales. Due to its proximity to the John Lennon Airport, Liverpool South Parkway can only benefit.
3. Merseyrail also have a desire to create an Outer Rail Loop that encircles the city. Nothing has happened much in recent years, but if the North Liverpool Extension Line should be reopened, I’ll ride it, as it goes through places dear to my memory of the wonderful four years I spent in Liverpool. C and myself at one time lived in a rented flat near Gateacre station on the line and regularly drunk in the Black Bull pub in Gateacre. If the line should be reopened and a circular railway is formed around Liverpool, Soputh Parkway station will only gain more traffic.
4. HS2 and HS3, if they reach Liverpool will surely stop at Liverpool South Parkway.
Most Parkway stations in this country are isolated and you need a car to get to them, but Liverpool South Parkway is unique in that it is a transport hub outside of the city centre close to an airport.
I believe that in time South Parkway will become an alternative station to Lime Street. After all, it only takes twenty minutes on a train between South Parkway and Central or Moorfields in the city centre.
Improved trains and a few tram-trains can only hasten the rise of this station’s importance.
13. The Canada Dock Branch and the Edge Hill Spur
I talked in Section 7 about how the Canada Dock Branch between Bootle and Edge Hill could improve passenger services in an arc in the north-eastern part of the city and in Section 8 about how capacity problems at Lime Street might be improved by the Edge Hill Spur.
Edge Hill station is one of the oldest stations in the country and will only grow in importance, when it receives the new electrified services from Manchester in a few months. At present the Canada Dock Branch is not electrified, but with the large number of freight trains going into and out of the docks, it can’t be long before this line gets wired.
This Google Earth image shows where the southern end of the Canada Dock branch splits to allow trains to go east to Broad Green station or west to Edge Hill station.
The chord going east is the Olive Mount Chord, which was only reopened in 2009 to create an easier route for freight trains between Seaforth Dock and the West Coast Main Line. Read this section in the Wikipedia entry for Seaforth Dock, which describes how one three hundred metre rail line made everything easier and increased capacity of the rail line by 100%. It also freed up capacity so that a passenger service could be created.
The station south of the junction is Wavertree Technology Park on the main Liverpool to Manchester Line, between Edge Hill and Broad Green. It should also be noted that there used to be a station at Edge Lane, where the branch crosses the road of that name.
Obviously, if the Canada Dock Branch were to be run using tram-trains, there are possibilities of extra stops in the area.
Merseyrail originally planned to put a transport hub at Broad Green and you can see why, as trains on both the Canada Dock Branch and the Edge Hill spur could pass to or through the station. As this Google Earth image shows, the station is shoe-horned into a forest of motorways and dual-carriageway roads.
, A good creative architect could make something of this transport hub and give Broad Green a bay platforms for the extra trains.
14. The North Mersey Branch To Aintree
The North Mersey Branch is a railway to the north of Liverpool, that is really only used for engineering purposes. It originally linked Gladstone Dock and Bootle with Aintree and the racecourse.
This Google Earth image shows the line of the Aintree end of the branch.
The station on the left of the image is Seaforth and Litherland and Aintree station and the racecourse can be seen in the east.
The line could also be extended to the west into the docks and at the east to Kirkby, which is an area that in the 1960s needed a good sort-out of public transport and probably still does.
Could this be a line that would benefit the area, by being turned into a tram-train route across the north of the city?
15. The Skelmersdale Branch
Skelmersdale is the second largest town in North West England without a railway service. Merseyrail’s entry on Wikipedia, has a section about the reopening of the Skelmersdale Branch to the town centre, which includes this.
The reopening of a section of the Skelmersdale Branch from Upholland to Skelmersdale town centre has been proposed.[42] The line was completely closed in 1963. This would give Skelmersdale, the second largest town in North West England without a railway service, direct access to Liverpool city centre. Network Rail has recommended that a further feasibility study be carried out.
One proposal is to extend the line from Ormskirk station by laying 3 miles of new single track along the previous route towards Rainford Junction station.
This single track proposal could be one to be built in an affordable way for a tram-train.
16. Electrified and Extended Lines In The North
Under the electrification plans for the North, some of the lines fanning out in the north of Liverpool and Southport will be electrified.
In Tier One, the Southport to Manchester Line and the Kirkby Branch would be joined to the electrification in Manchester at Salford Crescent station, which is being improved and expanded.
This electrification is essentially separate from the third-rail Northern Line, so it does mean that Southport and Kirkby stations will be on both electrification systems.
