The Anonymous Widower

From Reading To Gatwick Airport Along The North Downs Line

After writing Connecting Reading And The West To Gatwick Airport And Eurostar, I decided to go and look at the reality of the North Downs Line between Reading and Gatwick Airport stations.

I took my usual route to Reading, which is to go to Moorgate and get the Elizabeth Line direct to Reading using my Freedom Pass, after having breakfast in the Leon on Moorgate.

  • I then had to leave the station at Reading, so that I could buy my ticket to Gatwick Airport.
  • It would be so much easier, if there ere a couple of ticket machines on the bridge or platform at Reading station, so that passengers, who were changing trains could buy tickets quickly and easily.

In the end, I caught the 11:24 train to Gatwick with only a few minutes to spare.

From Reading To Gatwick Airport Along The North Downs Line

Along the North Downs Line, the train was a well-refreshed Great Western Railway Class 165 train.

These are some of the pictures, that I took on the route.

Note.

  1. The route goes through a lot of typical Surrey heathland.
  2. I noticed several pubs along the way.
  3. I suspect that there are some good walks from the stations.
  4. Reading and Guildford are university cities.
  5. Sandhurst is home to the Royal Military Academy.
  6. Farnborough Airport used to be home to the Royal Aircraft Establishment.
  7. Most of the seats on the train were taken.

I would expect that for a mainly rural route it is fairly busy.

Hitachi’s Intercity Battery Trains

Hitachi have developed an Intercity battery train and it is described on this page on their web site, where this is said about converting the trains to battery-electric operation.

A quick and easy application of battery technology is to install it on existing or future Hitachi intercity trains. Hitachi Rail’s modular design means this can be done without the need to re-engineer or rebuild the train and return them to service as quickly as possible for passengers.

Replacing one diesel engine with just one battery reduces emissions by more than 20% and offers cost savings of 20-30%. Our intercity battery powered trains can cover 70km on non-electrified routes, operating at intercity speeds at the same or increased performance.

That performance is certainly enough for Reading and Ashford via Gatwick, as only 37.7 miles in total, is not electrified.

Does The North Downs Line Mirror The East-West Rail?

Consider.

  • The East West Rail will encircle London to the North, between Oxford and Cambridge.
  • The North Downs Line encircles London to the South, between Reading and Ashford.

They could be considered two complimentary rail lines.

A Milton Keynes And Ashford International Service

Looking at the track layout on OpenRailwayMap, it would appear that one of Hitachi’s proposed Intercity Battery Trains fitted with dual voltage could pick its way elegantly along the East West Rail and the North Downs Line between Milton Keynes and Ashford International via Oxford, Reading and Gatwick Airport.

An Occasional Sheffield And Ashford International Service

If you could run a service between Milton Keynes and Ashford International, why not extend it to Bedford or even Sheffield in the North?

I believe if you put these Hitachi’s proposed Intercity Battery Trains on a cross-country route, that they will quickly suffer from London Overground Syndrome. This is my definition of the syndrome.

This benign disease, which is probably a modern version of the Victorian railway mania, was first identified in East London in 2011, when it was found that the newly-refurbished East London Line and North London Line were inadequate due to high passenger satisfaction and much increased usage. It has now spread across other parts of the capital, despite various eradication programs.

Put simply, it can probably be summed up as Quality Attracts Passengers.

Serving Heathrow

There have been various plans to get rail access into Heathrow from the West, but none have so far got off the starting blocks.

It is my view, that in the interim period, after my trip last weekend in the superb Wrightbus hydrogen double deck bus from Sutton to Gatwick, that I wrote about in Sutton Station To Gatwick Airport By Hydrogen-Powered Bus, that we should ask Wrightbus, who are designing a hydrogen-powered coach, to design the ultimate coach to connect rail hubs to major airports.

I would then run these coaches every ten minutes between Reading station and Heathrow Airport.

Serving Attractions

I believe that pairing Hitachi’s proposed Intercity Battery Trains with Wrightbus’s hydrogen coach could be a winner for passengers and operators.

As an example, Lumo are hoping to run an open access service between Paddington and Carmarthen, if Heidi the Spoilsport permits. Would it not be sensible, if one of Wrightbus’s hydrogen coaches did the last mile duties to the ferry for Ireland at Fishguard harbour.

 

March 1, 2025 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , | 4 Comments

Connecting Reading And The West To Gatwick Airport And Eurostar

I have just checked the electrification between Reading and Ashford International using OpenRailwayMap.

