The Anonymous Widower

Disabled Access On South Western Railway’s Class 707 Trains

This article on Rail Technology Magazine is entitled RMT Backs Disabled Passengers Protest In London.

I will not comment directly on the article, but relate an incident, that I observed on Saturday, as I was travelling to Brentford station, to see Ipswich Town at nearby Brentford.

  • I was travelling in the fourth car of a ten-car formation of two five-car Class 707 trains, when we stopped at a station and seemed to be waiting a long time to depart.
  • I then noticed a guy in a motorised wheel-chair moving along the platform, who stopped at the door at the front of my car.
  • The guard then appeared on the platform, said something to the guy in the wheelchair and entered the train.
  • He returned a couple of minutes later holding the folding ramp, which he used professionally to load the guy and his wheelchair into the train.
  • A couple of minutes later after stowing the ramp, the guard closed the doors and gave the signal to start.

This picture shows the height difference at Brentford station.

This is not as bad as some train-plarform gaps, but why isn’t it flat?

A station-man on the London Overground once told me, that loading disabled passengers on to trains using a ramp,  is a major source of delay.

Saturday’s incident illustrated the problem beautifully.

It also showed the professionalism of one of their staff

South Western Railways use a very inefficient system.

  • The guard had to walk some way to load the passenger, as he happened to be at the back of the train.
  • He was actually in the second train, so had to walk on the platform.
  • The ramp had to be removed from and replaced in its cupboard.
  • How many times, do guards and station staff catch their fingers in the ramp?

If level access were to be provided between train and platform, the guard would just have acted as a guide to get the guy in the wheelchair on the train.

South Western Railways are getting a new fleet of Class 701 trains.

  • These trains will be walk-through, meaning the guard can get to where assistance is needed easily. And in the dry, if it’s raining hard.
  • Will the trains floors, be level with those of the platforms?
  • If not, will a Harrington Hump be provided?

Surely, this will mean many disabled in a wheelchair, like an acquaintance of mine, will be able to push or drive themselves into and out of the train.

It will of course help others like those with an infant in a buggy or dragging a heavy case.

Let’s hope the new fleet of trains, will be designed to access the trains in a much better way than the current Class 707 trains, and the older Class 455 trains.

Conclusion

Could this incident illustrate the problems, that prompted South Western Railway to decide to return the Class 707 trains to the leasing company?

Does what I saw , have any relevance to the role of guards on trains?

The incident I saw, would have required assistance from a second person, even if the access had been totally level.

Note.

  • London Underground and Overground try to always have somebody on the platform, when a train is in the station.
  • The Docklands Light Railway always have someone on the train.

South Western Railway could use either method.

 

April 10, 2018 Posted by | Transport/Travel | , , , | Leave a comment

Steam Methane Reforming

In The Liverpool Manchester Hydrogen Clusters Project, I used an extract that describes the project.

This was a paragraph from the extract.

It proposes converting natural gas into clean-burning hydrogen gas, using a process called steam methane reforming. The process also removes CO2 from the gas, which can then be captured using existing carbon and capture storage technology and stored in depleted offshore gas reservoirs.

So what is steam methane reforming?

Methane is a chemical compound consisting of one carbon and four hydrogen atoms, that is the major component of natural gas.

This first paragraph is from the Wikipedia entry for steam reforming.

Steam reforming is a method for producing hydrogen, carbon monoxide, or other useful products from hydrocarbon fuels such as natural gas. This is achieved in a processing device called a reformer which reacts steam at high temperature with the fossil fuel. The steam methane reformer is widely used in industry to make hydrogen. There is also interest in the development of much smaller units based on similar technology to produce hydrogen as a feedstock for fuel cells. Small-scale steam reforming units to supply fuel cells are currently the subject of research and development, typically involving the reforming of methanol, but other fuels are also being considered such as propane, gasoline, autogas, diesel fuel, and ethanol.

