How To Build A Step-Free Access Ramp For A Train

This new ramp or Harrington Hump, has been built on Platform 1 at Canonbury station.

I didn’t use it, as I was going the other way.

It looks to be a very good design.

  • Like all the best designs, it is simple.
  • It is double-ended.
  • It’s a gentle slope to ascend to train level, with no steps to trip on.
  • It’s got seats to prop yourself on.
  • It’s got a rail to hang on to.
  • Those with poor eye-sight wouldn’t miss it and trip over.
  • I suspect any sensible local builder could build one of these, from a kit of parts and instructions on a page of A4.

It looks to me like it is one of those classic engineering designs, that was developed using copious amounts of real ale, with everything written down on the back of fag-packets and used envelopes.

After my musings on dual-height platforms for the Bakerloo Line Extension, in How Will They Build The Bakerloo Line Extension?, I think that a modified version could handle the problems at stations on the Northern reaches of the Bakerloo Line, where 1972 Stock and Class 378 trains, share a platform.

December 12, 2016 Posted by | Transport/Travel | , , , , , | Leave a comment

Newbury Park Station

According to this article in the Ilford Recorder, Newbury Park station is going to be one of the first in the latest batch of stations to be given step-free access.

So I went for a look.

Note.

  • Lifts can probably be added easily to the existing bridge.
  • Lifts are certainly needed, ss I saw a couple of mothers struggling with buggies.
  • The station buildings on the platforms have potential for making really nice.
  • The barrel roof is not to my taste, and I would rejoice if it had to be demolished for health and safety reasons.
  • The station is a Grade II Listed building.

It is certainly an unusual station.

December 10, 2016 Posted by | Transport/Travel | , , , , | Leave a comment

Using Southern Crossrail Lite

On my trip to Shepperton today, I went from and to Waterloo station for  the Shepperton Branch Line.

For both journeys, I used the route between London Bridge and Waterloo East stations, that some want to use as part of Southern Crossrail.

Going to Waterloo, I started at Farringdon, and this waan’t a good place to start, as I didn’t have a clue to the best way and neither did the London Underground staff.

So I took the Metropolitan to Moorgate and hopped South on the Northern Line to London Bridge, from where I had three routes.

  • Jubilee Line
  • Train from London to Waterloo East.
  • Bus

At a pinch, I could walk along the Embankment

I suspect that when Crossrail and Thameslink are fully open, there will be a better route, between Farringdon and Waterloo.

  • Crossrail to Paddington, then Bakerloo Line to Waterloo.
  • Crossrail to Tottenham Court Road, then Northern Line to Waterloo.
  • Thameslink to London Bridge, then train to Waterloo East.

As a special Crossrail-Bakerloo pedestrian tunnel is being built at Paddington, that may be the best way. I wrote about this in Paddington Is Operational Again.

My route to Waterloo worked today, as did the route home after a raid on the excellent Marks and Spencer at Waterloo. The only problem was that a 141 bus to my house, had broken down and I had to wait at London Bridge.

I tend to use a 141 bus to and fropm London Bridge, as one stop is in the forecourt of the station and the other is less than a hundred metres from my house.

So how could this abbreviated Southern Crossrail Lite route be improved?

  • The London Bridge end works well, as generally all trains for Waterloo East station turn up on Platforms 8 or 9, which are the two sides of the same island.
  • Only one up escalator at London Bridge was available and I have a feeling, there could be a bit of a reliability issue.
  • I used a lift to go down coming back, to avoid walking to the escalator, and the lift was the sort of size the Victorians used because escalators weren’t in common use until later.
  • The lift was certainly big enough for a cricket team and all their kit.
  • There needs to be better connection between main line and Underground at London Bridge. I suspect this will get better, as more of the station opens.
  • For this route four trains per hour, as you get on a Sunday, aren’t enough.
  • At Waterloo East, the walking route could be improved.
  • Waterloo East needs a Next Train To London Bridge Indicator.
  • Waterloo has twin up and down escalators between the main concourse and the walking route, which is more than enough. Especially, as they were all working!

But I did notice several passengers used the route from London Bridge to Waterloo East stations, including at least two couples with children in pushchairs.

This new Southern Crossrail Lite is going to prove an invaluable alternative to the Jubilee Line.

