Is Wigan North Western Station Ready For High Speed Two?

This diagram shows High Speed Two services, as they were originally envisaged before Phase 2 was discontinued.

Note.

  1. Trains to the left of the vertical black line are Phase 1 and those to the right are Phase 2.
  2. Full-Size trains are shown in blue.
  3. Classic-Compatible trains are shown in yellow.
  4. Blue circles are shown, where trains stop.
  5. The dotted circles are where trains split and join.
  6. In the red boxes routes alternate every hour.
  7. Was Lancaster chosen as it’s close to the new Eden Project Morecambe?

Click on the diagram to enlarge it.

It would appear if High Speed Two sticks to this original pattern of services, then the following trains will go through Wigan North Western station.

  • 200 metre single train – London Euston and Lancaster, which stops at Old Oak Common, Crewe, Warrington Bank Quay, Wigan North Western and Preston.
  • 400 metre pair of trains – London Euston and Edinburgh Haymarket/Edinburgh Waverley/Glasgow Central, which stops at Old Oak Common, Preston, Carlisle.
  • 400 metre pair of trains – London Euston and Edinburgh Haymarket/Edinburgh Waverley/Glasgow Central, which stops at Old Oak Common, Birmingham Interchange, Preston, Carlisle.
  • 200 metre single train – Birmingham Curzon Street and Edinburgh Haymarket/Edinburgh Waverley or Motherwell/Glasgow Central, which stops at Wigan North Western, Preston, Lancaster, Carlisle and Lockerby and every two hours at Oxenholme and Penrith.

Note.

  1. Only single High Speed Two classic-compatible trains, stop in Wigan North Western station and they are only two hundred metres long.
  2. One train per hour (tph) terminates at Lancaster and a second tph terminates alternatively at Edinburgh Haymarket/Edinburgh Waverley or Glasgow Central.
  3. Four hundred metre long pairs of trains go through North Western station without stopping.

Currently Wigan North Western has 14 trains per day (tpd) stopping at the station, eleven of which go to Scotland and three to Blackpool.

This Google Map shows Wigan North Western station.

Note.

  1. The two long platforms in the middle of the station, where the Avanti trains stop.
  2. A long platform on the Southern side of the station used by local services to and from Liverpool and Blackpool.
  3. Three bay platforms on the Northern side of the station, one of which is unused, that handle local services to Manchester and beyond.

As the 265.3 metre long Class 390 trains can use the central platforms, High Speed Two classic-compatible trains will be able to use these platforms.

On my brief visit to the station yesterday, I took these pictures.

Note.

  1. All Class 390 trains are longer than High Speed Two classic-compatible trains, so the train in the pictures indicates that the High Speed Two trains will be able to stop at Wigan North Western station.
  2. The platforms are long and wide.
  3. The station is well-equipped with lifts, cafes, waiting rooms and some of the best toilets in a station in the North of England.
  4. Wigan Wallgate station is only a short walk away, with a selection of local services to Blackburn, Headbolt Lane, Manchester, Southport and a large proportion of Lancashire.
  5. The last two pictures were taken looking at the two stations from halfway.
  6. The shops between the two stations are a good selection and include a Morrisons Local.

I had been intending to go on to Preston, Lancaster and Morecambe, but a points failure at Preston meant that no trains were running.

Conclusion

The two Wigan stations and the buses that serve them,  could be a good interchange for passengers to catch High Speed Two.

I feel that most of the work needed to be done at Wigan North Western to get the station ready for High Speed Two will mainly be cosmetic or technical upgrades like signalling. I can’t see any expensive or disruptive upgrades like platform lengthening being needed.

May 11, 2025 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , | 3 Comments

Arriving In Liverpool Lime Street Station – 10th May 2025

Liverpool Lime Street station has one of the more spectacular approaches of British railway stations, as these pictures show.

These sections describe the approach.

Crossing The Mersey

You cross the Mersey at Runcorn on the Ethelfreda or Britannia Bridge, which is described in this Wikipedia entry.

It was completed in 1868 and hopefully in a few years, it will be carrying High Speed Two trains between London and Liverpool.

On your right as you cross the Mersey to Liverpool is the Silver Jubilee road bridge, which is a through arch bridge that opened in 1961 to replace a historic transporter bridge. I am just a little bit too young to have seen the transporter bridge.

Further to your right, you can see the Mersey Gateway Bridge, which is a cable-stayed bridge, that opened in 2017 and is described in this Wikipedia entry.

