The Anonymous Widower

1-in-11,000 Chance Of Contracting COVID-19 On Trains

The title of this post, is the same as that of this article on Rail Magazine.

That looks like a chance I’ll take!

August 7, 2020 Posted by | Health, Transport/Travel | , | 1 Comment

Plans For Cable Cars Between Bristol Temple Meads And Clifton Suspension Bridge

The title of this post, is the same as that of this article on Bristol Live.

The title only says half of it, as this is only the first route.

Conclusion

I like the idea!

I also think we should have more!

August 7, 2020 Posted by | Transport/Travel | , , , | 1 Comment

World’s First Hydrogen-Powered Double Decker Buses To Be Launched In Scotland

The title of this post, is the same as that of this article on The Herald.

This introduction says a bit more.

A fleet of hydrogen-powered double decker buses that is claimed to be the world’s first is due to be launched in Scotland later this year in what is seen as a major step forward in the use of hydrogen as a fuel.

First Aberdeen will be running fifteen hydrogen-fuelled buses.

August 7, 2020 Posted by | Hydrogen, Transport/Travel | , | Leave a comment

Hamburger Hochbahn Launches Tender For 50 Hydrogen Fuel Cell Buses

The title of this post, is the same as that of this article on H2 View.

The title says it all!

But it does show how hydrogen buses are proliferating around the world.

This makes the third hydrogen or energy project from the German city, that I have detailed.

August 7, 2020 Posted by | Energy, Hydrogen, Transport/Travel | , | Leave a comment

Beeching Reversal – Reopening Golborne Railway Station

This is one of the Beeching Reversal projects that the Government and Network Rail are proposing to reverse some of the Beeching cuts.

Golborne station was known as Golborne South station in its later years and this Google Map shows the station’s location in the village of Golborne.

I don’t want to disappoint anybody, but I don’t think a station here is a practical idea.

  • The proposal would mean adding a new station between Wigan North Western and Warrington Bank Quay stations. Would this slow Avanti West Coast services by an unacceptable amount?
  • High Speed Two services will use these tracks. Will that be acceptable to the new route’s engineers.?
  • Platforms for the West Coast Main Line and High Speed Two will need to be at least two hundred metres long. Is there enough space?
  • Where will the cars be parked in the village?

But the biggest problem, will be the disruption caused by constructing the station in the middle of a village.

Conclusion

I shall be very surprised if this station is reopened.

August 7, 2020 Posted by | Transport/Travel | , | 6 Comments

Beeching Reversal – Reopen Midge Hall Station

This is one of the Beeching Reversal projects that the Government and Network Rail are proposing to reverse some of the Beeching cuts.

Midge Hall station is a closed station on the Ormskirk Branch Line.

This Google Map shows what’s left of Midge Hall station.

Note.

  1. The single-track Ormskirk Branch Line running SW-NE across the map.
  2. Midge Hall Lane crossing it at right-angles in the South-West corner of the map, where a level crossing can be seen.
  3. The original station had two platforms, of which the remains can be seen.

There certainly seems plenty of space to rebuild the station.

The Ormskirk Branch Line

The Ormskirk Branch Line runs between Ormskirk and Preston stations.

  • It is single-track most of the way.
  • It is about 15.5 miles long.
  • The current trains take just over half-an-hour.
  • There are four intermediate stations.
  • Most services terminate in a bay platform at Preston station.
  • Ormskirk station is electrified with 750 VDC third-rail electrification.
  • Preston station is electrified with 25 KVAC overhead electrification.

The Future section in the Wikipedia entry says this.

There have been several proposals to extend the Merseyrail electric service to Preston using this line. This would restore the most direct Liverpool – Preston route. The reinstatement of the Burscough Curves has been proposed which would allow services to Southport from Preston and Liverpool via Ormskirk. This could be accompanied by the reopening of Midge Hall station.

The reports usually say, that this would be achieved by fitting batteries to the new Class 777 trains.

Battery Operation Of Merseyrail’s New Class 777 Trains

It would appear that on each round trip between Ormskirk and Preston, the trains will have to run thirty-one miles on batteries.

  • In Batteries On Class 777 Trains, I estimated that, the battery capacity of a Class 777 train was 300 kWh.
  • It also looks like Stadler have designed the Class 777 train, with battery-operation as an integral part of the design.

In an article in the October 2017 Edition of Modern Railways, which is entitled Celling England By The Pound, Ian Walmsley says this in relation to trains running on the Uckfield Branch, which is not very challenging.

A modern EMU needs between 3 and 5 kWh per vehicle mile for this sort of service.

I know both branches reasonably well and the Ormskirk Branch is probably the least challenging.

Consider.

  • The Class 777 train is probably equivalent in length to a three-car train, as the cars are short.
  • The Class 777 train appears to have a sophisticated traction system, that includes regenerative braking to the batteries.

If the Class 777 train can achieve 3 kWh per vehicle mile, it will have a range of 33.3 miles. Reduce it to 2 kWh per vehicle mile and the range would be 50 miles.

