The Anonymous Widower

Direct Rail Service Plan Supported By PM

The title of this post, is the same as that of this article on the BBC.

This is the sub-heading.

Plans for a new passenger rail service running direct trains between north Wales, the West Midlands and London have received support from the prime minister.

These three paragraphs add detail to the story.

A new open-access rail operator, external, called the Wrexham, Shropshire and Midlands Railway (WSMR), has been formed, offering passengers in Wrexham, as well as Gobowen, Shrewsbury, Walsall and Coleshill, a direct link with the capital.

Speaking in the Commons, Shrewsbury’s Labour MP Julia Buckley asked Sir Keir Starmer if he would support the provider’s application.

The prime minister responded, saying he would be “delighted to make sure the MP and other interested MPs meet with the rail minister to put their case forward”.

He didn’t actually say he supported the application, but then lawyers are careful with words, as every syllable costs money.

I have a few thoughts on this service.

The North Wales Metro

The North Wales Metro was announced today and I wrote about it in £2.1bn North Wales Rail Overhaul Plans Unveiled.

The Wrexham, Shropshire and Midlands Railway connects the North Wales Metro to Gobowen, Shrewsbury, Wolverhampton, Coleshill and London Euston.

Will The Trains Be Hydrogen Powered

In Alstom And Eversholt Rail Sign An Agreement For The UK’s First Ever Brand-New Hydrogen Train Fleet, I reported how Alstom could be going to build a fleet of hydrogen trains in Derby.

I just wonder, if Alstom are going to create a hydrogen train with this specification.

  • Five cars
  • 125 mph top speed
  • Ability to use electrification, where it exists.
  • Sufficient range on hydrogen to cover the non-electrified section of the route between Wrexham General and Wolverhampton.
  • Wrexham General and Wolverhampton is just under sixty miles and takes an hour and six minutes.

As the fastest trains between London Euston and Walverhampton take one hour and forty-nine minutes, trains would take just under three hours between London Euston and Wrexham General.

I rode  an Alstom hydrogen-powered train in Germany in March 2019 and wrote My First Ride In An Alstom Coradia iLint.

I took this picture at the time.

Alstom certainly have all the technology to build a 125 mph hydrogen-powered train, that can use electrification.

Where Would A Hydrogen Train Be Refuelled?

I suspect, that as the train would probably have a range of around a thousand kilometres, it could fill up overnight at Wrexham.

The hydrogen could be sourced from Runcorn or it might even be generated at the depot.

Would A Hydrogen Train Attract Passengers?

If the hydrogen-powered train were to be mouse-quiet like Wrightbus’s hydrogen buses, I believe it would.

May 22, 2025 Posted by | Hydrogen, Transport/Travel | , , , , , , , , , , , , | 2 Comments

Alstom Plans To Operate Its Own Passenger Train Service In The UK For The First Time

The title of this post, is the same as that of this press release from Alstom.

These two bullet points, act as sub-headings.

  • Alstom is partnering with SLC Rail to form a new open access rail operation between North Wales, Shropshire, the Midlands and London
  • Formal application now being submitted to the Office of Rail and Road (ORR) with passenger service sought from 2025

These are the first three paragraphs.

Alstom, global leader in smart and sustainable mobility, plans to operate a new passenger rail service across England and Wales. Working in partnership with consultancy SLC Rail, the open access operation will be known as Wrexham, Shropshire and Midlands Railway (WSMR).

As the country’s foremost supplier of new trains and train services, and a leading signalling and infrastructure provider, Alstom will operate its own rail service in the UK for the first time.

WSMR is seeking to introduce direct connectivity to and from North Wales, Shropshire, the Midlands and London that doesn’t exist today, linking growing communities and businesses, and making rail travel more convenient, enjoyable and affordable.

I can’t remember a service proposal being put forward by a train manufacturer since the privatisation of UK’s railways in the 1990s.

This is some more information and my thoughts.

The Route

This paragraph from the press release, describes the route.

The proposal envisages a service of five trains per day in each direction Monday to Saturday, with four travelling both ways on Sundays. Trains will stop at Gobowen, Shrewsbury, Telford Central, Wolverhampton, Darlaston, Walsall, Coleshill Parkway, Nuneaton and Milton Keynes on their journey between Wrexham General and London Euston.

