The Anonymous Widower

WSMR Resubmits Formal Application To The ORR

The title of this post, is the same as that of this press release from Wrexham, Shropshire and Midlands Railway.

These three paragraphs give full details of the application.

Wrexham, Shropshire and Midlands Railway is committed to delivering the connectivity that communities across Wales and England need and deserve. Our resubmitted application reflects stakeholder feedback and demonstrates how we’ve listened to MPs and regional partners who urged us to reapply.

This application differs from our previous submission, which includes us requesting fewer train paths and offering an additional stop at Wellington, enhancing connectivity for people in Shropshire. Furthermore, by making better use of available capacity – including paths that have been released and remain unused – we aim to strengthen regional links and support economic growth.

WSMR’s new open access service will provide faster, more convenient travel options for passengers in Wrexham, Shrewsbury, Wellington, Telford, Walsall and beyond, improving access to jobs, education and leisure opportunities. We remain committed to introducing this service for the regions we serve and delivering benefits for communities along the route.

Note.

December 2, 2025 Posted by | Transport/Travel | , , , , , , , | Leave a comment

Network Rail Objects To Wrexham To London Service

The title of this post, is the same as that of this article on the BBC.

This is the sub-heading.

Concerns have been raised about plans for a direct rail service between Wrexham and London, including fears over safety at level crossings.

These three paragraphs add details to the story.

Network Rail warned the line was already congested and there was not enough timetable capacity for extra services.

In a report, it said increased use would raise the risk of a collision at crossings along the route and that it could not support the application, put forward by a new open-access rail operator called the Wrexham, Shropshire and Midlands Railway (WSMR).

The new service would link Wrexham, Gobowen, Shrewsbury, Walsall and Coleshill up with the capital.

This Google Map shows the area of the crossing.

Note.

  1. Chirk station, which is fully-accessible via ramps, is at the top of the map.
  2. The railway between  and running down the middle of the map.
  3. The railway has a maximum speed of 70 mph.
  4. The Aqueduct and the Viaduct crossing the valley of the River Ceirog together.
  5. The large caravan park.
  6. Chirk Castle Park.

If the Viaduct level crossing is in this area, it is a serious accident waiting to happen.

The BBC article says this about the crossing.

They include the Viaduct level crossing in Shropshire, which it said was “used by large groups and is also a hot spot for trespassing and fatalities”.

The operator said work would need to be carried out to make it safe.

North Shropshire MP Helen Morgan has previously spoken out on the safety of the crossing, which is close to the Chirk Viaduct.

She has written to Network Rail to request additional safety measures be put in place.

Network Rail said it had reviewed the safety of the crossing and brought forward plans to install crossing lights, which should be in place in December this year.

Note.

  1. I hope this is enough. But, I do know that the level crossing lights work well at Thurston station in Suffolk.
  2. It must help, that there is a bridge at the station.

The line between Wolverhampton and Wrexham, except for a short 15 mph section at Shrewsbury has at least a 70 mph maximum speed.

As electric trains, including battery-electric ones, have fast acceleration and deceleration would it not be possible for them to slow down for the level crossings?

This could even be done automatically using digital signalling.

Conclusion

I believe that this level crossing problem is solvable.

 

 

 

 

June 9, 2025 Posted by | Transport/Travel | , , , , , , , | 4 Comments

Direct Rail Service Plan Supported By PM

The title of this post, is the same as that of this article on the BBC.

This is the sub-heading.

Plans for a new passenger rail service running direct trains between north Wales, the West Midlands and London have received support from the prime minister.

These three paragraphs add detail to the story.

A new open-access rail operator, external, called the Wrexham, Shropshire and Midlands Railway (WSMR), has been formed, offering passengers in Wrexham, as well as Gobowen, Shrewsbury, Walsall and Coleshill, a direct link with the capital.

Speaking in the Commons, Shrewsbury’s Labour MP Julia Buckley asked Sir Keir Starmer if he would support the provider’s application.

