The Anonymous Widower

Sadiq Khan: Prisoners Should Jump Queue For Housing

The title of this post, is the same as that of this article from The Times.

This is the sub-heading.

The mayor of London said prioritising those released would help to cut reoffending

I know politicians can make rash and barmy statements, but this must surely be one of the most ridiculous.

But then Khan likes wasteful, ridiculous policies like renaming all the lines of the London Overground, that I wrote about in Khan’s Stupid Plan To Rename The Overground Lines.

This is a comment to the article.

Do time for violent offences or drug trading. Obtain early release to make space in prisons for people who have posted hurty words on social media. On early release, jump the housing queue.

Surely this is stating the obvious.

September 12, 2024 Posted by | World | , , , , | 1 Comment

Freightliner Offers Single Container Transport By ‘Carbon Reduced’ Trains

The title of this post, is the same as that of this article on Railway Gazette.

These two paragraphs explain the service.

Freightliner has launched its ECO90 booking service which enables customers of any size to reduce their carbon emissions by sending as little as one container on trains powered by alternative fuels.

The trains currently use hydrotreated vegetable oil, and Freightliner told Rail Business UK that other options could be available in the future, A certificate confirms that the fuel is fully traceable and from sustainable sources, and a Scope 3 carbon emissions report is provided.

It will be interesting to see if this service succeeds.

I suspect that in the future, the service’s biggest competitor will be the hydrogen-or electric- powered truck, which will offer an end-to-end zero-carbon service with minimal cargo handling.

September 10, 2024 Posted by | Transport/Travel | , , , , | Leave a comment

SSE Announces Construction Of Aberarder Wind Farm

The title of this post, is the same as that as an advert on my online edition of The Times.

Click the advert and you get this page, with the title of this post.

This is the sub-heading.

Aberarder secured 15-year CfD in UK Allocation Round 5

These three paragraphs give more details of the wind farm.

SSE has taken a final investment decision to proceed with Aberarder Wind Farm in the Scottish Highlands, in a circa £100m investment boost for its onshore wind portfolio.

Construction of the 12 turbine, 50MW wind farm, which is wholly owned by SSE Renewables, will begin before the end of the year with completion scheduled for the end of 2026. The Aberarder project was successful in September 2023 in the UK’s fifth Contract for Difference (CfD) Allocation round, securing a 15-year contract for low-carbon power generation.

Located at Strathnairn near Inverness, on a natural plateau at an average of 700m above sea level, the Aberarder project site sits directly adjacent to the operational 94MW Dunmaglass Wind Farm, which is jointly owned by SSE Renewables and Greencoat UK Wind.

It would appear that a £100m investment in the Scottish Highlands will get you a fully-operational 50 MW wind farm.

These are my observations and thoughts.

SSE’s Project Overview Of Aberarder Wind Farm

These four paragraphs are SSE’s project overview from this page on the SSE Renewables web site.

The Aberarder Wind Farm project is located in Strathnairn near Inverness, on a natural plateau at an average of 700m above sea level. It will sit directly adjacent to the operational 94MW Dunmaglass Wind Farm, which is jointly owned by SSE Renewables and Greencoat UK Wind.

The project was developed by RES and consented by The Highland Council in April 2017. The consent allows for the construction of a 12-turbine onshore wind farm, with each turbine having a maximum tip height of up to 130m and is expected to have an export capacity of 49.9MW. SSE Renewables reached an agreement with RES to acquire Aberarder in October 2022.

In September 2023 Aberarder was successful in the UK’s fifth Contract for Difference (CfD) Allocation Round and was awarded a 15-year contract for low carbon power generation. SSE took a final investment decision to proceed with Aberarder Wind Farm, in a circa £100m investment in May 2024, construction is scheduled to begin before the end of 2024 with completion scheduled for the end of 2026.

Our focus is now on building strong and meaningful relationships with the local community surrounding the Aberarder Wind Farm. As a responsible developer and operator, we are looking forward to working closely with the community in surrounding area to fully realise the benefits of this exciting project.

Construction has now started and it would appear that in two years, the twelve-turbine wind farm will be producing power.

SSE’s Description Of Dunmaglass Wind Farm

These four paragraphs are SSE’s description from this page on the SSE Renewables web site.

Located to the south east of Inverness, on a natural plateau at an average of 700m above sea level, Dunmaglass is SSE’s highest wind farm to be constructed.

SSE acquired the project from RES in May 2013 and initial enabling works began in the summer of 2013 which included the upgrading of 11km of tracks and the construction of two timber deck bridges.

Highland contractor RJ McLeod was awarded the £16m main civil works contract in summer 2014.

Dunmaglass became fully operational in 2017.

This paragraph also illustrates the challeges of the It looks like the construction of the larger Dunmaglass wind farm.