  • Between Cardiff and Reading the electrification is 25 KVAC overhead.
  • Between Reading and Wokingham the electrification is 750 VDC third-rail.
  • Between Wokingham and Reigate is not electrified.
  • Between Reigate and Gatwick Airport the electrification is 750 VDC third-rail.
  • Between Gatwick Airport  and Ashford International the electrification is 750 VDC third-rail.

Only 37.7 miles is not electrified.

Hitachi’s Intercity Battery Trains, have a range on battery power of seventy kilometres or forty-five miles, so these trains could go between Reading or any station to the West to any station on the North Downs Line, including Guildford, Redhill, Gatwick Airport, Tonbridge and Ashford International stations.

The trains would need to be dual voltage and I’m fairly sure, that no new infrastructure would be needed.

A Green No-Fly Route Between Europe And Ireland

Consider.

  • The Great Western Main Line is electrified to Cardiff.
  • There is no electrification to the West of Cardiff.
  • Cardiff and Fishguard Hsrbour is 115.6 miles.
  • There is a ferry between Fishguard and Rosslare.

I suspect Hitachi could configure one of their Intercity Battery Trains, that could connect Ashford International and Fishguard Harbour stations.

February 28, 2025 Posted by | Transport/Travel | , , , , , , , , , , , , , , | 9 Comments

Sutton Station To Gatwick Airport By Hydrogen-Powered Bus

In Central London and Gatwick Airport For Free On A Freedom Pass, I indicated it was possible to go to Gatwick Airport for nothing, if you had a Freedom Pass, which is also a free bus pass for England.

This morning I took public transport to Gatwick Airport by this route.

  • I took a 43 bus to London Bridge station.
  • This bus terminates in the bus station in front of the train station, so it was a simple step-free entry into the part of the station, where Southern Trains terminate.
  • I took a Southern Train to Sutton station.
  • I then took a Metrobus 420 bus from Sutton station to Gatwick Airport.

These pictures show the journey.

Note.

  1. The bus stop is directly outside the entrance to Sutton station.
  2. Sutton station is step-free.
  3. The information on the Metrobus’s buses at Sutton station is poor.
  4. The bus had a 74 number plate, so was registered after September 1st, 2024.
  5. The bus said it was a hydrogen bus.
  6. The seats were comfortable with leather facings.
  7. The route was mainly through rural Surrey.
  8. There were sections of dual-carriageway road with continuous 40 mph running.
  9. There were a number of steep hills.
  10. Previously, I have been told by a Bradford Councillor, that the City of Bradford is going for hydrogen-powered buses , as the city has lots of steep hills.
  11. The unusual Reigate and Redhill War Memorial on the A25.
  12. The route goes past Hadworth, Reigate and Redhill stations.
  13. Just before Gatwick Airport, the bus called at East Surrey Hospital.

I have some thoughts.

Does This Hydrogen Bus Have Almost The Quality Passengers Would Expect From A Coach?

Consider.

  • I was very impressed with the quality of the bus and its fittings.
  • But its biggest assets were the ride and mouse-quiet noise and being vibration-free.
  • It was certainly up there, with the best British buses on UK roads.
  • Strangely, I never rode in any of London’s Green Line coaches of the 1950s and 1960s.

But as Wrightbus are selling hydrogen-powered single-decker buses to the Germans, the quality must be of a certain standard.

The Performance Of The Bus

I would sum up the bus as follows.

  • The bus didn’t hang around and it was well-driven.
  • On much of the dual-carriageway, the bus appeared to be at the maximum speed limit of 40 mph
  • Ride and seats were comfortable.
  • There was virtually no vibration.
  • At times, you almost felt you were in a top-of-the-range coach.
  • The running gear is from German company ZF, which certainly doesn’t hinder the ride.
  • The journey from Sutton to Gatwick Airport is twenty miles and took about ninety minutes.

I would feel that if Wrightbus design their CoachH2 chassis to the same standard of this bus, they’ll have a difficulty to meet sales demand.

Wrightbus Hydrogen Buses For My Local Bus Route 141

Consider.

  • The 141 bus route is my local bus, which gets me to Moorgate, Bank, London Bridge and Manor House.
  • The length of the full route is twenty miles and it takes about an hour to go from London Bridge station to Palmers Green.
  • The route is currently run by older Wrightbus hybrid diesel-electric buses.
  • I suspect that modern hydrogen buses could last almost all day on one fill of hydrogen, with perhaps a top-up at lunchtime.