I am fairly certain, that Stadler have designed a train, that can achieve a round trip between Ormskirk and Preston, without needing a battery top-up at Preston.

I don’t think, that it will need to use overhead wires either.

So that will save on infrastructure costs!

Charging The Batteries

The batteries would be charged using the existing third-rail electrification between Ormskirk and Hunts Cross stations.

No new infrastructure would be needed.

Future Services Between Liverpool And Preston

Preston and Liverpool already a direct hourly electric service via Huyton, St. Helens and Wigan North Western and until proven otherwise a second hourly service via Ormskirk would probably be a more-than-adequate replacement for the current Ormskirk and Preston service.

This would probably be achieved by one if the four trains per hour (tph) continuing to Preston.

As the current trains take about thirty minutes to run between Ormskirk and Preston, I think this could help devising a passenger-friendly timetable.

Future Services Between Southport And Preston

There is currently no train service between Southport and Preston stations.

But there used to be tracks as this Google Map shows.

Two railway lines run across the map.

The two railway lines cross towards the North-East corner of the map.

Note the two green scars of the disused and overgrown Burscough Curves reaching East from Burscough Bridge station.

  • The Northern curve connects to the Ormskirk Branch Line and used to enable trains to go between Southport and Preston stations.
  • The Southern curve connects to the Ormskirk Branch Line and used to enable trains to go between Southport and Ormskirk stations.

Full or even partial restoration of these curves would improve connections to Southport and Preston.

Extend Some Liverpool and Southport Services To Preston

One possibility would be to extend perhaps one-in-four Liverpool and Southport services to Preston via the following route.

  • Reverse at Southport
  • Via Burscough Bridge station and using the Northern Burscough Curve.

Coupled with a one-in-four extension from Ormskirk station, this would provide the following.

  • A two tph service between Liverpool and Preston
  • A two tph service through Rufford, Croston and Midge Hall stations.

With precise and intelligent timetabling. I suspect that Rufford, Croston and Midge Hall stations could all be single-platform stations.

Extend Some Liverpool and Ormskirk Services To Preston Via Southport

Another possibility would be to extend perhaps one-in-four Liverpool and Ormskirk services to Preston via the following route.

  • Using the Southern Burscough Curve to Southport via Burscough Bridge station.
  • Reverse at Southport
  • Via Burscough Bridge station and using the Northern Burscough Curve.

If the route used the electrified Platform 3 at Southport to reverse, it could top-up the batteries.

The Future Midge Hall Station

The design of the station will depend on the train frequency through the station.

An Hourly Service

Midge Hall station would probably be a single-platform station.

  • There would only need to be a single-track railway, as now!
  • The signalling would be handled by one train working, where only one train at a time would be allowed on the single-track between Ormskirk and Preston stations.
  • Passengers needing to cross the line to get to the platform, would use the level crossing.
  • Trains would arrive at fixed times in each hour.

It would be a very basic, but practical station.

A Two tph Service

Midge Hall station could probably still be a single-platform station.

  • There would only need to be a single-track railway, as now!
  • For a two tph service the signalling would need to be more sophisticated.
  • Passengers needing to cross the line to get to the platform, would still use the level crossing.
  • Trains would arrive at fixed times in each hour.

It would be a basic, but practical station.

A More Frequent Service

Midge Hall station would need to be a two platform station, as the line would need to be double-track.

  • Comprehensive signalling would be needed.
  • There could need to be a footbridge, with full step-free access.

It would be more expensive option.

A Compromise

I suspect in the end, Midge Hall station will be designed as a simple single-platform station, that can be upgraded, as required.

Conclusion

The frequency of the service between Ormskirk and Preston has a big effect on the cost of the work to be done.

But I can certainly envisage a two tph service along this route, if the Burscough Curves are reinstated.

  • One tph via Ormskirk.
  • One tph via Southport.

There would be two tph, through the reinstated Midge Hall station.

 

 

August 7, 2020 Posted by | Transport/Travel | , , , , | 6 Comments

Study Reveals Barriers To American Electric Car Adoption

The title of this post, is the same as that of this article on Hydrogen Fuel News.

The conclusion of the study from George Washington University, is that Americans don’t know much about electric vehicles.

And I suspect, that could apply to a lot of people and not just Americans.

August 6, 2020 Posted by | Transport/Travel | , | Leave a comment

East West Rail Takes New Steps Further East

The title of this post is the same as that of this article on Rail News.

This is the introductory paragraph.

A business case for improving train services between Cambridge, Ipswich and Norwich is to be developed by consultants on behalf of the East West Rail Consortium, as an addition to the plans for reopening the former Varsity Line between Oxford, Bedford and Cambridge.

I have covered this before in East West Rail Makes ‘Powerful Case’ For Direct Services From Ipswich And Norwich To Oxford, where I reference this report on the East-West Rail web site, which is entitled Eastern Section Prospectus and gives full details of their proposals.

I particularly like these smaller projects.

  • An A14 Parkway station.
  • A frequent tram-train between Ipswich and Felixstowe.
  • Some extra electrification
  • Increase of speed limits to 100 mph
  • Haughley Junction improvements.