Drax’s Biomass

As you approach Lime Street station, you pass through Edge Hill, where there are the GB Railfreight sidings, where the biomass trains for Drax power station are marshalled for their journey across the Pennines. These Drax trains seem to be one of the few freight trains in the UK, that carry advertising. Tesco trains also do, but their’s is just big letters.

In Do Cummins And Stadler Have a Cunning Plan?, I talked about the possible conversion at some date in the future of GB Railfreight’s new electro-diesel Class 99 locomotives to electro-hydrogen locomotives. These locomotives will surely be ideal for hauling Drax’s biomass trains across the Pennines.

I do believe that these Class 99 locomotives are the future of heavy freight trains in the UK. In Iarnród Éireann Looks At Diesel Loco Replacement Options, I write about speculation, that Stadler may build a version for the Irish.

Through The Edge Hill Cutting

From Edge Hill a deep cutting through the sandstone takes you into Lime Street station.

It looked good in the sun, but the first time I arrived in the city to start my studies at Liverpool University, it was chucking it down and the cutting was very dark and wet.

It was a very different welcome to that, which I got yesterday.

My Train Arrived In Platform 10

Liverpool Lime Street has two cast iron train sheds.

  • The Western shed has platform 1 to 5 and generally handles trains from the East.
  • The Eastern shed has platform 6 to 10 and generally handles trains from the South.

Note.

  1. Changing between trains is just a step-free walk across the station concourse.
  2. Both sections have their own taxi rank and full-size clock.
  3. The Ticket Office is in the Western train shed.

I just walked from my train to the Ticket Office, bought a Lancashire Day Ranger ticket and then walked fifty metres to my next train.

How many stations have such an easy change of trains?

Is Liverpool Lime Street Station Ready For High Speed Two?

Consider.

  • I travelled North in an 11-car Class 390 train, which is 265.3 metres long and can carry 607 passengers.
  • As the last pictures show, the train fitted easily into platform 10.
  • High Speed Two plans to send 200 metre classic-compatible trains to Liverpool Lime Street, with each having a capacity of up to 528.

It looks to me, that these High Speed Two classic-compatible trains will fit into Liverpool Lime Street station, at any platform that currently accepts an eleven-car Class 390 train.

Looking on Real Time trains over the last few days, I’ve found eleven-car Class 390 trains using platforms 9, 10 and 6.

It seems that Network Rail’s engineers have done a superb job to turn the Grade II Listed station, into one of the best operationally.

May 11, 2025 Posted by | Design, Transport/Travel | , , , , , , , , , , , , , , , , , | 2 Comments

New Routemasters As Advertising Hoardings

Increasingly, New Routemasters are appearing as advertising hoardings.

Note.

  1. I am unsure if some of the products should be advertised so prominently.
  2. The last picture is of a naked bus to fill the space.
  3. I shall be adding to this gallery.

In Could London’s New Routemaster Buses Be Converted To Hydrogen Power?, I came to this conclusion.

I believe from my knowledge of Cummins and the way they work, that they will come up with a hydrogen-based solution, that will replace the Cummins diesel in these buses with a zero-carbon engine.

If Cummins don’t then someone else will.

Whoever solves the problem of converting London’s new Routemasters to hydrogen will have one of the best adverts for their product, there has ever been.

After converting London’s thousand Routemasters, the engineers could move on to anything powered by a Cummins engine.

It would be a quick, easy and affordable way to create a thousand zero-carbon buses.

May 11, 2025 Posted by | Design, Transport/Travel | , , , , | 2 Comments

An Annoying Day

My plan was simple on Saturday May the 10th.

I intended to go to Liverpool Lime Street on a Day Return ticket.

I would then buy a Lancashire Day Ranger ticket and visit Wigan North Western, Preston and Lancaster stations, to see how ready, they are for High Speed Two services.

I also intended to go to Morecambe to see how the Eden Project Morecambe was getting on.

I did get to Wigan North Western station and later wrote Is Wigan North Western Station Ready For High Speed Two?

But then there was a points failure at Preston and after waiting at the station for over an hour for tranport to Preston, I changed plan.

I decided to go back to Liverpool by way of Wigan Wallgate and Headbolt Lane stations.

On return home, I wrote Wigan Wallgate To Headbolt Lane – 10th May 2025.

A Quick Run Back To London

At Lime Street station, I walked into the Wetherspoons pub at the station, with the intension of buying a bottle of my favourite brew, which all of the chain stock. But not this one!

So I got an early train back to London.