They would have no difficulty handling the route  and would greatly increase the customers current rock-bottom satisfaction.

Hydrogen Buses In Leafy Suburbs

  • Where I live, is not particularly leafy or a suburb.
  • But I seems to remember, when I moved here, that some of my neighbours complained about the noise of the 76 bus route.
  • So Transport for London put on some quieter buses.

I would expect, that Metrobus might use the mouse quieter hydrogen buses in post areas, to avoid annoyance.

Hydrogen Buses As Route Extenders

Effectively, the Metrobus route 420 is acting as a route extender for Southern and Thameslink services coming South from London.

As it is a quality bus, that gets a move on, I suspect that some travellers, who previously  took a train to Sutton, Tadworth, Reigate, Redhill or other stations and were then picked up, may take a hydrogen bus to a more convenient bus stop.

Because of the long range of a hydrogen bus or coach, zero-carbon performance, should be achieved without any range anxiety for passengers, driver or bus company.

Onward From Oakhampton Parkway Station

Consider.

  • In 2014, storms destroyed the railway at Dawlish in Devon.
  • As there was no alternative route, the storms cut everything west of Dawlish off from the rest of the UK.
  • It is now likely, that a Park-and-Ride station will be built close to Okehanpton, which commuters would use for travel to Exeter.
  • The main road to the South-West ; the A 30 will pass nearby.

It  would appear, that Okehampton Interchange station could be used, if Nepture decided to show his power again.

Hopefully, the emergency plan will scare Nepture away.

Lumo To The Scottish Borders

Consider.

  • Lumo have applied to extend some of their Edinburgh services to Glasgow.
  • Talking to a friend in the Scottish Borders, they said, that travelers drive to Newcastle or Morpeth to catch Lumo for London.
  • Four or five Lumo services every day stop in each direction at Morpeth station.
  • So would it be sensible to run  a bus or coach through the Scottish Borders to connect with the Lumo services?

This Google Map shows Morpeth in relation to the Border towns.

Note.

  1. Morpeth is marked by the red arrow in the South-East corner of the map.
  2. Galashiels, Galashiels, Hawick, Jedburgh, Peebles, Saint Boswells and Selkirk can be picked out on the map.
  3. The coach service would probably terminate at Galashiels, as it has a large bus terminal and and a railway station.
  4. Click the map to show it to a larger scale.

Morpeth to Galashiels is 69 miles and it should take about an hour and a half.

Hydrogen Buses As Rail Replacement Buses

Consider.

  • I have had Rail Replacement Coaches as opposed to buses a few times in the UK.
  • Once on the East Coast Main Line but usually on the Great Eastern Main Line to Ipswich or Norwich.
  • They are generally more suited to their task. as they are faster and more luxurious.
  • Many of our major rail lines run alongside trunk roads or motorways or fast dual carriageways.

So because hydrogen buses and coaches a have superior performance, than their diesel cousins, will hydrogen be the better fuel for a Rail Replacement Bus.

Metrobus’s Hydrogen Buses

This press release on the Metrobus web site is entitled Hydrogen Buses.

This is the sub-heading.

Our commitment to Zero Emissions

As part of our commitment to reducing emissions, twenty new hydrogen fuelled buses will operate on Fastway routes 10 & 20. These new buses demonstrate an ongoing commitment to reducing our local emissions. They deliver against science-based targets set by Metrobus and its parent company, The Go-Ahead Group, of becoming a net zero business by 2045 and decarbonising our bus fleet by 2035.

Conclusion

This bus is the best I’ve ridden in.

February 22, 2025 Posted by | Hydrogen, Transport/Travel | , , , , , , , , , , , , , , , , , , , , , , , , , | 6 Comments

Network Rail Consults On Reigate Turnback Platform Plans

The title of this post, is the same as that of an article in Rail Magazine.

This is the introductory paragraph.

Network Rail is consulting with the public over plans to build a 12-car turnback platform at Reigate.

The third paragraph says this.

NR says “Reigate is hampered by platforms that are four-car in length. This means that Southern trains must split/join at Redhill, adding time to journeys and limiting capacity”

Other points are also made.

  • Thameslink’s Class 700 trains which are fixed formations of eight or twelve cars can’t call at Reigate station.
  • Power is poor at Reigate limiting the length of trains.
  • Passengers from Reigate to London Bridge and beyond need to change at Redhill or East Croydon.

This Google Map shows the station.