Where they do interact more directly is when under Tier Three of the electrification, the Ormskirk to Preston Line is electrified.
This line crosses the Southport to Manchester Line at the Burscough Curves. Merseyrail have wanted to reinstate this full junction for some time and this is said about the curves on the Wikipedia entry for Merseyrail.
The Burscough Curves were short chords linking the Ormskirk to Preston Line with the Manchester to Southport Line. The last regular passenger trains ran over the curves in 1962; the tracks were subsequently lifted. The reinstatement of the Burscough Curves would allow direct Preston-Southport and Ormskirk-Southport services and provide an alternative Liverpool-Southport route. Network Rail has recommended that a strategy for the Burscough Curves be developed further.
This Google Earth image shows the curves.
The two stations are Burscough Junction indicated by the red arrow on the Ormskirk to Preston Line and Burscough Bridge on the Southport to Manchester Line. The crossing of the two lines can be clearly seen and the two curves can also be made out, although the track was lifted decades ago.
Although, a reinstated junction would undoubtedly be good for the area, this link doesn’t really have any ramifications for the rail system in Liverpool, as both lines will have 25kV AC overhead electrification.
If trains on the Northern Line are to run past Ormskirk and Kirkby, they would have to be dual-voltage.
17. The Outer Rail Loop
Wikipedia explains the Outer Rail Loop in a section of the entry for Merseyrail, This is said.
The Orbital Outer Rail Loop was a part of the initial Merseyrail plans of the 1970s. The route circled the outer fringes of the city of Liverpool using primarily existing rail lines merged to create the loop. With Liverpool city having a semi-circular footprint with the city centre at the western fringe against the River Mersey, the western section of the loop would run through the city centre. The scheme was started along with the creation of Merseyrail however postponed due to cost cutting.
As Liverpool has been a major port since we started building railways in this country, as in London and Glasgow, they go hither and thither linking the docks to the lines in and out of the city.
The railways that may go to create the Outer Rail Loop, like the North Liverpool Extension Line, North Mersey Branch Line and some of the electified lines in the city, are either fully operational or safeguarded.
It’s a real pity that all those railways closed after the Beeching Report, were not protected from building over, as we’d have saved millions in creating some of the new railways.
But then design by hindsight is easy.
As finally planned the Outer Rail Loop was a northern loop and a southern one. Each probably has their own very good reasons why they should be built and the large economic forces at work in Liverpool will decide what actually gets built.
Most of the North Liverpool Extension Line now is a walk called the Mersey Path. This Google Earth image shows the green way, where the track used to be.
The red arrow picks out Broad Green station and you can see the green line of the Mersey Path or Liverpool Loop Line passing to its right in a northerly direction. At the southern end it splits with one branch going east to Halewood and the other west to Hunts Cross.
I never rode the original trains, but the place names as you go north bring back lots of memories; Gateacre, Childwall, Broad Green, Knotty Ash, West Derby, Fazakerley, Walton, Aintree and Huskisson. Pronunciation of most has to be learned by foreigners!
In writing this, I think those planners in the 1960s got their ideas right. An Outer Rail Loop might just be a good idea for which the technology has finally arrived.The Liverpool Loop Line has certainly been well-laid out as a cycle and walking route.
Imagine a tram-train using the path in tram mode running on mainly a single track with passing places, which it shares with the cycle and walking route of the Mersey Path. I don’t know of this being done in the UK, but I’ve certainly seen it in The Netherlands. But something similar has been done to provide a walking and cycling route alongside the Cambridge Guided Busway and Wilford Toll Bridge is being widened to take Line 2 of the Nottingham tram and cyclists and pedestrians.
Starting at Hunts Cross, it would go up the line to Broad Green, where it would have an interchange with the Liverpool to Manchester and Wigan services, and then it would loop across the north of the city to the Mersey and the Docks. Interchanges could be made with the Northern Line there and the tram-trains could even go back down the riverside to Hunts Cross.
18. Electrification Between Liverpool and Manchester via Warrington Central
This electrification has been proposed in the Tier One electrification plans for the North.
This is the busiest passenger route between the two cities will start from Hunts Cross at the Liverpool end and continue through Warrington to Manchester Piccadilly.
This electrification has been mooted before and the Wikipedia section for the line says this.