The Most Expensive Taxi Back From Euston

I paid over thirty pounds, when under twenty is the norm, not because I was being ripped off, but by the number of roadworks, that slowed our journey.

May 11, 2025 Posted by | Transport/Travel | , , , , , , , , , , | 2 Comments

Does Your Car Have A Large Capacity, Dash Mounted Refrigerator?

I suspect not, but Wrightbus’s new Contour Coach will have one for the driver and the lucky soul, who sits in the other front seat.

Wrightbus have now put the specification of the Contour coach on a page that is entitled Experience The Contour Difference.

This is the introduction.

Introducing the Wright Contour Diesel Coach, where luxury, innovation, and performance come together. Since 1946, Wright has been at the forefront of transportation innovation, shaping the future with its unwavering commitment to excellence. Today, as UK’s No.1 zero-emission bus manufacturer and one of Europe’s fastest growing brands, Wright is making a bold return to the luxury coach market with the all-new Contour Diesel Coach (available in UK and Europe). In the 1980s, Wright revolutionised the luxury coach industry with its innovative, high-end Contour models, setting new standards in design and comfort. On 5th March 2025, Wright makes a bold return to the coach market with the all-new Contour Diesel Coach, redefining performance, style, and efficiency, offering spacious interiors, advanced safety features, and a high-performance Cummins X11 Euro 6 engine delivering 400hp. With competitive pricing, reduced lead times, and full service support to ‘complete Vehicle OEM and operator support’ from Wright’s All Service One Network, the Contour is built to exceed expectations. Plus, with a 2-year or 200,000km warranty backed fully by Wright, it ensures reliability and peace of mind.

I asked Google AI if the Cummins X11 engine can be converted to hydrogen and was told this.

Yes, while not inherently designed for hydrogen from the factory, the Cummins X11 engine, like many Cummins diesel engines, can be converted to run on hydrogen fuel. This involves modifications, including changing the cylinder head and fuel system.

As I discussed in Wrightbus StreetDeck Ultroliner Next-Gen To Get Cummins Power, it appears Wrightbus are going the Cummins route, to open up the possibility of converting the vehicles to hydrogen at some point in the future.

Cummins have certainly seen a green vision. on the Road to Net Zero, which seems to go via their Darlington factory.

 

The coach specification includes.

  • Premium reclining seats for all passengers.
  • Adjustable armrests, and USB ports at every seat.
  • Safety features like 3-point seat belts and ‘buckle up’ alerts.
  • Powered doors to the lockers underneath.
  • Reversing and rear-door cameras.

Wrightbus are also promising reduced lead times, which in my experience as a part-owner of a leasing company, that financed a large number of coaches, is very much to be welcomed.

Hydrogen Fuel Cell-Powered Coaches

Two trips convinced me, that hydrogen fuel cell coaches are the way to go.

In Riding Rail Air Between Reading Station And Heathrow Terminal 5, I did what it says in the title.

I was very disappointed.

The coach may have been a nearly-new top-of-the-range model, but my journey was to the accompanying thump-thump-thump of the diesel engine. There were also no USB ports, which these days many British Rail-era trains are sporting.

In Sutton Station To Gatwick Airport By Hydrogen-Powered Bus, I also did what it said in the title.

I was very impressed and it convinced me that hydrogen fuel cell-powered coaches could be an interesting proposition.

The power unit was mouse-quiet and the bus had more than adequate performance for the route, through the Surrey Hills.

It would be a very fruitful experiment, if say a twenty-mile route to say an airport, that is currently run by a traditional diesel coach, were to be replaced by a hydrogen fuel cell-powered bus, with a more luggage-friendly interior.

  • Would passenger numbers increase?
  • Would the number of airport workers using the service increase?

I believe that in a few years diesel coaches will be filed under Betamax.

Is There A Market For A Wrightbus Hydroliner FCEV-based Hybrid Coach?

A few years ago, there was a plan, to improve public transport to Heathrow, that would have seen the Elizabeth Line to Terminal 5 extended to Staines. I went to Staines and discussed this with one of the staff at the station.

He was all for this, as it would have given staff at the airport and in the airlines, an easy route to and from work, which would mean, they didn’t have to pay to take their car, especially, when they were working difficult shifts.

A Wrightbus Hydroliner FCEV, with a hybrid interior geared to both passengers with heavy luggage and passengers and airport and airline workers with just a carry-on size bag, might appeal to some operators.

Especially for some of the night bus routes operating to Heathrow.

May 11, 2025 Posted by | Design, Hydrogen, Transport/Travel | , , , , , , | Leave a comment