New Escalators At Bank Station To The Docklands Light Railway – 18th October 2022

In New Escalators At Bank Station Between The Northern Line And The DLR, I indicated that construction could be almost finished of the escalators that will connect the two lines.

The escalators have now opened.

Note.

  1. At the top of the escalators, you are delivered to a plaza, where the cross-tunnel between the two Northern Line platforms and the moving walkway to the Central Line meet.
  2. At the bottom of the escalators, you are in a wide passageway between the two DLR platforms.
  3. At the other end of the passageway, there are a pair of escalators that lead to Circle and District Line platforms and the Monument entrance to Bank station.

The escalators certainly open some faster pedestrian routes through the station.

October 18, 2022 Posted by | Transport/Travel | , , , , , , | Leave a comment

Should Oyster Be Combined With A Freedom Pass?

Consider.

  • This morning I wanted an early start, so to get to Moorgate, I left before 0900, which meant I couldn’t use my Freedom Pass on the buses and Underground.
  • So I used my Oyster Card, which still had some money on it.
  • After breakfast, it was nearly ten, so I swapped my card back to the Freedom Pass.

I believe it would be more convenient, if I had one card that handled both ticketing modes. It would be an Oyster card, but when I used it outside of the morning Peak, the card wouldn’t be charged.

October 18, 2022 Posted by | Transport/Travel | , , | 3 Comments

New South Wales Plans Three Batteries

This article on Energy Storage News is entitled Shell Battery Project In New South Wales Would Add 1GWh Energy Storage To Growing Market.

The three batteries are.

  • Shell – 500MW/1,000MWh BESS project in Wellington, in Central West NSW.
  • Waratah Super Battery 700MW/1,400MWh transmission system “shock absorber”
  • A proposed 500MW/2,000 MWh BESS from energy generator-retailer EnergyAustralia.

Note.

  1. All batteries appear to be lithium ion.
  2. This gives a total output of 1.7 GW and a total storage capacity of 4.4 GWh.
  3. The NSW government is targeting 12GW of renewable energy capacity by 2030.
  4. 3 GW of utility-scale wind and solar in development, construction, or already in operation, in the state.

The state seems to be making a good start.

October 17, 2022 Posted by | Energy, Energy Storage | , , , , , | 2 Comments

Q&A: What does ‘Subsidy-Free’ Renewables Actually Mean?

The title of this post, is the same as that of this article on Carbon Brief.

This is the first paragraph.

Recent announcements in the UK and across the rest of Europe seem to be ushering in a new era of “subsidy-free” renewables, which can be deployed without government support.

The article gives a detailed explanation and is a must-read.

October 17, 2022 Posted by | Energy, Finance & Investment | , , , | Leave a comment

BayWa r.e. Unveils Subsidy-Free Floating Wind Project Offshore Portugal

The title of this post, is the same as that of this article on offshoreWIND.biz.

This is the first paragraph.

BayWa r.e. has officially applied to secure the rights for an exclusive use of the seabed for a commercial-scale floating offshore wind project in Portugal, which the company said will be the first subsidy-free floating wind farm in the world.

Note.

  1. BayWa are a German company headquartered in Munich.
  2. The windfarm will have a 600 MW capacity in total, in a dedicated zone off the coastline of Viana do Castelo.
  3. It will be a floating wind farm.
  4. Viana do Castelo is situated at the mouth of the Lima River and is about 74 km. to the North of Porto.

But surely the most significant fact about this project is that it is subsidy-free.

BayWa And Subsidy-Free Wind Farms

This page on the BayWa web site is entitled BayWa r.e. Sells UK’s First Subsidy-Free Wind Farm.

This is the first paragraph.

BayWa r.e. has reached a milestone for itself and the UK renewable energy sector with the completion and sale of the country’s first subsidy-free windfarm to James Jones & Sons Ltd and London-based specialist asset manager, Gresham House Asset Management.

Note.

  1. This is the first time, I’ve seen Gresham House associated with wind farms.
  2. BayWa appear to have a fifteen year agreement with Tesco for the generated electricity.

The whole page is a must read.

 

Conclusion

Does this mean, that we will be seeing subsidy-free floating wind farms around the UK?

Get the engineering, manufacturing and financial support right for floating wind farms in the UK and wind farms could be bumper-to-bumper around these islands.

October 17, 2022 Posted by | Energy, Finance & Investment | , , , , , , , | 2 Comments

Plans Emerge For 8 GW Of Offshore Wind On Dogger Bank

Wikipedia has an entry, which is a List Of Offshore Wind Farms In The United Kingdom.

The totals are worth a look.

