The Anonymous Widower

Mayors Head To Parliament With Plan For Northern Arc To Deliver Green Growth

The title of this post, is the same as that of this news item from Liverpool City Region.

These four bullet points act as sub-headings.

  • Steve Rotheram and Andy Burnham take case for backing Northern Arc to Treasury – as new data shows North can drive green growth and unlock £90bn for UK economy
  • Liverpool City Region and Greater Manchester Mayors will meet with ministers and MPs today, and Andy Burnham will give evidence at Business and Trade Select Committee on the UK’s industrial strategy
  • Economic analysis shows that investing in transport infrastructure and a pipeline of projects across the North would benefit the whole UK economy, improving living standards and closing the North-South productivity gap
  • Mayors will also address Innovation Zero World Congress in London, showing how city-regions can create high quality jobs by pioneering low-carbon innovation

These two paragraphs add a bit more detail.

The right investment would create a growth corridor, stretching from the Mersey to the Pennines and connecting into West and South Yorkshire, underpinned by transport networks that would include a new railway linking Liverpool and Manchester.

The Northern Arc area spans regions with close economic ties to Lancashire, North Wales, Hull and the North East. With international connections through the Port of Liverpool and Manchester Airport, it’s well positioned for global trade.

If I have a problem with the mayors’ thoughts, the plan outlined in the news item is rather Liverpool/Manchester-based with Hull being the only city outside that area getting a mention. Do Blackburn, Blackpool, Bradford, Burnley, Doncaster, Huddersfield, Leeds, Preston, Rotherham, Scunthorpe, Stockport, Wigan and York exist?

For instance you would expert a report from Liverpool and Manchester’s Mayors to call for a new railway between their two cities. And of course they do!

The current TransPennine Lines has two main routes across the Pennines between East and West.

If ever there was a rail route, designed by Topsy, it is the North TransPennine Route.

  • There are six separate services, if you ignore Newcastle and Edinburgh Waverley, which is a shuttle to fill a gap in rail services.
  • In the West trains terminate at Huddersfield, Liverpool Lime Street, Manchester Airport, Manchester Piccadilly and Manchester Victoria
  • In the East trains terminate at Edinburgh Waverley, Hull, Leeds, Newcastle, Redcar Central, Scarborough and York.
  • Terminals like Huddersfield, Hull, Liverpool Lime Street, Newcastle and York are some of the best terminal stations in the UK, but others are very second rate.

I suspect, this North TransPennine Route structure brought about the demise of TransPennine Express.

The  South TransPennine Route on the other hand, although it was built by several different railway companies, they were all intent on the same thing. An East-West route across the Pennines through Doncaster, Manchester and Sheffield.

  • The Western terminal is Liverpool Lime Street, which in my view is the finest grand terminus in the UK, in terms of architecture, onward connections and operation. It is also the oldest still-operating grand terminus mainline station in the world, in that it dates from 1836.
  • The Eastern terminal is Cleethorpes, which is an efficient four-platform recently-refurbished station, that is within a hundred metres of some of the best gluten-free fish and chips, I’ve ever tasted on the pier.
  • Intermediate stations include Liverpool South Parkway, Warrington Central, Birchwood, Irlam, Urmston, Manchester Oxford Road, Manchester Piccadilly, Stockport, Sheffield, Meadowhall, Doncaster, Scunthorpe, Barnetby, Habrough and Grimsby Town.
  • Liverpool South Parkway has a bus connection to Liverpool Airport
  • Liverpool Lime Street, Manchester Oxford Road, Manchester Piccadilly, Stockport, Sheffield and Doncaster are stations with comprehensive onward connections.
  • The route is electrified between Liverpool Lime Street and Manchester Piccadilly and at Doncaster.Liverpool Lime Street and Cleethorpes is 148.2 miles
  • Hazel Grove and Doncaster is without electrification and is 52.3 miles long.
  • Cleethorpes and Doncaster is without electrification and is 52.1 miles long.
  • I believe that Hitachi, Siemens and Stadler could supply battery-electric trains, that would be able to work the route, with the addition of a short length of overhead wires at Cleethorpes, so that trains could return to Doncaster.
  • Trains go straight through all the intermediate stations, so there are no time-wasting reverses.
  • Journey time is just over three and a half hours.

I believe that a mouse-quiet battery-electric train would pack in the punters, if only for the novelty.

But.

A battery-electric train would probably knock perhaps thirty minutes off the journey.

The timetable would be an hourly train at all stations.

The service would pass the mother’s birthday test, in that you could easily visit any station from any other and buy your mother lunch before returning on a convenient train.

There are connections to and from London at Liverpool Lime Street, Manchester Piccadilly, Stockport, Sheffield and Doncaster.

It could be a very useful East-West train service.

 

April 30, 2025 Posted by | Energy, Transport/Travel | , , , , , , , , , , , , , , , , , , , , , , , , , , , | 2 Comments

Between Dore & Totley And Bamford Stations – 1st April 2025

I wanted to see the newly-built passing loop between Heathersage and Bamford stations, so the easiest way was to go to Bamford station and return from Bamford station to Sheffield station.