Note.

  1. The proposed call at the new Darlaston station.
  2. The route is electrified between Euston and Nuneaton and Walsall and Wolverhampton.
  3. Much of the route North of Nuneaton is on tracks with a maximum speed of 70-80 mph.

The route is in these sections.

  • Euston and Nuneaton – 96.7 miles – electrified
  • Nuneaton and Walsall – 26.7 miles
  • Walsall and Wolverhampton – 6.7 miles – electrified
  • Wolverhampton and Shrewsbury – 29.7 miles
  • Shrewsbury and Wrexham General – 30.3 miles

That is a total of 190.1 miles or 380.2 miles round trip.

I suspect that the service will need bi-mode trains.

Should The Service Call At Wellington?

This article on the BBC is entitled Rail Company Urged Not To Forget Wellington.

This is the sub-heading.

A rail company which is bidding to bring back a direct service between Shropshire and London has been urged not to forget a town.

These are the first three paragraphs.

Wrexham, Shropshire and Midlands Railway said it was preparing to apply to the government to run the service.

Trains would stop at Gobowen, Shrewsbury, Telford, Wolverhampton, Walsall, Coleshill and Nuneaton.

But Telford and Wrekin Council said the omission of Wellington as a stop was “short-sighted”.

Although Wellington is smaller than than Shrewsbury and Telford, it looks like a bit of analysis would provide a solution, that would be acceptable for all parties.

The Trains

In the press release, this phrase is used.

positive impact to both communities and the environment.

I can’t see any more electrification being erected on the route, so the trains will need to be bi-mode.

  1. Bi-mode diesel trains won’t have a positive impact on the environment.
  2. As the route between Wolverhampton and Wrexham General is not electrified, a battery-electric train would need a range of at least 60 miles or 120 miles for the round trip, if there were no charging at Wrexham General.
  3. But Alston are developing a Hydrogen Aventra, which I wrote about in Alstom And Eversholt Rail Sign An Agreement For The UK’s First Ever Brand-New Hydrogen Train Fleet.

So could Alstom be using this route to trial and showcase their new Hydrogen Aventra?

I believe that the route will be very suitable for a hydrogen train.

  • Changeover between electric and hydrogen power can always take place in a station.
  • All hydrogen refuelling could be performed at one end of the route.
  • A large proportion of the UK’s green hydrogen is produced by INEOS at Runcorn, which is less than fifty miles from Wrexham. A refuelling tanker could supply the train, as they do on some hydrogen routes in Germany.
  • London has only small amounts of hydrogen infrastructure.

I suspect that refuelling will be done at the Wrexham end of the route.

This Alstom visualisation shows the train.

But it is only a three-car train.

  • That is not a problem, as Aventras can be lengthened as required to the length required for the number of passengers.
  • Some Aventras, like the Class 701 trains for South Western Railway, have even been ordered as ten-car trains.
  • Two three-car trains may also be the ideal capacity, running as a six-car train.

So capacity will not be a problem.

If it is assumed that Alstom’s trains for the WSMR route, can use the overhead wires, where they exist, each trip between Wrexham General and London will require a total of 86.7 miles or 140 kilometres of running on hydrogen.

  • A round trip will therefor require 280 kilometres of running on hydrogen.
  • But between London Euston and Nuneaton, it will just be another electric train.
  • I suspect that like the similar Class 730 train, it will be capable of 110 mph on the West Coast Main Line.
  • Alstom’s Coradia iLint hydrogen train has a range of around a 500-800 kilometres on hydrogen.
  • The WSMR trains will probably be 100 mph trains using hydrogen on a route, where that speed is possible.

So if a Hydrogen Aventra has a similar range to the Coradia iLint, it will be able to do two round trips before refuelling.

How Long Will The Service Take?

West Midlands Trains, who use the similar Class 730 trains take one hour and eleven minutes between London Euston and Nuneaton with a single stop at Milton Keynes Central.

As the WSMR trains will use the same route, I suspect the same time can be used.