The Liverpool to Warrington section of this line was initially scheduled to be on the Merseyrail electric urban network. The Strategic Plan for the North West, the SPNW, in 1973 envisaged that the Outer Loop which was to be an orbital line circling the city of Liverpool, the Edge Hill Spur which is a tunnel connecting the east of Liverpool to the central underground sections, and the lines to St. Helens, Wigan and Warrington would be electrified and all integrated into Merseyrail by 1991. This meant that trains from Warrington would access Liverpool city centre’s underground stations via the Northern Line and Liverpool Central underground station, giving access to Liverpool’s shopping and business quarters. This never transpired, however is a long term aspiration of Merseytravel.
It truly has taken a long time to be planned, let alone delivered.
If Northern Line trains do eventually run to Warrington, then like the trains used to extend to the north, they will have to be specified as dual-voltage, to run in the third-rail electrified tunnel and on the sections of the line with 25kV AC overhead electrification.
19. A Coastal Tramway
Liverpool Airport is on the bank of the Mersey and the current Northern Line goes all the way up the coast to Southport. The West Lancashire Railway used to continue the line to Preston but was closed in the 1960s. This Google Earth image shows the coasts and major towns around Liverpool.
This image shows there is a possibility to extend the tramway in the north. If the Blackpool trams and the Northern Line were both extended almost as far as Preston, they could be connected across the River Ribble and you would have a scenic way of getting between Blackpool and Liverpool on a coastal tramway, that took in all range of sites from world class architecture to some of the best links golf courses.
Going west the Wirral Line at West Kirby could be extended down the coast of the River Dee. I don’t think you’d make a direct route, but passengers could change lines at an upgraded James Street station. Its design doesn’t really reflect its importance as a station, but says more about being an economy station station created in the 1970s.
Going south towards Widnes and Runcorn would never have been a possibility, when I lived in Liverpool and worked in Runcorn in the late 1960s, but now all is changing. I believe that it is so significant that it deserves its own section.
If Northern Line trains do eventually run to Warrington, then they will have to be specified as dual-voltage.
20. The Mersey Gateway
The Mersey Gateway is a new bridge being built over the river to the east of the existing Silver Jubilee Runcorn-Widnes Bridge. This Google Earth image shows the Mersey from Liverpool South Parkway station to the massive Fiddlers Ferry Power Station.
The station is indicated by a red arrow and you can clearly see the existing bridge across the Mersey, next to the Britannia Bridge carrying the Liverpool Branch of the West Coast Main Line. The power station is at the top right or north-east corner of the image.
This is said by Wikipedia about the charging arrangements for the new bridge.
It is envisaged that the new bridge will be a toll bridge, with three lanes in each direction. The Halton Borough Council has also stated that the current bridge will also become a toll bridge, making Halton the only borough in England separated by only toll bridges. It was also put forward that the current bridge may be reduced to one lane in each direction for vehicles, with the other two lanes being converted into cycle lanes and/or pedestrian lanes.
As the current bridge is toll free, it will go down like a lead balloon. Especially with those, who commute across the river to and from Liverpool every day. There is this report on the BBC, saying that Halton residents will be able to use the bridge for free. It would appear there is a strong campaign against the tolls from the report.
One good alternative would be to extend the Northern Line from Hunts Cross to Runcorn, but Runcorn station would not have the capacity in its present form. Look at this Google Earth image of the area from the station to the bridges.
It might be possible to squeeze in the extra platform and junctions that would be needed, or more probably the trains could go on via the Halton Curve to Chester via Frodsham and Helsby. Obviously, following practice on the Northern Line, there would be an objective of providing four trains per hour to and from Hunts Cross and the centre of Liverpool. Look at this Google Earth image of the northern end of the Halton Curve.
Surely a station could be built in this area, which could also be used to turnback trains for Liverpool. Tram-trains might be able to take a circular on-street route around the town, if that was thought to be what was needed.
Returning to the North Bank of the river, the first image in this section shows a rail freight line that runs from Liverpool docks to the power station for the transport of biomass via Liverpool South Parkway. This Google Earth image shows the area north of the Mersey around Widnes.
The freight line can be seen going across the image from west to east, passing under the railway and roads linking to the existing bridges, then following on the north side of the dual-carriageway before going southwards to follow the St. Helens Canal.
So could this line be used by extended Northern Line services in the future? I suspect that within a few years, plans will be published for the decommissioning of the power station, as it is now over forty years old, so who knows what will be done with the site. But surely, a good train or tram-train service to the centre of Liverpool in the west and Warrington and Manchester in the east will be essential, whatever is developed on the site.