  • Operational – 13279 MW
  • Under Construction – 4125 MW
  • Proposed Under The UK Government’s Contracts For Difference Round 3 – 2412 MW
  • Proposed Under The UK Government’s Contracts For Difference Round 4 – 7026 MW
  • Exploratory Phase, But No Contract for Difference – Scotland – 24,826 MW
  • Exploratory Phase, But No Contract for Difference – England – 14,500 MW

Note.

  1. That gives a Grand Total of 66,168 MW or 66.168 GW.
  2. The government’s target is 50 GW of offshore wind by 2030.
  3. The typical UK power need is around 23 GW, so with nuclear and solar, we could be approaching three times the electricity generation capacity that we currently need.

The figures don’t include projects like Berwick Bank, Cerulean Wind, Norfolk Vanguard or Northern Horizons, which are not mentioned in Wikipedia’s list.

I regularly look at the list of wind farms in this Wikipedia entry and noticed that the number of Dogger Bank wind farms had increased.

They are now given as.

  • Dogger Bank A – 1200 MW – Completion in 2023/24
  • Dogger Bank B – 1200 MW – Completion in 2024/25
  • Dogger Bank C – 1200 MW – Completion in 2024/25
  • Dogger Bank D – 1320 MW – No Completion Given
  • Dogger Bank South – 3000 MW – No Completion Given

Note, that gives a Grand Total of 7920 MW or 7.920 GW.

This article on offshoreWIND.biz is entitled BREAKING: SSE, Equinor Plan 1.3 GW Dogger Bank D Offshore Wind Project.

It was published on the October 6th, 2022 and starts with this summary.

SSE Renewables and Equinor are looking into building what would be the fourth part of Dogger Bank Wind Farm, the world’s largest offshore wind farm, whose three phases (A, B and C) are currently under construction. Surveys are now underway at an offshore site where the partners want to develop Dogger Bank D, which would bring Dogger Bank Wind Farm’s total capacity to nearly 5 GW if built.

Obviously, there are a few ifs and buts about this development, but it does look like SSE Renewables and Equinor are serious about developing Dogger Bank D.

More Dogger Bank Gigawatts for UK As RWE Moves Forward With Two 1.5 GW Projects

This subheading describes, the 3 GW wind farm, that I listed earlier as Dogger Bank South.

These three paragraphs describe the projects.

RWE is now moving forward with two new offshore wind farms in the Zone, each with a 1.5 GW generation capacity, after the company obtained approval from the UK Secretary of State for Business, Energy and Industrial Strategy (BEIS) to enter into an Agreement for Lease with The Crown Estate this Summer, following the Round 4 leasing process.

The wind farms will be built at two adjacent sites located just southwest of the Dogger Bank A offshore wind farm and are dubbed Dogger Bank South (DBS) East and Dogger Bank South (DBS) West.

RWE has also started with geophysical seabed surveys within the wind turbine array areas for its two new projects.

It appears that they have already got the leasing process started.

When Will Dogger Bank D And Dogger Bank South Be Operational?

Consider.

  • In How Long Does It Take To Build An Offshore Wind Farm?, showed that a lot of offshore wind farms have gone from planning permission to first operation in six years.
  • I don’t think that there will be planning permission problems on the Dogger Bank.
  • The two wind farms are a continuation of Dogger Bank A, B and C and the Sofia wind farms.
  • A lot of the construction, would be more of the same.

With average luck, I can see Dogger Bank D and Dogger Bank South in full production before the end of 2028.

October 16, 2022 Posted by | Energy | , , , , , , , , , , , | Leave a comment

Portugal’s Sevenair Eyes Up To 6 Heart Aerospace ES-30 Electric Aircraft

The title of this post, is the same as that of this article on Simple Flying.

Some points from the article.

  • Sevenair are a Portuguese regional airline.
  • Sevenair run several short routes.
  • Heart Aerospace has 230 firm orders and a 100 options for the the ES-30.

Heart Aerospace may not have been the first company to fly an electric airliner, but they do seem to be attracting orders.

October 16, 2022 Posted by | Transport/Travel | , , , , | Leave a comment

Harbour Energy

This article in The Times in the Tempus column is entitled Oil And Gas Producer Harbour Energy Offers Safe Haven.

This is the first paragraph.

Booming commodity prices mean Harbour Energy is throwing off cash and yet the biggest oil and gas producer in the UK North Sea is still struggling to gain credibility in the eyes of investors.

Reading the column, it does seem a bit of a paradox, when the author says.

  • London-listed oil and gas companies are cheap.
  • Harbour Energy is in the bargain basement.
  • The share price doesn’t reflect the P/E ratio.
  • The company seems to have the money for acquisitions.
  • It doesn’t seem to have taken advantage of the Ukraine situation.
  • Revenues should transform its cash flow position.

The author finishes by recommending to buy the shares.

