Extending The Elizabeth Line – Serving South-East London

The Inadequacies Of Abbey Wood Station

Abbey Wood station is the Elizabeth Line’s main terminus in South-East London.

The architecture is impressive, as the pictures taken before the station was finished show.

But other things are less than impressive.

  • There is no station parking.
  • Central London rail terminals served by Elizbeth Line services are only Liverpool Street/Moorgate and Paddington.
  • Central London rail terminals served by National Rail services are Cannon Street, London Bridge, King’s Cross and St. Pancras.

In my view, Abbey Wood is a lost cause, as a commuter station, unless substantial parking is built at the station.

Parking At Stations In West Kent

This list shows the number of car parking spaces at stations in West Kent and South East London.

  • Barnehurst – 162 *
  • Belvedere – None *
  • Bexleyheath – 83 *
  • Chatham – 276 *
  • Dartford – 186 *
  • Ebbsfleet International – 4945 #
  • Erith – None *
  • Eynsford – 15
  • Farningham Road – None
  • Gillingham – 152 *
  • Gravesend – 94 *
  • Greenhithe – 8 *
  • Longfield – 88
  • Meopham – 167
  • Northfleet – None *
  • Plumstead – None *
  • Rochester – None *
  • St. Mary Cray – 31
  • Slade Green – 25
  • Sole Street – 61
  • Stone Crossing – None *
  • Strood – 112 *
  • Swanley – 106
  • Swanscombe – None *
  • Welling – 117

Note.

  1. An asterisk (*) indicates direct trains to and from Abbey Wood station for the Elizabeth Line.
  2. An hash(#) indicates direct trains to and from Stratford International for the Elizabeth Line.

These figures are according to the National Rail web site.

It looks like unless you can walk to your nearest station and that has an easy connection to Abbey Wood, you’re probably better off going to Ebbsfleet and parking there.

Travelling Between Ebbsfleet International And The Elizabeth Line At Stratford International

Consider.

  • Southeastern’s Highspeed service between Ebbsfleet International and Stratford International has a frequency of three trains per hour (tph)
  • It takes less than twelve minutes between the two stations.
  • It takes ten minutes to walk between Stratford International and Stratford Station for the Elizabeth Line and Greater Anglia services.
  • There are eight Elizabeth Line tph to Paddington, calling at all stations. For Heathrow change at Whitechapel station.

Note.

  1. From these points, it should be possible to estimate the time you should park at Ebbsfleet to get to an event in London or East Anglia, if you live in Kent and are parking at Ebbsfleet International.
  2. I think four tph between Ebbsfleet International and Stratford International would make the route more attractive.
  3. If you’re going to Norwich or Ipswich be careful, as only one of the two tph stop at Stratford.

I catch the 12:30 from Liverpool Street for matches at Ipswich on Saturdays. This is the 12:38 from Stratford, so I suspect if you parked at parked at Ebbsfleet before 12:00, you’d make it.

Who’d have thought, that when they built the massive car parks at Ebbsfleet international, that they would be a Park-and-Ride for football at Ipswich. And Norwich too!

Changing Trains At Stratford

This map from Cartometro shows the two Stratford stations.

Note.

  1. The Elizabeth Line is shown in purple.
  2. The Central Line is shown in red.
  3. The Jubilee Line is shown in silver.
  4. The Overground is shown in orange.
  5. Lifts and escalators take passengers to and from the surface from between platforms 2 and 3 at Stratford International station.

Two pedestrian tunnels connect all the platforms in Stratford station.

  • Elizabeth Line trains use platforms 5 and 8.
  • Central Line trains use platforms 3, 3a and 6.
  • Great Eastern Main Line trains use platforms 9, 9a and 10.
  • Overground trains use platforms 1 and 2.

All platforms have lifts.

I suspect, that when you get to know the Stratford complex well, it’s easier than it looks.

But it does need better signage.

Full Step-Free Route Between Ebbsfleet And Heathrow Central

I have just used Transport for London’s Journey Planner, as if I was in a wheelchair and need full step-free access to go from Ebbsfleet to Heathrow Central.

This was the route.

  • Southeastern to Stratford International station – 10 mins
  • Walk to Stratford station – 21 mins
  • Jubilee Line to Bond Street – 24 mins
  • Bond Street to Heathrow Central – 32 mins

Note.

  1. The times are slower than say myself.
  2. I think it is possible to pick up the Elizabeth Line at Stratford.

But the route is certainly possible in a wheel-chair.

The Penge Interchange

This map from Cartometro shows where the East London Line of the London Overground and the Chatham Main Line between Victoria and Chatham cross in Penge.

Note.

  1. The East London Line runs North-South through Sydenham and Penge West stations.
  2. The Chatham Main Line runs through Penge East station.

There is a plan by Transport for London to create a Penge Interchange station on railway land, where the two lines cross.

  • The station could replace Penge West and Penge East stations.
  • It would be fully step-free.
  • Interchange would be allowed between the East London Line and the Chatham Main Line.

This would increase connectivity for those travelling to and from South-East London and West Kent.

I brlieve that this one interchange could help level-up a large area of South-East London.

 

January 29, 2023 Posted by | Sport, Transport/Travel | , , , , , , , , , , , , , , , , , , , , | 2 Comments

Penge East Station – 11th March 2022

When I wrote Advance Warning Of Brixton To Beckenham Junction Rail Closure In July, I realised I’d never been to Sydenham Hill station.

So when I visited Sydenham Hill station this morning, I decided to take the train through Penge Tunnel to take some pictures of Penge East station.

Note.

  1. The station is a Grade II Listed Building.
  2. It has been well-painted since I last visited.
  3. It would be very difficult to make the existing bridge step-free.

I think this station could be difficult to incorporate into a Penge Interchange station.

But it would be a shorter walk along the platforms to a lift and stairs to the high level platforms, than the current one to Penge West station.

March 13, 2022 Posted by | Design, Transport/Travel | , , , , | 1 Comment

Thoughts On Southeastern’s Metro Services

It is regularly proposed that Southeastern‘s Metro services should be taken over by Transport for London (TfL)

What Are The Metro Services?

According to Wikipedia, these are Metro services. I have added a quick thought of my own.

