The Anonymous Widower

My 78-Year-Old Legs Are More Reliable Than The New Chinese Buses On London’s 141 Bus Route

So we all know what we’re talking about, here’s a few pictures.

Note.

  1. The buses seem to have no serious faults from a passenger point of view.
  2. One middle-aged lady on the plump side, said she didn’t like the buses.
  3. The aisle between the front seats doesn’t seem to be built for large people.
  4. The seats are reasonably comfortable.
  5. One morning, I stood on a long journey and I felt the road-holding wasn’t as good as a New Routemaster.
  6. On several buses, the interior route display has not been working.
  7. As I don’t wear a watch, I find a non-working display annoying.
  8. I haven’t been upstairs yet.
  9. As picture numbers three and four show, the bus looks a bit pokey at the back downstairs.

But I am very suspicious about the buses’s  reliability or ability to handle the route, which is fairly long.

Take this morning, when I was coming home from London Bridge station.

  • There was only a 43 bus at the shared stop with the 141 bus.
  • As the routes are identical until Old Street station, I took the 43 bus to Moorgate station.
  • At Moorgate station, I took a 76 bus, which gets me within walking distance of where I live.
  • Someone said, that a 141 bus would mean a wait of ten minutes.
  • In the end my 78-year-old legs delivered be home.

I didn’t see a 141 bus going my way on my journey.

I have seen behaviour like this several times, since some Chinese electric buses were introduced on to the route.

As a graduate Electrical and Control Engineer, it looks to me, that there is one of two problems with these buses.

  • The batteries aren’t large enough for the route.
  • Not enough time is allowed for charging the batteries at the end of the route.

This page on the Wrightbus website is entitled Wrightbus Electroliner ‘Most Efficient Double-Deck Battery-Electric Bus’, and it contains this paragraph, which probably explains their philosophy and ambition.

We have already gained a strong reputation for our hydrogen double deck but we want to lead the world in zero-emissions full stop. Wrightbus has the best brains in the business when it comes to technology and our StreetDeck Electroliner puts us squarely at the front of the pack. We haven’t weighed the bus down with a high battery volume just so we can say it’s got the most power or range; instead, we’ve made it the most efficient vehicle on the road by combining optimum power with a class-leading rapid charge, meaning our electric bus spends more time on the road than any other.

It also probably sets a very high bar, which the Chinese can only achieve by adding battery volume and making their buses pokey.

To be fair to the buses, the 141 route is probably nearly 20 miles long.

In Sutton Station To Gatwick Airport By Hydrogen-Powered Bus, I wrote about what it says in the title.

In that post, I said this about hydrogen buses running on the 141 route.

Wrightbus Hydrogen Buses For My Local Bus Route 141

Consider.

  • The 141 bus route is my local bus, which gets me to Moorgate, Bank, London Bridge and Manor House.
  • The length of the full route is twenty miles and it takes about an hour to go from London Bridge station to Palmers Green.
  • The route is currently run by older Wrightbus hybrid diesel-electric buses.
  • I suspect that modern hydrogen buses could last almost all day on one fill of hydrogen, with perhaps a top-up at lunchtime.

They would have no difficulty handling the route  and would greatly increase the customers current rock-bottom satisfaction.

I am sure, they would improve the horrendous reliability of the route.

I also wonder, if Wrightbus have another solution.

In UK Among Tri-Axle Zero-Emission Wrightbus StreetDeck Prospects, I talk about Wrightbus’s new Tri-Axle Zero-Emission Wrightbus StreetDeck bus and how it would be ideal for the 141 bus route.

  • The 141 bus route is the old 641 trolleybus route, so all clearances are generous.
  • The tri-axle design can probably carry a better-optimised battery.
  • There used to be two bus routes on the route and now there is only one, so more capacity is needed.
  • The 141 bus route bridges the gap between the Northern section of the Piccadilly Line and the Elizabeth Line, Bank and London Bridge.
  • The new air-conditioned Piccadilly Line trains, will increase the passengers on the line.
  • There will be a lot more housing built in Enfield, at the Northern end of the Piccadilly Line and more bus capacity will be needed between Manor House and the City of London.

Some of TfL’s rerouting of buses in North London, was a crime against mathematics.

October 4, 2025 Posted by | Hydrogen, Transport/Travel | , , , , , , , , , , , , , , , , , , | 2 Comments

Did Plans For Crossrail Ever Include A Station At Holborn?

I have only one North-South bus route, where I live.

The 141 bus connects Palmers Green and London Bridge station.

  • The 141 bus was the replacement for the 641 trolley bus, which was the main link between Wood Green, Turnpike Lane and Harringay, and the City of London, when I was a child.
  • The vehicles are up to ten years old Wrightbus diesel hybrids.
  • The route suffers badly from overcrowding as it connects, Bank and Moorgate stations in the City of London, with the outer reaches of the Piccadilly Line.

