The Anonymous Widower

Gasunie Investigates Hydrogen Network In North Sea

The title of this post, is the same as that of this news article on the Gasunie web site.

December 5, 2022 Posted by | Energy, Hydrogen | , , , , , , , , | Leave a comment

A Long Journey Home

A friend had booked between London and Edinburgh today on the 13:00 LNER train from King’s Cross. She was also travelling with her miniature Schnauzer.

.We had arranged to meet at Marylebone, so I could help them across London to King’s Cross and have a much-needed hot chocolate in King’s Cross before they caught the train North and I went to a meeting organised by my cardiologist.

I had checked out King’s Cross earlier and there was trouble with srveral delayed and cancelled trains.

It wasn’t strikes or bad management from LNER and the problem is explained in this article from the Yorkshire Evening Post, which is entitled Trains From Leeds To London Cancelled Or Delayed After Thieves Steal Signalling Cables From Railway Tracks.

In the end we made the train in time and also had time to have a hot chocolate in LEON, whilst we sat out the back with the dog.

We were texting each other most of the afternoon and with assistance from Real Time Trains, the journey went as follows.

  • The train left King’s Cross at 13:08, which was eight minutes late.
  • By Peterborough, the train was running seventeen minutes late. 
  • The driver kept this delay until Retford, where he lost another eighty minutes.
  • The train was now running 97 minutes late and this grew by four more minutes by Newcastle.
  • My friend reported that they stopped at Newcastle, as they had no driver.
  • In the end, LNER found a driver or a way for the current driver to continue to Edinburgh and the train left Newcastle after a thirty minute stop.
  • The train was now two hours and ten minutes late.
  • Eventually, it pulled into Edinburgh, two hours and five minutes late, after the driver had picked up a few minutes on the approach to Edinburgh.

Note.

  1. The incoming train that formed this service arrived in King’s Cross from Edinburgh seventy two minutes late, mainly because of the cable theft. It should have arrived and returned to Edinburgh an hour earlier. But it arrived conveniently to form the 13:00 to Scotland.
  2. As the train presentation team turned the train in nineteen minutes instead of twenty-one, they saved a couple of minutes.
  3. I suspect the delay at Retford was getting through the area without any signalling.
  4. Had the driver run out of hours by Newcastle, as he had been in the cab for four-and-a-half hours?
  5. Normally, four-and-a-half hours would have enabled the driver to have driven to Edinburgh.

These are my thoughts.

Cable Theft

In the days of British Rail, I did some work for British Rail using my software called Daisy, which led to a report entitled Failure Reporting And Analysis On British Rail, which was written by J. S. Firth CEng, MIEE, MIRSE, who worked for SigTech, which was a Business Unit of the British Railways Board.

If anybody who has a legitimate reason to read the report, I still have the complimentary copy sent to me by Mr. Firth and would be happy to provide a copy.

I did flag up a project called Unauthorised Cable Removal And Fault Triage, as one of the winners in the First Of A Kind 2022 competition organised by the Dept of BEIS.

If there is anything I can do to help, let me know.

Problems In France

A friend in France told me that there is a problem with stealing overhead electrification cables in France.

This article on RFI is entitled Copper Wire Thieves Force France’s High-Speed TGV To Go Slow.

There are several similar stories on French and other European web sites.

Signalling Using Radio

The East Coast Main Line is being signalled using modern ERTMS digital signalling, where drivers read the signals on an in-cab display, which is connected by radio to the signalling system.

This extract from Wikipedia describes the first project.

In June 2020 it was reported that the UK government would provide £350 million to fund the UK’s first digital signalling system on a long-distance rail route. The signalling is to be fitted on a 100-mile (161 km) section of the East Coast Main Line between Kings Cross, London, and Lincolnshire, which will allow trains to run closer together and increase service frequency, speed and reliability. No date for when the new technology, already in use on the Thameslink lines at London Bridge and some London Underground lines, has been given.

If the cables are removed will this reduce crime?

LNER Delay Repay

My friend will be entitled for a full refund of her single ticket.

This page on the LNER web site gives full details.

Note.

  1. You have 28 days to claim.
  2. If you have a return ticket, you may be entitled to something for that leg of the journey.

I would add, that you should always keep all your tickets, in case the return journey goes belly-up.

December 5, 2022 Posted by | Transport/Travel | , , , , , , , , , , | 3 Comments

Scotland’s Largest Offshore Wind Farm Entering Home Stretch

The title of this post, is the same as that of this article on offshoreWIND.biz.

December 5, 2022 Posted by | Energy | , , , , , | 2 Comments