If the process has a problem, it is that is produces carbon dioxide, which in the case of the Liverpool Manchester Hydrogen Clusters Project is captured and will be stored depleted gas reservoirs.

April 10, 2018 Posted by | World | , , , , | Leave a comment

Lipman Says Corbyn Must Leave The Stage

This title of this post, is the same, as that of a small article in The Times.

Ms Lipman used the words, malign, scary and antisemitic.

Enough said!

I sent a text to a friend, who knows Maureen Lipman.

Strangely, she received the text, as she was talking to Ms Lipman on the phone.

April 9, 2018 Posted by | World | , , | 3 Comments

ScotRail’s ‘385s’ Face Further Delay As New Windscreens To Be Fitted

The title of this post is the same as that of this article on Rail Magazine.

This is the opening paragraph.

Hitachi has confirmed to RAIL that new windscreens are to be fitted to ScotRail’s new Class 385s, which are already late entering traffic because of infrastructure problems.

It’s all a bit of a mess.

Hopefully, we’ll see the trains in service soon.

I do wonder, if the communication lines and manufacturing process are a bit long, between Japan and Newton Aycliffe

April 9, 2018 Posted by | Transport/Travel | , | Leave a comment

The Liverpool Manchester Hydrogen Clusters Project

The project is described briefly on this page on the Cadent web site.

This is the introduction.

The use of hydrogen in place of natural gas could offer a route to widespread decarbonisation of gas distribution networks.

The Liverpool-Manchester Hydrogen Cluster project is a conceptual study to develop a practical and economic framework to introduce hydrogen into the gas network in the Liverpool-Manchester area.

It proposes converting natural gas into clean-burning hydrogen gas, using a process called steam methane reforming. The process also removes CO2 from the gas, which can then be captured using existing carbon and capture storage technology and stored in depleted offshore gas reservoirs.

The hydrogen gas would then be supplied to a core set of major industrial gas users in Liverpool-Manchester and fed into the local gas distribution network as a blend with natural gas.

Note.

  1. At Runcorn, Ineos make hydrogen and chlorine by the electrolysis of brine.
  2. When I worked in Castner-Kellner works at Runcorn, it was generally taken away be truck.
  3. The Burbo Bank wind farm in Liverpool Bay, can produce 348 MW of electricity using some of the biggest wind turbines in the World, according to this article in The Guardian.
  4. Using excess  electricity generated by win turbines at night, is used by the Germans to create hydrogen.

It doesn’t look like the project will suffer from a shortage of hydrogen.

Alsthom And Hydrogen Powered Trains

Alsthom have a site at Widnes, where they modify and paint trains. They have also indicated, that they might build new trains in the UK.

They have also developed a hydrogen-powered train called the Alsthom Coradia iLint, which starts test running with passengers in a couple of months.

This promotionalvideo shows how Alsthom’s hydrogen-powered Coradia iLint works.

The North Wales Coast Line would be an ideal test track.

  • It’s around eighty miles long.
  • It is nearly all double-track.
  • It has a 90 mph operating speed.
  • It’s probably pretty flat, as it runs along the coast.

I don’t think too many people would bother about a few extra quieter trains, just emitting steam and water vapour.

North Wales could be getting a new environmentally-friendly tourist attraction.

 

April 9, 2018 Posted by | Transport/Travel | , , , , , , | 3 Comments

Is This The World’s Toughest Management Job In Public Transport?

I came across this article on the BBC, which is entitled Meet The Brit In Charge Of Fixing NYC’s Subway.

It is an excellent read.

April 9, 2018 Posted by | Transport/Travel | | Leave a comment

Crewe Hub To Be First ‘All-Digital’ Station, Says Transport Chief

The title of this post is the same as that of this article in the Warrington Guardian.

This is the first three paragraphs

Delays caused by signalling faults could eventually be a thing of the past on trains running to and from Crewe.

