The Anonymous Widower

LNER Tickets For Christmas Getaway

The title of this post, is the same as that of an article in Edition 939 of Rail Magazine.

These are the first two paragraphs.

LNER has made available thousands of Advance tickets for the festive period.

It follows research by the operator suggesting that some 48% of people are planning to travel this Christmas to see family and friends, with 30% of them looking to book at least six weeks in advance.

This is surely a good thing and will LNER eventually copy Lumo in allowing ticket purchases longer in advance?

The article says that LNER Internet enquiries and ridership are on the up, with the latter at over 90 % of pre-pandemic levels.

 

September 12, 2021 Posted by | Transport/Travel | , , , | 1 Comment

Open Access Operators And The Lumo Model

In the UK, there are only three established Open Access operators, who run UK train services.

  • Grand Central
  • Heathrow Express
  • Hull Trains

From the 25th of October, they will be joined by Lumo.

We probably don’t think of Heathrow Express as an Open Access operator and as it is effectively a short distance special service with new trains between Heathrow and Paddington, it has its own business model, that may or may not survive.

But how will Lumo and their bold new business model affect Grand Central, Hull Trains and any future Open Access operators?

Grand Central Trains

Grand Central is a well-established Open Access operator.

  • They run services between London King’s Cross and Bradford Interchange, Sunderland and several other convenient en-route stations.
  • They are owned by Deutsche Bahn.
  • They also regularly seem to apply for new routes and extra services.

But they have a big problem fast catching up on them; they have a diesel-only fleet and need to decarbonise.

I also think that all express passenger services on the East Coast Main Line will at some date need to be run by 140 mph trains capable of running with full digital signalling and a degree of Automatic Train Operation.

In Lumo: Why Won’t The New Train Service Stop At Yorkshire Stations?, I said that to continue to be successful, they probably need to embrace the Lumo model and acquire new trains.

I will repeat what I said in the related post.

This would entail.

  • The ten diesel Class 180 trains would be replaced by new electric trains.
  • The trains would need a 140 mph capability under digital signalling to fit in with the plans of Network Rail, LNER and Lumo to create a top-class high-speed high-capacity East Coast Main Line.
  • The trains would need a battery capability as Grand Central’s routes are not fully electrified.
  • They could copy Lumo’s green marketing philosophy, ticketing and catering offering.

As to the trains, I’m sure that Hitachi could offer a version of their Intercity Tri-Mode Battery Train, the specification of which is shown in this Hitachi infographic.

The trains would need a range of fifty miles on battery-power.

I have some other thoughts.

Financing

If you look at the finances of decarbonising Grand Central, they would need a new fleet of ten trains, which as Lumo’s fleet of five trains are reported to be costing £100 million, so that figure can be at least doubled.

There would also be costs for the two charging systems at Bradford Interchange and Sunderland. But at least there are several possible solutions for charging systems, so the price will probably not be more than a few million, if that.

Will Deutsche Bahn be prepared to stump up the extra finance?

A Service To Cleethorpes

In the Wikipedia entry for Grand Central, there is a section which is entitled London Kings Cross to Cleethorpes, which outlines a proposed service.

  • It would split and join with the London King’s Cross and Bradford service at Doncaster.
  • It would call at Crowle, Scunthorpe, Barnetby, Habrough and Grimsby.
  • Doncaster and Cleethorpes is 52.1 miles and should be in range of a Battery-electric train with a charging system at Cleethorpes.

Using current times from LNER and TransPennine Express, I estimate that Hitachi Intercity Tri-Mode Battery Trains could travel between London and Cleethorpes in around two hours and twenty minutes.

With digital signalling on the East Coast Main Line to the South of Doncaster, the overall time could be much closer to two hours.

This could be a very viable service with battery-electric trains capable of running at 140 mph on the East Coast Main Line and for sixty miles at 100 mph on battery power.

Maximising The Use Use Of Train Paths By The Use Of Splitting And Joining

The proposed service to Cleethorpes is a classic use of splitting and joining, which enables two separate services to run a large part of their routes together.

