Surveys Completed For Celtic Sea Floating Offshore Wind Projects
The title of this post, is the same as that of this article on offshoreWIND.biz.
This is the sub-heading.
N-Sea Group has finished a series of benthic and geophysical surveys for Llŷr 1 and Llŷr 2 floating offshore wind projects in the Celtic Sea.
I described the two projects in detail in Two More Floating Wind Projects In The Celtic Sea.
- At least the surveys are complete and it still appears that a commissioning date of 2026/27 is still feasible for these twin 100 MW projects.
- In the original documents, it was stated that there would be six next generation turbines in each wind farm, with a capacity of between 12 and 20 MW.
- There appears to be no decision on the floats or turbine size to be used.
I wouldn’t be surprised to see larger turbines used and the capacity of the farms increased.
Five New Railway Stations Considered For West Midlands
The title of this post, is the same as that of this article on Rail Advent.
This is the first paragraph.
Transport authorities in the West Midlands are considering the case for building five new stations at Balsall Heath, Coventry East (Binley), Foleshill, Castle Bromwich and Tettenhall.
The location of the stations is as follows.
- Balsall Heath station is on the Camp Hill Line and was formerly known as Brighton Road station, which was shut in 1941 as a wartime economy measure.
- Castle Bromwich station, will be between Birmingham and Water Orton.
- Coventry East station will be on the main line between Coventry and Rugby.
- Foleshill station will be on the Coventry-Nuneaton Line, between Coventry and Coventry Arena stations.
- Tettenhall station will be to the west of Wolverhampton on the Wolverhampton Shrewsbury Line.
Note.
- Balsall Heath station would require construction of the Bordesley Chords and extra capacity at Moor Street Station.
- Coventry East station will benefit from the opening of High Speed Two, will will allow more local services.
- Castle Bromwich station would also benefit from the extra capacity from High Speed Two and the Midland Rail Hub.
Railways in Central Birmingham appear to be having a big sort out.
The article also says this about other stations, being planned in the West Midlands.
These planned new stations will add to expansion of the region’s rail network that is already underway, with new stations being built on the Camp Hill line in south Birmingham at Moseley Village, Kings Heath and Pineapple Road, and on the Walsall to Wolverhampton line serving Darlaston and Willenhall. A new station is also planned at Aldridge, with funding allocated subject to business case. The City of Wolverhampton, South Staffordshire District and Staffordshire County councils have also looked at the case for a new station at Brinsford, which will be considered alongside the case for nearby Tettenhall Station.
In the last part of the article, Andy Street talks about the funding secured.
It certainly looks like station builders in the West Midlands will have lots of work to do.
Dutch Take Aim At Lower Green Hydrogen Costs By Combining Offshore Wind And Floating Solar
The title of this post, is the same as that of this article on offshoreWIND.biz.
This is the sub-heading.
A consortium of Dutch companies has launched a government-backed project to explore the synergies between offshore wind, offshore solar and hydrogen production at sea for improved sustainability of North Sea renewable energy projects.
T thought about calling this post, The Dutch Go For The Full Monty, but there is no mention of wave or tidal power.
These two paragraphs outline the project.
The four-year project, dubbed Solar Enhanced North Sea Energy Hub (SENSE-HUB), is expected to accelerate the rollout of offshore solar into offshore renewable energy systems.
Let by TNO, short for Netherlands Organization for Applied Scientific Research, the project will address the integration of various energy system modules for the Dutch North Sea by understanding and removing the implementation barriers for future SENSE-HUBs from a technical, economical, ecological, legal and societal perspective.
I wouldn’t be surprised to see more integrated systems like this in the waters around our coasts.
I also believe that the ultimate offshore energy production system will also use wave and tidal power to generate electricity and have inbuilt energy storage.
Moorgate To Charlton Via Cannon Street
I needed to go to Charlton station this morning to take a couple of photographs for a possible blog post.
- I had had my usual breakfast in LEON on Moorgate, so I started from Moorgate station.
- I took the Northern Line one stop to Bank station.
- It was then straight up the double escalators.
- I followed this by a brisk walk along Cannon Street.
The total time between entering Moorgate station and sitting on my train at Cannon Street station was about ten minutes.
One of London’s more difficult stations to access now has a North-South Underground line, to go with its East-West line.
NHS Prevention Programme Reduces Type 2 Diabetes By A Fifth
The title of this post, is the same as that of this article on The Times.
This is the sub-heading.
Participants are given free Fitbits or smart watches to help them lose weight
These two paragraphs outline the program.
An NHS scheme that sends obese patients to slimming classes and gives them free Fitbits has cut diabetes rates by one fifth.
The NHS Diabetes Prevention Programme, also known as Healthier You, offers health advice alongside free cookery and exercise sessions online or in person. Participants are given NHS-funded Fitbits or smart watches to monitor their activity to help them lose weight.
Note.
- Manchester University have analysed the project.
- Those on the scheme lost five pounds on average.
- The Healthier You programme is available in all parts of England.
It sounds like the programme has been a success.
I’d like to hear of peoples’ stories about this programme.