The new bay platform, which will be numbered 3, will go on the South side of the tracks at the East end of the station, where the car-park currently is situated.

Future Services At Reigate Station

In the Wikipedia entry for Reigate station, under Future, this is said.

In 2020, Network Rail announced that they are planning to upgrade Reigate station, which includes constructing a new 12-carriage bay platform (number 3) on the south side of the station, and extending the existing platform 2 to also accommodate 12-car trains. Currently the track layout just east of the station forces Southern to turn its trains around on platform 2, and since this platform is not long enough to accommodate 8-car sets, Southern services to and from Reigate are limited to 4 carriages in length. The upgrade would enable longer trains to serve the station, and the new bay platform would allow trains to/from London to terminate there instead of occupying the through westbound track, thus improving reliability on the whole line. 

Once the upgrade is delivered, there are further proposals to introduce Thameslink services running to London Bridge, London St Pancras and beyond to destinations north of London, replacing the current Southern services to London Victoria.

In some ways, this work at Reigate is all part of a larger series of projects, that are aiming to improve reliability and create more capacity on the Brighton Main Line.

The Brighton Main Line Improvement Project

This £300 million project is described on this page on the Network Rail web site.

The improvement project focussed on the southern end of the Brighton Main Line between Three Bridges and Brighton / Lewes. Major engineering work was planned for the Victorian-era tunnels at Balcombe, Clayton, Haywards Heath and Patcham and the railway which runs through them.

We stemmed leaks into the tunnels and improved drainage, while the third rail power supply and signalling were replaced or upgraded.

Elsewhere on the closed section, we replaced the track and sets of points, which enable trains to switch between tracks.

The project is now complete and won an award at the Railway Innovation Awards 2019.

Upgrading Gatwick Airport StationThis £150 million project is described on this page on the Network Rail web site.The size of Gatwick Airport station will be doubled to improve the journey between train and plane.Benefits will include.

  • Improved Accessibility
  • A better journey experience
  • Improved train performance

Works will include.

  • Doubling the size of the station concourse.
  • Eight new lifts, five new escalators and four new stairways.
  • Widened platforms 5 and 6.
  • Upgraded connections to the terminal.

The works will start in May 2020 and finish in 2023.

Access for All At Crawley Station

This £3.9 million project is described on this page of the Network Rail web site.

Crawley station is being upgraded to full step-free access, which should be complete in Autumn 2020.

It looks like a second bridge is being installed over the tracks.

I do wonder, if Crawley station is being upgraded, so that it can be used as a back-up access to Gatwick Airport, if some of the construction work at Gatwick Airport station means that the station will be closed.

The dates certainly fit and the station has two trains per hour (tph) to both London Bridge and Victoria stations.

Unblocking The Croydon Bottleneck

This £300 million project is described on this page of the Network Rail web site.

This is the introductory paragraph.

We are proposing an upgrade to the Brighton Main Line, to provide more reliable, more frequent and faster services for the 300,000 passengers who rely on it each weekday, and to provide the capacity needed for future growth.

There is also what looks to be a fairly frank video.

Platform 0 At Redhill Station

Redhill station gained a new Platform 0 a couple of years ago.

This long platform must help the operation of the station.

Thoughts On The Reigate Scheme

These are my thoughts on the building of two twelve-car platforms at Reigate station.

Thameslink To Reigate

This document on the Network Rail web site is entitled Connecting Reigate To Thameslink.

Currently, train services to the Reigate/Gatwick Airport/Crawley area are as follows.

  • Southern – Two tph – London Victoria and Reigate via East Croydon, Purley, Coulsdon South, Merstham and Redhill.
  • Southern – Two tph – London Victoria and Southampton/Portsmouth via East Croydon, Gatwick Airport, Three Bridges, Crawley and Horsham
  • Thameslink – Two tph – Peterborough and Horsham via East Croydon, Purley, Coulsdon South, Merstham, Redhill, Horley, Gatwick Airport, Three Bridges and Crawley
  • Thameslink – Two tph – Bedford and Gatwick Airport via East Croydon, Purley, Coulsdon South, Merstham, Redhill, Earlswood, Salfords and Horley.
  • Thameslink – Two tph – Cambridge and Brighton via East Croydon and Gatwick Airport
  • Thameslink – Two tph – Bedford and Brighton via East Croydon and Gatwick Airport
  • Gatwick Express – Two tph – London Victoria and Brighton via Gatwick Airport
  • Gatwick Express – Two tph – London Victoria and Gatwick Airport
  • Great Western Railway – One tph – Reading and Gatwick Airport via Reigate and Redhill

Stations around Gatwick will get the following services from London

  • Coulsdon South – Six tph
  • Crawley – Four tph
  • Earlswood – Two tph
  • Gatwick Airport – Sixteen tph
  • Horley – Four tph
  • Merstham – Six tph
  • Redhill – Six tph
  • Reigate – Two tph
  • Salfords – Two tph

I can see good reasons for terminating the Bedford and Gatwick Airport service at Reigate.