At a meeting on Friday Pete Waterman, chairman of the Cheshire and Warrington Local Transport Body (LTB), revealed that Network Rail, the Department for Transport and HS2 Ltd have agreed that the town will become home to Britain’s first all-digital station.

It means that all trains running from Crewe to Warrington, Chester and other destinations across Cheshire would benefit from the same technology which will be used by HS2 services – meaning lines could run more efficiently with trains travelling in a tighter sequence.

I feel that increasingly, digital signalling will be used to improve capacity on UK railways.

April 9, 2018 Posted by | Transport/Travel | , | 1 Comment

Call For ETCS On King’s Lynn Route

The title of this post, is the same as that on an article in Edition 849 of Rail Magazine.

The article is based on this document on the Fen Line Users Aoociation web site, which is entitled Joint Response To Draft East Coast Main Line Route Study.

In addition to ETCS, which could improve capacity on the East Coast Main Line, they would also like to see journey time reductions using trains capable of running at 125 mph or faster on the King’s Lynn to King’s Cross route.

The Fen Line

The Fen Line runs between Ely and King’s Lynn stations.

  • It is mainly single -track with a double-track section at Downham Market station.
  • The line has an operating speed of 90 mph.
  • The line is electrified.
  • All stations have two platforms.
  • Looking at the line from my virtual helicopter, I suspect that redoubling would be possible.
  • Passenger numbers are increasing at stations on the line.
  • There are several level crossings.

It also would appear that because of the complicated nature of timetabling trains on the East Coast Main Line to the South of Hitchin, that there are often delays on the Fen Line, as there is only one passing place at Downham Market.

I therefore agree with the opinions expressed on the Fen Line Users Association, that restoring double-track could help reduce delays on the Fen Line.

The Cambridge Line

The Cambridge Line connects Cambridge to the East Coast Main Line at Hitchin.

  • It is double-track throughout.
  • It is fully electrified.
  • It has a 90 mph operating speed.
  • King’s Lynn to King’s Cross services use the line.
  • Currently four trains per hour (tph) run between Cambridge and Kings Cross.
  • This will be increased by two tph, when Thameslink is fully operational.

King’s Lynn to King’s Cross services use this line.

The Current Timetable

Trains seem to take around an hour and forty minutes to go from King’s Cross to King’s Lynn, where they take under ten minutes to turnround and then they take around an hour and forty minutes to return to King’s Cross. I suspect, it isn’t the easiest service for an operator to mrun, as a train could be sitting in King’s Cross for thirty minutes.

How Could The Service Between King’s Lynn and King’s Cross Be Improved?

From the Rail Magazine article, the views of the Fen Line Users Association and the details of the route, the following could help.

ERTMS And ETCS

ERTMS and the closely related;  ETCS are digital systems that enable trains to run faster and closer together, which could increase the capacity of the line and reduce journey times.

The Wikipedia entry for the East Coast Main Line says this about recent and future development of the signalling.

A new Rail Operating Centre (ROC), with training facilities, opened in early 2014 at the “Engineer’s Triangle” in York. The ROC will enable signalling and day-to-day operations of the route to be undertaken in a single location. Signalling control/traffic management using ERTMS is scheduled to be introduced from 2020 on the ECML between London King’s Cross and Doncaster – managed from the York ROC.

I would think it likely that if the whole route from King’s Lynn and King’s Cross were digitally signalled, there would be advantages.

  • It would help the merging of trains at Hitchin.
  • It would help in managing trains on the single-track sections of the Fen Line.

The Rail Magazine article mentions flighting trains on the single-track sections, where two or more trains in the same direction, went though in succession.

It would also allow closer spacing and higher frequencies on the East Coast Main Line.

All trains using the route, including freight trains, would need to be fully equipped for digital signalling.

Improving The Fen Line

The biggest improvement would come by redoubling the line between Littleport and King’s Lynn.