The train line could also have stations or even simple tram stops in the region of both bridges. Unfortunately, due to the design and height of the approaches to the Britannia and Silver Jubilee Bridges, a simple interchange might not be possible, but you could rebuild the station at Ditton, where the two lines meet.
The biggest problem for Widnes and Runcorn, is that the borough is effectively in two parts on either side of the River Mersey.
The availability of tram-trains may give advantages to sorting this out, but overall the Mersey Gateway, looks like a project,that has been designed in isolation for road users.
21. Onward To Warrington
Currently, Widnes is served by trains on the Liverpool to Manchester Line that go via Warrington Central station.This Google Earth image shows the Warrington area.
Warrington Central station is to the right of the red arrow indicating Warrington and Warrington Bank Quay station is below the arrow to the left on the West Coast Main Line. One of the problems of the trains in the town, is that you have to get a shuttle bus, a taxi or walk between the two stations.
Note how the freight line along the Mersey goes around the bend of the Mersey on the left, under Warrington Bank Quay station in the disused Low Level station and then crosses the Mersey before going off in a south-easterly direction. To the West of Warrington, this railway is the St. Helens and Runcorn Gap Railway and to the East it is the Warrington and Altrincham Junction Railway. It effectively was another route between Liverpool and Manchester, although it is closed in places and just runs freight services over parts of the line.
As both these southern Liverpool-Manchester routes go through Warrington, it could be a reasonable assumption, that some of the trains on the Northern Line could turnback in the town, as was originally envisaged in 1973.
There is a lot of scope to provide an intelligent solution to turning trains round, which would at worst add another four trains an hour to and from Liverpool.
I’ve just looked at how you get from Widnes to London or Carlisle by train on the National Rail Journey Finder. It is not an easy journey and at best involves a change at Liverpool or Manchester and at worst a transfer across Warrington.
A few days after I wrote this article, I visited Warrington. I found a modern town with a good shopping centre and wrote this.
As I walked through Warrington town centre, I thought that an innovative tramway engineer could probably find a way to turn the tramway northward after Bank Quay station to perhaps finish its journey by Warrington Central station and the bus station. The route would probably be not more complicated than some of those in Manchester that I saw today.
But you could also go for a simple solution. There is probably space at the low-level Bank Quay station for a bay platform, where trains from Liverpool would turn back. That would not solve the problem of transfer passengers between the two rail stations and the bus station. They use a shuttle bus at present, so why not increase the frequency, perhaps power it by batteries and make it more visible!
It is not an easy problem to solve, but I do believe that Warrington would make an ideal additional destination for Northern Line trains.
Unless they revert to street running, the trains coming to Warrington would be normal trains without any tram capability, thus simplifying the needs even more.
And after Warrington, should the Northern Line trains go all the way to Manchester? Or could the line through Warrington Central go to Manchester and the southern line underneath Bank Quay go to Stockport? The possibilities are endless.
If Liverpool’s tram-trains are certified for Manchester and vice-versa, you probably get some innovative joint services but you stir up an awful lot of political hornets’ nests.
22. Conclusions
Liverpool still has a lot of connecting railways and as it is acquiring a new fleet of electric trains and has aspirations to link the airport to the Merseyside electric rail network using a tram-train. There are also other places where a tram-train could be sensibly used to create new services, perhaps including these lines and applications.
1. The Airport Connection From South Parkway.
2. The Canada Dock Branch serving the football grounds.
3. Furthe Extensions to the Northern Line in both the North and South.
4. An iconic tram running up the river from Garston to Bootle and possibly further.
5. The Liverpool Loop Line from Hunts Cross to Aintree and Litherland.
I would think it would be prudent if the new train order included a number of tram-trains.
Liverpool though, does show that you don’t need to have trams to run tram-trains. You just need freight lines where adding passenger services is a necessary and plausible idea. You add the simpler stations using well-proven tramway technology, to make the whole project affordable.
The Northern Line could grow from a well-used, but limited line, which predominately serves the northern side of Liverpool, to one that goes along the bank of the Mersey and through Liverpool City Centre from Runcorn, Widnes, Warrington and Liverpool Airport in the South, to Southport, Ormskirk, Kirkby and Preston in the North. In the future, It might even link Chester and Stockport to Wigan, Preston and Blackpool.
If you look at the East London Line in London, which is of a similar layout, with modern trains, this now handles sixteen trains per hour through its core section. I think it is reasonable to expect that the Northern Line should be able to take a similar number of trains with just the investment of creating extra Southern terminals.