  • On the East Coast Main Line, it means that maximum use can be made of the paths available.
  • Splitting and joining is part of the specification for the Hitachi trains and they do it automatically in under two minutes.
  • LNER are already talking about using the technique to serve various destinations from Leeds.

I wouldn’t rule out Grand Central’s two services working as a pair between London King’s Cross and Doncaster, where they would split and join.

Conclusion On Grand Central Trains

Decarbonisation with high-speed battery-electric trains could ensure the future of Grand Central Trains.

Hull Trains

Hull Trains is another well-established Open Access operator.

  • They run services between London King’s Cross and Hull and Beverley.
  • They have a fleet of five bi-mode Class 802 trains.
  • The company is part of First Group.

Hull Trains don’t have the decarbonisation problem of Grand Central Trains, as I suspect Hitachi will come up with a solution to turn Class 802 trains into a battery-electric train with a range of perhaps seventy miles on battery power.

  • Beverley and Temple Hirst junction is a distance of 44.3 miles and is the only section of the route without electrification.
  • Charging of the batteries will be needed at the Eastern end and probably would be best handled by a short length of electrification in Hull station or between Hull and Brough stations.

The Class 802 trains are also ready for updating to run under the new digital signalling of the East Coast Main Line.

First Harrogate Trains

First Harrogate Trains was a subsidiary of Hull Trains, which hoped to run the following services.

  • London King’s Cross and Harrogate via York
  • London King’s Cross and Cleethorpes via Peterborough, Spalding and Lincoln

Both these services could be run in conjunction with the current service with an appropriate split and join.

Conclusion On Hull Trains

As both Hull Trains and Lumo share London King’s Cross and are both owned by First Group, I would expect that both train operators would share some services, methods and ideas.

There may be advantages if Hull Trains’s Class 802 trains and Lumo’s Class 803 trains could run each other’s services.

Grand Union

Grand Union is a prospective open access operator who are proposing to operate train services from England to Wales and Scotland.

They are proposing two services.

London Paddington and Cardiff Central via Reading, Bristol Parkway, Severn Tunnel Junction, Newport and Cardiff Parkway, with a possible extension later to Swansea andLlanelli or Carmarthen.

London Euston and Stirling via Milton Keynes Central, Nuneaton, Crewe, Preston, Carlisle, Lockerbie, Motherwell, Whifflet, Greenfaulds and Larbert.

Note.

  1. London Paddington and Cardiff Central is fully electrified, but there is no electrification West of Cardiff Central.
  2. Cardiff Central and Swansea are 45.7 miles apart.
  3. London Euston and Stirling is fully electrified.

Currently, the rolling stock for both services is proposed to be a tri-mode Class 93 locomotive hauling a rake of Mark 4 coaches and a driving van trailer.

The locomotive should be capable of handling the routes to Stirling and Cardiff using the electrification alone.

When the Cardiff route is extended, Grand Union would intend to use Class 802 trains, which could be fitted with batteries to serve Swansea, where the batteries would be charged.

There is no sign as yet, that the Office of Rail and Road have approved any of their possible services, but both services might be improved with some Lumo-style thinking.

Alliance Rail Holdings

Alliance Rail Holdings, which is a sister company to Grand Central, is ultimately owned by Deutsche Bahn, seems to have several ideas for new services, but only seems to have got approval to one.

They were given approval some years ago to run a service between London Euston and Blackpool North.

  • Calls would be made at Poulton-le-Fylde, Kirkham and Wesham, Preston, Nuneaton and Milton Keynes Central.
  • There will be six trains per day.
  • Trains would be InterCity 225 trains.
  • The approval is for seven years from 2018.

But because of the pandemic it hasn’t run.

Conclusion

The Lumo model will affect all these services.

 

 

 

September 12, 2021 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , | 3 Comments

My Ticket To Ride

I’ve just picked up my ticket to ride to Edinburgh on the 27th of next month from Dalston Junction station.

All very conventional!