  • Gatwick Airport has sixteen tph to Central London.
  • During the rebuilding of Gatwick, it might be a good idea not to have trains terminating at Gatwick.
  • Reigate is under seven miles from Gatwick Airport and a coach service would take under twelve minutes.

This would mean that, train services to the Reigate/Gatwick Airport/Crawley area are as follows.

  • Southern – Two tph – London Victoria and Southampton/Portsmouth via East Croydon, Coulsdon South, Merstham, Redhill, Earlswood, Salfords, Horley, Gatwick Airport, Three Bridges, Crawley and Horsham
  • Thameslink – Two tph – Peterborough and Horsham via East Croydon, Purley, Coulsdon South, Merstham, Redhill, Horley, Gatwick Airport, Three Bridges and Crawley
  • Thameslink – Two tph – Bedford and Reigate via East Croydon and Redhill
  • Thameslink – Two tph – Cambridge and Brighton via East Croydon and Gatwick Airport
  • Thameslink – Two tph – Bedford and Brighton via East Croydon and Gatwick Airport
  • Gatwick Express – Two tph – London Victoria and Brighton via Gatwick Airport
  • Gatwick Express – Two tph – London Victoria and Gatwick Airport
  • Great Western Railway – One tph – Reading and Gatwick Airport via Reigate and Redhill

Stations around Gatwick will get the following services from London

  • Coulsdon South – Four tph
  • Crawley – Four tph
  • Earlswood – Two tph
  • Gatwick Airport – Fourteen tph
  • Horley – Four tph
  • Merstham – Four tph
  • Redhill – Six tph
  • Reigate – Two tph
  • Salfords – Two tph

Note.

  1. I have adjusted calling patterns to what is shown in the document called Connecting Reigate to Thameslink.
  2. Southern and Gatwick Express services will go to Victoria
  3. Thameslink services will go via London Bridge and St. Pancras.
  4. Passengers will be able to change at Redhill or East Croydon to swap their London terminal between Victoria and London Bridge/St. Pancras.

Obviously, Network Rail must have their own and better plans to run the services.

Will Platform 3 At Reigate Be Used As An Emergency Platform?

With the right track layout and signalling a  bay platform can easily handle four tph, as platforms on the London Overground do at Clapham Junction, Crystal Palace, Dalston Junction, Highbury & Islington, New Cross and West Croydon stations. Some of these platforms will be going to six tph within a couple of years.

Over the next three years, Gatwick Airport station is being rebuilt.

Surely, Reigate would make an ideal station to turn trains, if the Brighton Main Line was blockaded.

  • Passengers could be taken by bus to Gatwick.
  • The two twelve-car platforms would be able to handle the longest trains on the Brighton Main Line.
  • The car park could be used as a bus terminal.

It looks to me, like Network Rail are planning for the worst.

Electrification To Guildford?

Consider.

  • One of the sub-projects of the rebuilding of the platforms at Reigate station will be boosting the power supply.
  • Within two years, Great Western Railway will be running Class 769 trains with a third-rail capability between Reading and Redhill/Gatwick.
  • All passenger trains running between Redhill and Reigate will have a third-rail capability.
  • There is a 750 VDC electricity supply for electrification at Guildford.

So why, shouldn’t the line be electrified to Guildford station?

Thameslink To Guildford?

Consider.

  • Trains between Reigate and Guildford take twenty-five minutes to do the twenty miles on the North Downs Line.
  • I have read somewhere, that Guildford station is to be rebuilt.
  • The North Downs Line passes through the sizeable town of Dorking.
  • Two tph between Reading and Gatwick and two tph between Guildford and Redhill could surely share tracks between Guildford and Redhill.

If the line between Reigate and Guildford had been electrified, would it be worthwhile extending Thameslink from Reigate to Guildford?

Conclusion

I like this scheme at Reigate, but I do think there’s more behind it than has been disclosed.

March 25, 2020 Posted by | Transport/Travel | , , , , | 5 Comments