Rolls-Royce Supplies mtu Large-Scale Battery Storage To Secure The Latvian National Grid

The title of this post, is the same as that of this press release from Rolls-Royce.

These four bullet points, act as sub-headings.

  • Latvia synchronizes its electricity grid with the European grid in 2025
  • Large-scale battery storage system from Rolls-Royce ensures stability of the power grid in Latvia
  • Transmission system operator AST orders 160MWh mtu EnergyPack
  • Facility will be one of the largest battery storage systems in the EU

This is the first paragraph.

Rolls-Royce has received an order from the Latvian transmission system operator Augstsprieguma tikls (AST) to supply an mtu large-scale battery storage system to secure the Latvian power grid. In 2025, Latvia, together with the other Baltic states, will synchronize its energy supply system with the continental European power grid.

Note.

  1. This is a Rolls-Royce press release, not a Rolls-Royce mtu press release.
  2. Recently, Rolls-Royce mtu supplied the generators for Redditch power station, which I wrote about in Centrica Completes Work On 20MW Hydrogen-Ready Peaker In Redditch.
  3. In The Modern Way To Grow Tomatoes, I describe how a Rolls-Royce mtu Combined Heat and Power unit (CHP), is used in the growing of tomatoes.

Could it be that using the Rolls-Royce name prominently, makes sales easier?

April 2, 2024 Posted by | Energy, Energy Storage | , , , , , , , | 2 Comments

The Modern Way To Grow Tomatoes

I was looking around the Centrica Business Solutions web site, when I found this page, which is entitled Second CHP Powers New Greenhouses At Frank Rudd & Sons, that describes how tomatoes are grown in large greenhouses.

These paragraphs introduce Frank Rudd & Sons and what they do.

Frank Rudd & Sons is a family-run producer of cherry vine and plum tomatoes, generating around 1,500 tonnes of produce every year. Based in Over Peover, near Knutsford, the business was started in 1939 and is now run by the third generation of the Rudd family.

Their greenhouses use an innovative growing system, with suspended grow bags full of nutrient seed. This means they’re able to grow tomatoes for 11 months of the year – and also means they have a continual need for heat.

What’s more, when they constructed new greenhouses – going from 9 acres of glass to 15 acres – Frank Rudd & Sons needed an energy partner who could support their increase in demand.

These paragraphs describes Centrica Business Solutions’s solution.

Centrica Business Solutions originally partnered with Frank Rudd & Sons in 2017 to install a new Combined Heat and Power (CHP) unit to power their operations. When Frank Rudd & Sons began to expand their greenhouses in 2023, they needed to install a second CHP to meet their increased demand. Once again, they invited Centrica Business Solutions to support.

We designed and installed a turnkey 1.5MW CHP system to power their production processes. The CHP generates heat and carbon dioxide, which are both fed into their greenhouses and are vital components to the growing process. The system also generates electricity, which Frank Rudd & Sons sells back to the grid through an export agreement – giving the business a significant ongoing revenue stream.

One of the pictures shows that the CHP unit is from Rolls-Royce mtu.

March 17, 2024 Posted by | Energy, Food | , , , , | 4 Comments

Poo power To Heat Homes In West London As Thames Water Continues To Reduce Its Carbon Footprint

The title of this post, is the same as that of this press release from Thames Water.

These are the three bullet points.

  • Thames Water unveils its second successful gas-to-grid project.  
  • Around 4000 homes in West London will be heated using converted sewage sludge from Mogden sewage treatment works starting early this year.   
  • This initiative is part of Thames Water’s commitment to reduce its carbon emissions across its operations thereby reducing its contribution to the causes of climate change. 

These three paragraphs outline the project.

Thames Water has announced sewage sludge will be used to heat homes in West London early this year, after successfully delivering its second gas-to-grid (G2G) project, at its Mogden Sewage Treatment Works (STW).

The success of the gas-to-grid model established at Deephams STW in North London in 2021, where biogas is converted into biomethane to heat homes in Enfield, served as the blueprint for the project at Mogden.