London Cannon Street And London Cannon Street via Greenwich And Bexleyheath

  • This service runs along the North Kent and Bexleyheath Lines at a frequency of two trains per hour (tph).
  • Stations served are London Bridge, Deptford, Greenwich, Maze Hill, Westcombe Park, Charlton, Woolwich Dockyard, Woolwich Arsenal, Plumstead, Abbey Wood, Belvedere, Erith, Slade Green, Barnehurst, Bexleyheath, Welling, Falconwood, Eltham, Kidbrooke, Blackheath, Lewisham, St. Johns, New Cross and London Bridge.
  • The round trip takes around 100 minutes.

This route would surely be ideal for operation by TfL, as it runs totally in Greater London.

London Cannon Street And London Cannon Street via Greenwich And Sidcup

  • This service runs along the North Kent and Sidcup Lines at a frequency of two tph.
  • Stations served are London Bridge, Deptford, Greenwich, Maze Hill, Westcombe Park, Charlton, Woolwich Dockyard, Woolwich Arsenal, Plumstead, Abbey Wood, Belvedere, Erith, Slade Green, Crayford, Bexley, Albany Park, Sidcup, New Eltham, Mottingham, Lee, Hither Green, Lewsisham, St. Johns, New Cross and London Bridge.
  • The round trip takes around 100 minutes.

This route would surely be ideal for operation by TfL, as it runs totally in Greater London.

London Charing Cross And Dartford via Blackheath And Abbey Wood

  • This service runs along the North Kent Line at a frequency of two tph.
  • Stations served are Waterloo East, London Bridge, Woolwich Arsenal, Abbey Wood, Belvedere, Erith, Slade Green, Dartford, Gillingham

Because it is more of an Outer Suburban service, this service would probably stay with Southeastern.

London Charing Cross And Dartford via Bexleyheath

  • This service runs on the Bexleyheath Line at a frequency of two tph.
  • Stations served are Waterloo East, London Bridge,Lewisham, Blackheath, Kidbrooke, Eltham, Falconwood, Welling, Bexleyheath and Barnehurst
  • London Charing Cross and Dartford takes around 60 minutes with a round trip of around 120 minutes.

This route would surely be ideal for operation by TfL, as it runs totally in Greater London except for Dartford.

London Victoria And Gravesend via Bexleyheath

  • This service runs along the Bexleyheath Line at a frequency of two tph.
  • Stations served are Denmark Hill, Peckham Rye, Nunhead, Lewisham, Blackheath, Kidbrooke, Eltham, Falconwood, Welling, Bexleyheath, Barnehurst, Dartford, Greenhithe

Because it is more of an Outer Suburban service, this service would probably stay with Southeastern.

London Charing Cross And Dartford via Sidcup

  • This service runs along the Sidcup Line at a frequency of two tph
  • Stations served are Waterloo East, London Bridge, Hither Green, Lee, Mottingham, New Eltham, Sidcup, Albany Park, Bexley and Crayford
  • London Charing Cross and Dartford takes around 45 minutes with a round trip of around 100 minutes.

This route would surely be ideal for operation by TfL, as it runs totally in Greater London except for Dartford.

London Charing Cross And Gravesend via Sidcup

  • This service runs along the Sidcup Line at a frequency of two tph
  • Stations served are Waterloo East, London Bridge, New Eltham, Sidcup, Bexley, Crayford, Dartford, Stone Crossing, Greenhithe, Swanscombe and Northfleet

Because it is more of an Outer Suburban service, this service would probably stay with Southeastern.

London Cannon Street And Orpington via Grove Park

  • This service runs along the South Eastern Main Line at a frequency of two tph.
  • Stations served are London Bridge, New Cross, St Johns, Lewisham, Hither Green, Grove Park, Elmstead Woods, Chislehurst, Petts Wood
  • London Cannon Street and Orpington takes around 40 minutes with a round trip of around 120 minutes.

This route would surely be ideal for operation by TfL, as it runs totally in Greater London.

London Charing Cross And Sevenoaks via Grove Park

  • This service runs along the South Eastern Main Line at a frequency of two tph.
  • Stations served are Waterloo East, London Bridge, Hither Green, Grove Park, Elmstead Woods, Chislehurst, Petts Wood, Orpington, Chelsfield, Knockholt, Dunton Green

Because it is more of an Outer Suburban service, this service would probably stay with Southeastern.

London Cannon Street And Hayes

  • This service runs along the Hayes Line at a frequency of two tph.
  • Stations served are London Bridge, New Cross, St Johns, Lewisham, Ladywell, Catford Bridge, Lower Sydenham, New Beckenham, Clock House, Elmers End, Eden Park, West Wickham
  • The Hayes Line could be on the Bakerloo Line Extension.
  • London Cannon Street and Hayes takes around 40 minutes with a round trip of just under 90 minutes.

This route would surely be ideal for operation by TfL, as it runs totally in Greater London.

London Charing Cross And Hayes

  • This service runs along the Hayes Line at a frequency of two tph.
  • Stations served are Waterloo East, London Bridge, Ladywell, Catford Bridge, Lower Sydenham, New Beckenham, Clock House, Elmers End, Eden Park, West Wickham
  • The Hayes  Line could be on the Bakerloo Line Extension.
  • London Charing Cross and Hayes takes around 40 minutes with a round trip of just over 90 minutes.

This route would surely be ideal for operation by TfL, as it runs totally in Greater London.

London Victoria And Orpington via Beckenham Junction

  • This service runs along the Chatham Main Line at a frequency of two tph.
  • Stations served are Brixton, Herne Hill, West Dulwich, Sydenham Hill, Penge East, Kent House, Beckenham Junction, Shortlands, Bromley South, Bickley and Petts Wood.
  • London Victoria and Orpington takes around 40 minutes with a round trip of around 95 minutes.

This route would surely be ideal for operation by TfL, as it runs totally in Greater London.

London Victoria And Bromley South via Beckenham Junction

  • This service runs along the Chatham Main Line at a frequency of two tph
  • Stations served are Brixton, Herne Hill, West Dulwich, Sydenham Hill, Penge East, Kent House, Beckenham Junction, Shortlands
  • London Victoria and Bromley South takes around 30 minutes with a round trip of around 67 minutes.

This route would surely be ideal for operation by TfL, as it runs totally in Greater London.

Some General Observations

These are some general observations on all the routes.