 

 

 

October 30, 2016 Posted by | Transport/Travel | , , , , , | Leave a comment

An Updated Manningtree Station

I stopped off at Manningtree station on the way to the football last night to have a look at the new step-free subway and perhaps buy a drink in the buffet.

Having a drink en route to Ipswich, is probably a good idea at the moment, as Ipswich station is being updated and there is nowhere between the station and Portman Road to buy one.

These were the pictures I took.

Note.

  • There is a loop on the Northern side of the station, which has been modified to create a short through Platform 4.
  • The subway is fully operational, although signs say there is still work to do.
  • The subway is ideally placed for a passenger to get off a Norwich-bound train, walk to the subway and cross underneath the lines to either the station exit or a train on the Harwich branch waiting in Platform 1.

As to the buffet, it wasn’t worth a visit, as the cider, which is so important for coeliacs, was rubbish.

The New Manningtree Depot

This article in Rail News says this about the new Stadler Flirts ordered by Greater Anglia.

The trains will be maintained at the existing depots, including Crown Point at Norwich, and also at a new depot at Manningtree which is to be built on a former industrial site alongside the main line.

This Google Map shows the area.

Manningtree Depot Site

Manningtree Depot Site

The Great Eastern Main Line crosses the map, with Manningtree station clearly marked.

Going East, there is a fully-electrified triangular junction, where the Harwich Branch or Mayflower Line joins the main line, followed by two crossings of the River Stour.

Then to the North and South of the main line, there is a large derelict industrial site, which I suspect will be the location of the depot, as it is the only place that fits the Rail News description.

I suppose the biggest question about this depot, as will it be North or South of the main line. But there is masses of space and I wouldn’t be surprised to see the site used for other commercial purposes as well.

Other questions might include.

  • Will housing be developed in the area? Probably not, as it could be liable to flooding.
  • Will the depot be developed with limited overhead wires for safety and ascetic reasons?
  • Will a station be built to serve the area?
  • If one is, will it have extensive car parking in the space available?
  • How will environmentalists react to development of the deelict industrial site?

I do suspect locally, that the new employment opportunities will be welcomed.

The Manningtree Station Level Crossing

This Google Map shows a close-up of Manningtree station.

Manningtree Station

Manningtree Station

Note how the road crosses the railway at the right. Wikipedia says this about the crossing.

A second peculiar feature just east of the station is a combination of a road underpass and a level crossing. The underpass has limited height and the parallel level crossing is needed to permit higher vehicles to cross the railway.

This article on the BBC has a video about the crossing, which surely makes a case for improvements.

The title of the article is Bus trapped on Manningtree railway crossing: Driver fined says it all.

Luckily, the only damage was to the driver’s wallet!

With increased traffic on the railway lines through the crossing, will we be seeing improvements to this crossing, which surely must cause problems for trucks at times?

Platform 4

I think we’ll be seeing more use of Platform 4 as the lines get busier and the traffic gets faster.

  • I have read somewhere, that the updated Platform 4 will be used as a means of allowing fast trains to overtake. I suppose a Colchester to Ipswich local train could wait in Platform 4, whilst a London to Norwich express went through on Platform 3.
  • Perhaps the line could be used by trains going down the Harwich Branch to improve connectivity to the branch with London to Norwich expresses in the Peak.
  • I also think for operational reasons train companies like to have a station before a depot, so that any sleeping passengers can be woken and offloaded.

But seriously, why would you get Platform 4 ready for increased use and not use it?

The Future Of The Mayflower Line

Wikipedia for Harwich Town station says this about services on the line.

As of December 2015 the typical weekday off-peak service is one train per hour to Manningtree, although there some additional services at peak times. Trains generally call at all stations along the Mayflower Line; some are extended to or from Colchester and/or London Liverpool Street.

I suspect that an ideal service would be at least two trains per hour (tph) on the line, which were timed to connect with fast services on the Great Eastern Main Line at Manningtree.

Currently there are direct trains in the Peak to and from Liverpool Street. The train, that I got to Manningtree last night was actually going to Harwich, after dividing into two at Colchester, with the front half of the train going on to Clacton-on-Sea.

In the new franchise, Greater Anglia will be running new Aventra trains on the branch. As they are buying five and ten-car trains, I would assume that the five-car version will work the Mayflower Line.