The line is but a sapling just about to grow into a tree, with a full size collection of branches.
If you look at the Future section in the Wikipedia entry for Merseyrail, you realise the potential that there is in Liverpool’s railways.
Tram-trains could help the dreams become realities.
It Looks Like This Class 319 Scrubbed Up Well
After a quick glance at the picture of Northern Rail’s first Class 319 train in a piece in Global Rail News, it looks like it’s scrubbed up well.
But then anything based 0n a Mark 3 coach, as are the 319s, are like well-respected actresses, who with a bit of make-up, TLC and some well-made clothes can outperform their younger fellows.
I’m looking forward to riding one from Liverpool Lime Street to a fully-rebuilt Manchester Victoria in a few weeks time.
Only In Liverpool
I like this story of a grey seal that has been found in the middle of a field in St. Helens seventeen miles from the nearest coastline.
Liverpool is a city, where fun is never far from peoples’ minds.
As it contains a video of a man with a broom trying to move a large sea mammal, everyone in the city will be trying to write an appropriate joke.
When the story broke, someone high-up in Boots was on the radio and he suggested that some of their up-market trout pate would be good for the seal.
Electrification Of Manchester To Preston Via Bolton
My trip to Bolton today, beautifully illustrated that the Manchester to Preston line needs to be electrified and the Ordsall Chord needs to be built. This chord would allow trains to serve both Manchester Piccadilly and Victoria stations as they pass through the city.
Trains do run directly between Piccadilly and Horwich Parkway, but going to the match, I did want to take some pictures in Manchester, so I walked to Victoria and got the train from there. Hopefully, when the scheme is fully implemented, all of the stations served by the line will get better connections at Piccadilly to and from the South.
Wikipedia says this about services between Horwich Parkway and Manchester
Northern Rail: there is a half-hourly service Monday to Saturdays northbound to Preston, with hourly extensions to Blackpool North and southbound to Bolton, with trains running alternately to Manchester Piccadilly or Manchester Victoria. An hourly service continues onwards to Stockport and Hazel Grove.
Trans-Pennine Express: one train per hour calls in each direction throughout the day, northbound to Blackpool North and southbound to Manchester Airport.
I think after the Ordsall Chord is built, it is reasonable to assume that a good proportion of the services will call at both Manchester stations. Certainly, it has been stated that Manchester Airport services will do this.
The train I got to the match from Victoria was one of Northern Rail’s better elderly diesel units, but coming back I was in one of TransPennine’s modern Class 185 trains.
After electrification of the line, I suspect there’ll be a bit of a reallocation of routes between the two train companies and most services on the line will be run by refurbished Class 319 trains. These are four carriages to a trainset and they can also be run in eight and twelve coach formations, so they can run services based on the newly-electrified lines in a very flexible manner, suited to the traffic.
I personally think that the train service between Manchester and Blackpool is totally inadequate at just a couple of rather pedestrian trains per hour.
As electrification is likely to bring a raising of speed limits and a larger pool of bigger and much better rolling stock, I would think that in a few years time, the Manchester-Blackpool service will bear no relation to the terrible one it is today.
At present it is not just the Manchester-Liverpool and Manchester-Preston-Routes that are being electrified. In their description of the electrification in this report, Network Rail show this map.

Northern Electrification Map
Note how Wigan-Liverpool via Huyton, Manchester Victoria-Leeds via Huddersfield and Guide Bridge-Stalybridge are also shown as going to be electrified. As is the Windermere Branch Line, which is not shown on this map. All are costed and funded, but there have been a few engineering problems, meaning that the Manchester to Liverpool services didn’t start when they should have done. The problems are reported in the Liverpool Echo.
Network Rail has admitted the long-awaited launch of electric train services between Lime Street and Manchester Victoria and Manchester Airport will now be postponed until next year, possibly as late as February.
The serious delay has been blamed on “unexpected ground conditions and technical issues” encountered while installing the overhead catenary wires on the 184-year-old former Liverpool & Manchester Railway mainline, said Network Rail.
This will only be the start of the revolution.
As there are 86 Class 319 trainsets, that are to be split between the North and the Great Western Main Line, I’m sure that enough sets can be found to run a good service between the following destinations, when the current electrification plans are complete.