  • Lewisham will be on the Bakerloo Line Extension.
  • There are interchanges with TfL services at Abbey Wood, Elmers End, Greenwich, Lewisham, London Bridge, New Cross, Peckham Rye, Waterloo East, Woolwich Arsenal
  • All of the routes appear to be capable of handling 90 mph trains.
  • It is possible that an interchange would be built at Penge between the Chathan Main Line and the East London Line of the London Overground.

A Trip Between London Cannon Street And London Cannon Street via Greenwich And Sidcup

I took this trip on a Class 465 formation.

  • The service is more of a suburban trundler, than a brisk commuter train.
  • I timed the train around 60-65 mph in places, but at times in was running at around 30 mph.
  • Stops always weren’t always performed in the most urgent manner.

I got the impression, that the service could be run faster.

The Current Metro Trains

Currently, the Metro fleet appears to be formed these trains.

  • Class 376 trains – Five cars – Built in 2004-5 – 75 mph maximum – 228 seats
  • Class 465 trains – Four cars – Built in 1994 – 75 mph maximum – 334 seats
  • Class 466 trains – Two cars – Built in 1994 – 75 mph maximum – 168 seats.

Note.

  1. All can run as ten car trains, either as five+five or four+four+two.
  2. All have First Class seating.
  3. None of the trains don’t gangways.
  4. A ten-car Class 376 formation has 456 seats and is just over 200 metres long.
  5. A ten-car Class 465/466 formation has 836 seats and is 205 metres long.
  6. I think there are enough trains to form 99 ten-car trains and 15 twelve-car trains.

But what is the affect on timetables in that all are 75 mph trains?

Possible Replacement Trains

The trains could be replaced by other two hundred metre long trains, as anything longer would probably need platform lengthening.

Various examples of Bombardier Aventras with different interiors must be in the frame, if they can sort their software problems, but other manufacturers could also produce trains.

Performance

Trains must be able to make full use of the track, which appears to be good for 90 mph.

As the new trains will share tracks with Thameslink’s 100 mph Class 700 trains and Southeastern’s 100 mph Class 377 trains, I wouldn’t be surprised to see the new fleet of trains have a 100 mph operating speed and the appropriate acceleration, that this brings.

Length

The current trains are just over 200 metres long, as are the nine-car Class 345 trains.

The new trains will be the same length to avoid large amounts of expensive platform lengthening.

Interior Layout And Capacity

These styles could be used.

  • Class 710-style with longitudinal seating, no toilets – Capacity estimate -482 seated and 1282 standing passengers.
  • Class 345-style with longitudinal/transverse seating, no toilets – Capacity – 450 seated, 4 wheelchair, 1,500 people total[passengers.
  • Class 701-style with transverse seating toilets – Capacity –  556 seats, 740 standing.

This will be a big increase in capacity.

Other Features

Trains will probably have these other features.

  • Full digital signalling, either fitted or future-proofed.
  • Ability to walk through the train.
  • Step-free access between platform and train.
  • Wi-fi, power sockets and 5G boosting.

First Class and toilets would be at the discretion of the operator, but TfL Rail and the London Overground see no point in fitting them.

Transfer To The London Overground

As I said earlier there is more than a chance, than some or all of the Metro routes will be transferred to the London Overground.

As Kent County Council doesn’t like the idea of London having control of their train services, I would suspect that a compromise would be reached, whereby any service wholly within Greater London or terminating at Dartford would be transferred to the London Overground.

This would mean that these services would be transferred.

  • London Cannon Street And London Cannon Street via Greenwich And Bexleyheath
  • London Cannon Street And London Cannon Street via Greenwich And Sidcup
  • London Charing Cross And Dartford via Bexleyheath
  • London Charing Cross And Dartford via Sidcup
  • London Cannon Street And Orpington via Grove Park
  • London Cannon Street And Hayes
  • London Charing Cross And Hayes
  • London Victoria And Orpington via Beckenham Junction
  • London Victoria And Bromley South via Beckenham Junction

All services would be run by high capacity 200 metre long trains.

  • The frequency would be two tph, with many doubling up to give four tph.
  • There would be no First Class seating.
  • Seating could be longitudinal, with no on-train toilets.
  • Step-free access between platform and train.

As the train will have better performance, services could be faster with shorter journey times.

Will Passengers Accept The Spartan Trains?

Some passengers might not like the lack of First Class, the longitudinal seating and no toilets.

But consider.

  • In the next few months, London Overground will be replacing conventional Class 315 trains between Liverpool Street and Chingford, Cheshunt and Enfield Town. Currently, these trains don’t have First Class or toilets and it will be interesting to see how the new Class 710 trains on these routes are received.
  • When Crossrail extends to Ebbsfleet and/or Gravesend, they’ll get more of this type of train.
  • Trains with longitudinal seating have a much increased capacity at all times and especially in the Peak, where it is needed.
  • If you look at passenger numbers on the London Overground there is a very steady climb. So London Overground must be doing something right.
  • Toilets are being removed on several Metro services from London to Heathrow, Hertford North, Reading, Shenfield and Stevenage.
  • It may be better and more affordable to build more toilets in stations.

I think there is more than a chance, that if TfL take over these Southeastern Metro routes, that a less austere train could be used.

Perhaps for compatibility with Crossrail, Class 345 trains with their mixture of longitudinal and conventional seating would be used.

Penge Interchange

I wrote about TfL’s plans for Penge Interchange in this post called Penge Interchange.

This new station, should be one of the conditions of TfL taking over Southeastern’s Metro services.

The new station could be fully step-free and would seriously improve connections to and from South East London.

 

 

 

 

 

 

 

February 14, 2020 Posted by | Transport/Travel | , , , , , , , , | 4 Comments

Penge Interchange

This map from carto.metro.free.fr shows the lines through Penge West and Penge East stations.

The two stations are a valid out-of-station interchange, but neither is step-free.

Penge East station could be difficult to make step-free, as the footbridge is listed.

I think that it is one of those structures that Network Rail wouldn’t miss, if it was decided to install it at the National Railway Museum.

Could this be one of the reasons, why it has been suggested by Transport for London, that a new station be built, where the lines through the two Penge stations cross.

  • It could be fully step-free.
  • The station would be built on railway land.
  • It would have four tph between Victoria and Bromley South stations.
  • It would have four tph between Highbury & Islington and West Croydon stations.
  • It would have two tph between London Bridge and Caterham stations
  • It might also be possible to have platforms on the Crystal Palace branch, thus adding six tph between Highbury & Islington and Crystal Palace. stations.
  • The station could have Thameslink platforms.