Currently serving over 2 million customers, Mogden is the third largest STW in the UK, and has the potential to reach and supply gas to 4000 homes in West London. This comes as part of the company’s commitment on energy transition, by transforming the way it creates and uses power to reach net zero carbon emissions.

The press release then gives a paragraph of explanation as to how the system works.

A byproduct of the sewage treatment process is sewage sludge, which is then digested to produce BioGas. Mogden STW then generates electricity with this BioGas via Combined Heat and Power (CHP) engines. The Gas-to-Grid plant, which will be managed by gas supplier SGN, intends to take a proportion of this BioGas and to ‘uprate’ it to export quality which is achieved by filtering, scrubbing and then compressing gas so it can be used as fuel for cooking and heating.

This Thames Water graphic illustrates the process.

This press release is not Thames Water’s image from many of its customers.

January 26, 2024 Posted by | Energy | , , , , , , , | 2 Comments

Google Starts Building £790m Site In Hertfordshire

The title of this post, is the same as that of this article on the BBC.

This is the sub-heading.

Google has invested $1bn (£790m) to build its first UK data centre

These are the first four paragraphs.

The tech giant said construction had started at a 33-acre site in Waltham Cross, Hertfordshire, and hoped it would be completed by 2025.

Google stressed it was too early to say how many jobs would be created but it would need engineers, project managers, data centre technicians, electricians, catering and security personnel.

The prime minister said it showed the UK had “huge potential for growth”.

The project marked the latest investment by a major US tech firm in Britain, after Microsoft announced it would invest £2.5bn to expand data centres for artificial intelligence (AI) across the UK.

Note.

  1. By “completed by 2025” do they mean completed before 2025 or completed by the end of 2025. Judging by the time they took to build their London HQ, its the latter.
  2. Rishi is right about the UK having a huge potential for growth! Especially, if the nihilists of the United States vote in the Big Orange!
  3. Judging by the total spend of £2.5 billion on data centres and the £790 million for this one, this looks to be the first of three.

But where is this data centre going to be built?

This article on EssexLive is entitled Google To Move Into Waltham Cross With £788m Data Centre To Support ‘AI Innovation’, where this is said.

The new data centre will go on land at Maxwell’s Farm, next to the A10 Great Cambridge Road and around one mile from the M25 junction 25. Debbie Weinstein, Google vice president and managing director in the UK and Ireland, set out the decision in a blog post on Thursday, January 18 – the fourth day of the World Economic Forum’s Davos 2024 in Switzerland.

This is a Goggle Map of that area, when I searched for Maxwell’s Farm.

Note.

  1. The red arrow indicates the result of my search, which Google interpreted as A.J. Maxwell.
  2. The dual-carriageway road running down the East side of the map is the A10 between London and Cambridge.
  3. The A10 road joins the M25 at Junction 25.
  4. The arrow to the South-West of the roundabout indicates the new studios; Sunset Waltham Cross, which is being built.
  5. At the other side of the studio site, there is a label saying New River and this important piece of London’s water infrastructure can be traced to the top of the map.
  6. The other dual-carriageway road is the B198 or Lieutenant Ellis Way.
  7. A quick calculation shows that 33 acres is roughly a 365 metre square.

I would suspect that the data centre will lie somewhere between the A10, the B198 and the New River.

This Google Map shows the South-East corner of the site.

Note.

  1. There appears to be a lane running East-West, that crosses over both the A10 and the New River.
  2. Theobalds Lane appears to have some housing and possibly a farm.
  3. The smaller field by the roundabout appears to have some animals using it as grazing.
  4. The field between the East-West lane and Theobalds Lane appears to have a good crop of cereal.

The East-West lane would appear to be a possible Southern border of the site.

This Google Map shows where the East-West lane goes.

Note.

  1. The lane leads to Queen Mary’s High School.
  2. The school also has access from Lieutenant Ellis Way.
  3. The New River appears to form, the Eastern boundary of the school site.
  4. There are sports pitches between the New River and the school.

The New River looks to be the Western boundary of the Google site.

This Google Map shows around the red arrow from the Google search that led me to this area.

Note.