The prime minister responded, saying he would be “delighted to make sure the MP and other interested MPs meet with the rail minister to put their case forward”.

He didn’t actually say he supported the application, but then lawyers are careful with words, as every syllable costs money.

I have a few thoughts on this service.

The North Wales Metro

The North Wales Metro was announced today and I wrote about it in £2.1bn North Wales Rail Overhaul Plans Unveiled.

The Wrexham, Shropshire and Midlands Railway connects the North Wales Metro to Gobowen, Shrewsbury, Wolverhampton, Coleshill and London Euston.

Will The Trains Be Hydrogen Powered

In Alstom And Eversholt Rail Sign An Agreement For The UK’s First Ever Brand-New Hydrogen Train Fleet, I reported how Alstom could be going to build a fleet of hydrogen trains in Derby.

I just wonder, if Alstom are going to create a hydrogen train with this specification.

  • Five cars
  • 125 mph top speed
  • Ability to use electrification, where it exists.
  • Sufficient range on hydrogen to cover the non-electrified section of the route between Wrexham General and Wolverhampton.
  • Wrexham General and Wolverhampton is just under sixty miles and takes an hour and six minutes.

As the fastest trains between London Euston and Walverhampton take one hour and forty-nine minutes, trains would take just under three hours between London Euston and Wrexham General.

I rode  an Alstom hydrogen-powered train in Germany in March 2019 and wrote My First Ride In An Alstom Coradia iLint.

I took this picture at the time.

Alstom certainly have all the technology to build a 125 mph hydrogen-powered train, that can use electrification.

Where Would A Hydrogen Train Be Refuelled?

I suspect, that as the train would probably have a range of around a thousand kilometres, it could fill up overnight at Wrexham.

The hydrogen could be sourced from Runcorn or it might even be generated at the depot.

Would A Hydrogen Train Attract Passengers?

If the hydrogen-powered train were to be mouse-quiet like Wrightbus’s hydrogen buses, I believe it would.

May 22, 2025 Posted by | Hydrogen, Transport/Travel | , , , , , , , , , , , , | 2 Comments

Key Rail Route To London Scrapped A Year Ago Could Return – Here’s Why

The title of this post, is the same as that of this article on the Shropshire Star.

This is the sub-heading.

A key railway line to London that was scrapped a year ago, could be set for a return.

This is said in the article.

South Shropshire MP Stuart Anderson is among those who has thrown his support behind plans to restore direct rail services to London, after Avanti ceased to operate the route almost a year ago in June 2024.

On March 12, Mr Anderson met with Wrexham, Shropshire and Midlands Railway (WSMR) who have developed the plans.

If their application is approved, it would see the return of direct services between Wrexham and London via Shropshire. WSMR, the aspirant open access operator, plans to deliver five daily train services between the county and capital city.

It’s only sketchy information and given the Government’s lukewarm support for open access services, I don’t hold out much hope, especially as Stuart Anderson is a Conservative MP.

 

 

May 6, 2025 Posted by | Transport/Travel | , , , | 2 Comments

Alstom Plans To Operate Its Own Passenger Train Service In The UK For The First Time

The title of this post, is the same as that of this press release from Alstom.

These two bullet points, act as sub-headings.

  • Alstom is partnering with SLC Rail to form a new open access rail operation between North Wales, Shropshire, the Midlands and London
  • Formal application now being submitted to the Office of Rail and Road (ORR) with passenger service sought from 2025

These are the first three paragraphs.

Alstom, global leader in smart and sustainable mobility, plans to operate a new passenger rail service across England and Wales. Working in partnership with consultancy SLC Rail, the open access operation will be known as Wrexham, Shropshire and Midlands Railway (WSMR).

As the country’s foremost supplier of new trains and train services, and a leading signalling and infrastructure provider, Alstom will operate its own rail service in the UK for the first time.

WSMR is seeking to introduce direct connectivity to and from North Wales, Shropshire, the Midlands and London that doesn’t exist today, linking growing communities and businesses, and making rail travel more convenient, enjoyable and affordable.