I feel it would offer the following benefits.

  • Better connection between South East and North London.
  • Better connection between South East London and Crossrail, with all its connections.

Penge Interchange might allow the two older Penge stations to be closed.

September 13, 2019 Posted by | Transport/Travel | , , , , | 5 Comments

A Hard Look At Crossrail 2

We’re nearly into 2017 and in the last year or so various projects have been suggested and events have happened, that could affect the need, design and use for Crossrail 2.

In alphabetical order, here they are.

Bakerloo Line Extension

It now looks like the Mayor is keen to get the Bakerloo Line Extension started, so it can be completed earlier in 2029.

This will be a tube-size extension and if it goes as quietly as the Northern Line Extension, I can’t see its construction causing much disruption.

Note these points about the Bakerloo Line with its Extension.

  • It will be a feeder line into Waterloo station,
  • The line has no connection to Crossrail 2
  • The line will have interchange with Thameslink at Elephant and Castle station, which is scheduled for upgrading.
  • The line will have a useful cross-platform interchange with the Victoria Line at Oxford Circus station.
  • The line will have an interchange with the East London Line at New Cross Gate station.
  • The line connects to four main line termini; Charing Cross, Marylebone, Paddington and Waterloo.

Because it connects to so many other lines and doesn’t connect to Crossrail 2, I feel that this project should be done before Crossrail 2.

Battersea Power Station Station

To be expanded!

Brexit

Who knows what effect this will have on Crossrail 2?

Cannon Street, Charing Cross, London Bridge and Waterloo East Stations

London Bridge station  will become effectively four stations after rebuilding is finished.

  • Platforms 1 to 3 will be a three-platform through station for trains to and from Cannon Street station.
  • Platforms 4 and 5 will be an island platform through station for Thameslink.
  • Platforms 6 to 9 will be a four-platform through station for trains to and from Charing Cross station.
  • Platforms 10 to 15 will become a six-platform terminal station.

Note.

  1. Exchange between any two sets of services is step-free and by escalator or lift.
  2. Platforms 4-5 are the only island platform on Thameslink’s central core.
  3. London Bridge will become London’s most usable large station and expose St. Pancras for the fraud that it is.

London Bridge is already changing my travel patterns.

  • When coming back from South of London, I always use the station and get a 141 bus from the forecourt.
  • When returning from Waterloo, I often walk to Waterloo East station and get a train across to London Bridge..
  • Charing Cross station is difficult to access from North and East London, so I now can easily access Charing Cross services from London Bridge.

The proof of the pudding is true for me with London Bridge.

Once  the Thameslink Programme and the rebuilding of London Bridge station is finished, I believe that the improvements across the South Bank will be impressive and very convenient for passengers.

There is one project left to be defined and started.

The upgrading of the rather poor Waterloo East station should meet the following objectives.

  • Better information as to which platform to get the next train.
  • Better access from street level.
  • Faster access with perhaps a travelator from Waterloo station.
  • Better connections to the Underground.

Given the location of the station, it could be one that was redeveloped to provide commercial or residential properties with a new station underneath.

If it were updated to a modern standard, it would become a true Charing Cross South station.

Central Line Improvements

The Central Line could be considered to be Crossrail Zero and various plans exist to improve it.

The Central Line is in some ways the joker in the pack, so don’t be surprised at some of the projects that take place on this line.

Its biggest effect on Crossrail 2, is that because of it’s connections in North-East London, an improved Central Line, Liverpool Street station and Four-tracking of the West Anglia Main Line could absorb more traffic from North East to Central  and West London.

Chiltern Metro Creation

Wikipedia says this about a Chiltern Metro.

New Chiltern Metro Service that would operate 4+tph for Wembley Stadium, Sudbury & Harrow Road, Sudbury Hill Harrow, Northolt Park, South Ruislip and West Ruislip. This would require a reversing facility at West Ruislip, passing loops at Sudbury Hill Harrow, and a passing loop at Wembley Stadium (part of the old down fast line is in use as a central reversing siding, for stock movements and additionally for 8-car football shuttles to convey passengers to the stadium for events).[73] This ‘Chiltern Metro’ service was not programmed into the last round of franchising agreements.

When I wrote Could A Chiltern Metro Be Created? and came to the conclusion, that it might be possible, I got several positive responses.

With Chiltern getting access to Old Oak Common station in the future, this is the sort of project that Chiltern could develop themselves, if capacity was available.

This project wouldn’t connect to Crossrail 2, so I doubt its creation will have much affect on Crossrail 2.

It would certainly be a good fit wit the Bakerloo Line at Marylebone.

Clapham Junction Station

Clapham Junction station is a station that doesn’t make use of its full potential and I suspect that it will see considerable improvement before the late-2020s.

  • The Northern Line will be extended to Clapham Junction from Battersea Power station.
  • Crossrail 2 could be built to call at the station.
  • Reorganisation of the suburban services from Waterloo through Wimbledon could see a high-frequency 20 tph service calling at the station.
  • Could a similar reorgnaisation of services from Waterloo through Richmond create a high-frequency service on that route.
  • The Overground will be providing 6 tph from Dalston Junction from 2018.

I have not talked about the other main line services into Victoria.

  • It looks like suburban services into Waterloo can be grouped into high-frequency Waterloo-Richmond and Waterloo-Wimbledon Metros.
  • Could the services out of Victoria be grouped into a similar set of high-frequency Metros?

It does appear that suburban services between Victoria and Balham call at  Clapham Junction station as follows.

  • Platform 14 – Towards Victoria
  • Platform 15 – Towards Balham

As there would appear to be around 12 tph in both directions, could the capacity between Balham and Victoria be increased using ATO.

All this could result in a much more efficient station at Clapham Junction, with high-frequency suburban services and room for more  long-distance services.

Continental Connections At Ebbsfleet And Stratford positive comments

Millions of pounds were poured into creating the inadequate station at St. Pancras International.

  • There are not enough platforms for future Continental and Midland Main Line services.
  • Connection to the Underground and Thameslink are terrible.
  • St. Pancras is not on Crossrail, which was a truly awful design crime.
  • Passenger connections between the various lines at St. Pancras were designed by someone, who never used a train.

As the Heritage Taliban would forbid the demolishing of the station, we must find ways of making a silk purse out of a sow’s ear.