  • Trains could pass anywhere on the Fen Line.
  • It might also be possible to avoid complicated operating procedures.
  • Timetabling should be easier.
  • Extra services would be possible.
  • Delays should be reduced, as there would be less knock-on effects from problems on the East Coast Main Line.

On the flat lands of the fens, it might also be possible to increase the operating speed.

Improving Ely

Ely is a mess, where trains always seem to be waiting for something.

Hopefully, improvements are on the way, as I wrote in Are The Trains In Ely Finally To Be Sorted?

According to an e-mail and comments on this post, Ely North Junction needs improvement.

This Google Map shows the junction.

Note.

  1. Ely station is to the South West.
  2. starting at the top-left and going clockwise, lines go to Peterborough, Ely and Norwich.
  3. The last set of lines are sidings.

There would appear to be two solutions.

  • Extra lines and flat junctions can be added. Flat junctions mean that trains have to cross each other.
  • From what I’ve read digital signalling is very good at handling junctions, by making sure trains present themselves correctly, so this may be a better solution.

Either solution could be make to work very well!

Improving The Cambridge Line

There don’t appear to be any projects on the Cambridge Line, but I suspect that Network Rail are looking for small things, that will save minutes here and there.

125 Mph Trains

Who’d have thought forty or fifty years ago, that someone would seriously suggest running trains capable of 125 mph to King’s Lynn?

The Class 387 trains are 110 mph trains and I have recorded one at that speed on the East Coast Main Line.

Would a 125 mph train, be able to use that speed South of Hitchin?

If it could then.

  • It could cruise on the fast lines with all the fast trains to and from the North.
  • It would cut a couple of minutes  from the journey time.

Once digital signalling is operational, the trains could be closer together, which would increase line capacity.

There are several fast electric multiple units, that have been built in recent years or are on order.

  • Bombardier Class 387 – 110 mph – In service.
  • Bombardier Aventra – 110 mph -In development for West Midlands Trains.
  • CAF Class 397 – 125 mph – In development for TransPennine Express.
  • Hitachi Class 801 – 125 mph On test for service entry this year.
  • Siemens Class 350 – 110 mph – In service.

Bombardier are also showing ideas for a 125 mph bi-mode Aventra to various train operating companies, which I wrote about in Bombardier Bi-Mode Aventra To Feature Battery Power.

To build a 125 mph bi-mode train, you probably start with a 125 mph electric train.

So have Bombardier designed a 125 mph version of the Aventra?

It would appear, that Bombardier, Hitachi and possibly CAF and Stadler will be offering 125 mph electric multiple units, with a bi-mode version if needed, for lines without electrification.

But there are several routes in addition to Kings Cross to King’s Lynn

  • St. Pancras to Corby
  • Euston to the West Midlands
  • Liverpool/Manchester to Edinburgh/Glasgow
  • Leeds/York to Edinburgh/Glasgow.
  • Waterloo to Bournemouth/Southampton/Weymouth

Train travel could be getting faster?

Conclusion

The ultimate benefit would come if trains could do a round trip in under three hours.

This would probably need a journey time of perhaps an hour and twenty-four minutes between King’s Cross and King’s Lynn. It is certainly not possible now, but it might be with the following.

  • 125 mph-capable trains.
  • Digital signalling on the East Coast Main Line and on the Cambridge and Fen Lines.
  • 125 mph running, where possible on the East Coast Main Line.
  • Improvements at Ely.
  • Full double-tracking of the Fen Line.
  • If possible, 100 mph running on the Cambridge and Fen Lines.

A three-hour round trip would allow the current service of one tph to be run with just three trains.

If both of the twice-hourly fast services between Kings Cross and Cambridge were extended to King’s Lynn, instead of the current one, this would mean that the following service could be possible with just six trains.