As Nuneaton and Wrexham General are 93.4 miles apart a table can be created showing the time for the rest of the journey for different average speeds

  • 50 mph – 1 hour 52 minutes – 3 hours 3 minutes.
  • 60 mph – 1 hour 33 minutes – 2 hours 44 minutes.
  • 70 mph – 1 hour 20 minutes – 2 hours 31 minutes.
  • 80 mph – 1 hour 10 minutes – 2 hours 21 minutes.

Note.

  1. The first time is the Nuneaton and Wrexham General time and the second time is the overall journey time.
  2. Typical Avanti West Coast services via Crewe and a change at Chester, take between two-and-a-half and three hours.

I suspect, if the WSMR trains can keep the speed up through the Midlands, that two hours and 30 minutes could be possible.

Could The Hydrogen Aventra Run At 125 mph Under The Wires?

In March 2018, I wrote Bombardier Bi-Mode Aventra To Feature Battery Power, which was based on this article in Rail Magazine.

These are a few points from the article.

  • Development has already started.
  • Battery power could be used for Last-Mile applications.
  • The bi-mode would have a maximum speed of 125 mph under both electric and diesel power.
  • The trains will be built at Derby.
  • Bombardier’s spokesman said that the ambience will be better, than other bi-modes.
  • Export of trains is a possibility.
  • Bombardier’s spokesman also said, that they have offered the train to three new franchises. East Midlands, West Coast Partnership and CrossCountry.

Have Alstom looked at what they bought from Bombardier and decided the following train is possible?

  • Five-cars or what the customer needs.
  • 125 mph under the wires.
  • Running on hydrogen away from the wires.
  • 100 mph on tracks without electrification.

Obviously, maximum speeds  would depend on track limits.

Looking at 125 mph Avanti West Coast trains that have a Milton Keynes stop between London Euston and Nuneaton, they can reach Nuneaton ten minutes quicker than West Midlands Trains 110 mph Class 730 trains.

Two hours and 30 minutes between London Euston and Wrexham is looking increasingly possible.

Are we seeing an audacious proposal from Alston to sell new trains to CrossCountry and a host of other franchises?

Conclusion

London Euston and Wrexham would appear to be an excellent route for an Aventra-based hydrogen train.

  • It can probably cruise at 110 mph on the West Coast Main Line between London Euston and Nuneaton.
  • All switchovers between electrification and hydrogen can be performed in electrified stations.
  • Hydrogen would only be used North of Nuneaton.
  • The train can be refuelled at Wrexham General, with fuel supplied from INEOS at Runcorn.
  • Given the typical 1000 km. range of hydrogen trains, a train can probably do three round trips without refuelling.

I can see this being a service with an excellent operational record.

 

March 15, 2024 Posted by | Hydrogen, Transport/Travel | , , , , , , , , , , , , , , , , , , , | 2 Comments

Reopening The Oswestry – Gobowen Line

On October 27th this Beeching Reversal Project was given £50,000 to build a case for reopening.

These are my thoughts.

Gobowen Station

Gobowen station appears to be a fine station.

Wikipedia says this about the future of the station.

Gobowen station may become the northern terminus of the proposed Cambrian Heritage Railways line to Llynclys, Pant and Blodwel via Oswestry. Shropshire Council was to acquire the coal yard at Gobowen for railway-related uses, including car parking for the station. If the plans are fully realised, the station would have three platforms, one of which would be for the Heritage Railway.

It does look as if, Shropshire Council have got the money for a full study.

This Google Map shows Gobowen station.

Note.

  1. The two tracks of the Chester-Shrewsbury Line each have a platform.
  2. Step-free access is by the level crossing, which is at the North end of the station.
  3. It looks like it would be space to convert the Northbound platform into an island platform, where the Western platform face would be for the heritage trains.

This second Google Map shows the tracks at the South end of Gobowen station.

Note.

There is a set of points to allow trains to access a third platform at Gobowen station.

The single-track line to Oswestry branches off to the West at the bottom of the map.

It would appear that a bay platform at Gobowen station can be created to handle trains to Oswestry.

Oswestry Station

Oswestry station appears to be another fine station.