Developing Ebbsfleet International and Stratford International, as flexible interchanges for the Continent might be a workable project, to squeeze a quart into the pint bottle that is St. Pancras.

  • Some Continental trains would all go to St. Pancras and stop selectively at Stratford and Ebbsfleet.
  • Low-cost Continental services would terminate at Ebbsfleet.
  • Train stabling could be simplified by creating more at Ebbsfleet.
  • Stratford Internation and Stratford stations need a high capacity link, that means you don’t have to walk through Eastfield.
  • Ebbsfleet and Stratford would have easy access to Crossrail.
  • Tottenham Court Road station would be about 25-30 minutes from Ebbsfleet, Gatwick and Heathrow.

Sorting out Continental services by avoiding St. Pancras could lower the need to improve services to St. Pancras by building Crossrail 2.

Crossrail Collateral Improvements

Crossrail will not only go East-West across London, but it will enable other improvements.

  • Undergroud Lines at Tottenham Court Road and Bond Street stations have already got better access.
  • Whitechapel station will be a major interchange.
  • The Bakerloo Line will get step-free access at Paddington station.
  • Access to the Nortern City Line at Moorgate station will be improved.
  • The Jubilee Line will become a loop of Crossrail between Straford and Bond Street via Canary Wharf, London Bridge and Waterloo.

The last two points will dramatically increase access to Waterloo station for its revamped suburban services, which are planned to become part of Crossrail 2.

Four-Tracking Of The West Anglia Main Line

If you travel to Cambridge or Stansted Airport in the Evening Peak, it is a nightmare.

Consider.

  • The West Anglia Main Line is a double-track main line.
  • It has a 100 mph maximum speed.
  • The signalling and electrification is generally good.
  • It has several busy level-crossings.
  • Most of the stations are not step-free and inadequate.
  • It has a decent Park-and-Ride station at Whittlesford Parkway, but needs more, including one with access to the Northern part of the M25.
  • An increasing amount of freight from London Gateway could need to use the line.
  • It has two London termini at Liverpool Street and Stratford, both of which will connect to Crossrail.
  • There is space to develop comprehensive interchange stations at Broxbourne, Bishops Stortford and Cambridge South (Addenbrooke’s)
  • In the next decade it will get improved connectivity to branches and East-West routes, like the Chingford, Stanstedand Hertford East branches, the East West Rail Link and improved and possible new lines from Cambridge.

All versions of Crossrail 2 and the improvement of Cambridge and Stansted Airport services, need the West Anglia Main Line to be of the following standard.

  • Four tracks.
  • At least 110 mph running between London and Bishops Stortford.
  • Elimination of level crossings.
  • New strategic stations.
  • Creation of the space for a Northern portal to Crossrail 2.

Project management also says, that this should be done before Crossrail 2, as otherwise the disruption to the West Anglia Main Line will be so high as to be a total nightmare.

Liverpool Street Station

The new Greater Anglia franchise has ordered £1.4billion on new trains.

Will Liverpool Street station be able to cope with all the increased services?

In An Idea For A New Station At Shoreditch High Street, I wrote about plans to create extra platforms North of the station in the area of Shoreditch High Street station.

It’s an idea, but also consider the following.

  • Crossrail will remove some local trains from the station.
  • Platforms at Liverpool Street station will be lengthened.
  • Overground services from the station will be getting new Class 710 trains.
  • The new trains should be able to turn round faster in the station.
  • Other Services might terminate at Stratford.

After Crossrail, the Overground and Greater Anglia have settled down, there will probably be some reorganisation at Liverpool Street station.

Perhaps extra platforms at Shoreditch High Street for Overground services from Liverpool Street station might be a good idea.

  • This map from carto.metro.free.fr shows the lines around Shoreditch High Street station.
Lines Around Shoreditch High Street Station

Lines Around Shoreditch High Street Station

Consider.

  • The new platforms would be in the right place for the lines approaching from Bethnal Green and Hackney.
  • The new platforms could have extension development on top.
  • There would be good connection to the East London Line.
  • Up to four platforms could be released in Liverpool Street station.
  • What would connect all the knitting would be high-quality fast pedestrian links between the new platforms at Shoreditch, the main Liverpool Street station and Crossrail and the various Underground Lines.
  • As the Central Line is not deep underground, could it be opened up so all the terminal platforms at Shoreditch had their own escalators and lifts to the line?
  • Lea Valley services would gain their own well-connected dedicated terminal.
  • Cambridge and Stansted Airports could have the prime positions in the main Liverpool Street station.

Improving services up the Lea Valley, would fulfil some of the objectives of the North East leg of Crossrail 2.

Northern City Line Improvements

Use a station like Essex Road on the Northern City Line  and it’s like going back to the first few years of the Twentieth Century.

But the following improvements are scheduled.

  • New six-car Class 717 trains.
  • 12 tph all day with more in the Peak.
  • Some station improvements would also be welcome.
  • A well-designed interchange to Crossrail, the Underground and main line services out of Liverpool Street, enabled by a massive double-ended station  at Moorgate.
  • Will the operating procedures be modernised?

The line will also be renamed the Great Northern Metro.

It probably doesn’t affect Crossrail 2, but it will provide increased capacity from Hertfordshire into the City and Canary Wharf.

Northern Line Improvements

I may complain about some of the crap 1960s design on the Victoria Line, but many stations on the Northern Line have really been bodged together.

Would improving the line to the standard of the best of the other deep-level tube lines be a cost-effective way of creating a pair of modern North-South routes across London?

Once Camden Town station is rebuilt, Transport for London’s long term objective of splitting the Northern Line into two can be achieved.

  • Edgware to Battersea Power Station via Charing Cross and Waterloo
  • High Barnet to Morden via Bank

Probably the most difficult part, would be choosing understandable names.

The only effect on Crossrail 2, would be that once the Northern Line is split, it will become another feeder route for Waterloo.

Old Oak Common Station

If Old Oak Common station ever gets designed and built, it will enable interchange between a lot of lines.

  • Bakerloo Line
  • Central Line
  • Chiltern Line
  • Crossrail
  • HS2
  • North London Line
  • West Coast Main Line
  • West London Line

The station won’t directly affect Crossrail 2, but it could enable a lot of journeys to be done without it.

I also feel that Old Oak Common station should be built before Crossrail 2 because of its usefullness in avoiding Crossrail 2 territory.