September 11, 2021 Posted by | Transport/Travel | , | 5 Comments

Lumo: Why Won’t The New Train Service Stop At Yorkshire Stations?

The title of this post, is the same as that of this article on the Yorkshire Post.

This is the first article, I’ve found about Lumo, that has a negative headline.

The reason is probably very simple, in that most Lumo services are planned to stop at only at Newcastle and Morpeth, with two services having an extra stop Stevenage.

They are intending to run the service in as short a time as possible between London King’s Cross and Edinburgh.

As each stop has a time penalty, not stopping in Yorkshire will give potential to go cut the journey time.

But the positive message that comes from the writer of the Yorkshire Post article is that Yorkshire likes the concept.

This paragraph is their take on the service.

The goal is to encourage a more environmentally friendly mode of transportation and affordable travel. Lumo will provide low-carbon emissions, affordable long-distance travel for more than one million passengers every year.

Perhaps they would like their own Yorkshire flyer.

The obvious way for this to happen would be for the Open Access operator; Grand Central to convert themselves into a train operator like Lumo.

  • The ten diesel Class 180 trains would be replaced by new electric trains.
  • The trains would need a 140 mph capability under digital signalling to fit in with the plans of Network Rail, LNER and Lumo to create a top-class high-speed high-capacity East Coast Main Line.
  • The trains would need a battery capability as Grand Central’s routes are not fully electrified.
  • They could copy Lumo’s green marketing philosophy, ticketing and catering offering.

As to the trains, I’m sure that Hitachi could offer a version of their Intercity Tri-Mode Battery Train, the specification of which is shown in this Hitachi infographic.

The trains would need a range of fifty miles on battery-power.

Charging facilities wold be needed at Bradford Interchange and Sunderland stations, as neither has suitable 25 KVAC overhead electrification.

Conclusion

The conversion of Grand Central to work on the Lumo model is possible and as the trains will need to be changed to zero-carbon ones soon to meet decarbonisation objectives, I would suspect that at least that will happen.

 

 

 

September 11, 2021 Posted by | Transport/Travel | , , , , , , , , | 1 Comment

New East Linton Station Development Given The Go Ahead

The title of this post, is the same as that of this article on Rail Technology Magazine.

This is the first paragraph.

Proposals to open a station in the village of East Linton, for the first time in over half a century, have just been approved by East Lothian Council’s planning committee.

In The Scottish Borders Have Caught London Overground Syndrome, I said this.

It would also appear that because of the success of the Borders Railway, that there are suggestions to add new stations on the East Coast Main Line at Reston and East Linton. This is said under Future in the Wikipedia entry for East Linton station.

Proposals to reopen the station, along with the former station at Reston, have received the backing of John Lamont MSP, who has taken the case to the Scottish Parliament. A study published in 2013 proposed that East Linton and Reston stations be reopened. Since Abellio ScotRail took over the franchise in April 2015, they have now committed to reopening East Linton and Reston Stations as part of the local Berwick service by December 2016 but due to the shortage of rolling stock this will now commence in December 2018.

So it would appear there is a high chance it will happen.

Reston station is well on the way to completion and the site is shown in this Google map.

Note.

  1. The East Coast Main Line running between the North-West and South-East corners of the map.
  2. The brown scars around the railway indicate the site of the station.
  3. The main A1 road is just off this map to the North.

In New Rail Service From Newcastle To Edinburgh To Stop At These Northumberland Stations, I indicated that a new service from TransPennine Express will start running in December 2021 and will call at Reston station, when it opens.

Now East Linton station is on its way.

This Google Map shows the village of East Linton.

Note.

  1. The East Coast Main Line going through the middle of the village.
  2. The A1 curves South of the village.

Will the station be built in the middle of the village?

The page on Scotland’s Railway, indicates it will be.

East Linton and Reston stations seem to be progressing at speed, but then so did Horden and it appears Soham will be open this year.

Network Rail seem to have at last got their project management right.

 

September 10, 2021 Posted by | Transport/Travel | , , , , | Leave a comment

The London And Edinburgh Travel Market

This paragraph comes from of this article on Railway Gazette.