The height at which Dunmaglass is located presented its challenges during construction and the winter months brought high winds and plenty of snow. The site was fully completed and handed to the operations team in 2017.

Surprisingly, the legendary Highland midges didn’t get a mention.

The Sale Of 49.9 % Of Dunmaglass Wind Farm To Greencoat UK Wind

This sub-heading outlines the sale.

In February 2019, SSE sold 49.9% of Dunmaglass to Greencoat UK Wind PLC as part of a deal in which Greencoat acquired a 49.9% stake in both Dunmaglass and the nearby Stronelairg wind farm.

This paragraph gives more details of the sale.

In February 2019, SSE signed agreements for the sale of 49.9% of Dunmaglass wind farm to Greencoat UK Wind Plc (“UKW”). This sale was part of a £635m deal in which Greencoat acquired a 49.9% stake in both Stronelairg and Dunmaglass wind farms. The stakes equate to 160.6MW (megawatts) of capacity, with an average valuation for the two wind farms of around £4m per MW. This valuation demonstrates SSE’s ability develop quality, low carbon assets and infrastructure vital to the GB energy market.

The interesting figure is that SSE was paid £4m per MW for the interest of 160.6 MW, that they sold.

Aberarder wind farm is a 50 MW wind farm and it appears that it will cost £100 million to build.

If after a couple of years of operation, the wind farm is worth £4 million per MW, then SSE have doubled their money.

Does this illustrate, why the professionals like SSE and Greencoat UK Wind invest in wind farms?

  • SSE would have taken the risk, that they could build the wind farm.
  • SSE have the engineering skillsto do an excellent job.
  • Greencoat UK Wind are buying into a producing asset, with a known cash flow.

SSE also get more money to build more wind farms.

Where Are Aberarder And Dunmaglass?

This Google Map shows the site of Aberarder wind farm with respect to Inverness.

 

Note.

  1. Inverness is at the top of the map on the waters of the Solway Firth.
  2. Aberarder wind farm is marked by the red arrow.
  3. Aberarder is a hamlet to the North-West of the wind farm.
  4. Drumnaglass is a shooting estate to the North-West of the wind farm.
  5. Loch Duntelchaig is the main reservoir for Inverness.

This second Google Map shows the Drumnaglass wind farm.

Note.

  1. Drumnaglass wind farm has 33 turbines and a capacity of 94.05 MW.
  2. There is a track network of 11 km. linking all the turbines.
  3. A good proportion of the turbines can be picked out on the map.

It would appear that Aberarder wind farm will lie to the South-East of this wind farm.

Aberarder Wind Farm To Fort Augustus

In Cloiche Onshore Wind Farm, I talked about the 130.5 MW Cloiche wind farm and its future construction to the East of Fort Augustus and Stronelairg wind farm.

This Google Map shows the position of Aberarder wind farm with respect to Ford Augustus.

Note.

  1. Loch Ness runs across the North-West corner of the map.
  2. Fort Augustus and Stronelairg wind farm, are at the Southern end of the loch.
  3. The red arrow shows Aberarder wind farm.
  4. Foyers pumped hydro is on the Eastern bank of Loch Ness, at about the same latitude as the Aberarder wind farm.
  5. The lake at the bottom of the map, to the South-East of Ford Augustus, is the Glendoe Reservoir, that powers the Glendoe hydroelectric scheme.

There are certainly, a lot of SSE-owned and/or SSE-controlled assets in the area and I wouldn’t be surprised, if SSE integrated them more closely, or added a few more wind farms.

Why Are SSE Advertising The Start Of Construction?

SSE have been advertising for some time on The Times web site.

As they are not a retail energy company anymore, as they sold their retail business to OVO, the advertising, is probably about spreading a good corporate message and getting their strategy broadcast.

September 9, 2024 Posted by | Energy | , , , , , , , , , , , , , | 4 Comments

Orpington Station And The 358 Bus

This morning, I went to Orpington station, to look at the preparations for the 358 bus and took these pictures.

Note.

  1. Orpington station is a eight -platform station with full step-free access.
  2. There are three bay platforms.
  3. The platforms are long.
  4. There was no sign of the new Irizar ie Trams, that will be used on the 358 route.
  5. The charger had been installed.

Transport for London have said the new vehicles will be running in Summer 2024.

But then TfL’s promises, must be taken with a large pinch of salt.

 

September 7, 2024 Posted by | Transport/Travel | , , , , , | 1 Comment

Slough Multifuel Energy-From-Waste Facility Begins Operations

The title of this post, is the same as that of this news item from SSE Thermal.

This is the sub-heading.

SSE Thermal and Copenhagen Infrastructure Partners (CIP), partners of a new energy-from-waste facility in Slough, have entered commercial operations ahead of schedule.