Penge Stations

Various reportsincluding one from TfL have proposed an interchange between Penge East station on the Chatham Main Line with Penge West station on the East London Line.

This could create more capacity between Orpington and Highbury and Islington stations, without going through Victoria.

Piccadilly Line Improvements

I lived on the northern reaches of the Piccadilly Line for the first eighteen years of my life. Quite frankly the stations have changed little since the arrival of the unpainted aluminium 1956 Stock in  the late 1950s.

  • There are a lot of dingy stations.
  • There are very few step-free stations.
  • Some of the Central London stations have very narrow platforms.
  • Interchange with other lines often involves a lot of walking.
  • Compared to other lines, the trains seem slow.
  • The trains are still overcrowded.

Perhaps the biggest change to the line from that period, was the building of the  cross-platform interchange at Finsbury Park station with the Victoria Line, which improves access to Centra London.

But changes are happening.

  • The New Tube for London could be in service on the line by the mid-2020s.
  • The trains will run under ATO.
  • Train frequency will be improved from the current level of around 24 tph most of the week.
  • Crossrail could mean that less passengers use the Piccadilly Line to Heathrow.
  • Holborn station is scheduled for a rebuild.

Hopefully, the new trains will give the line a whole new persona.

Look at this map from carto.metro.free.fr of the lines through Piccadilly Circus and Leicester Square stations.

Piccadilly Circus And Leicester Square Stations

Piccadilly Circus And Leicester Square Stations

Note.

  1. These two stations desperately need better and step-free access.
  2. Piccadilly Circus was originally to be a Crossrail 2 station, but this has been dropped.
  3. Both stations have a large Art Deco ticket hall underneath major road junctions.
  4. Neither station has any surface buildings of architectural merit.

Could adding extra passageways, escalators and lifts to these two stations do the following?

  • Make both stations step-free.
  • Give step-free and fast easy access between the Bakerloo and Piccadilly Lines at Piccadilly Circus station.
  • Give step-free and fast easy access between the Northern and Piccadilly Lines at Leicester Square station.

This would give Piccadilly Line passengers easier access to the soon-to-be-extended Northern and Bakerloo Lines.

I wouldn’t be surprised to see a radical solution in this area linking the important visitor destinations.

  • Covent Garden.
  • Leicester Square
  • Piccadilly Circus
  • Soho
  • Trafalgar Square

It might start with pedestrianising the entire area.

A Piccadilly Line with more capacity, a good interchange at Piccadilly Circus and a better ambience could be an alternative  route to Crossrail 2 for many of those it is designed to serve.

Thameslink Collateral Improvements

Very little has been said about the benefits of an improved Thameslink in Central London.

The features and improvements that could have far reaching affects are.

  • Finsbury Park and Elephant and Castle stations will be rebuilt or upgraded.
  • Will Camberwell station be built?
  • The link to the Piccadilly, Victoria and Northern City Lines at Finsbury Park station could get heavy use to avoid the long walks at St. Pancras.
  • Gatwick Airport has lots of ambitions for a new station to serve most of the South.
  • Thameslink will run initially at 24 tph, but will this limit be increased?

A lot of the plans aren’t finalised yet and it will be interesting to see what develops.

Vauxhall Station Improvements

I use the link at Vauxhall station, between the Victoria Line and Waterloo suburban services occasionally and every time I do, it seems to have been improved.

I suspect Network Rail and Transport for London have ideas to improve the interchange further.

Victoria Line Improvements

Dear Old Vicky – The Silver Queen of them all, who keeps on giving.

There is not much left to do with this line, but more capacity can be handled by doing the following.

  • Create a reversing loop at Brixton via a single platform station under Herne Hill station, which would improve frequency.
  • Create a double-ended station at Walthamstow Central to improve safe capacity and add lifts.
  • Further improve the interchange to services to and from Waterloo at Vauxhall station.
  • Improve stations like Tottenham Hale, Highbury and Islington and Oxford Circus.

As with the Central Line improvements, an improved Victoria Line could provide extra North-East to Central London capacity, prior to the building of Crossrail 2.

Victoria Station Improvements

Victoria station will be getting an upgraded Underground station in 2018.

Victoria is effectively two stations.

  • One for Southeastern services going down the Chatham Main Line.
  • One for Southern services going down the Brighton Main Line.

It is a crazy situation, with London’s most Westerly Southern terminal being the main terminal for the most Easterly services.

The Southern services via Clapham Junction, Balham and East Croydon are not too much of a problem, but the Southeastern services are designed more by the accident of history, than the needs of a modern railway and its passengers.

The typical 2015 off-peak service run by Southeastern is:

  • 4tph to Orpington via Herne Hill and Bromley South
  • 2tph to Dartford via Lewisham and Bexleyheath
  • 2tph to Dover Priory via Bromley South and Chatham
  • 1tph to Ashford International via Bromley South and Maidstone East
  • 1tph to Canterbury West via Bromley South and Maidstone East
  • 1tph to Ramsgate via Bromley South

All of these services have to be timetabled across South London and often cause bottlenecks and troubles at places like Herne Hill.

It has led to a suggestion of a tunnel from Battersea to Bromley under Brixton, that I wrote about in A Tunnel Under Brixton.

Waterloo And City Line Improvements

The Waterloo and City Line is not even a Cinderella Line, but one of her poor rats.

A new high-capacity step-free entrance in Walbrook Square at the Bank station end is opening in 2017.

This will mean that capacity is unbalanced. So could we see the following?

  • Larger capacity and step-free  entrance at the Waterloo end of the line.
  • Higher frequency and larger and more trains working the line.
  • Trains running automatically without drivers.
  • 24/7 operation.
  • The Night Drain, so that bankers can drink and gamble all night!

The upgrading of Bank and Waterloo stations for other services must have their own positive effects.

I believe that the Drain will be a very different animal in 2025.

It will act as a link line to all those suburban services going out of Waterloo. Perhaps an escalator connection between the suburban platforms at Waterloo and the Drain should be provided.

Waterloo Station Improvements

There are various improvements happening at Waterloo station.

  • The Eurostar platforms are being brought into use for suburban services.
  • This extra platform capacity will allow other platforms at Waterloo to be lengthened.
  • South West Trains are currently commissioning a fleet of 30 new Class 707 trains.
  • Improved services are being provided by Southeastern between Charing Cross and London Bridge stations via Waterloo East station, which are made possible by the Thameslink Program.