  1. A.J. Maxwell is identified by the red arrow in the Theobalds Enterprise Centre.
  2. The New River can be seen at the West of the map.
  3. A hedge runs roughly East-West to the North of the Enterprise Centre.
  4. North of the hedge are a number of football pitches, which appear to belong to the Affinity Academy at Goffs Churchgate.

The hedge could be the Northern boundary of the Google site.

This Google Map shows the area between the South of the Enterprise Centre and the East-West lane I picked out earlier.

A crude measurement indicates it could be around 33 acres or slightly more.

This picture is used in nearly all the news reports about the Data Centre.

Note.

  1. Could that be the gentle curve of the New River on the left?
  2. With the high fence, the New River forms an almost-mediaeval defence against trespassers.
  3. There looks to be a dual-carriageway road running down the other side of the site, which would be the A10.
  4. Between the A10 and the site, there appears to be loots of dark areas, which I take to be car parks.
  5. Are the car-parking spaces in the front of the picture marked for those, who are disabled? There certainly appear to be chargers on some spaces.

I have a few thoughts.

The Relative Locations Of Google’s Data Centre And Sunset Studios?

This Google Map shows the two sites to the West of the A10.

Note.

  1. St. Mary’s High School is in the North-West corner of the map.
  2. Cheshunt Football Club is in the North-East corner of the map.
  3. The dual-carriageway A10 runs North-South on the map.
  4. I believe that Google’s Waltham Cross Data Centre will be located in the field to the West of the A10, at the top of the map.
  5. The A10 connects to the M25 at Junction 25, which is in the centre at the bottom of the map.
  6. In The Location Of Sunset Studios In Broxbourne,  Sunset Studios are placed to the North West of the Junction 25 roundabout.
  7. Just as the A10 forms the Eastern boundary of both sites, the New River forms the Western boundary.

The two sites are close together between the A10 and the New River, separated by the dual-carriageway Lieutenant Ellis Way.

Will Google’s Data Centre Be Storing Data For Sunset Studios?

I’ve never worked in the production of films, but these days with digital electronic cameras, CGI, motion capture and other techniques, producing a film must need huge amounts of data storage.

  • So have Sunset Studios outsourced their data storage needs to Google?
  • Perhaps too, Sunset Studios found the local authority welcoming and this attitude was recommended to Google.
  • Both sites will need local services like electricity, gas, sewage and water.

I suspect that there would be cost savings in construction and operation, if the two sites shared the utilities.

Providing Electricity And Heat For Both Sites

Consider.

  • I estimate from information given in the Wikipedia entry for Google Data Centres, that a data centre needs between 10 and 12 MW.
  • There is no obvious power source like offshore wind or a nuclear power station nearby.
  • There is the 715 MW Rye House gas-fired power station, which is a few miles away.
  • In Google Buys Scottish Offshore Wind Power, I talked about how Google had signed a Corporate Power Purchase Agreement to buy 100 MW from the Moray West offshore wind farm.

Google and Sunset Studios would also want an electrical and heat supply that is at least 100 % reliable.

Liverpool University had the same problem on their hundred acre campus in the centre of Liverpool.

  • The University decided to build their own 4 MW Combined Heat and Power Unit (CHP), which is described in this data sheet.
  • It is fired by natural gas.
  • On their web site, Liverpool University state that their CHP can be adapted to different fuel blends. I take this includes zero-carbon fuels like hydrogen and carbon-neutral fuels like biomethane.

But given their location in Waltham Cross close to the Lea Valley, CHP units may have a use for their carbon dioxide.

This Google Map shows between Junction 15 of the M25 and Tomworld.

Note.

  1. Junction 25 of the M25, where it joins the A10 is in the South-West corner of the map.
  2. The sites of Google’s Data Centre and Sunset Studios can be picked out with reference to the previous map.
  3. Tomworld is in the North-East corner of the map.
  4. So why should Tomworld need a lot of carbon-dioxide?

This Google Map shows Tomworld.

Note.

  1. This web page indicates what Tomworld do.
  2. They have 44 acres of glass growing tomatoes, about five miles to the North-East of Google’s Data Centre.
  3. The map has lots of other greenhouses.

I know of a guy, who has a large greenhouse, that grows tomatoes for the supermarkets.