I took these pictures along the outward route.

Note.

  1. Hathersage seems a tidy and attractive village.
  2. All the stations I visited, seem to be long on information.
  3. The last three pictures show the passing loop from the bridge at Bamford station.
  4. eathersage and Bamford stations are not step-free.
  5. The piling is of a similar quality to a larger scale of a surgeon sewing up a patient after a serious operation.

This OpenRailwayMap shows the loop.

Note.

  1. The three tracks of the passing loop appear almost straight.
  2. Are they level I wonder?
  3. The loop looks level from my pictures.
  4. Bamford station is 83.9 miles from Cleethorpes according to Real Time Trains.
  5. Dore & Totley station is 75 miles from Cleethorpes according to Real Time Trains.
  6. Dore & Totley and Bamford stations are 8.9 miles apart and  TransPennine Express Class 195 trains take eight minutes to go between the two stations.

I’ll take an average speed of just under 70 mph on a straight and level track.

What speed would a battery-electric Class 802 train, be able to achieve?

This track seems to have been built for battery-electric InterCity Trains and their drivers to have fun.

If the engineers had wanted to make it better they could have used concrete slab track, but to my camera and my eyes, it looks to be extremely level.

I took these pictures along the return route.

Only by looking at all pictures and the map in detail in this post, can you get a feeling for what has been done.

The Wikipedia entry for the Hope Valley Line says this.

The work includes creating a 3,600 feet (1,100 m) passing loop between Bamford and Hathersage.

But this is no passing loop, as it’s much more of a passing straight!

It will be very interesting to see how many minutes can be saved between Dore & Totley And Bamford stations.

My Only Worry

This OpenRailwayMap shows the Eastern section of the Hope Valley Line.

Note.

  1. The triangular junction at Dore is at the East of the map.
  2. The blue arrow indicates Bamford station.
  3. The straight and level passing loop to the East of Bamford station.
  4. Click the map to show it to a larger scale.

Will this section of track, with trains going through at seventy mph, every few minutes be too dangerous for some people on the four stations on the route?

 

April 2, 2025 Posted by | Transport/Travel | , , , , , , | Leave a comment

Dore & Totley Station – 1st April 2025

It seems like only yesterday, when I visisited Dore and Totley station and wrote Dore And Totley Station – 13th July 2020, when I took these pictures.

But it was yesterday, when I visited the station again and look at the station now.

Note.

  1. The footbridge is in keeping with the original station building.
  2. The only changes to the original station building, is a small amount of tasteful restoration.
  3. The footbridge is high enough for future electrification.
  4. There are one shelter on the entry/car park and two on the far side.
  5. As I watched several Class 158, Class 195 and Class 222 trains pass through, it appears that the curve has been profiled for speed.
  6. I am pretty sure, that the station has been designed so that if required, at least one extra platform can be added to the Chesterfield Lines.
  7. The Rajdhani Restaurant in the original station building is rated 4.2 on Trip Advisor, which says they do gluten-free options.
  8. The maximum speed through the station appears to be 50 mph, with 70 mph on the Chesterfield Lines.

From my brief visit, it appears to be another  station, that has been superbly updates.

Let’s bring on a few more.

April 2, 2025 Posted by | Food, Transport/Travel | , , , , , , , , | Leave a comment

Rail Minister Marks Completion Of £150m Hope Valley Railway Upgrade

The title of this post is the same as that of this article on Rail Magazine.

These first two paragraphs summarise the work.

More reliable journeys are promised on the Hope Valley line between Manchester and Sheffield after a £150 million upgrade was completed in early April.

Over the last three years, the existing platform at Dore & Totley station on the south side of Sheffield has been extended to cope with six-coach trains. Meanwhile the second platform has been rebuilt and commissioned (after it was removed in the 1980s), two mechanical signal boxes have been abolished and a new one-kilometre freight loop laid in the Peak District. At Hathersage, a pedestrian crossing has also been removed and replaced with a footbridge.

These are my thoughts.

Dore And Totley Station

The Rail Magazine article says this about the improvements at Dore and Totley station.

Replacing two tracks through Dore & Totley removes a single-track bottleneck that often saw Sheffield to Manchester express services held up by slower stopping services and cement trains destined for Earles Sidings. A nine-day shutdown of the route in March was needed to finish the work.

The new platform sits between the Midland Main Line and the Hope Valley line, so can only be reached via the new footbridge or lifts. As well as the usual ‘blister paving’ slabs marking the edge of the platform, other tactile paving has been laid to help people with visual impairments find their way around the station.

This OpenRailwayMap shows the new layout of tracks at Dore and Totley station.

Note.