Lumo is aiming to carry more than 1 million passengers per year. It is particularly targeting people who currently fly between Edinburgh and London; in June it says there were 74 764 air journeys on the route, compared to 82 002 by rail.

Lumo’s million passengers per year, will equate to around 83,300 passengers per month.

What these figures don’t show is the number of rail journeys made to intermediate stations like Newcastle, York, Doncaster and Peterborough.

These are a few thoughts.

Rail Capacity Between London And Edinburgh

Consider.

  • LNER is currently the only rail carrier offering a daytime service between London and Edinburgh.
  • LNER run approximately 26 trains per day (tpd) in both directions between London and Edinburgh.
  • A nine-car Class 801 train can carry 510 Standard Class passengers and 101 First Class passengers.

That means that LNER had a capacity of just over 950,000 seats in June.

It might seem poor to have only sold 82,002 seats in June between London and Edinburgh, which is just 8.6 % of the available seats.

On the other hand, LNER’s two trains per hour (tph) are a lot more than London and Edinburgh trains, as they connect towns and cities all the way up the East Coast Main Line between London and Aberdeen.

Lumo’s capacity of a million seats per year, works out at 83,300 seats per month, which is another 8.7 % of capacity.

  • Lumo will sell seats on price initially and I suspect they’ll end up running about 85-95 % full.
  • It has been stated that they need to run 80% full to break even.
  • I also think, that they would like to have a few seats for late bookers.

But even so, they will surely affect LNER’s bookings.

What Will LNER Do?

Several of the things, that Lumo are doing can be easily copied by LNER.

  • Early booking.
  • Improve onboard service.
  • Better seating.

They could even reduce prices.

I think it is very likely we could end up with a price and service war between LNER and Lumo.

Would The Airlines Be The Losers?

This could be an outcome of competition between LNER and Lumo.

We are now talking about times of around four hours and twenty-five minutes between London and Edinburgh, but there are improvements underway on the East Coast Main Line.

  • The remodelling of the approach to Kings Cross station has not been reflected in the timetables.
  • The Werrington Dive Under has not been completed yet.
  • Digital signalling is being installed South of Doncaster.
  • The power supply is being upgraded North of Newcastle.

When these and other improvements are complete, I can see journey times reduced below four hours.

But would that only be for starters?great b

If a 1970s-technology Intercity 225 train, admittedly running as a shortened train formation, could achieve a time of just under three-and-a-half hours for the 393.2 miles between Kings Cross and Edinburgh stations in September 1991, what could a modern Hitachi train do, if all of the improvements had been completed and perhaps half of the route could be run at 140 mph under the watchful eyes of full digital signalling and an experienced driver.

Consider.

  • London and York is nearly two hundred miles of fairly straight railway, that is ideal for high speed.
  • Current trains run the 393.2 miles in four hours 25 minutes, which is an average speed of 89 mph.
  • A train running at 89 mph would take two hours and fifteen minutes to cover 200 miles.
  • A train running at 125 mph would take one hour and thirty-six minutes to cover 200 miles.
  • A train running at 140 mph would take one hour and twenty-six minutes to cover 200 miles.

When Network Rail, Great British Railways or the Prime Minister renames the East Coast Main Line as High Speed East Coast, I think we can be sure that trains between London and Edinburgh will be able to achieve three-and-a-half hours between the two capitals.

High Speed Two is only promising three hours and forty-eight minutes.

What About LNER’s New Trains?

LNER Seeks 10 More Bi-Modes, was written to explore the possibilities suggested by a short article in the December 2020 Edition of Modern Railways.

There has been no sign of any order being placed, but Hitachi have moved on.

  • They are building the prototype of the Hitachi Intercity Tri-Mode Battery for testing on the Great Western Railway.
  • They have completed some of the Class 803 trains for East Coast Trains, which has now been renamed Lumo. These trains have a battery for hotel power in case of catenary failure, but no diesel engines.
  • They are building the Class 807 trains for Avanti West Coast, which appear to be designed for high speed and have no batteries or diesel engines.
  • The latest versions of the trains will have a reshaped nose. Is it more aerodynamic at high speeds?

