Wind Farms On The East Coast Of Scotland

This map shows the proposed wind farms off the East coast of Scotland.

There are five wind farms in the map.

  • The green area is the cable corridor for Seagreen 1a
  • Inch Cape is the odd-shaped wind farm to the North and West of the green area
  • Seagreen at the top of the map, to the North of Inch Cape.
  • Marr Bank with the pink NE-SW hatching
  • Berwick Bank with the green NW-SE hatching
  • Neart Na Gaoithe is edged in blue to the South of the green area.

Berwick Bank and Marr Bank are both owned by SSE and appear to have been combined.

These are some more details on each of the now four wind farms.

Seagreen

These are details of the Seagreen wind farm.

  • Seagreen will be Scotland’s largest and the world’s deepest offshore wind farm when complete.
  • The first phase will have 114 turbines and a capacity of 1075 MW.
  • It will connect to the grid at a new substation at Tealing near Dundee.
  • The cables will run to the North of the Inch Cape wind farm.
  • It will be completed in 2023.
  • The second phase (1a), will have 36 turbines.
  • It may have larger turbines.
  • The cables will run in the green area to Cockenzie in East Lothian.

This press release from SSE is entitled Another Milestone For Scotland’s Largest Offshore Wind Farm As 4,800 Tonnes Offshore Platform Completed.

This is the first paragraph.

The topside forms the backbone of the offshore wind farm. At 40 metres long, 45 metres wide and 15 metres high, the heavyweight superstructure’s role is to collect and manage 1,075MW of power generated by the 114 Vestas wind turbines before transferring it ashore via around 60km of offshore subsea cabling.

This platform is used to connect the 114 turbines to the shore.

Inch Cape

This paragraph from the home page of the Inch Cape web site, describes the wind farm.

The Inch Cape Offshore Wind Farm, currently in late stage development, will see up to 72 turbines located 15 km off the Angus Coast and connect to the National Grid at Cockenzie, East Lothian. Once complete, it will be one of Scotland’s largest single sources of renewable energy and power up to 1 million homes with clean electricity.

The home page says it will generate up to 1 GW of electricity.

Neart Na Gaoithe

This sentence for the Wikipedia entry for the Neart Na Gaoithe web site describes the wind farm.

It is being developed by Mainstream Renewable Power at a cost of £1.4bn. Offshore work began in 2020, with completion planned for 2023.

The Wikipedia entry says it will generate up to 450 MW of electricity.

Berwick Bank

These two paragraphs from the project page of the Berwick Bank web site describes the wind farm.

Located in the North Sea, in the outer Firth of Forth, Berwick Bank Offshore Wind Farm has the potential to deliver up to 4.1 GW of installed capacity, making it one of the largest offshore opportunities in the world.

Berwick Bank Wind Farm is in the development stage and previously the project was comprised of two separate proposals, Berwick Bank Wind Farm and Marr Bank Wind Farm. Following initial rounds of consultation, it has been decided to combine our proposals into one single opportunity – Berwick Bank Wind Farm.

At 4.1 GW,  Berwick Bank is a big wind farm.

The capacity of the four farms can be summarised as follows.

  • Seagreen – 1075 MW
  • Neart Na Gaoithe – 450 MW
  • Inch Cape – 1000 MW
  • Berwick Bank – 4100 MW

This gives a total of 6625 MW.

 

March 9, 2022 Posted by | Energy | , , , , , , | 4 Comments

‘Upgrade East Coast Main Line Before HS2’ If Leeds And Yorkshire Want Faster Rail Links To London

The title of this post, is the same as that of this letter to the Yorkshire Post.

This is the opening paragraph.

The decision to scrap HS2 running to Leeds is controversial but those who travel to London should not despair.

The writer makes these points.

  • High Speed Two will probably charge a premium fare because of the speed.
  • The current journey time to the capital is two hours 13 minutes at a cost of £28-60, if purchased in advance.
  • Planned improvements on the East Coast Main Line will reduce the journey time to London King’s Cross to one hour 56 minutes.
  • High Speed Two will take one hour 22 minutes.
  • If the line between Doncaster and Leeds were to be improved, the journey time could be reduced to one hour 45 minutes.

The writer finishes by saying that if the government ‘four tracked’ the entire East Coast route, 140mph LNER’s Azuma trains would match the times of High Speed Two.

In What Will Be The Fastest Times Possible Between London King’s Cross And Leeds?, I came to this conclusion.

It looks like a non-stop service between London and Leeds running at 140 mph, with perhaps some sections at perhaps a bit faster, could be able to match the High Speed Two times.

Running non-stop saves a total of eighteen minutes.

In an hour, I would give Leeds one non-stop and one stopping service to London.

March 9, 2022 Posted by | Transport/Travel | , , , , , , | 13 Comments

Ukraine Maternity Hospital ‘Destroyed’ By Russian Shelling

The title of this post, is the same as that of this article on the BBC.

These are the first two paragraphs.

Russian forces surrounding the southern port city of Mariupol have destroyed a maternity hospital, Ukraine says.

President Volodymyr Zelensky said children were under the wreckage, and called on Western leaders to impose a no-fly zone.

This Wikipedia entry is entitled Russian–Syrian Hospital Bombing Campaign.

The campaign may have been started by the Syrians, but the Russians joined in later in 2015-2018, as this paragraph from Wikipedia describes.

After Russia began military operations in Syria, aerial bombardment intensified. In 2015, there were more than 300 attacks on medical facilities by Syrian and Russian forces. From May to December 2016, medical facilities were attacked about 200 times by Russian and Syrian forces.

It does look to me, that the Russians consider bombing hospitals to be a legitimate tactic. It is not, as it is a war crime.

March 9, 2022 Posted by | World | , , , , , , | 5 Comments

From Belfast With Love

Ben Wallace has just announced in the House of Commons, that Ukraine has received over three and a half thousand NLAW missiles and more are on the way.

This has appeared in the last few minutes on the Wikipedia entry for the Starstreak missile.

On March 9, 2022, Defense Secretary Ben Wallace said that the United Kingdom was looking into delivering Starstreak missiles to Ukraine, to prevent Russian air supremacy amid the Russo-Ukrainian War.

Both NLAW and Starstreak missiles are made by Thales in Belfast.

This YouTube video shows NLAW missiles including during training with Ukrainian forces.

Read the comments, of which this is an example.

In Ukraine the instructions on how to use NLAW is top trending content on Facebook and Instagram. Amazingly you can fit a comprehensive instruction on how to shoot a tank with NLAW in like 10 pictures with arrows and subtitles.

These missiles will change the face of defensive warfare.

 

March 9, 2022 Posted by | World | , , , , , , | 2 Comments