  • He heats the greenhouse with a gas-fired Combined Heat and Power Unit (CHP).
  • The electricity produced runs his business.
  • Any surplus electricity is fed into the grid.
  • The carbon dioxide is fed to the plants in the greenhouse, which helps them grow quality tomatoes.

I just wonder, if carbon dioxide from CHP units at Google’s Data Centre and Sunset Studios could be used by the multitude of greenhouses in the Lea Valley.

Could A Carbon Dioxide Pipeline Be Built Along The M25?

This Google Map shows the Northern section of the M25, South of Waltham Cross.

Note.

  1. The M25 running East-West across the bottom of the map.
  2. Junction 25 of the M25 in the South-West corner of the map.
  3. The A10 running North-South at the West of the map.
  4. Google’s data centre and Sunset Studio are to the West of the A10.
  5. The River Lee, which has numerous water courses is at the East of the map.

I wonder, if a carbon dioxide pipeline could be built along the M25 to connect the producers to those who could use it?

  • It would not be a dangerous pipeline as carbon dioxide is a fire extinguisher.
  • It wouldn’t be a huge pipe.

I think it would be possible.

Google’s Commitment To Being Zero-Carbon

This blog post on the Google web site is entitled Our $1 Billion Investment In A New UK Data Centre, has a section, which has a sub-title of 24/7 Carbon-Free Energy By 2030, where this is a paragraph.

Additionally, we’re also exploring new and innovative ways to use the heat generated by data centres, and this new facility will also have provisions for off-site heat recovery. Off-site heat recovery presents an opportunity for energy conservation that benefits the local community, as it allows us to capture the heat generated by the data centre so that it can be used by nearby homes and businesses. The data centre is also set to deploy an air-based cooling system.

If they are  using off-site heat recovery, it would be logical to use waste carbon dioxide from CHPs to provide carbon dioxide for the local horticultural businesses.

Will Google Be Building A Vertical Farm Nearby?

In Schneider Electric: Vertical Farming – The Next Yield In Data Centre Sustainability, I noted that some data centres are paired with vertical farms to increase their sustainability.

Could Google be doing that in Waltham Cross?

  • They will have a lot of waste heat.
  • They will have a fair bit of carbon dioxide, which could be used to help plants grow.
  • The local workforce probably contains a lot of experience of market gardening.

I like the idea of pairing a data centre and a vertical farm.

Public Transport Access

Consider.

  • Increasingly, the cost of electric vehicles, medical problems and the UK economic situation are causing people to adopt a car-free lifestyle.
  • After my stroke, my eyesight deteriorated such, that I am no longer allowed to drive.
  • Others may live in one-car families and it may not be their’s to use every day.
  • Or your car may just break down on the way to work.

For these and probably lots of other reasons, any large site employing a lot of employees, must have a valid way of getting there by public transport.

The nearest rail station to Google’s Data Centre and Sunset Studios is Theobalds Grove station.

This Google Map shows the roads between the sites and the station.

Note.

  1. The Sunset Waltham Cross label in the South West corner.
  2. Google’s Data Centre will be just off the map to the West of the A10.
  3. Theobalds Grove station is marked by the TfL roundel in the North-East corner of the map.
  4. There would appear to be no bus stops on Winston Churchill Way or the A10.

I walked South from the station to Winston Churchill Way, where I took these pictures.

Note.

  1. At that point, I gave up because of the cold and pollution.
  2. It was also a Saturday morning about midday.

The route I took is certainly not an alternative route to get to Google’s Data Centre or Sunset Studios.

A Possible Station At Park Plaza North

This article on the BBC is entitled Broxbourne: Two New Stations Planned.

This is the sub-heading.

Two new train stations could be built in Hertfordshire if plans to tighten planning policies are adopted.

This is the first paragraph.

Broxbourne Borough Council said stops at Park Plaza North – between Turkey Street and Theobalds Grove London Overground stations – and Turnford on the London to Bishop’s Stortford route would be subject to a consultation.

Later the BBC say that Park Plaza North station will be South of the A121 Winston Churchill Way near Waltham Cross

This Google Map shows the area South-East of the roundabout, where Winston Churchill Way meets the A10.