  • This will mean that there will be an increase in capacity on the line.
  • There will also be a large increase in comfort.
  • I would assume that two five-car trains are easily joined and separated to provide shared services, such as I experienced last night.
  • As the journey between Harwich Town and Manningtree takes twenty-two minutes, two trains would be needed to run a 2 tph service.

Running 2 tph may be a problem, as the electrification is one of the Treasury’s budget specials. Wikipedia says this.

The line diverges from the Great Eastern Main Line at Manningtree and is double-track for passenger services as far as Harwich International where connecting ferry services are available to Hoek van Holland and Esbjerg. Beyond Harwich International, the original second track remains in place as a through-siding, but only the “up” (Manningtree-bound) line was electrified and that section to Harwich Town is bi-directional.

But Bombardier may have a solution, in that the line was used for the BEMU trial, where a Class 379 train with an onboard battery, ran one way on the overhead wires, charging the battery at the same time.

As all Aventras will be wired to accept onboard energy storage, will we be seeing battery power on the Mayflower Line?

I think the answer is yes!

On my way to Manningtree, I was sitting next to a lady going to Harwich and when I talked about the battery train test of twenty months ago, she said she’d ridden the train and liked it. She didn’t qualify her initial statement with any negative statement.

 

 

October 19, 2016 Posted by | Food, Transport/Travel | , , , , | Leave a comment

Progress Through Walthamstow – 28th September 2016

These pictures show the Gospel Oak to Barking Line through Walthamstow.

Note.

  • It looks like both tracks have been mostly relaid.
  • The slab track under Pretoria Avenue, where it was put in due to a sewer being beneath the bridge.
  • There is also slab track at the other end of this section of line, but I suspect, it’s covered with ballast.

From what I could see at Blackhorse Road station, there doesn’t appear to be any foundations for lift towers or ramps to create step-free access to the Overground platforms. On Network Rail’s Access for All list of improvements. the improvements at Blackhorse Road station are listed as Future Planned for 2017/2018.

As the new Class 710 trains will start running in 2018, surely it would be good planning to at least do all the work needed on the Overground platforms now!

Or is there some rule, which says that when you make one line at a station step-free for all, you must do that for all lines?

It is interesting to look at this Google Map of the station.

blackhorseroadstation

The Victoria Line station is the square building to the North East of the obvious GOBlin station, with the space between the stations being just grass and some bushes.

In one of the pictures, there is a lot of work going on in this area.

Could it be, that there is a route to create a lift shaft from somewhere in this area, that goes both down to the Victoria Line and on the surface connects to the ticket hall and the bridge over the GOBlin?

It could also be work associated with a new chiller described in this article on the TfL web site., which is entitled Innovative new fan chiller to help customers beat the heat.

If you look inside the station, you’ll see that the escalators down to the Victoria Line platforms, start just to the West of the bridge over the Overground.

Without more information, it’s difficult to work out what is happening.

But it would surely be a good idea to do all the work at the same time and get the station step-free before the GOBlin starts running electric trains.

 

September 29, 2016 Posted by | Transport/Travel | , , | 1 Comment

Escalators In Station Design

Over the last few months, I’ve been to three brand-new stations.

All are well-built stations with step-free access.

But I have to ask, if Kirkstall Forge and Lea Bridge would be better stations with a more favourable financial outlook, if they had escalators instead of stairs to the bridge.

Consider.

  • London Transport used escalators extensively before the Second World War and few think that was wrong.
  • Escalators must surely attract more paying passengers.
  • If escalators are used could we see them paired with inclined lifts. to perhaps create more compact stations.

Quite frankly, Kirkstall Forge and Lea Bridge have boring layouts. I do think, we need more innovative station designs.

In some ways the most interesting station I’ve seen in the last few months is Welwyn Garden City, where the station is on the First Floor of a Shopping Centre. The main escalators and lifts are in the Shopping Centre with individual lifts and stairs to the platforms.

September 28, 2016 Posted by | Transport/Travel | , , | Leave a comment

Abbey Wood Station – 9th June 2016

I took these pictures at Abbey Wood station.

If you look at the various pictures I have taken over the past months of this station, the station is progressing and the builders seem to be managing to always have a working station amongst all the construction work.

Certain factors have helped in this important aim.