Whilst Waterloo is not a Crossrail 2 station, a fair proportion of its services via Wimbledon are planned to be transferred to the new line.

How will all the Waterloo developments affect this? I’ve no idea, but TfL could know after the end of 2017 and certainly will by the end of 2018.

Waterloo Station Suburban Services Proposed To Move To Crossrail 2

These suburban termini and their routes are due to be connected to Crossrail 2.

I have written An Analysis Of Waterloo Suburban Services Proposed To Move To Crossrail 2, which investigates the issues in detail.

I came to the following conclusion.

Crossrail 2’s proposals for the suburban branch lines from Waterloo to the four destinations of Chessington South, Epsom, Hampton Court and Shepperton stations, can be fulfilled using the following.

  • Modern high-performance 100 mph trains like Class 707 trains.
  • Some improvements to track and signals between Waterloo and Wimbledon stations.
  • Wimbledon station would only need minor modifications.
  • A measure of ATO between Waterloo and Wimbledon stations.

What effect will this have on the design of Crossrail 2?

Waterloo Station Links To The North,South and East

Waterloo station is well connected to the North,South and East, in the opposite directions to the lines to Vauxhall, Clapham Junction stations and all points South-West.

  • Bakerloo Line between Queen’s Park and Elephant and Castle stations
  • Charing Cross Branch of the Northern Line between Camden Town and Kennington stations
  • Jubilee Line between Baker Street and Stratford.stations.
  • Passengers using the Victoria Line to get to and from Waterloo, will use the cross-platform change at Oxford Circus.
  • Waterloo and City Line, to Bank station.

But it will be even better connected by 2029.

  • The Bakerloo Line will go between Queen’s Park and Lewisham stations.
  • The Northern Line could be split into two, with the branch through Waterloo, going between Edgeware and Battersea Power Station stations.
  • The Waterloo and City line will have new entrance in Walbrook Square.
  • Waterloo East station will have frequent connections between Charing Cross and London Bridge stations.
  • Possible improvements at stations like Oxford Circus and Piccadilly Circus could create excellent links to the Victoria and Piccadilly Lines.

Waterloo station will have superb connections.

I can’t see any reason why, two routes to the South-West branches of Crossrail 2 couldn’t be provided; one through the central tunnel and the other from Waterloo station.

Wimbledon Station

The current plan requires Wimbledon station to be seriously rebuilt and this is causing problems with the natives, which I can understand.

In the plan, twenty tph will come together at Raynes Park or Wimbledon stations and take the tunnel to the North.

But why do all trains have to go through the tunnel?

Some could start at Clapham Junction or Wimbedon stations.

I’m sure that a better plan for Wimbledon will arrive.

An Initial Conclusion

The more I write about rail projects in Central London, the more I’m convinced that a lot of the objectives of Crossrail 2 can be met in other ways.

As an example of my thinking, I believe that new faster Class 707 trains or something similar could double the frequency from 2 tph to the Crossrail 2 frequency of 4 tph on the suburban services out of Waterloo via Wimbledon.

This would mean.

  • Wimbledon station would not need substantial rebuilding.
  • 20 tph would use the slow lines between Waterloo and Wimbledon,
  • Trains would stop as required at Clapham Junction, Earlsfield and Vauxhall.
  • Waterloo to Wimbledon would probably need ATO like Crossrail or Thameslink, but handling 20 tph is not exceptional.

But surely, the biggest factor is that Waterloo to Wimbledon local services would have at least double the capacity.

A Conclusion About Automatic Train Operation

You could argue, that as a Control Engineer, I’m biased, but it seems to me, that if ATO were installed on the lines through Clapham Junction to Waterloo and Victoria capacity could be increased on the following suburban routes.

  • Waterloo to Wimbledon
  • Waterloo to Richmond
  • Victoria to Balham

Whether the Unions would agree to its introduction is another matter.

But then the automation would only need to be to Victoria line standard with driver monitoring.

A Virtual Crossrail 2

I am drawn to thinking that we could have a high-capacity link along generally the route of Crossrail 2, that could be upgraded in the future as circumstances dictate that more capacity is needed.

The existing West Anglia Main Line is congested and it needs to be four-tracked from Coppermill Junction to Broxbourne for several reasons.

  • To accomodate Crossrail 2
  • To handle more trains to Stansted Airport and Cambridge.
  • To handle more freight trains.
  • To increase line speed.

This project would be backed by Greater Anglia, Stanstad Airport, Cambridge and Transport for London.

If the lines out of Waterloo were upgraded, as I mentioned in the previously, there would then be the problem of creating the middle section of a Virtual Crossrail 2.

If an extension to Liverpool Street station were to be built as I indicated earlier to the North of the main line station beside Shoreditch High Street station, there could be at least three routes.

  • Crossrail to Bond Street and then the Jubilee Line.
  • East London Line to Canada Water and then the Jubilee Line.
  • Walk to the Waterloo and City Line.

Good design of the extra platforms might m,ake this work well!

Conversion From Virtual To Real Crossrail 2

The big problem is that those living close to the intermediate stations (Like me!), would not get a brand new railway.

This would need a tunnel to be bored from Tottenham Hale to Wimbledon, which could be delayed until it is really needed and the money can be raised.

There would be ways to cut the cost.

  • The line could be tunnel only and would not connect to surface railways.
  • There would be no station in Chelsea
  • An alternative Southern terminus for Crossrail 2 could be Clapham Junction, Balham or Tooting Broadway stations, but that would mean that Balham and/or Tooting didn’t get their station.
  • It could be created as a small-bore tube between Tottenham Hale and Wimbledon.

Consider the services to the possible Southern termini, if lines through Clapham Junction were to be upgraded with ATO.

  • Wimbledon could be getting 20 tph from Waterloo and 2 tph from Thameslink
  • Balham currently gets 12 tph from Victoria and a few other services.
  • Tooting Broadway will just get the Northern Line.

So it is Tooting Broadway that is in the greatest need of extra services.

If extra services are needed at Wimbledon or Balham, the capacity could be on the existing lines signalled under ATO, which could certainly handle 24 tph.

So would it be logical to not pass through Tooting Broadway station, but use it as the Southern terminal?

Or could a loop tunnel from Clapham Junction go through the following stations?