- Liverpool-Blackpool
- Liverpool-Lancaster, Carlisle and Scotland
- Liverpool-Leeds/Newcastle via Manchester Victoria
- Manchester-Blackpool
- Preston-Windermere
Services from Liverpool, that go North up the West Coast Main Line, don’t run at present, except to Preston and Blackpool. But if the lines are all electric, subject to the paths being found, I think that one of the operators will run direct services between Liverpool and Glasgow. Failing that Liverpool to Blackpool services will probably be timed to connect with services to both Scotland and the South at Preston. Or perhaps some of the First TransPennine services between Scotland and Manchester , could divide and connect at Preston. But whatever happens travel between Liverpool and Scotland will be a lot easier.
Once electrification gets to Leeds, this will enable services from Manchester and Liverpool to go all the way to Newcastle, opening up more possibilities for new services.
I don’t believe that this will be the end of the development of electric services in the North.
The Class 319 trains currently ply between Bedford and Brighton, which by road is about 120 miles. So they should be capable of serving the slightly shorter distance between Liverpool and Hull. It would seem they are capable of travelling across the North of England reliably. As they are 100 mph electric trains, they certainly wouldn’t be slower on the route than the current Class 185 trains and probably only slightly slower than the new Class 350 trains, that First TransPennine use on Manchester-Scotland services.
In a few months time, electric services between Liverpool and Manchester will commence, probably followed about two years later by electric services from Liverpool and Manchester to Preston and Blackpool.
If the North like their refurbished trains running on electrified lines, it will be hard to resist the pressure to put in more electrification.
If Network Rail can get its act together on electrification, I think that by 2022, the number of electrified lines in the North will be greater than currently planned.
The route from Manchester to Sheffield by the Hope Valley Line will probably be a priority, as when the Midland Main Line from Sheffield to Doncaster, Nottingham and London is electrified in 2020, it will open up all sorts of routes like Liverpool and Manchester to Nottingham and the East Midlands.
If Hull to Leeds and Doncaster is electrified, then this opens up the possibility of electric Liverpool and Manchester to Hull services via Leeds. The BBC has this report about ministers backing the electrification.
The government has backed plans to electrify the Hull to Selby rail line.
Transport Secretary Patrick McLoughlin said he was making £2.5m available to take the project to the next stage
First Hull Trains is planning to spend £94m electrifying 70 miles (112km) of track to improve connections with the wider rail network.
Work is already under way to electrify the line from Manchester to Leeds, York and Selby and is due to be completed by December 2018.
This one will happen, as First Hull Trains wouldn’t spend £94million of their own money, if they didn’t think they’d make a decent return. They are probably trying to get their hands on some of the InterCity225s that will be made redundant by the new Class 800/801 trains.
It is almost if a hundred miles per hour railway across the country is fighting its way to birth by stealth, aided by some refurbished over twenty-years old British Rail rolling stock.
An interesting aside is what will happen to the thirty one InterCity225s. I have heard a rumour that some will be cascaded to the Greater Anglia Main Line to run London to Ipswich and Norwich services currently run by Class 90 locomotives hauling Mark 3 coaches.
I haven’t travelled in an InterCity225 for some months, but the last time I did on a short trip to Peterborough, they did not appear to my untrained eye to be scrapyard fodder yet.
As they are genuine 200 kph high speed trains, could we see them providing fast services from Liverpool to Newcastle and Hull in under two hours? Politicians and comedians may well have poked fun at British Rail for years, but now that we have a UK cash flow shortage, who are stepping up to the plate to help out our impoverished railways? A whole series of British Rail trains like the InterCity 225s and Class 319. No-one should forget the refurbished Class 315, Class 317 and InterCity125s, which will fill other gaps in the bad planning of our railways in theThatcher, Blair and Brown decades.
The only problem with the InterCity225s, is that they may be too long for some of the stations across the Pennines. But solving that is in the grand scheme of things a relatively minor problem for good engineers, architects and construction teams. Also, as they get replaced will some end up on the West Coast Main Line providing direct services to Blackpool?
Once the basic spine across the country is complete and running high-capacity services fast electric services between Blackpool, Liverpool and Manchester, in the West and Leeds, Hull and Newcastle in the East, two things will happen.
Politicians will press Network Rail to create a genuine high speed railway or HS3, across the country, as they love high profile projects, by which they will be remembered.
But more importantly, all of those connecting lines across the North will be prime candidates foe electrification, so they can be home to some more Class 319s.
HS3 will eventually be created, but only when the new electrified service is in need of more capacity.
I think that the electrification in the North is an unstoppable series of projects, that will only finish, when all lines are electrified.