  • The previous station was unloved by everyone and had absolutely no architectural merit.
  • There are no heritage issues.
  • Good design of a temporary step-free pedestrian bridge, that appears to be morphing into a permanent one, has aided passengers.
  • There always seems to be cheery staff on hand for lost and puzzled passengers.
  • Traffic is heavy in the area, but not unmanageably so.

But I think most importantly, the Crossrail portal is some distance away from the station, keeping the two projects effectively separate.

Compared to some station rebuilds, I’ve encountered in the past, so far it has been a textbook example of good project management.

June 10, 2016 Posted by | Transport/Travel | , , , , , , | Leave a comment

Underneath And Above The Arches

London Fields station has improved in some ways with Overgroundisation since I wrote Before Overground – London Fields in September 2014.

It just shows what you can do with an army of cleaners and painters. And a touch of Overground Orange!

But there is still the problem of step-free access to solve.

This Google Map shows how difficult this could be.

London Fields Station

London Fields Station

The site is cramped, with the platform and stairs for the Liverpool Street platform squeezed between the slow and fast lines.

I wouldn’t be surprised if Transport for London, put the addition of step-free access to this station at the very back of the queue.

Unless of course, they could persuade a developer to do something very imaginative and expensive, which they can market as having its own station and a large park with an Olympic-sized swimming pool.

November 15, 2015 Posted by | Transport/Travel | , , , | Leave a comment

Crossrail 2 October 2015 – Dalston Station

Are us plebs in humble Dalston going to get one of the best and busiest stations on Crossrail 2?

I wrote that opening statement in jest, but think about the proposed combined Dalston station’s position in London’s rail network.

  • It is the most Northerly station before the two branches to New Southgate and Broxbourne link under Stamford Hill.
  • Dalston Junction (Or is it Dalston South?) gives an escalator connection between Crossrail 2 and an up to twenty-four trains an hour to South-East London on the East London Line.
  • Dalston Kingsland (Or is it Dalston North?) gives an escalator connection between Crossrail 2 and all those trains on the North London Line.

So Dalston will become the important interchange for a large number of cross-London journeys. Raynes Park to New Southgate may well be direct, but so many journeys like Norwood Junction to Brimsdown will just be a single change at Dalston.

Crossrail 2 will put Dalston in one of the most important places on the map of London’s rail network.

Crossrail 2’s proposal for Dalston Station

This Crossrail document is entitled Dalston Station.

The proposal in the document starts like this.

The Crossrail 2 station at Dalston would be a double-ended station, with an interchange at Dalston Junction at the southern end, and an interchange with Dalston Kingsland at the Northern end.

So we get three stations in one, which also means that at last there will be a true dry interchange between Dalston Kingsland station on the North London Line and Dalston Junction station on the East London Line.

This map from the document shows the layout of the two existing stations and their connection by means of two two-hundred and fifty metre long underground Crossrail 2 platforms.

Crossrail 2 Dalston Station

Crossrail 2 Dalston Station

It would appear that two shafts will be sunk to the Crossrail 2 tunnels.

  • The Southern one would be in the Tesco Express or the bar next door,
  • The Northern one would be just to the north of Ridley Road in the block containing the NatWest Bank.

Note how much of the route of the Crossrail 2 tunnels, runs on the East side of Kingsland High Street, under the Shopping Centre and the new flats. The tunnels will be at least twenty metres down just to get past High Speed One, which runs under the North London Line and Dalston Kingsland station, so any older buildings will be well above any Crossrail 2 construction.

I would also suspect that High Speed One also makes designing and construction of  the Kingsland end of the station challenging.

The Work Sites

The Crossrail 2 proposal for Dalston station is nothing but ambitious and to build it there will be no less than five work sites.

  • Site A – Would be used as the main site for construction of the station tunnels and southern station shaft
  • Site B – Would be used for construction of a new Crossrail 2 station entrance and ticket hall. The site includes properties on the southern side of Bradbury Street.
  • Site C – Would be used for construction of the northern station shaft and escalator connection to the Crossrail 2 platforms
  • Site D – Would be used for construction of a new bridge providing access from the new ticket hall to the westbound platform at Dalston Kingsland
  • Site E – Would be used for construction of a station entrance and ticket hall, for interchange with Dalston Junction station.

But I would be very surprised if the work wasn’t phased so that the work-load in Dalston was spread and work is performed in a logical order.

Dalston Kingsland station is a dump compared to Dalston Junction station, with all the charm, access problems and convenience of a Victorian tube station.