In Cerulean Winds Is A Different Type Of Wind Energy Company, I introduced Cerulean Winds and their £30 billion plan to decarbonise much of North Sea oil and gas production. This sensational plan is described in full on this page of their web site, which is entitled The Cerulean Winds Intog Scheme.

It strikes me that Harbour Energy could be the sort of energy company that could benefit from Cerulean Winds’s scheme.

  • It could increase their gas production by ten percent.
  • Harbour Energy probably have the money to decarbonise.
  • Would decarbonising their North Sea operations improve the company’s profile?

I will certainly watch for any links between the two companies.

 

 

October 15, 2022 Posted by | Energy | , , , | Leave a comment

The Salamander Project

The Salamander project may be a strange name for a proposed Scottish offshore wind farm, but that is what it is.

It is being developed by Ørsted and the Simply Blue Group.

There is a web site, which has this bold mission statement.

Helping To Unlock Scotland’s Floating Offshore Wind.

These paragraphs outline the project.

The Salamander project will utilise innovative and cutting-edge floating offshore wind technologies to produce zero-carbon electricity. The development aims to be a stepping stone to help Scotland and the UK to progress towards a net-zero future.

With a proposed 100 MW pre-commercial size project, the Salamander project which is located off Peterhead in the East coast of Scotland, is in an advanced planning stage. Salamander has a strong focus on supply chain development and will provide an opportunity for the local supply chain to gear up for commercial scale opportunities in Scotland, as well as de-risking floating wind technologies for the future commercial projects in Scotland and beyond. This will allow Scotland to maximise the financial benefit of its strong offshore wind resource and generate long term jobs for its local communities.

The project will contribute to the Scottish government’s target of 11 GW of installed offshore wind by 2030, as well as the UK government’s target of 5 GW of operational floating offshore wind by the same date.

There is also a video, which is very much a must-watch.

Floating offshore wind is a relatively new technology and will become the major generator of the world’s electricity within the next decade.

Note this phrase in the first paragraph.

The development aims to be a stepping stone to help Scotland and the UK to progress towards a net-zero future.

This philosophy is shared with other projects.

In DP Energy And Offshore Wind Farms In Ireland, I said this.

They are also developing the Gwynt Glas offshore wind farm in the UK sector of the Celtic Sea.

  • In January 2022, EDF Renewables and DP Energy announced a Joint Venture partnership to combine their knowledge and
    expertise, in order to participate in the leasing round to secure seabed rights to develop up to 1GW of FLOW in the Celtic Sea.
  • The wind farm is located between Pembroke and Cornwall.

The addition of Gwynt Glas will increase the total of floating offshore wind in the UK section of the Celtic Sea.

  • Blue Gem Wind – Erebus – 100 MW Demonstration project  – 27 miles offshore
  • Blue Gem Wind – Valorus – 300 MW Early-Commercial project – 31 miles offshore
  • Falck Renewables and BlueFloat Energy – Petroc – 300 MW project – 37 miles offshore
  • Falck Renewables and BlueFloat Energy – Llywelyn – 300 MW project – 40 miles offshore
  • Llŷr Wind – 100 MW Project – 25 miles offshore
  • Llŷr Wind – 100 MW Project – 25 miles offshore
  • Gwynt Glas – 1000 MW Project – 50 miles offshore

This makes a total of 2.2 GW, with investors from several countries.

It does seem that the Celtic Sea is becoming the next area of offshore wind around the British Isles to be developed.

These Celtic Sea wind farms include Erebus, which like Salamander is a 100 MW demonstration project.

Salamander And Erebus Compared

Consider.

  • Both are 100 MW floating wind demonstration projects.
  • Salamander and Erebus are 27 and 21 miles offshore respectively.
  • Salamander and Erebus are close to the deepwater ports of Peterhead and Milford Haven.
  • Both are described as stepping-stone projects.
  • Both projects talk about developing supply chains.
  • The developers of Salamander and Erebus include Ørsted and EDF Renewables respectively, who are both big beasts of the offshore wind industry.

Both wind farms are in areas, where the UK, Scottish and Welsh governments want to develop massive offshore wind farms, that will eventually total over 50 GW. I believe that Salamander and Erebus will indicate any problems, that will be likely to occur in the building of these massive offshore floating wind farms.

It is a very sensible plan and could lead to an energy rich future for the UK.

How Long Will It Take To Assemble A Floating Wind Turbine?

Each floating wind turbine requires these major components.

  • A wind turbine, which in the Kincardine Wind Farm have a capacity of 9.5 MW, is obviously needed. Some proposed floating offshore wind farm are talking of turbines between 14 and 16 MW. These turbines will be very similar to onshore turbines.
  • A float, usually made out of steel or possibly concrete. Various designs have been built or proposed. The Wikipedia entry for floating wind turbine gives several examples.
  • The anchoring system to keep the float with its turbine in the desired position.
  • The electrical system to connect the wind turbine to the offshore substation, which could also be floating.