Talking to people on the trains to Bolton yesterday, I don’t think the passengers know how their lives will change, when what is certainly going to be implemented happens.
One very extensive traveller, I met on the train between Manchester Victoria and Horwich Parkway, didn’t realise that the new electric trains in a couple of years would be larger units that the current diesels. He also had travelled on Thameslink to his daughter in South London and actually thought the current trains on that route were pretty good. He hadn’t realised that these would be running after a basic refurbishment all around Manchester.
And then on the trip back to Piccadilly, I met two young ladies, who were coming all the way from Eskdale to see the Who in Manchester. They didn’t kow that the branch to Windermere is going to be upgraded and said that it would have made their journey today a lot easier.
The rail industry in the North needs to spread the word. I have a feeling that the Class 319s, when they start operating in a few months between Liverpool and Manchester will start the process.
Refurbishing A Northern Rail Class 319
There has been a bit of disquiet up North, about the new Liverpool to Manchester electrified service being run by late-1980s vintage Class 319 trains. I took a few pictures in October and they can be seen on this post.
I think it is best to charitably describe the interiors as something designed by a committee of accountants, with a love of pink!

I would use the word dreadful liberally! Now look at this page on the Northern Rail web site and in particular this image.

Inside A Northern Rail Class 319
Where’s all the pink gone? Or are Northern Rail applying a liberal use of Photoshop?
I doubt it’s the latter, but it does show how British Rail got the engineering right with the Mark 3 coach, on which the Class 319 is based.
On the page on the Northern Rail website, there’s a time-lapse video of the refurbishment, if you still think it’s all fake.
The proof of the pudding will be in the eating and I can’t wait to ride between Liverpool and Manchester on an electric train.
To be fair to the Class 319, it must be one of the ugliest trains on the UK network and I bet everybody wishes they’d got someone like Kenneth Grange to upsex the front end, as he did for the InterCity 125. But as an old Suffolk horseman said to me.
A good horse is never a bad colour.
The Class 319 is a good train, but the old colour isn’t the best.
Liverpool To Manchester Is Getting A Twenty-First Century Railway
One of the scandals of the UK rail network, is the train services between Liverpool and Manchester. The lines from these two cities to London were fully electrified by the mid-sixties and even Glasgow was reached in 1974. The details are on Wikipedia.
But the train services are still run mainly using some of Northern Rail’s scrapyard specials or Class 142 and Class 150 diesels as they prefer to call them. Are there two as important cities anywhere in the world, which has to put up with such terrible elderly rolling stock on a rail route between them.
It has always puzzled me, why this train service wasn’t electrified, as after all both cities are served by electrified main lines.
I have read that both Harold Wilson and Margaret Thatcher didn’t like trains, but surely electrifying the route between Liverpool and Manchester would give a boost to both cities.
On the other hand the other obvious pair of cities ripe for joining by an modern electrified railway are Edinburgh and Glasgow. And of course the original line via Falkirk is still run by diesel trains! You’d think that Blair or Brown would have found the funding for that to buy a few votes in Scotland!
But at last nearly fifty years after it should have been carried out as a follow-on to the West Coast Main Line, construction crews are working on the line. I took these pictures as they are upgrading Huyton station.
It’s all rather ironic to see this, giving Harold Wilson’s attitude to rail, considering that he was the MP for the area.
I took a train from Huyton to Leyland, so I didn’t see how far the electrification has got from the Manchester end, but work was obvious all the way from Huyton to Wigan North Western station.
There is no reason to believe that Class 319 electric trains will not be running between Liverpool and Manchester, on the planned December 2014 timetable change.
Whatever happens, Huyton will be getting a four-platform station with lifts between the platforms and the existing subway.
If all goes to plan, they’ll be getting an updated service between Liverpool and Manchester.
It’ll be interesting how this all works out by say the end of 2015. And then when all the electrification is completed in 2017.
1. Will the generally two trains per hour service frequency between Liverpool and Manchester Victoria be increased?
Even if they are not, they’ll be longer trains and they’ll be a lot faster. They’re will also be an improvement to the services that stop at all stations on the route, as the Class 319 trains are faster with much better acceleration.
2. As the line between Huyton and Wigan will be electrified, will there be electric services between Liverpool and stations on the West Coast Main Line?