It does seem that there is an emphasis on speed, better acceleration and efficiency.

  • Could the lessons learned be used to improve the performance of the existing trains?
  • Could a small high performance sub-fleet be created to run LNER’s Scottish services?

There are certainly possibilities, that would cut journey times between London and Edinburgh.

Conclusion

I can see the airlines flying between London and Edinburgh suffering a lot of collateral damage, as the two train companies slug it out.

 

September 10, 2021 Posted by | Transport/Travel | , , , , , , , , , , , , | 4 Comments

LNER’s Terrible Tickets

On my last trip on LNER to Spalding, I had to buy the tickets in the Booking Office, as I can’t get the hang of their machines at King’s Cross.

Like several other companies, they have changed to thermal tickets.

They are awful!

  • You can’t put them in a typical pocket in a wallet.
  • They curl up.
  • I constantly drop them, because my left hand doesn’t work properly.
  • Is thermal paper as environmentally-friendly as the credit-car-sized card tickets?

They should be banned as soon as possible!

 

September 10, 2021 Posted by | Transport/Travel | , , | 5 Comments

The Definitive Seating Layout Of Lumo’s Class 803 Trains

This article on Economy Class and Beyond is entitled Enter Lumo – The New East Coast Railway Competitor.

It contains a drawing from Lumo,  which shows the layouts of the seats on the train.

  • Coach A – 44 Standard seats – 8 Priority seats – 2 Wheelchair spaces – 2 Tip up seats – Accessible toilet – 56 Total seats
  • Coach B – 84 Standard seats – 12 Priority seats – Bike store – Toilet – 96 Total seats
  • Coach C – 84 Standard seats – 12 Priority seats – 96 Total seats
  • Coach D – 84 Standard seats – 12 Priority seats – Bike store – Toilet – 96 Total seats
  • Coach E – 52 Standard seats – 8 Priority seats – 2 Tip up seats – Accessible toilet – 62 Total seats

Note.

  1. This is a total of 406 seats.
  2. Judging by the position of the tip-up seats they are for staff and perhaps emergency use, if say a coffee gets spilled on a seat.
  3. Each car has a pair of tables, where four can sit. As Lumo’s business model allows early booking, if you and your partner want to take the kids to see granny on her birthday, you should be able to get a table, by booking early.
  4. There are two bike stores in Coaches B and D.

These are some further thoughts.

Toilet Provision

I was on an LNER Class 800 train earlier this week and needed to go to the toilet.

  • I wasn’t sure which way I needed to go, as I couldn’t see a sign pointing me to the toilet, but in the end I struck lucky.
  • You don’t have that problem with Lumo’s trains, as there appears to be a toilet at both ends of the three middle coaches, either in your car or the next.
  • If you’re in one of the driver cars, there is an accessible toilet at the blunt end.

I don’t think anybody will argue with the toilet provision on Lumo’s trains.

Can The Trains Be Lengthened?

If you look at the diagram of the train, Coaches B and D appear to be identical with a toilet and a bike store at one end.

These ends are connected to the centre car, which doesn’t have its own toilet, but passengers can use the toilets in the next coaches.

One of the advantages of this layout is that although it is a five-car train, it only has four coach types, which must help in both manufacture and maintenance.

But it also helps, if the train service is successful and more capacity needs to be provided.

An extra coach just needs to have a toilet at one end and when it is slotted into the formation. The train software, then automatically acknowledges the additional car.

The rule of having a toilet at both ends of the centre coaches will not be broken.

These trains are certainly designed for a service that could be more successful, than the train operator has initially planned.

The maths of lengthening are very simple.

  • Each new coach will add another 96 seats.
  • The five trains (25 coaches) cost £100 million.
  • That is £4 million per coach.
  • All stations on the route are capable of handling at least nine-car trains.

Different lengths of trains would give the following increases.