  • It is also Grade II Listed.
  • It has just a single platform.
  • It appears to be owned by the local authority.

This Google Map shows the station.

Note.

  1. The station is the large building with the chimneys in the South-East corner of the map.
  2. The single platform is behind it.
  3. The platform is long enough to take a 1200 metre long train.

This station would make an ideal terminus.

The Track Between Oswestry And Gobowen

The track is single-track with a couple of foot crossings, so I don’t think it will need much to bring it up to a modern standard.

A Shuttle Service Between Oswestry And Gobowen

I suspect a two-car shuttle train between the two stations would suffice for most of the day.

Transport for Wales have some Class 230 trains and these would be ideal. They could even be battery-electric trains if a battery charging system were to be installed at one station.

Could Avanti West Coast Run A Service To London?

It looks like Avanti West Coast’s Class 805 trains could run along the line between Gobowen and Oswestry.

So could Avanti’s planned service to Gobowen terminate at Oswestry instead?

It would all depend on the passenger forecasts and actual numbers

Could Avanti West Coast Run A Battery-Electric Service To London?

Consider.

  • Oswestry is a town of 17,500 people, so probably has a reasonable electricity supply, especially if it were to be backed up by a battery.
  • The amount of renewable electricity produced over the border in Wales is only going to grow.
  • There is plenty of space at Oswestry to put in a charging system to replace the batteries.

Distances are as follows.

  • Crewe and Chester – 21.1 miles
  • Chester and Gobowen – 24.6 miles
  • Gobowen and Oswestry – 3.3 miles

This is a total distance of 49 miles.

Avanti West Coast have ordered thirteen bi-mode Class 805 trains, which will replace the diesel Class 221 trains currently working between London Euston and Chester. Holyhead and Shrewsbury.

  • They will run at 125 mph between Euston and Crewe using electric power.
  • If full in-cab digital signalling were to be installed on the electrified portion of the route, they may be able to run at 140 mph in places under the wires.
  • They will use diesel power on the North Wales Coast Line to reach places like Chester, Holyhead and Wrexham.
  • According to an article in Modern Railways, the Class 805 trains could be fitted with batteries.

I wouldn’t be surprised that when they are delivered, they are a version of the Hitachi’s Intercity Tri-Mode  Battery Train, the specification of which is shown in this Hitachi infographic.

Note.

  1. I suspect that the batteries will be used to handle regenerative braking on lines without electrification, which will save diesel fuel and carbon emissions.
  2. The trains accelerate faster, than those they replace.
  3. The claimed fuel and carbon saving is twenty percent.
  4. It is intended that these trains will be introduced next year.

But Hitachi have not given any predictions of the range of these trains on battery power alone.

However, they do claim a battery range of 56 miles for the Hitachi Regional Battery Train, which is based on similar technology.

I believe it would be possible to run a zero-carbon London Euston and Oswestry service.

  • The trains would be Class 805 trains fitted with batteries.
  • Trains could stop at Milton Keynes Central, Lichfield Trent Valley, Stafford, Crewe, Chester, Wrexham General and Gobowen.
  • Trains would use electrification between London Euston and Crewe.
  • Trains would recharge their batteries South of Crewe and at Oswestry.

I doubt that a battery-electric zero-carbon train serving Cheshire, Shropshire and North-East Wales would have a negative effect on the area.

Just as Hull and Lincoln seem to be moving towards a frequency of one train per two hours from London, I wonder if this service could ever attain the same frequency.

Onward From Oswestry

Cambrian Heritage Railways are planning to run services past Oswestry on their heritage railway.

Will this be a good idea?

Where Now For First Group?

First Group are a shareholder in Avanti West Coast.

They also own Lumo, who last week launched their open-access service between London and Edinburgh. Their marketing is all about being green and sustainable.

I just wonder if a battery-electric service to Gobowen is successful, they will apply this model all over the group.

Hull Trains service between London and Hull is an obvious possibility for a battery-electric zero-carbon service.

Conclusion

It looks to me, that reopening of the Oswestry – Gobowen Line opens up other possibilities.

October 31, 2021 Posted by | Transport/Travel | , , , , , , , , , , , , , , , | 4 Comments