In a reasonable world, it would be replaced now, whether Crossrail 2 is built soon or postponed to the Twenty-Second Century.

The need for a Site D indicates that a new bridge will be built across the station to give access. As Site D is currently in the construction site for new flats called Fifty Seven East and Dalston Kingland station desperately needs step-free access, then surely this bridge should be built now!

To further assess the work-sites, I walked along Tottenham Road to Site A, then crossed to Site E, before walking up Kingsland High Street to look at Sites B, C and D.

There is certainly, a lot going on and if everybody gets it right, it can become one of London’s more important High Streets.

What Is Already Happening In Kingsland High Street?

Before I come to my conclusions, I’ll say a little about what is already happening.

  • Plans may have been published to rebuild Dalston Kingsland station.
  • There are more projects to build  flats in the area. London needs housing and as these will be designed so they don’t affect Crossrail 2, they will go ahead.
  • The Dalston Kingsland Shopping Centre is supposed to be being rebuilt.
  • There are also plans to improve the pedestrian flows on what is a very congested road for walkers.
  • There will be other changes due to the Cycle Superhighway passing about fifty metres to the west of Kingsland High Street.

So in say four or five years time, we should have a better High Street and Kingsland station, whether Crossrail 2 is coming or not!

Conclusions

So what are my initial conclusions?

  • Because of the station design, there will need to be some demolition at both current stations.
  • Site A needs a full rebuild, as it has very little property of merit and I certainly wouldn’t miss the Subway, Tesco and the bar on the end. The shaft to access the new platforms, will probably be in the middle of the current Tesco.
  • Site  B is in a bad state with much of the property locked up. Some of the properties on Bradbury Street will need to be demolished to rebuild Dalston Kingsland station, let alone build the Crossrail 2 station. Will anybody mourn?
  • Site C is where the Northern shaft will be. There will be some demolishion.
  • Site D is a curious one in that it is inside a site that is being developed.
  • Site E is where the new entrance to |Dalston Junction and the Crossrail 2 station is going to be built. I’d have hoped that the Crossrail 2 passages would have been laid out in the redesign of the Overground station. What’s been published gives me doubts!
  • How much of the demolition will be of properties worth keeping? Those that I photographed didn’t shout save me!

There are three sites on the High Street, which will be very much affected by the rebuilding of Dalston Kingsland station and building of Crossrail 2.

  • Site A, where the Southern shaft for the station is located.
  • Site B, where the Northern entrance to the new station is proposed, is substantially closed at present.
  • Site C, opposite Dalston Kingsland station that will contain the Northern shaft for the station and escalator connection to the Crossrail 2 platforms.

All could be developed with new residential or commercial properties on top.

I believe that the proposed plan for the new Crossrail 2 station should be treated as what it is, just a proposal.

Or at least as far as the above ground presence is concerned.

All three sites could be developed as welcoming portals to enhance the public transport system as it serves the area around Dalston.

I would apply the principle, that access to the Crossrail 2 station, should be available from both sides of Kingsland High Street at both the Northern and Southern ends.

I will now look at each site in detail.

Site A

This is a Google Map showing Dalston Junction station and Site A.

Dalston Junction Station And Site A

Dalston Junction Station And Site A

Note the station and its towers above in the East and Bentley Road Car Park in the West. You should be able to pick out the Tesco Express on the Kingsland Road.

I walk to Dalston Junction station most days to get the Overground. But it is not a good walking route.

  • The pavements along the Balls Pond Road and Kingsland Road are very narrow and you are squashed between traffic and large numbers of walkers.
  • It is easier to walk up Tottenham Road, but as with the other route crossing Kingsland Road can be difficult.
  • If you live to the South West of Dalston Junction station, it is probably easier to walk to Haggerston station, as I do sometimes.
  • It is particularly difficult to cross at the cross roads where the Balls Pond Road meets the Kingsland Road.

As the frontage of Site A on the Kingsland Road will have to be substantially demolished, in an ideal world, provision would be made to access the escalator and lift connection to the Crossrail 2 station from the West side of Kingsland Road.

Perhaps when the frontage of Site A on Kingsland Road is rebuilt after Crossrail 2 works have finished, it should provide a subway under the road to the station and the sort of shops and cafes, that passengers like in their stations.

It would welcome those, who live to the South West of Dalston Junction station to the area, just as Dalston Square on the other side of the station welcomes those from the South East.

Site B

This is a Google Map showing Dalston Kingsland station and Sites B and C.

Dalston Kingsland Station And Sites B And C

Dalston Kingsland Station And Sites B And C

Site B is to the North of Dalston Kingsland station, on the West side of Kingsland High Street.

Note that this map was made before the construction of Fifty Seven East started, as Peacocks is still on the West side of Kingsland High Street.

I feel that if they rebuild Dalston Kingsland properly, then then are possibilities to not only build residential or commercial development on top of Site B, but over the railway and the station as well.

Land is expensive and the station occupies almost as much space as Fifty Seven East, so surely a similar sized development over the station would be a welcome addition to London’s housing stock.

I would also hope that the design of the station includes the following.

  • A step-free subway under Kingsland High Street to Ridley Road Market. This is probably a given, as the escalators to Crossrail 2 go down from Site C.
  • As the station is close to the Cycling Superhighway, I suspect that it will be heavily used by cyclists, who would need lots of secure bike parking.
  • Personally, I would like easy walking access along Bradbury Street as I regularly walk to Dalston Kingsland station along that route.

There are certainly lots of possibilities to make the existing Dalston Kingsland station a welcoming North West gateway to Crossrail 2 and Kingsland High Street.

Site C

This is a Google Map showing Dalston Kingsland station and Sites B and C.

Dalston Kingsland Station And Sites B And C

Dalston Kingsland Station And Sites B And C

Site C is to the North of Dalston Kingsland station, on the East side of Kingsland High Street. The NatWest bank, which is at the Northend of Site C is indicated.

Any development on this site must enhance the Ridley Road Market and provide that gateway for those travelling to and from the North East of the station.

It is essential that there is an entrance to the station on the East side of Kingsland High street, to give good connections to the market and the Shopping Centre.

 

My Ultimate Test Of The New Station

My ultimate test of the new Dalton station would be on a cold and wet day, to have the ability to arrive at Dalston Kingsland station on the North London Line, go down an escalator to Crossrail 2, where I can walk along to the Southern End, go up the escalator and exit the station on the West side through a rebuilt Site A.

And do it pushing my yet-to-be-born great-grandchild in a buggy! The spirit of my grandmother, who was born opposite Dalston Junction station would be very pleased!

 

 

 

 

 

October 29, 2015 Posted by | Transport/Travel | , , , , , , | 3 Comments

The Inclined Lift In An Improved Greenford Station

I visited Greenford station in January 2012, just after Transport for London announced that the last wooden escalator would be replaced with an inclined lift.

The lift has now been installed.

I rode down and then used the escalator up.

It is impressive and you do wonder how many other stations could have this type of lift installed.

This article on the Crossrail web site, entitled Crossrail and TfL to Install First Incline Lifts in UK Public Transport, says this.

Crossrail and Transport for London (TfL) today awarded a major contract to Kone for around 50 lifts for the new Crossrail stations as well as five lifts for Bank, Greenford and Hammersmith Tube stations.

Crossrail will pioneer the use of incline lifts to deliver step-free access at two of the major central London stations. Four innovative incline lifts will run alongside escalators at Farringdon and Liverpool Street Crossrail stations where it is not possible to install vertical lifts. London Underground will also install an incline lift at Greenford station by 2014.

My gateway to the Victoria Line; Highbury and Islington could be a possibility, but one of the station staff told me, that the space at the bottom of the current set of two escalators and a fixed staircase is very small and fitting a third escalator is impossible.

But it might be possible to squeeze in a much needed inclined lift. Note that the lift doesn’t intrude into the circulation space at the top and bottom of the stairs.

I suspect that Transport for London will be watching the Greenford installation with more than a usual interest.

They’ve certainly got several stations with both an up and down escalator and a stairway between that could be possibilities for conversion to fully step-free by the use of an inclined lift.

The station I could have used more times than any other; Southgate has the required space between the escalators, but as it is a Grade 2* Listed building, I can’t see the heritage lobby allowing even a well-designed and tasteful inclined lift into the Jewel of the Piccadilly Line.

But Bounds Green, Manor House, Turnpike Lane, Walthamstow Central and Wood Green could be ones to upgrade.

October 22, 2015 Posted by | Transport/Travel | , , , | 5 Comments