  • Six-car trains would hold 502 seats and increase capacity by 24 %.
  • Seven-car trains would hold 598 seats and increase capacity by 47 %.
  • Eight-car trains would hold 694 seats and increase capacity by 71 %.
  • Nine-car trains would hold 790 seats and increase capacity by 94 %.

The ability to lengthen trains so easily, must mean that Lumo can match their train size to demand, without needing any extra expensive train paths.

Bicycle Storage

There are two bike storage racks in Coaches B and D.

As there has been complaints about bicycle storage on these Hitachi trains, I would assume that Lumo have got the provision right for the target market.

Wheelchair Travellers

These are positioned next to one of the accessible toilets, which is standard practice.

How Will These Trains Compare To Budget Airliners?

This is not a great picture of even a boring subject like the A14 going over the East Coast Main Line.

But it was taken from an airline-style seat through the wide window of an LNER Hitachi train, that is in the same family as the trains purchased by Lumo.

Try taking a decent picture through the porthole on a budget airliner.

If Lumo have used decent seats for the trains, they will have the budget airlines screwed, glued and tattooed on the London and Edinburgh route.

Conclusion

These are certainly trains designed for their market.

September 9, 2021 Posted by | Design, Transport/Travel | , , | 1 Comment

Lumo Aims To Be The Green Alternative To Edinburgh – London Flights

The title of this post, is the same as that of this article on Railway Gazette.

Some points from the article.

Lumo Is Targeting Flyers

This is a paragraph.

Lumo is aiming to carry more than 1 million passengers per year. It is particularly targeting people who currently fly between Edinburgh and London; in June it says there were 74 764 air journeys on the route, compared to 82 002 by rail.

I find it interesting that the number of passengers using air and rail are within nine percent. I thought it would have been more of a difference.

The Service Will Ramp Up

This is a paragraph.

Services will ramp up over a period of months to the planned timetable of five trains each way per day. A small increase is envisaged at the December timetable change, followed by full implementation in Q1 2022.

There is a lot of training to do and some more Class 803 trains to be delivered.

Viability Level

Industry sources are quoted that at the prices charged, the trains will need to be eighty percent full to be viable.

As a Control Engineer, who has built hundreds of mathematical models, I am fairly certain, that by adjusting ticket prices and getting the marketing right, they’ll hit that level.

Late Bookers

The eighty percent viability level probably means that they can afford to leave a few seats available for those that need to book the day before.

Yesterday, when I went to Spalding, I bought my ticket in the Booking Office half-an-hour before travel and got a seat with a window.

Seat allocation algorithms on LNER seem to be very good and I don’t think Lumo’s will be in any way inferior.

Early Bookers

The article says advance tickets can be bought earlier than the usual twelve weeks.

So say you always travel to Scotland for your mother’s birthday, you can buy the ticket early and not be hit by low availability, as it turns out later that Rangers are playing Celtic on the day you travel.

Mutual Support In Case Of Disruption

This is a paragraph.

Reciprocal contracts providing support in case of disruption have been signed with other operators, including LNER.

I think in all the troubles yesterday, that I wrote about in Azumas Everywhere!, LNER could have done with some help yesterday.

Lumo Want To Grow Rail

This is a quote from the company.

We want to grow rail and bring people to a more sustainable, environmentally way of travelling.

They also seem fairly relaxed if you want to travel in First on LNER.

Luggage

This is a paragraph.

Passengers will be able keep their luggage close by or, for an additional charge, have it delivered to their final station or destination.

Does that mean you’re going to Edinburgh to see the family at Christmas and the New Year, you can take a lot of luggage and get it delivered both ways?

Efficient Running North Of Newcastle

I particularly liked this paragraph.

The trainsets will be able to run with power draw limited to 80% of normal on the northern part of the East Coast Main Line where there is limited power supply, with modelling by FirstGroup’s engineers and Network Rail suggesting that for five-car sets this will not affect sectional running times and will allow electric trains to continue running.

If you’re on time, the passengers won’t mind, but the electricity saved is all profit.