The overcrowding on the 141 bus route has got worse in the last couple of years because of the following.

  • The rebuilding of London Bridge station brought more passengers to the 141 bus route.
  • The opening of the new London Bridge bus station at London Bridge station has improved access to the buses at London Bridge station.
  • The improvement of the connection of the buses to the Docklands Light Railway, Central Line and Northern Line at Bank station.
  • The opening of the Battersea branch of the Northern Line, which brings more passengers to Bank station.
  • The opening of the new Cannon Street entrance to Bank Underground station.
  • The opening of the Elizabeth Line through Moorgate station.
  • Recently, a new walking route between Moorgate and Liverpool Street was opened, which will bring more passengers to the buses on Moorgate.
  • The rebuilding of Old Street station brought more passengers to the 141 bus route.

So what was the response of the Mayor and Transport for London, to all this increase of passenger numbers?

The 21 bus, which shadowed the 141 route, and doubled the number of buses through where I live, was moved to serve Holloway.

It was a big crime against mathematics and the wishes of our long-serving Labour MP; Meg Hillier.

So to handle many more passengers between London Bridge station and Newington Green through the City of London, the number of buses was halved.

I believe that the overcrowding will get worse because of the improvements, that Transport for London have planned.

  • The Piccadilly Line will be getting new air-conditioned trains within a couple of years and these will inevitably attract more passengers to the line.
  • On the other hand the air-conditioning may persuade passengers to use the Piccadilly Line more than they do now. Instead of changing to the 141 bus at Manor House station, passengers could change at Finsbury Park, King’s Cross St. Pancras or Holborn stations for other routes to the City of London.
  • The third line to receive the new air-conditioned trains will probably be the Central Line, which would create another East-West air-conditioned line and bring more passengers to Bank station.
  • The Central Line could give some relief for the buses through Bank, if an extra station was built on the Central Line to interchange with Shoreditch High Street station on the East London Line of the London Overground.
  • The fourth line to receive the new air-conditioned trains will probably be the Waterloo and City Line, which would create another air-conditioned line and bring more passengers to Bank station.
  • It is likely, that more services will be added to the Elizabeth Line, which will bring more passengers to Moorgate station.
  • It is likely, that more services will be added to the Northern City Line, which will bring more passengers to Moorgate station.
  • The Mayor is also planning to pedestrianise Oxford Street, which may fill up the Central Line with extra passengers.

It looks to me, that there will be a need for a large increase of bus capacity through the City of London on a North-South axis.

On the other hand, the City of London  have stated that they will pedestrianise many of their streets.

So what can be done to avoid gridlock in the City of London?

Develop The Northern City Line At Moorgate

I use this route regularly to and from Moorgate station.

  • It already has new Class 717 air-conditioned trains.
  • The route is already  digitally signalled in conjunction with the East Coast Digital Programme.
  • It has two platforms at Moorgate station.
  • Highbury & Islington station has interchanges with the Victoria Line and the North and East London Lines of the London Overground.
  • Finsbury Park station has interchanges with the Victoria Line and National Rail services.
  • Bowes Park station has an out of station interchange with Bounds Green station on the Piccadilly Line.
  • Step-free access needs improving.
  • The Victorians had plans to extend the line to Lothbury near Bank station.

If the Northern City Line could handle more passengers, would passengers get to all parts of the City of London by changing at Finsbury Park and walking from Moorgate or Old Street stations?

I regularly go between my house and Moorgate, by taking a bus to Essex Road station and using the Northern City Line.

I believe that with improvements on the Northern City Line, the line could be turned into a very valuable part of London’s rail infrastructure.

Connect The Central Line And The East London Line At Shoreditch High Street Station

I wrote about this proposal in Will Shoreditch High Street Be Connected To The Central Line?

The Elizabeth Line needed to be completed before this could be started.

Build The Western Extension Of The Docklands Light Railway

I wrote about this proposal in The Bank Station Upgrade And The Western Extension Of The DLR.

Rebuild Holborn Station

The interchange between Piccadilly and Central Line at Holborn station is difficult to say the least.

Holborn station is being extended with a new entrance. As with Euston, I suspect it has been designed with a feasible place for DLR platforms to be added.

This document on the TfL web site, gives more details of what is proposed at Holborn station.

I extracted this visualisation of the proposed station.

This map from carto.metro.free.fr shows the lines in the through and around the station.

.Note, the Elizabeth Line, which is shown by dotted lines passes to the North of the station.

Conclusion

Not all these improvements need to be done, but each would improve transport in the City of London.

 

June 4, 2025 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment