How Much Power Is Needed To Run A Train At 125 mph?

In an article in the October 2017 Edition of Modern Railways, which is entitled Celling England By The Pound, Ian Walmsley says this in relation to trains running on the Uckfield Branch, which is not very challenging.

A modern EMU needs between 3 and 5 kWh per vehicle mile for this sort of service.

Can I get any other figures for running at 125 mph, that agree or disagree with these figures?

Class 801 Train

I have found this on this page on the RailUKForums web site.

A 130m Electric IEP Unit on a journey from Kings Cross to Newcastle under the conditions defined in Annex B shall consume no more than 4600kWh.

This is a Class 801 train.

  • It has five cars.
  • Kings Cross to Newcastle is 268.6 miles.
  • Most of this journey will be at 125 mph.
  • The trains have regenerative braking.
  • I don’t know how many stops are included

This gives a usage figure of 3.42 kWh per vehicle mile.

InterCity 125

Note that the Class 43 power cars of the InterCity 125 (HST) put 1,300 kW to the rail and have a 1,700 kW engine. Two of these powerful beasts giving out a total of 3,400 kW,, can sustain a ten-car train (two power cars and eight passenger cars) at 125 mph.

In the roughly thirty seconds, it would take to cover a mile, an HST could use 3400/120 kWh or 28.3 kWh.

Counting the locomotives as a car and dividing by ten gives 2.83 kWh per vehicle mile.

This is actually a maximum figure, as the driver could throttle-back if required.

This figure is not out of line with the 3.42 kWh per vehicle mile for a Class 801 train, that I stated earlier.

The force was with Terry Miller and his team.

Class 222 Train

The Class 222 trains have one 580 kW engine in each car.

In the thirty seconds, it would take to cover a mile, a Class 222 train would use 580/120 or 4.83 kWh per vehicle mile.

Again this must be a maximum figure.

Class 170 Train

The Class 170 train is a 100 mph train with a 315 kW engine in each car.

In the thirty-six seconds, it would take to cover a mile at 100 mph, a Class 170 train would use 315/100 or 3.15 kWh per vehicle.mile.

Again this must be a maximum figure.

Conclusions

I know this was a rather rough and ready calculation, but I can draw two conclusions.

  • Trains running at 125 mph seem to need between three and five kWh per vehicle mile.
  • The forty year old InterCity 125 has an efficient energy use, even if the engines are working flat out to maintain full speed.

The only explanation for the latter is that Terry Miller and his team, got the aerodynamics, dynamics and structures of the InterCity 125 almost perfect. And this was all before computer-aided-design became commonplace.

In future for the energy use of a train running at 125 mph, I shall use a figure of three kWh per vehicle mile.

It is also probably a good starting point for a 100 mph train.

After all, if a forty-year-old diesel-electric train built from steel can achieve that figure, surely a modern electric train built from aluminium can do better!

 

July 13, 2019 Posted by | Transport | , , , | 14 Comments

Tender Set To Be Issued For East West Rail Rolling Stock

The title of the this post is the same as that of this article on Rail Magazine.

Brief details of the fleet include.

  • Eleven trains.
  • Self-propelled.
  • Three cars.

Services are due to commence in 2024, serving Oxford, Aylesbury, Milton Keynes and Bedford.

Here are a few of my thoughts.

Are Three Car Trains Long Enough?

New train services in the UK, especially those on new or reopened routes, seem to suffer from London Overground Syndrome.

I define it as follows.

This benign disease, which is probably a modern version of the Victorian railway mania, was first identified in East London in 2011, when it was found that the newly-refurbished East London Line and North London Line were inadequate due to high passenger satisfaction and much increased usage. It has now spread across other parts of the capital, despite various eradication programs.

The Borders Railway certainly suffered and the London Overground is still adding extra services on the original routes.

Three-car trains may be enough for the initial service, but provision must be made  for running longer trains.

  • The trains that are purchased must be capable of lengthening.
  • Platforms must be built for longer trains.

So often we don’t future-proof new rail routes.

What Performance Is Needed?

I’ll ask this question first, as it may affect the choice of train.

The trains will certainly be at least capable of 100 mph operation.

But I wouldn’t be surprised if they were capable of 110 mph or even 125 mph, as this would surely make it easier for trains to go walkabout on the Great Western, Midland and West Coast Main Lines.

Faster East West trains might also get more services out of the fleet.

Appropriate acceleration and braking would be needed.

Conservative Or Innovative?

Will we get more of the same or will some of the responders to the tender offer trains based on innovative designs?

I would hope that as the line will eventually connect Oxford and Cambridge via Milton Keynes, the trains will take over the flavour of the route and be more innovative.

The Route

The eventual full route of the East West Rail Link will serve these sections.

  • Reading and Ocford – 25 miles – Partially-electrified
  • Oxford and Milton Keynes – 43 miles – Not electrified
  • Milton Keynes and Bedford – 20 miles – Partially-electrified
  • Bedford and Sandy – 10 miles – Not electrified
  • Sandy and Cambridge – 25 miles – Partially-electrified.

Note.

  1. The distances are approximate.
  2. With the exception of Oxford, all the major stations will be served by electric trains on other routes.

It is rather a mixture created out of existing and abandoned routes.

Could Battery Trains Run On The East West Rail Link?

Consider.

  • All the major stations except Oxford have electrification.
  • Sections of the route are electrified.
  • The route is not very challenging.
  • The longest section without electrification is around forty miles.

All this leads me to believe that a battery-electric train with a range of forty miles could handle the route, if there was the means to charge the train at Oxford.

Possibly the easiest way to achieve the charging station at Oxford station, would be to electrify between Didcot Junction and Oxford stations.

In How Much Power Is Needed To Run A Train At 125 mph?, I showed that to run at 125 mph, a train needs around three kWh per vehicle mile.

This would mean that to run between Oxford and Milron Keynes stations, would need a maximum power of around 40*3*3 kWh or 360 kWh.

This is only a 120 kWh battery in each car.

I am fairly certain, that a well-designed battery train could run on the East West Rail Link.

The Usual Suspects

There are several train companies, who could be offering existing trains or their developments.

Alstom

Alstom don’t have a current design of train for the UK, but they are heavily into the development of trains powered by hydrogen.

By 2024, I suspect they will be offering a purpose-built hydrogen-powered train for the UK.

Also, by that time, I think it will be likely, that many buses in cities will be powered by zero-carbon hydrogen and the availability of this fuel would be much better than it is today.

An East West Rail Link running hydrogen-powered trains would go a long way to answer the electrification lobby.

Bombardier

Bombardier are developing a 125 mph bi-mode Aventra with batteries, that they are proposing for various franchises in the UK, including the Midland Main Line.

I believe that by rearranging the components of this train, they could develop a train that would be very suitable for the East West Rail Link.

  • Three cars
  • At least 100 mph operating speed
  • In service by 2024 or earlier.

It could be a bi-mode train with batteries, or if battery and the associated charging technology has improved, it could be a battery-electric train.

The latter would certainly fulfil the flavour of the route.

Bombardier’s Aventra would also have the advantages of an electrical version and the ability to add more cars.

CAF

CAF have recently introduced the Class 195 traincaf in the UK.

But would a diesel train be acceptable on a flagship route?

On the other hand CAF have been delivering battery-powered trams for several years and I wouldn’t be surprised to see the company, offer an innovative battery-electric train for the East West Rail Link.

Hitachi

Hitachi don’t make self-powered trains in the UK.

But in Hitachi Plans To Run ScotRail Class 385 EMUs Beyond The Wires, I wrote about the company’s plans to use batteries as range extenders on their Class 385 trains.

I suspect that by 2024, these trains will be running in Scotland and they will probably be high-quality reliable trains.

So could these trains be able to run between Reading and Cambridge using battery power, topped up at the various sections of electrification along the route.

Hitachi’s development regime is cautious, professional and well-funded, so I suspect they could offer a version of the Class 385 train, for delivery in 2024.

Hitachi would also have the advantages of an electrical version and the ability to add more cars.

Siemens

Siemens have a large number of modern electrical multiple units in the UK, but none are self-powered, except the diesel Class 185 train.

Siemens will have a factory in the UK to built London Underground trains by 2024.

But eleven trains could be an expensive order to fulfil, if it required a new self-powered train design.

Stadler

Stadler are an innovative company and their Class 755 train will shortly be starting passenger service in East Anglia.

  • It is three-cars, which is extendable if required.
  • It has a 100 mph operating speed.
  • It is a bi-mode; diesel and electric train.
  • Trains for Wales have ordered a diesel/electric/battery version.
  • There are rumours of hydrogen-powered versions.

Stadler could certainly deliver some of these trains by 2024.

Summing Up

I would suspect that the front runners are Bombardier, Hitachi and Stadler, with CAF in fourth place.

  • All could probably develop a zero-emission train for the route using battery technology.
  • Stadler will have trains in service this year, and I suspect Bombardier and Hitachi will be running trains by 2022.

I think we could be seeing some very good trains on the route.

 

 

 

 