As a Control Engineer, my philosophy would be to have an economy mode for 80 % power sections.

  • Trains would enter these sections with a full battery, that had been charged earlier from the electrification.
  • The battery would provide hotel power in these sections.
  • Traction power would come from the electrification.
  • Trains could leave these sections with an almost flat battery.

The battery is not used for traction, but because it is handling the hotel power, less power is drawn from the electrification for traction.

I always remember Freddie Laker was keen on getting his pilots to save fuel.

Charging The Hotel Power Battery

Obviously this can be charged from the overhead electrification, although I doubt they would charge it in sections where power supplies are limited.

But can the battery be charged using regenerative braking?

In Do Class 800/801/802 Trains Use Batteries For Regenerative Braking?, I tried to answer this question using the information in this document on the Hitachi Rail web site, which is entitled Development of Class 800/801 High-speed Rolling Stock for UK Intercity Express Programme , which was published in 2014 and contains this diagram of the traction system.

Note that BC in the diagram stands for battery charger. So even in 2014, Hitachi were thinking about batteries.

In this diagram it seems to me, that electricity for the Auxiliary Power Supply and charging any batteries, can come from these sources.

  • The Electrification
  • The Generator Unit, if fitted
  • The Drive Converter if it can divert regenerative braking energy to the APS.

It is all very comprehensive.

Handling Engineering Blockades

This is a paragraph.

Lumo has looked at how to manage any engineering blockades involving diversions away from the wires, with options including transfers to Hull Trains or TPE services operated using bimode trainsets, transfer to buses if no alternatives are available, and even the cancellation of a service if passengers indicate they would prefer not to travel if their journey will be disrupted.

Being part of a larger group always helps.

Borrowing Trains

Yesterday, whilst waiting to leave Peterborough, I saw a TransPennine Express Class 802 train go through.

Peterborough isn’t exactly near the Pennines!

On checking today, it appears it was running in one of Lumo’s paths.

So was the train being borrowed for training purposes?

But I can envisage, when a difficult blockade say around Newark is to be enacted, that Lumo would borrow a bi-mode from TransPennine Express, so they could use diesel to run the service via Lincoln.

Conclusion

There’s a lot more to Lumo than has so far been disclosed.

In the meantime read the Railway Gazette article, as there’s more there for starters.

September 9, 2021 Posted by | Transport/Travel | , , , , , , , , | 4 Comments

Werrington Dive-Under – 8th September 2021

I had gone to Peterborough to take pictures of the Werrington Dive Under, from a train between Peterborough and Spalding.

I took these pictures going Peterborough and Spalding.

My train between Peterborough and Spalding stations took the following route.

  • The Class 158 train was a great improvement on the Class 153 train, I took in From Peterborough To Lincoln in 2015.
  • It started in Platform 1b at Peterborough station.
  • It then crossed over to the Down Fast line to go North.
  • Finally, it slowed to cross the Up Fast and Up Slow lines to go towards Spalding.
  • It is surely not an efficient and the safest way to run a railway.

Think about turning right on a busy dual carriageway, by going through a gap in the central reservation.

This diagram shows the new track layout of Werrington Junction.

Note.

  1. My train was going North on Line 5, so it had to use the two crossovers to get to the lines to Spalding.
  2. The Up Stamford (Line 4) can be seen in the pictures after the two lines have disappeared into the dive-under.

It’s a pity the first of my pictures aren’t better, but the sun was in the wrong direction.

I took these pictures going Spalding and Peterborough.

Note.

  1. The train used the Up Slow (line 7) to go between Werrington Junction and Peterborough station.
  2. The last two pictures show the Class 158 train in Platform 1b at Peterborough station.

At least this time, the train didn’t cross the Fast lines.

Will Passenger Trains Use The Werrington Dive-Under?

I’m very sure they will!

  • On the Western side of Peterborough station, there are four platforms 4 to 7 and an avoiding line for freight trains going North.
  • It appears that all of these lines can access the Down Stamford (Line 1) and Up Stamford (Line 4) to go to Werrington Junction.
  • At Werrington Junction, trains either take the route to Stamford or use the dive-under for Spalding.