  1. The four tracks at the North of the map go to Sheffield station.
  2. The Eastern pair of tracks are the Midland Main Line and they go to the South-East corner of the map for Chesterfield and the South.
  3. The Western pair of tracks are the Hope Valley Line and they go to the South-West corner of the map for Manchester.
  4. The blue lettering in the middle of the map indicates Dore and Totley station.
  5. There is a single track curve between the Midland Main Line and the Hope Valley Line, which is mainly used by freight trains.

This secondOpenRailwayMap shows Dore and Totley station in greater detail.

The big improvement is that the Hope Valley Line is now double instead of single track, which must eliminate a lot of delays.

These pictures show the station in July 2020.

The pictures clearly show the single track and platform at Dore and Totley station.

Dore South Curve

Dore South Curve links the Southbound Midland Main Line with the Westbound Hope Valley Line.

This OpenRailwayMap shows the curve.

There is a crossover in the South-West corner of the map, so with careful signalling, trains can use the Dore South Curve in both directions.

Bamford Loop

This is a freight loop between Bamford and Hathersage stations.

This OpenRailwayMap shows the loop.

Note.

  1. The Hope Valley Line goes diagonally across the map.
  2. Manchester is to the North-West.
  3. Sheffield is to the South-East.
  4. Bamford station is in the North-West corner of the map.
  5. Hathersage station is just off the South-East corner of the map.
  6. The loop is on the Northern side of the Hope Valley Line.

The loop will most likely be used by trains going to Sheffield or Chesterfield.

Hathersage Footbridge

This Google Map shows Hathersage station.

Note.

  1. Dore Lane and the B 6001 appear to pass under the railway.
  2. There appears to be what could be foundations just to the West of the platforms at Hathersage station.
  3. From pictures found by Google the bridge appears to be a simple steel structure.

I shall have to go and take pictures.

Fast Trains Between Manchester And Nottingham

In the Wikipedia entry for the Hope Valley Line, this is said.

Nottinghamshire County Council and the Department for Transport have investigated the possibility of adding another service that does not call at Sheffield in order to improve the journey time between Nottingham and Manchester. Stopping (and changing direction) in Sheffield, the fastest journey is 110 minutes (in 2019), but the council has estimated bypassing Sheffield would cut the time to 85 minutes. Suggested improvements on a 2+1⁄2-mile (4 km) stretch near Stockport may reduce journey times by 2–3 minutes.

Consider.

  • According to Google, the driving time between the two cities is 128 minutes and the motorway route is via the M1 and M62.
  • If nearly half-an-hour could be saved between Manchester and Nottingham could be a big saving in journey time.
  • Manchester Piccadilly is likely to be rebuilt for High Speed Two and a fast route via Nottingham could be a viable alternative.
  • Both Manchester and Nottingham have good local tram and train networks.
  • As the electrification of the Midland Main Line progresses, the route will be increasingly suitable for 100 mph battery-electric trains.

A Manchester and Nottingham express service looks to be an easy service to implement after the Hope Valley Line has been improved.

Hourly Stopping Trains Between Manchester And Sheffield

The Wikipedia entry for the Hope Valley Line gives these details for the stopping service between Manchester Piccadilly and Sheffield.

  • Trains are hourly.
  • Trains call at Reddish North, Brinnington, Bredbury, Romiley, Marple, New Mills Central, Chinley, Edale, Hope, Bamford, Hathersage, Grindleford and Dore & Totley.
  • But some services do not call at some or all of Edale, Bamford, Hathersage, Grindleford and Dore & Totley giving some 2-hour gaps between services at these stations.

Let’s hope that some of the extra capacity is used to provide a regular service at all stations on the Hope Valley Line.

As in a few years, it will have electrification at both ends, this route could be very suitable for battery-electric trains.

Completion Date

It appears that the first day, when passengers will be able to use the new upgraded tracks and stations will be Thursday, the 2nd of May.

Conclusion

The improvements, certainly seem to allow extra and improved services through on the Hope Valley Line.

I also feel that in a few years, services will be run by battery-electric trains.

 

April 27, 2024 Posted by | Transport/Travel | , , , , , , , , , , , | 2 Comments

A Community Engagement App For The Hope Valley Line Upgrade

The Hope Valley Line Upgrade has its own web site.

This is the sub-heading.

We’re upgrading the railway between Manchester and Sheffield to provide more reliable and faster journeys for passengers

The first paragraph gives the project timeline.

The project started in Spring 2021 and is due to be completed in Spring 2024.

There is also a section, that is entitled Community Engagement, where this is said.

Communication is very important to us and we will be writing to local residents with plenty of notice before work starts, as well as holding public engagement events throughout the project to keep the local community informed on its progress.

For regular updates on the main improvement work, you can also download the Hope Valley Railway Upgrade community engagement app, which will contain details of upcoming work activities, news, and initiatives and events for the local community.

That is new territory for Network Rail or at least the first time, I’ve seen one.

Until proven otherwise, it looks like it could be a good idea.

October 25, 2023 Posted by | Computing, Transport/Travel | , , , , | 1 Comment