  • Wandsworth Common
  • Balham
  • Streatham Common
  • Tooting
  • Tooting Broadway and/or St. George’s Hospital
  • Earlsfield

The tunnel is probably too long to be single-track with single-platform stations, like the Loop under Liverpool on the Wirral Line.

But fast trains and good design of track and stations, might just make an affordable Crossrail 2 serving both Balham and Tooting Broadway.

Who knows?

I don’t!

But I have seen some crazy ideas work on my travels around the railways of Europe and we must not put limits on what we think is possible.

Conclusion

I shall be surprised if Crossrail 2 is built before 2040, as various projects and ATO will create enough capacity to push the line futher into the future.

December 28, 2016 Posted by | Transport/Travel | , , , , , , , , , , | 5 Comments

Orpington Station – 3rd August 2015

After An Exploration At Penge, took a train from Penge East station to Orpington station.

These pictures I took, show a well-appointed station with full step-free access and a selection of long through and bay platforms.

Could Orpington be one of the extra destinations that are needed by the East London Line?

It takes thirty four minutes of travelling time to get to Whitechapel changing at New Cross at the moment, so it is actually closer than West Croydon, which takes forty minutes.

The route passes through a series of important and busy stations like New Cross, Lewisham and Petts Wood. It could either be via Beckenham Junction and Bromley South or via Hither Green and Chislehurst.

Using Opington as a destination  for the East London Line would appear to connect a lot of South East London to Crossrail at Whitechapel and the Jubilee Line at Canada Water.

It would also fit in well with Transport for London’s desire to take over services in South East London. The Wikipedia entry says this.

However, since taking over the West Anglia services, TfL have once again proposed to take over the suburban routes, currently operated by Southeastern after their franchise ends. The opposition to TfL taking over routes from Kent County Council have softened after a London Assembly meeting, which Kent County Council attended. Kent have set out “red lines” to its support, stating no Southeastern Mainline service should be negatively affected by a take over by TfL.

So bringing an uprated  East London Line to Orpington might appear on the surface to fit in well with TfL’s ambitions.

It certainly seems that they have big ambitions in South East London.

Could it be Borough Jealousy?

Councils like Bromley have seen the improvements in transport and the related benefits in Northern boroughs like Hackney, Islington and Brent and want a piece of Orange action themselves.

August 3, 2015 Posted by | Transport/Travel | , , , , , , | 1 Comment

An Exploration At Penge

I took the Overground to Penge West station and then walked to Penge East station. The walk is about 15 minutes.

The objective was to investigate the Penge Interchange proposed in the Transport Infrastructure Plan for 2050, After all, I can’t find any other reference to this on the Internet. Even if you search the whole of the Infrastructure Plan, Penge is only mentioned once.

This is a Google Map showing both stations.

Penge West And East Stations

I took these pictures at Penge West station

Penge West is a typical South London station, but it is not step-free and it has an uncovered bridge. There is also only one entrance and exit on the Northbound platform. It will have to be rebuilt with a new footbridge and a possible entrance/exit on the Southbound side. This Google Map shows the station and the surrounding area.

Penge West Station

Penge West Station

It would appear that there is enough space to rebuild the station with a second entrance/exit on the Sounthbound side of the lines. The other line crossing the top left corner of the map, is the line that takes the East London Line to Crystal Palace.

Whilst I walked to Penge East station, I took these pictures.

The bridges at Penge West station, probably rule out any connection of the two lines in a rebuilt station.

Incidentally, the walk is well-signposted except for the unfortunate sign directing you to Penge East station off the High Street, which is only visible when you’ve passed by.

These are pictures of Penge East station.

The station has the worst footbridge, I’ve seen for a long time and surely only the grace and favour of the woodworms holding hands, stops it from falling onto the railway. It is of course not step-free.

Believe it or not this dreadful footbridge is Listed. It also is a regular walking route across the railway for people not using the trains.

So making Penge East station comply with the disability Regulations would mean putting a second footbridge somewhere else.

The irresistible force of the Disability regulations has met the immoveable object of the Heritage Lobby. Wth which group would Network Rail least prefer to have a big fight?

This Google Map shows the area from Penge East station to where the lines go under the Brighton Main Line

Penge East Station

Penge East Station

I think that having looked at both Penge East and Penge West to improve services in the area, TfL and Network Rail have taken the decision to perhaps build a new Penge Interchange station, where the lines cross.

This has led to the inclusion of the single word, Penge, under a list of possible interchange stations in Transport for London’s future predictions. This Google Map shows the area where the lines cross.

A Possible Site For A Penge Interchange Station

A Possible Site For A Penge Interchange Station

There are actually three groups of lines that cross the lines through Penge East.

  • The single-track northbound Sydenham Spur linking Crystal Palace to the Brighton Main Line.
  • The four-track Brighton Main Line with the slow lines on the outside.
  • The single-track southbound Sydenham Spur linking the Brighton Main Line to Crystal Palace.

Depending on how much you would want to spend, you could build new platforms on the Brighton Main Line and the Sydenham Spur and link them by lifts to platforms on the line through Penge East.

A few points.

1. I think that the platforms would be extended from Penge East towards the new interchange.

2. The Listed footbridge at Penge East would be saved and the woodworm can be given help from craftsmen to hold the bridge up.

3. There would appear to be a service tunnel under the railway, that gives access to the building on the eastern side of the Brighton Main Line. Could this help in the design and construction of the station?

4. From the Google Map, there would appear to be space for an access to the station from Lawrie Park Road.

5. The area around Penge West station could probably be connected to the new complex by a footpath running along the railway lines. There could also be some rerouting of buses.

6. The station could probably be designed to create an East- West walking and cycling route under the railway.

7. Network Rail would get improved access to their building on the eastern side of the tracks.

It is also interesting to look at the passenger statistics for the stations in the area for 2013-14.

  • Penge West – 0.5 million
  • Penge East – 1.5 million
  • Anerley – 0.7 million – South of Penge West
  • Sydenham – 2.3 million- North of Penge West

These statistics provoke me to say, that if a Penge Interchange station was developed where the lines cross, would it be sensible to close the current Penge West station?

After my visit to Penge and my cursory investigation, I am led to the conclusion, that building a new Penge Interchange station, which possibly incorporates elements of the current Penge East station, and closing the lightly-used Penge West station, is not an impossible dream.

 

 

 

 

 