It looks to me, that if the trains to and from Spalding terminated in one of the Western platforms, then they could use the Stamford Lines to access the dive-under and they wouldn’t cross the Fast Lines of the East Coast Main Line on the flat.

Greengauge 21’s Suggestion, That Thameslink Be Extended To Spalding

In the study by Greengauge 21, which is entitled Connecting East Lincolnshire, this is said.

As noted the Spalding-Peterborough line should be a strong candidate for electrification because of its freight potential, and if so it could also accommodate an extension of Thameslink services from London and the South East to Spalding where interchange would be made with a Spalding–Boston–Louth–Grimsby express bus using the A16.

This proposal may be possible, if instead of using the dive-under, the Thameslink trains were able to use the Up Slow (line 7) to go both ways between Werrington Junction and Peterborough station.

As in the near future, full digital signalling will apply through Peterborough, this shouldn’t be a problem.

Electrification Of The Werrington Dive-Under?

Consider.

  • There is a gap of around ninety miles in the freight route between the comprehensive electrification at Peterborough and Doncaster stations on the Great Northern and Great Eastern Joint Line (GNGE).
  • There are dozens of level crossings.
  • The route goes through the centre of Lincoln, where there are two level crossings.

There are two ways of decarbonising the route.

  • Full electrification
  • Using hydrogen-powered freight locomotives.

Both solutions have their proposers and opponents.

I favour hydrogen-electric hybrid locomotives, that can use electrification where it exists, as it reduces the infrastructure cost on overbridges and in freight depots.

  • Hydrogen-powered locomotives have a go-anywhere capability.
  • There are also a lot of routes in the UK, where freight trains currently run and it would take a long time to electrify all of them.
  • As rail freight companies would have to purchase a lot of new locomotives, I can see them opting for hydrogen-electric hybrid locomotives.

But there are others, who think the only way is full electrification.

London And Lincolnshire By Electric Train

Passenger trains are not a problem, as Alstom, CAF, Hitachi, Stadler and others have demonstrated battery ranges of over fifty miles.

LNER are currently serving Lincoln from London using Hitachi bi-mode Class 800 trains, which use diesel for the 16.5 miles between Newark and Lincoln.

Hitachi’s proposed Intercity Tri-Mode Battery Train, is described in this Hitachi infographic.

I believe it would be possible to handle London and Lincoln via Newark without using diesel.

It also looks like it will be possible to convert the LNER’s current Class 800 trains into Intercity Tri-Mode Battery Trains.

But I doubt their range would sufficient to go between London and Lincoln via Peterborough, Spalding and Sleaford, unless there were to be a charging system at Lincoln.

But surely though, the ideal train for Lincolnshire would be a train that ran between London and Cleethorpes via Peterborough, Spalding, Sleaford, Lincoln, Market Rasen and Grimsby Town.

  • Peterborough and Lincoln is 56.9 miles.
  • Lincoln and Cleethorpes is 47.2 miles.
  • The service could be timed for a convenient interchange with the other Lincolnshire train services.
  • The service could run perhaps a few times per day.

With charging systems at Lincoln and Cleethorpes, similar to the Hitachi ABB Power Grids system that I described in Solving The Electrification Conundrum, this service could be run by an Intercity Tri-Mode Battery Train.

Peterborough And Lincolnshire By Electric Train

If you could run between Peterborough and major places in Lincolnshire, as part of a London service, I also suspect that a well-designed Peterborough and Lincolnshire service could serve Lincolnshire almost equally well.

It might use Platform 5 to terminate at Peterborough.

  • This is paired with Platform 4, which is the platform generally used by LNER trains from London, so there would be a cross-platform interchange going North.
  • Going South, there would be a need to use the footbridge.

How many people would use an hourly cross-TransLincs service?

 

September 9, 2021 Posted by | Transport/Travel | , , , , , , , , , | 2 Comments