Liverpool has a disadvantage here when compared to Manchester, in that there is significant traffic from Scotland to Manchester Airport. This was the reason that TransPennine introduced Class 350 trains on the Glasgow to Manchester Airport route. So Liverpool will never have as many direct trains from Scotland as Manchester.
At present generally about two trains per hour from Liverpool connect with perhaps a fifteen to twenty minute wait at either Wigan North Western or Preston for Scotland. The problem with introducing direct Liverpool to Scotland services is the lack of paths for trains. So perhaps we might see trains time-tabled to mean the change at say Preston was a simple walk across the platform.
An alternative would be to have two four-car trains from each of Manchester and Liverpool, join together at Preston for going onward to Carlisle and Scotland. Some train companies seem loathe to do this, whereas when done properly as I observed at Cambridge, it makes for an efficient railway.
3. Will the increase in the number of trains available for the route, mean an increase in late night services?
Obviously, there will have to be a need for the trains, but my train back from Wigan, wasn’t just two sad Ipswich fans and a guide dog.
One thing I found, when talking to some fellow passengers at Huyton, was how little some of them knew about the developments going on. Have Northern Rail and Network Rail got their PR right?
Liverpool Resurgent Or Phred!
Jacob Epstein‘s sculpture entitled Liverpool Resurgent sits on the front of the Lewis’s Department Store in Liverpool.
When I was at Liverpool University in the 1960s, during Panto or Rag Week, we used to walk down Brownlow Hill to pay homage to the sculpture, who was always known colloquially as Phred.
Only In Liverpool
With all the political correctness these days, you don’t see many adverts like this.

Only In Liverpool
As I will have left Liverpool long before Thursday, I can’t go!
Is there another city in the world, where a large proportion of the population are comedians?
Liverpool Gets Another Event
This morning Liverpool is hosting the start of the Tour of Britain.
It seems to me, that since being European Capital of Culture in 2008, Liverpool has received more of the large events, than it should have on the law of averages.
Perhaps, it’s just that the City is more efficient in attracting them!
On the other hand the Sea Odyssey of 2012, brought 800,000 people into the centre and had an economic impact of £32million.
So they know that events work.
It’ll be interesting to see the figures for the Tour de Yorkshire in Leeds and Sheffield.
Forward Thinking In Liverpool
As a Londoner, I have always been fascinated with the City’s transport system. I have watched it develop and grow for over sixty years, from the days of trams and trolley buses through the classic Routemaster buses and the birth of the Victoria Line to the present day. London always seemed to have some sort of plan, even if sometimes some of them like the Bakerloo Line extension to Camberwell don’t get implemented and some like bendy buses were a mistake. In some ways one of the best parts of London’s transport system, that has grown over these years has been its coherent and understandable non-electronic information system, which is second to none in the world.
When I first went to Liverpool in the 1960s, the local train system was old and decaying and although the buses were generally younger than most of London’s, the only way to find how to get to different parts of the city, was find out your bus route before you started. It was the same in London in those days, but now generally turn up at any bus stop, train or Underground station in the capital and want to go a particular tube station and you can easily find the route.
Liverpool, Manchester, Birmingham and most of our large cities, still have public transport systems that are fairly incomprehensible to a visitor, who perhaps just wants to get to the hospital to see their Auntie Gladys.
I have never seen something as basic as a decent pedestrian or bus route map at a bus stop outside of the capital.
Could London’s obvious superiority in this area and others in particular, be down to London having an overall transport body, whose origins go back almost a hundred years? Part of Transport for London’s genes say that you must make the best of what you’ve got and that all design must be top class, even if you can’t afford the best architects and designers.
Most conurbations outside London don’t have overall transport bodies with such a heritage. They also often seem to allow the train and bus companies to go off in their own directions, rather than one that is best for everyone.
As an example, ask any visitor to London, how many bus companies there are. They will probably say one. Which is not true as there are several, who each run a number of routes to the same rigid standards laid down by Transport for London. How many areas outside London have a joined-up transport system?
Merseyside is slightly different, in that many of the local rail routes are run under the name of Merseyrail, in much the same way as the London Overground. It is system that seems to serve the city and its visitors well.
I was pleased to see on Global Rail News, that Liverpool is developing a thirty year rail plan. Here’s the first part.
The Liverpool City Region has worked with Network Rail to draw up a 30-year plan to improve passenger and freight rail links.
The Long Term Rail Strategy outlines 12 high-priority rail projects for the city and surrounding area designed to improve both suburban and intercity rail services.
Are other cities so forward thinking? I shall get hold of their plan and explore it.