Future Offshore Wind Power Capacity In The UK

I am building this table, so that I can get a feel for the electricity needs of the UK.

According to Wikipedia, on February 2020, there were thirty six offshore wind farms consisting of 2180 turbines with a combined capacity of 8113 megawatts or 8.113 gigawatts.

Currently, these offshore wind farms are under construction, proposed or are in an exploratory phase.

  • Triton Knoll – 857 MW – 2021 – Under Construction
  • Hornsea Two – 1386 MW – 2022 – Under Construction
  • Moray East – 960 MW – 2022 – Under Construction
  • Neart Na Gaoithe – 450 MW – 2023 – Under Construction
  • Seagreen Phase 1 – 1075 MW – 2023 – Under Construction
  • Dogger Bank A – 1200 MW – 2023/24 – Proposed
  • Dogger Bank B – 1200 MW – 2024/25 – Proposed
  • Dogger Bank C – 1200 MW – 2024/25 – Proposed
  • Moray West – 1200 MW – 2024/25  – Exploratory
  • Hornsea Three – 2400 MW – 2025 – Proposed
  • East Anglia One North 800 MW – 2026 – Exploratory
  • East Anglia Two – 900 MW – 2026 – Exploratory
  • East Anglia Three – 1400 MW – 2026 – Exploratory
  • Sofia Offshore Wind Farm Phase 1 – 1400 MW – 2023/2026 – Under Construction
  • Hornsea Four – 1000 MW (?) – 2027 – Exploratory
  • Rampion Two Extension – 1200 MW – Exploratory
  • Norfolk Vanguard – 1800 MW – Exploratory
  • Norfolk Boreas – 1800 MW – Exploratory

Note.

  1. The date is the possible final commissioning date.
  2. I have no commissioning dates for the last three wind farms.
  3. Wikipedia says that the Hornsea Four capacity is unknown by Ørsted due to the ever increasing size of available wind turbines for the project.

I can total up these wind farms by commissioning date.

  • 2021 – 857 MW
  • 2022 – 2346 MW
  • 2023 – 1525 MW
  • 2024 – 1200 MW
  • 2025 – 6000 MW
  • 2026 – 4500 MW
  • Others – 5800 MW

I can draw these conclusions.

  • Total wind farm capacity commissioned each year is increasing.
  • It looks like there will be a capacity to install up to 5000 or 6000 MW every year from about 2025.
  • If we add my figures for 2021-2026 to the 8113 MW currently installed we get 24541 MW.
  • Adding in 6000 MW for each of the four years from 2027-2030 gives a total of 48541 MW or 48.5 GW.

As I write this on a Sunday afternoon, wind power (onshore and offshore) is supplying 13 GW or forty-four percent of our electricity needs.

I have further thoughts.

Parallels With North Sea Oil And Gas

I was very much involved in the development of North Sea oil and gas, as my software was used on a large number of the projects. I had many discussions with those managing these projects and what was crucial in shortening project times was the increasing availability of bigger rigs, platforms and equipment.

Big certainly was better.

I believe that as we get more experienced, we’ll see bigger and better equipment speeding the building of offshore wind farms.

Reuse of Redundant North Sea Oil And Gas Platforms

Don’t underestimate the ability of engineers to repurpose redundant oil and gas platforms for use with windfarms.

Electrolysers on the platforms can convert the electricity into hydrogen and use redundant gas pipes to bring it ashore.

Some processes like steelmaking could use a lot of hydrogen.

Platforms can be used as sub-stations to collect electricity from windfarms and distribute it to the various countries around the North Sea.

Hydrogen

Some processes like steelmaking could use a lot of hydrogen. And I don’t think steelmakers would be happy, if the supply was intermittent.

So why not produce it with giant electrolysers on redundant oil and gas platforms and store it in redundant gas fields under the sea?

A large store of hydrogen under the sea could have the following uses.

  • Steelmaking.
  • Feedstock for chemical manufacture.
  • Transport
  • Power generation in a gas-fired power station, that can run on hydrogen.

It would just need a large enough hydrogen store.

Energy Storage

This large amount of wind power will need a large amount of energy storage to cover for when the wind doesn’t blow.

Some of this storage may even be provided by using hydrogen, as I indicated previously.

But ideas for energy storage are coming thick and fast.

The North Sea Link To Norway

The North Sea Link is much more important than an interconnector between Blyth in Northumberland and Norway.

  • At the Norwegian end the link is connected to a vast pumped storage energy system in the mountains of Norway.
  • This pumped storage system is filled in two ways; Norwegian rain and snow and UK wind power through the interconnector.
  • In times of need, we can draw electricity through the interconnector from Norway.
  • It has a capacity of 1.4 GW.
  • It was delivered on time for a cost of around €2 billion.