I suspect the consultants will come up with a few more useful projects.

August 6, 2020 Posted by | Transport/Travel | , , , , , | 2 Comments

Hyundai’s Hydrogen Truck Wins Award

The title of this post, is the same as that of this article on H2 View.

This is the introductory paragraph.

Hyundai’s hydrogen-powered fuel cell heavy-duty truck HDC-6 Neptune has won a 2020 Future Mobility of the Year (FMOTY) award.

Perhaps only a small step in the grand scheme of decarbonisation, but hydrogen trucks are starting to be noticed.

August 6, 2020 Posted by | Hydrogen, Transport/Travel | , | Leave a comment

A Visit To Stevenage Station’s New Fifth Platform

These pictures show the new fifth platform at Stevenage station.

These are a few thoughts.

The New Spacious Platform

As the pictures show, the platform is spacious with plenty of shelter, which probably indicates that it has been designed to handle more than the current two trains per hour (tph).

Why Is Train-and-Platform Not Step-Free?

Look at this picture.

Surely, with a new platform and trains specifically-designed for the route, passengers in wheelchairs, pushing buggies or trailing heavy cases should be able to just stroll in?

If as is likely this route goes to Transport for London because of their policy of allowing those needing assistance to just turn up, this could become a problem in the future. Especially, if a more intensive service was run on this route between Moorgate and Stevenage, where turnround times have been reduced!

Track Layout

It looks like the new Platform 5 at Stevenage station is directly connected to the Down Line of the Hertford Loop, so that trains from London come straight in from the Down Platform  2 at Watton-at-Stone station. My return train appeared to run the other way until crossing over to the Up Line before it arrived back at Watton-at-Stone station.

Google Maps have not been updated in the area, so I’m not sure of the full track layout.

Following freight trains through Watton-at-Stone, it would appear that they use these platforms at Stevenage station.

  • Platform 1 – Going South
  • Platform 4 – Going North

As would be expected, it looks like it is possible for a freight train to pass through Stevenage to and from the Hertford Loop, with a train in Platform 5.

How Many Trains Per Hour Can Run Between Moorgate And Stevenage?

The timetable has appeared to have been setup, so that a very relaxed two tph can run very reliably between Moorgate and Stevenage stations.

Currently, there are four tph from Moorgate on the Hertford Loop, which alternate between terminating at Hertford North station or the new platform in Stevenage station.

So, if a commuter going home to Stevenage missed his train, they’d be thirty minutes late for supper.

Perhaps not a disaster, but as I indicated in Stevenage Station’s New Fifth Platform Opened A Year Early, Stevenage has an important hospital and increasingly trains for the North are calling at the station.

I suspect, that Network Rail and Great Northern will be investigating, if the two tph to Hertford North station can be extended to Stevenage.

Certain things must be in their favour.

  • It is generally accepted, that a well-designed single platform can turn back up to four, and in some cases, six tph.
  • The new Class 717 trains have better performance than the former Class 313 trains.
  • The route is now run exclusively by the new fleet of trains.
  • There are turn-back platforms at Hertford North and Gordon Hill stations.

But the biggest factor, must be that the Hertford Loop along with the rest of the Southern part of the East Coast Main Line, is going to be equipped with ERTMS digital signalling.

I can certainly see a day in the not-to-distant future, when at certain times in the day four tph run between Moorgate and the new fifth platform at Stevenage.

Freight Trains Through The Hertford Loop

According to Real Time Trains, during yesterday about ten freight trains ran through the Hertford Loop.

In addition, there appear to be up to two-three paths in some hours, which were not used.

In the future, after ERTMS digital signalling has been added to the route and more freight services are equipped, I can see increasing numbers of freight services on the Hertford Loop.

More Passenger Services On The Hertford Loop

In the past, whilst returning from the North to London, during periods of disruption caused by track and catenary problems, engineering works or other incidents, the train has taken some unusual routes. In one instance, the InterCity 125 used the Hertford Loop.

These are timings of trains between Finsbury Park and Stevenage stations.

  • Moorgate services – 51 minutes
  • Thameslink – Cambridge and Brighton – 19 minutes
  • Great Northern – Cambridge Express – 16 minutes

To help with the bottleneck of the Digswell Viaduct, it is likely that the Cambridge Expresses will be 140 mph trains, so they can mix it with all the LNER, East Coast Trains, Hull Trains and the other high speed trains between Kings Cross and Hitchin, as I wrote in Call For ETCS On King’s Lynn Route.

Perhaps, other tricks can be employed using Stevenage station and the Hertford Loop Line.

  • Could some services go non-stop on the Hertford Loop Line instead of over Digswell?
  • Could some services split and join in the long platforms at Stevenage?
  • Could some services from the North turnback at Stevenage?

I obviously don’t know all the technicalities, but it does seem that the recent works at Stevenage and the upcoming ERTMS signalling may open up possibilities.

Conclusion

This looks to be a major improvement at Stevenage!

Except for the lack of step-free access!

I

 

 

August 5, 2020 Posted by | Transport/Travel | , , , , | Leave a comment