This section from the news item describes the operation of the plant.

Slough Multifuel will produce electricity and heat through burning waste-derived fuels made from various sources of:

  • municipal solid waste
  • commercial and industrial waste
  • waste wood

The 55 MW facility will divert thousands of tonnes of waste away from landfill. It will convert it into a valuable source of energy. The facility is expected to process around 480,000 tonnes of residual waste each year. The station will support the UK Government’s strategy to reduce landfill waste and the export of waste.

Effectively, it is a sophisticated state-of-the-art incinerator, that has been built by Hitachi Zosen Inova.

In an ideal world, everything would be recycled and there would be no landfill or incineration.

But that would only be possible in a green fascist state.

September 6, 2024 Posted by | Energy | , , , , , , | Leave a comment

Hawthorn Pit Solar Farm

This document from the Department of Business, Industry and Industrial Strategy lists all the Contracts for Difference Allocation Round 6 results for the supply of zero-carbon electricity.

Hawthorn Pit solar farm was given a Contract for Difference.

The solar farm has a web page on the Aura Power web site, where this paragraph describes the solar farm.

Aura Power is working on a solar farm proposal between Murton and South Hetton, with a capacity of up to 49.9MW (Megawatts). The solar farm will be built without subsidy and would generate enough clean electricity to power the equivalent of over 17,000 homes, saving around 15,203 tonnes of CO2 from entering the atmosphere each year.

This Google Map shows the location of Hawthorn Pit.

Note.

  1. The Durham coast is at the East with Seaham at the North and Horden at the South.
  2. The A 19 runs North-South in the middle of the map.
  3. Hawthorn Pit substation is marked by the red arrow.

This second Google Map shows the substation in more detail.

There are a lot of switches and wires.

From the map on the Aura Power web site, it appears that the solar farm is to to the North side of the substation.

Eastern Green Link One

In the future Hawthorn Pit substation will also host the Southern end of Eastern Green Link One, which will be a a 2 GW high voltage direct current (HVDC) electrical superhighway to be built between the Torness area in East Lothian, Scotland and Hawthorn Pit in County Durham, England.

This is number one of four such 2 GW undersea connections that will distribute energy between England and Scotland.

Conclusion

Hawthorn Pit substation could growto an important interchange in the grid.

September 6, 2024 Posted by | Energy | , , , , , , | 1 Comment

IQIP Launches New Piling Technique For Noise-Compliant Installation Of Largest Monopiles

The title of this post, is the same as that of this article on offshoreWIND.biz.

This is the sub-heading.

The foundation and installation specialist, IQIP, has put their newly developed piling technique EQ-Piling in action, which the Dutch company claims allows for the noise-compliant installation of even the largest monopiles.

This is the first paragraph.

Conventional impact piling is an established method for installing large monopile foundations at the required depths, but it generates noise that can be harmful to marine life, said the company with headquarters in Sliedrecht, the Netherlands.

The article describes in detail how the technique uses a 1,700 tonne water tank to prolong the impact time, which lowers the noise level.

Application To Railway Electrification

When the Gospel Oak and Barking Line was electrified, there were some complaints about the noise of the piling.

I wonder, if IQIP have a solution for the noise associated with the smaller piles used for railway electrification?

September 6, 2024 Posted by | Energy, Transport/Travel | , , , , , , , , | Leave a comment

Cloiche Onshore Wind Farm

This document from the Department of Business, Industry and Industrial Strategy lists all the Contracts for Difference Allocation Round 6 results for the supply of zero-carbon electricity.

The largest onshore wind farm in the Allocation Round, is the Cloiche wind farm, which has this web page,which is entitled Onshore Wind Projects , on the SSE Renewables web site.

It is the only project on the page and these two paragraphs describe its location and capacity.

The proposed 29 turbine Cloiche Wind Farm is located on the Glendoe and Garrogie Estates, adjacent to the operational Stronelairg Wind Farm and Glendoe Hydroelectric Scheme and approximately 11 kilometres (km) to the south-east of Fort Augustus in the Great Glen, in the Monadhliath mountain range.

It is anticipated that the wind farm will generate approximately 130.5MW.

This Google Map shows the location.

Between the village of Fort Augustus and the Stronelairg wind farm, lies the Southern end of Loch Ness.

In the South-East corner of the map, there is a large lake, which is shown in more detail in this Google Map.

This is the Glendoe Reservoir for the Glendoe Hydro Scheme, that was built in the early years of this century, by damming the River Tarff.

The dam is clearly visible at the Western end of the Reservoir.

The Glendoe Hydro Scheme was opened in 2009 and has a generation capacity of 106.5 MW.

The planning and building of the scheme are described in this Wikipedia entry and the entry is well worth a read.