Note.

  1. The green patch of land to the South-East of the roundabout where Winston Churchill Way meets the A10 appears to be ripe for development.
  2. Looking at the green patch with a higher resolution, the land is little more than high class scrub beloved of newts.
  3. The London Overground line to Cheshunt runs down the East side of the site.
  4. To the North, the London Overground crosses Winston Churchill Way to get to Theobalds Grove station.
  5. To the South, the London Overground crosses the M25 to get to Turkey Street station.
  6. There is a lane running East-West along the South edge of the site, which crosses the railway in a level crossing.

This picture clipped from Google StreetView shows the level crossing.

This is certainly one, that drivers dread.

This GoogleMap shows the level crossing and a stretch of the London Overground.

Note.

  1. The level crossing is in the South-East corner of the map.
  2. There isn’t much space to put a London-bound platform on the East side of the tracks, South of the Park Road circle.
  3. There is plenty of space to put a Cheshunt-bound platform on the West side of the tracks.
  4. North of the Park Road circle, there would appear to be space for two platforms.

It will need a lot of ingenuity to provide a safe and efficient solution to the problems of the level crossing and fitting a station in this limited space.

The first thing I’d do, would be to dig an underpass for pedestrians and cyclists to connect the two halves of Park Lane.

 

 

 

 

January 21, 2024 Posted by | Computing, Energy, Food, Transport/Travel | , , , , , , , , , , , , , , , , | 9 Comments

Centrica Business Solutions Delivers Significant Energy Savings For The Pirbright Institute

The title of this post, is the same as that of this press release from Centrica.

These three paragraphs outline the project.

Centrica Business Solutions has partnered with The Pirbright Institute to deliver sustainable on-site technology that will help reduce its net energy use by more than 10 per cent by 2026.

Centrica installed a new Combined Heat and Power Plant (CHP), which will provide around 75 per cent of Pirbright’s future power needs. The CHP uses natural gas to generate electricity and hot water at the site, with its exhaust gases also used to feed into a heat recovery generator to provide steam. It means CHP technology is over twice as efficient as conventional power sources and can lower organisational reliance on the Grid.

The Institute, which is dedicated to the study of infectious diseases of farm animals, has already devised an energy plan which has introduced energy-saving upgrades across the Surrey campus, including the closure of energy-inefficient buildings, the introduction of efficient lighting and a programme to raise staff awareness of energy consumption.

The system is still powered by natural gas.

Liverpool University

I was an undergraduate at Liverpool University and according to this page on their web site, which is entitled Sustainability, they seem to be following a similar route to the Pirbright Institute.

With a heading of Energy And Carbon, this is the mission statement.

The University’s ambition is to be a climate-resilient campus, that has minimal negative and maximum positive environmental impact, achieving net zero carbon by 2035. We monitor energy and carbon across the entire University as part of the Climate plan and in support of the Sustainability Strategy and Strategy2026 net zero carbon targets.

One section of the page has a title of The Green Recovery with Clarke Energy at the University’s Energy Centre, where this is said.

The University of Liverpool generates up to 90% of its campuses electricity needs on site in the Energy Centre, through CHP. Clarke Energy help the University operate CHP in the most efficient way, keeping us on track with technological developments, such as how the CHP can be adapted to take different fuel blends.

Although there is a nod to different fuel blends, I suspect that the system, like that at Pirbright, is currently powered by natural gas.

Clarke Energy, is headquartered in Liverpool and is a division of Kohler.

Centrica And HiiROC

CHP systems are becoming more common and like these two systems, they are generally powered by natural gas.

In Plans Submitted For Hydrogen Pilot Plant At Humber Power Station, I describe how Hull-based start-up; HiiROC are going to help fuel a gas-fired power station with a hydrogen blend.

This is a paragraph from this article on Business Live, which describes Centrica’s relationship with HiiROC.

It comes as the owner of British Gas has also increased its shareholding in the three-year-old business to five per cent. Last November it was one of several investors to pump £28 million into HiiRoc alongside Melrose Industries, HydrogenOne, Cemex, Hyundai and Kia, who joined existing strategic investors Wintershall Dea and VNG.