It can almost be thought of as an international bank of electricity and is probably one of the most significant pieces of European infrastructure built in recent years.

There are also plans to build NorthConnect, that would connect Peterhead in Scotland to Norway.

Conclusion

It looks like we’ll be able to reap the wind. And possibly 50 GW of it!

 

January 2, 2022 Posted by | Energy, Energy Storage, Hydrogen | , , , , , , | 2 Comments

Uniper To Make Wilhelmshaven German Hub For Green Hydrogen; Green Ammonia Import Terminal

The title of this post, is the same as that of this article on Green Car Congress.

This is the first two paragraphs.

Under the name “Green Wilhelmshaven,” Germany-based international energy company Uniper plans to establish a German national hub for hydrogen in Wilhelmshaven and is working on a corresponding feasibility study.

Plans include an import terminal for green ammonia. The terminal will be equipped with an ammonia cracker for producing green hydrogen and will also be connected to the planned hydrogen network. A 410-megawatt electrolysis plant is also planned, which—in combination with the import terminal—would be capable of supplying around 295,000 metric tons or 10% of the demand expected for the whole of Germany in 2030.

I can’t help feeling that there is some bad thinking here.

The Wikipedia entry for ammonia, says this about green ammonia.

Even though ammonia production currently creates 1.8% of global CO2 emissions, a 2020 Royal Society report claims that “green” ammonia can be produced by using low-carbon hydrogen (blue hydrogen and green hydrogen). Total decarbonization of ammonia production and the accomplishment of net-zero targets are possible by 2050.

So why is green ammonia imported rather than green hydrogen, which may have been used to manufacture the ammonia?

Green ammonia would appear to have two main uses in its own right.

  • As a feedstock to make fertiliser and other chemicals.
  • As a possible fuel for large ships, which could also be powered by hydrogen.

The only thing, I can think of, is that as liquid hydrogen boils at -253 ° C and liquid ammonia at -33 ° C, ammonia may be easier to transport by ship.

It may make a better fuel for large ships for the same reason.

This policy briefing from The Royal Society is entitled Ammonia: Zero-Carbon Fertiliser, Fuel And Energy Store.

This is the introductory paragraph.

This policy briefing considers the opportunities and challenges associated with the manufacture and future use of zero-carbon or green ammonia.

It is an excellent explanation of green ammonia and a must read.

Hydrogen for Wilhelmshaven

On the other hand, Wilhelmshaven, which is situated on Germany’s North West Coast would be in a good position to be a terminal for a hydrogen pipeline or electrical interconnector from the Dogger Bank, where both the Netherlands and the UK have plans for some of the largest windfarms in the world.

The UK’s Dogger Bank Wind Farm, which is being developed by SSE, looks to have an initial capacity of 4.8 MW, whereas the North Sea Wind Power Hub, being developed by the Danes, Dutch and Germans on their side of the Dogger Bank could be rated at up to 110 GW.

Wikipedia says this about how the two huge projects could be connected.

The power hub would interconnect the three national power grids with each other and with the Dogger Bank Wind Farm.

We could be seeing a 200 GW power station in an area of the sea, generally only known to those who listen to the shipping forecasts and fans like Marti Caine.

Under a section in the Wikipedia entry for the North Sea Wind Power Hub, which is entitled the North Sea Wind Power Hub Consortium, these points are made.

  • It is hoped that Norway, the United Kingdom, and Belgium will join the consortium.
  • Dutch gas-grid operator Gasunie has joined the consortium, suggesting converting wind power to gas and using near offshore gas infrastructure for storage and transport.
  • The Port of Rotterdam became the fifth member of the consortium.

This looks like a party, where some of our North Sea gas fields and infrastructure, lying in the triangle of the Humber, Teesside and the Dogger Bank could add a lot of value.

We could even see hydrogen generated in the European Eastern part of the Dogger Bank, stored in a worked-out gas field in the UK sector of the North Sea and then when needed, it could be pumped to Germany.

A 410 Megawatt Electrolyser

Ryze Hydrogen are building the Herne Bay electrolyser.

  • It will consume 23 MW of solar and wind power.
  • It will produce ten tonnes of hydrogen per day.

This would produce just 5.6 percent of the hydrogen of the Wilhelmshaven electrolyser

In H2 Green Steel Plans 800 MW Hydrogen Plant In Sweden, I wrote about a 800 MW electrolyser, that would produce 380 tonnes of hydrogen per day.

It looks like the Wilhelmshaven  electrolyser is very much a middle-sized one and would produce around 65,000 tonnes per year.

Conclusion

It looks like the Germans will be importing lots of green ammonia and green hydrogen from the North Sea.