  • Two tph
  • Stops at Cambridge, Cambridge North, Waterbeach, Ely, Littleport, Downham Market and Watlington.
  • Ten x 23 metre cars or twelve x 20 metre cars.
  • Possibly a bistro.
  • Trains might stop at Royston, Hitchin and/or Stevenage.

It would be a passenger-attracting 125 mph Metro.

There is improvement to come between King’s Cross, Cambridge and King’s Lynn, if the financial case stacks up.

 

 

 

April 8, 2018 Posted by | Transport/Travel | , , , , , | 18 Comments

Ticketing On Heathrow Southern Railway

This article on City AM is entitled New Elizabeth Line Services Are Coming To Heathrow’s Terminal 5 After Airport Strikes Deal With The Government and TfL. It contains this paragraph.

Heathrow has also announced that it is introducing Oyster and contactless payments for all rail services going into the airport. From May 2018, new ticket readers will be installed at Heathrow, so anyone using Heathrow Express and TfL Rail will be able to use an Oyster or contactless.

When I passed through Heathrow a couple of weeks ago, there was evidence of new ticket gates being installed.

Heathrow Southern Railway’s Proposed Services

Heathrow Southern Railway are proposing four services to the West of Terminal 5 at Heathrow.

  • Heathrow Express from Terminal 5 to Woking, Guildford and Basingstoke, with an additional stop at Farnborough Main.
  • Crossrail from Terminal 5 to Staines
  • A service from Terminal 5 to Waterloo with stops at Staines, Clapham Junction and possibly Ashford, Felham, Twickenham, Richmond and Vauxhall.
  • A service from Terminal 5 to Weybridge with stops at Egham, Virginia Water, Chertsey and Addlestone.

Some of the stations like those between Feltham and Waterloo already accept contactless ticking, but surely all of them must if Heathrow Southern Railway is built, as you’ll be able to use contactless ticketing at Heathrow, but not at say Woking or Basingstoke.

Onward From Basingstoke, Guildford And Woking

A proportion of travellers from places like Bournemouth, Exeter, Portsmouth, Salisbury and Southampton will use Heathrow Southern Railway to get to the airport, with an appropriate change at Basingstoke, Guidford or Woking.

Will these travellers want to use contactless ticketing?

Conclusion

There will be a lot of discussions about ticketing on the Heathrow Southern Railway.

These ticketing issues, help to make it very understandable, why MTR, a partner in South Western Railway, want to join the Heathrow Southern Railway, as I wrote about in MTR Vying To Join Heathrow Southern Rail Bid.

Travellers want the ticketing system with the least hassle and as London is proving, contactless ticketing with bank cards works well!

 

 

 

April 8, 2018 Posted by | Transport/Travel | , , , , | Leave a comment

HS2 Need To Get Their Act Together

Crossrail has been good in keeping Londoners and others informed about designs and what is happening, with constant updates to the News page on their web site.

Last month, HS2 started the contractual process to find a builder for the HS2 station at Old Oak Common.

But there is nothing about it on their News page, which is just a load of press releases.

I have found this picture of the proposed station in several places on the Internet.

But where is the detailed information page, which explains it all?

I found this map of the rail lines in Wikipedia Commons.

 

Note.

  1. It would appear that the rail line going along the North side of the common in the visualisation is the Great Western Main Line, which will also be used by Crossrail.
  2. It appears that the rail loop in the foreground of the visualisation, which is not shown on the map, is to allow Crossrail trains to access the North London Line.
  3. There must be another proposed loop or viaduct to allow trains to connect to the Northbound West Coast Main Line. This would allow Crossrail to be extended to Watford and Milton Keynes.

Where is the definitive map and information from HS2?

Old Oak Common station will affect travel plans for millions of travellers to and from most parts of London and a lot of places in the wider South East.

No wonder, there are people who don’t want HS2 to be built, if they have no information!

So why aren’t HS2 following the same news and information route, that has been successful for Crossrail?

April 7, 2018 Posted by | Transport/Travel | , , , , | 7 Comments