HiiROC’s system can take any hydrocarbon gas from biomethane, through chemical plant waste gas to natural gas and convert it to hydrogen and carbon black.

Carbon black has a large number of manufacturing uses and can also be used in agriculture to improve soil.

It looks to me, that HiiROC’s systems will be a simple way to convert natural gas-powered CHPs to zero carbon.

 

January 18, 2024 Posted by | Energy, Hydrogen | , , , , , , | Leave a comment

Businesses Back Hydrogen Trials To Accelerate Net Zero Ambitions

The title of this post, is the same as that of this news item on Centrica.

These are the three main findings of a business survey, to ascertain attitudes to hydrogen.

  • Three quarters (77%) of businesses back hydrogen as part of their energy improvement strategy with a quarter (27%) intending to trial or implement it in the next two years.
  • Almost one in ten (8%) respondents say they have already installed hydrogen-ready combined heat and power (CHP) units.
  • A third (33%) of firms say energy costs are motivating them to adopt hydrogen.

This paragraph details who were surveyed.

We surveyed 500 executives in December 2022 and January 2023 across food and beverage manufacturing, healthcare, hospitality and travel, pharmaceutical manufacturing, heavy industry, horticulture and light industry. 24% of respondents were from the UK, 16% Ireland, 20% Netherlands, 20% Italy, 20% Hungary.

It certainly looks to be a well-constructed survey, with a wide range of respondents.

I have some thoughts.

Centrica And Combined Heat And Power

I was initially surprised that eight percent of respondents had already installed hydrogen-ready combined heat and power units.

But according to Centrica Announces Hydrogen Ready Combined Heat And Power Partnership With 2G, Centrica are preparing themselves for selling systems in this area.

Businesses Are Certainly Looking At Hydrogen

A figure of 77 % of businesses are looking at hydrogen and 27 % are investing in hydrogen.

But I don’t think the average man on the Clapham Omnibus would be so enthusiastic.

Costs Are Motivating Firms To Adopt Hydrogen

I would be surprised if costs didn’t have an effect.

But if costs are driving them towards hydrogen, then hydrogen must be more affordable.

Which is one in eye for hydrogen deniers, who always tell me it is more expensive.

Are Centrica Working To Drop Their Costs?

These posts would suggest they are.

They are doing deals with start-ups and repurposing old plants and pipelines.

Conclusion

Centrica seem to be leading the charge to hydrogen in the UK.

April 19, 2023 Posted by | Energy, Hydrogen | , , , , , , | Leave a comment

Centrica Announces Hydrogen Ready Combined Heat And Power Partnership With 2G

The title if this post is the same as that of this press release from centrica.

This is the sub-heading.

Centrica Business Solutions is partnering with 2G Energy AG to provide customers with 100% hydrogen ready Combined and Heat Power (CHP) systems.

This paragraph outlines the project.

The move is in response to the growing need for integrated hydrogen solutions which are a key tool in the decarbonisation of decentralised energy. As the hydrogen network develops, the highly efficient units can continue to run on traditional fuel sources, helping future proof investments by ensuring an extended life for the assets.

It does appear that the 2G units can run on biogas or natural gas and switch to hydrogen, when it is available.

2G Energy have a web site, with lots of case studies.

January 31, 2023 Posted by | Energy, Hydrogen | , , , , | 2 Comments

GeoPura’s Construction World First

On the GeoPura web site there is a case study, which is entitled Construction World First.

These two paragraphs outline what was done.

Working in partnership with Siemens Energy our hydrogen fuel cell system, has provided off grid power and heat to National Grid’s UK Viking Link construction site.

The fuel cell system removes the need for diesel generators and provides innovative, sustainable, low carbon energy to the Viking Link interconnector project site.

The interesting thing, is that the heat that the hydrogen fuel cell gives out is collected and used to heat the remote site.

This last paragraph, explains the need for off grid power.

Off grid power is needed as this site didn’t have a grid connection for at least six to eight months, and the fuel cell system provided enough heat and power for the construction village during that time, removing the need for diesel generators.

There’s more in this Siemens Energy report.

 