Note that the designs for the float, anchoring and electrical systems will rely heavily on technology proven in the offshore oil and gas industry.

Principle Power are the designer of the WindFloat, which is one of the first floats to be used in floating offshore wind.

Their home page has a continuous full-screen video, that shows a WindFloat being assembled and towed out.

The video shows.

  • The completed float being floated alongside a dock, which obviously has an appropriate water depth.
  • The dock has a large crane.
  • The turbine tower and then the blades being lifted into position and securely fixed.
  • Finally, a tug tows the completed turbine/float assembly to its position in the wind farm.

This would appear to be an assembly operation, that could flow just like the production in any world-class vehicle factory.

  • There would need to be just-in-time delivery of all components.
  • The weather would need to be cooperative.
  • Lighting might be needed to work in poorer light levels.
  • This method of assembly would be turbine and float agnostic.
  • Multiple shift working could be employed.

My project management involvement tells me, that it would not be unreasonable to assemble, at least one complete turbine and its float and accessories in a working day.

I can do a small calculation.

The average size of turbine is 15 MW.

One turbine is assembled per day.

There are 300 working days possible in a year with multiple shift working, ignoring Bank Holidays and bad weather.

Just one site could produce 4.5 GW of floating wind turbines per year.

How Many Production Sites Could There Be?

These are surely the best possibilities.

  • Barrow
  • Belfast
  • Clyde
  • Devon/Cornwall
  • Forth Estuary
  • Great Yarmouth
  • Haven Ports
  • Holyhead
  • Humber
  • Liverpool
  • Milford Haven
  • Peterhead
  • Southampton Water
  • South Wales
  • Teesside
  • Thames Estuary

I have named sixteen areas, that could be suitable for the assembly of floating wind turbines.

So let’s assume that eight will be developed. That could mean as much as 36 GW of capacity per year.

The Energy Density Of Floating Wind Farms

In ScotWind Offshore Wind Leasing Delivers Major Boost To Scotland’s Net Zero Aspirations, I summarised the latest round of Scotwind offshore wind leases.

  • Six new fixed foundation wind farms will give a capacity of 9.7 GW in 3042 km² or about 3.2 MW per km².
  • Ten new floating wind farms will give a capacity of 14.6 GW in 4193 km² or about 3.5 MW per km².

Returning to the earlier calculation, which says we could have the ability to create 36 GW of wind turbines per year, with 15 MW turbines, this means with a generating density of 3.5 MW per km², the 36 GW would take up around a hundred kilometre square of sea.

Conclusion

We will become Europe’s powerhouse.

October 15, 2022 Posted by | Energy | , , , , , , , | 3 Comments

Battersea Power Station – 14th October 2022

I went to Battersea Power Station today and took these pictures.

Note.

  1. The picture of my jacket was taken in the toilet. All male toilets should have a hook for jackets.
  2. The crane is still in place.
  3. There are a number of shops still to open.
  4. There was no food store, although a Marks and Spencer’s food store is coming soon.
  5. The only place to have a coffee and cake and sit down was Starbucks. But I never eat in an American cafe or eat American food, as I don’t trust their gluten labelling.

One guy I met described it as Dubai without the sand.

I have some thoughts.

Getting There

There are two main routes.

  • Northern Line to Battersea Power Station station.
  • Thames Clipper to Battersea Power Station pier.

I went by the Northern line, changing both ways at Tottenham Court Road station to and from the Elizabeth Line.

  • This interchange is a short walk and step-free, if you use the lift.
  • There are no trains to Battersea Power Station on the Bank branch of the Northern Line.
  • There are five trains per hour (tph) to Battersea Power Station, with an extra two tph in the Peak.
  • There are no Night Tube trains to Battersea Power Station.

I can see this service being improved.

Arriving At Battersea Power Station By Underground

Punters were certainly arriving.

Gluten-Free Food

There was absolutely none, that I could find.

At least though a Gordon Ramsay restaurant is opening soon.

Signage

It wasn’t good. But then I have found several modern shopping centres work on this principle.

 

Conclusion

Canary Wharf is better.

  • Partly because the shops are more useful and to my taste.
  • But mainly because it is on the Elizabeth and Jubilee Lines, and the DLR.
  • All rail lines go through Canary Wharf rather than terminate there.

Battersea Power Station might be better, when the Northern Line is extended to Clapham Junction station.

 

 

October 14, 2022 Posted by | Food, World | , , , , , , , , , , , , , | 4 Comments