Stronelairg Wind Farm

Stronelairg wind farm, Cloiche wind farm and the Glendoe Hydro Scheme are all projects, that were or will be developed by SSE Renewables.

Stronelairg wind farm has 66 turbines and a total installed capacity of 228 MW.

It has a web page on the SSE Renewables web site.

These two paragraphs describe the location of Stronelairg wind farm.

Stronelairg sits at an elevation of around 600m above sea level in the Moadhliath Mountain range making it one of our windiest wind farms.

It sits within a natural bowl on a plateau, set well back from Loch Ness meaning that no turbines are visible from the main tourist routes in the area. Stronelairg is also located adjacent to our 100MW Glendoe hydro scheme and so the construction teams were able to use the hydro infrastructure as do our operational teams now.

Stronelairg wind farm appears tobe a powerful asset, hidden in the mountains.

Three Co-located Assets

As Cloche wind farm, will be adjacent to the operational Stronelairg Wind Farm and Glendoe Hydroelectric Scheme, these three energy producing assets, will be close together.

  • Cloiche wind farm – 130.5 MW
  • Stronelairg wind farm – 228 MW
  • Glendoe Hydroelectric Scheme – 106.5 MW

Note.

  1. This is a total power of 465 MW.
  2. This would be equivalent to a medium-sized gas-fired power station.
  3. All three assets could use the same grid grid connection and other facilities.

It could be considered a 358.5 MW wind farm, backed by a 106.5 MW hydro power station.

When there is a shortage of wind, the Glendoe Hydroelectric Scheme could step in, if required.

Conclusion

Onshore wind, backed up by hydroelectric schemes would appear to be a good way to create reliable hybrid power stations.

Do any other schemes in Allocation Round 6, involve combining onshore wind with existing hydro schemes?

September 5, 2024 Posted by | Energy | , , , , , , , , , | 3 Comments

World’s First Semi-Submersible Floating Offshore Wind Farm Tops Production Expectations

The title of this post, is the same as that of this article on offshoreWIND.biz.

This is the sub-heading.

In its four years of operation, the world’s first semi-submersible floating offshore wind farm, WindFloat Atlantic, has surpassed anticipated production figures, achieving a total cumulative output of 320 GWh.

These first three paragraphs give more detail.

Connected to the grid by the end of 2019 and fully commissioned in 2020, the floating offshore wind farm was developed by the Windplus consortium formed by Ocean Winds, a 50:50 joint venture between EDPR and ENGIE, Repsol, and Principle Power.

The pioneer wind farm consists of three platforms, each supporting one 8.4-MW Vestas turbine, which are anchored with chains to the seabed and connected to the onshore substation in the Portuguese municipality of Viana do Castelo through a 20-kilometre cable.

It has been reported that the project’s electricity production has steadily increased each year, reaching 78 GWh in 2022 and 80 GWh in 2023.

It certainly appears that floating wind power, is living up to and above its expectations.

September 5, 2024 Posted by | Energy | , , , | 1 Comment

Loganair Confirms Exclusive Partnership With Heart Aerospace To Develop Sustainable Regional Air Travel

The title of this post, is the same as that of this news item from Loganair.

This is the sub-heading.

Loganair, the UK’s largest regional airline, has joined with Swedish hybrid-electric airplane manufacturer Heart Aerospace, to launch a new and exclusive partnership dedicated to decarbonising regional air travel

These two paragraphs introduce the partnership.

The collaboration will focus on establishing use cases for Heart Aerospace’s hybrid electric aircraft within Loganair’s extensive Scottish and UK network.

Heart Aerospace is developing the ES-30, a hybrid-electric aircraft with the capacity to carry up to 30 passengers. The ES-30 has the potential to significantly reduce carbon emissions while offering cost-effective and accessible air travel.

These are my thoughts.

Loganair Has An Extensive Network Of Destinations

At the top end, there are international airports like Aberdeen, Birmingham, Edinburgh, Glasgow, Manchester and Newcastle-upon-Tyne.

And at the bottom end, there’s Barra!

Do the Swedes want the world-class publicity of landing the ES-30 on the beach at Barra airport?

Loganair’s Network Serves Some Airports, Where there Is Plenty of Green Electricity

Obvious ones in the UK are Aberdeen, Edinburgh, Inverness, Kirkwall, Liverpool, Newquay, Norwich and Sumburgh

I also suspect that one of the London airports will be made electric-aircraft friendly in the near future. Southend has the green electricity, but Loganair closed their routes to the airport.

Gothenburg And Scotland Could Be In Range Of An ES-30

Heart are based at Gothenburg and Loganair’s base at Aberdeen could be in range.

This could be useful for ferrying aircraft.

Conclusion

This looks like a partnership, that could go a long way!

September 5, 2024 Posted by | Transport/Travel | , , , , , | 2 Comments