I can’t remember a service proposal being put forward by a train manufacturer since the privatisation of UK’s railways in the 1990s.

This is some more information and my thoughts.

The Route

This paragraph from the press release, describes the route.

The proposal envisages a service of five trains per day in each direction Monday to Saturday, with four travelling both ways on Sundays. Trains will stop at Gobowen, Shrewsbury, Telford Central, Wolverhampton, Darlaston, Walsall, Coleshill Parkway, Nuneaton and Milton Keynes on their journey between Wrexham General and London Euston.

Note.

  1. The proposed call at the new Darlaston station.
  2. The route is electrified between Euston and Nuneaton and Walsall and Wolverhampton.
  3. Much of the route North of Nuneaton is on tracks with a maximum speed of 70-80 mph.

The route is in these sections.

  • Euston and Nuneaton – 96.7 miles – electrified
  • Nuneaton and Walsall – 26.7 miles
  • Walsall and Wolverhampton – 6.7 miles – electrified
  • Wolverhampton and Shrewsbury – 29.7 miles
  • Shrewsbury and Wrexham General – 30.3 miles

That is a total of 190.1 miles or 380.2 miles round trip.

I suspect that the service will need bi-mode trains.

Should The Service Call At Wellington?

This article on the BBC is entitled Rail Company Urged Not To Forget Wellington.

This is the sub-heading.

A rail company which is bidding to bring back a direct service between Shropshire and London has been urged not to forget a town.

These are the first three paragraphs.

Wrexham, Shropshire and Midlands Railway said it was preparing to apply to the government to run the service.

Trains would stop at Gobowen, Shrewsbury, Telford, Wolverhampton, Walsall, Coleshill and Nuneaton.

But Telford and Wrekin Council said the omission of Wellington as a stop was “short-sighted”.

Although Wellington is smaller than than Shrewsbury and Telford, it looks like a bit of analysis would provide a solution, that would be acceptable for all parties.

The Trains

In the press release, this phrase is used.

positive impact to both communities and the environment.

I can’t see any more electrification being erected on the route, so the trains will need to be bi-mode.

  1. Bi-mode diesel trains won’t have a positive impact on the environment.
  2. As the route between Wolverhampton and Wrexham General is not electrified, a battery-electric train would need a range of at least 60 miles or 120 miles for the round trip, if there were no charging at Wrexham General.
  3. But Alston are developing a Hydrogen Aventra, which I wrote about in Alstom And Eversholt Rail Sign An Agreement For The UK’s First Ever Brand-New Hydrogen Train Fleet.

So could Alstom be using this route to trial and showcase their new Hydrogen Aventra?

I believe that the route will be very suitable for a hydrogen train.

  • Changeover between electric and hydrogen power can always take place in a station.
  • All hydrogen refuelling could be performed at one end of the route.
  • A large proportion of the UK’s green hydrogen is produced by INEOS at Runcorn, which is less than fifty miles from Wrexham. A refuelling tanker could supply the train, as they do on some hydrogen routes in Germany.
  • London has only small amounts of hydrogen infrastructure.

I suspect that refuelling will be done at the Wrexham end of the route.

This Alstom visualisation shows the train.

But it is only a three-car train.

  • That is not a problem, as Aventras can be lengthened as required to the length required for the number of passengers.
  • Some Aventras, like the Class 701 trains for South Western Railway, have even been ordered as ten-car trains.
  • Two three-car trains may also be the ideal capacity, running as a six-car train.

So capacity will not be a problem.

If it is assumed that Alstom’s trains for the WSMR route, can use the overhead wires, where they exist, each trip between Wrexham General and London will require a total of 86.7 miles or 140 kilometres of running on hydrogen.

  • A round trip will therefor require 280 kilometres of running on hydrogen.
  • But between London Euston and Nuneaton, it will just be another electric train.
  • I suspect that like the similar Class 730 train, it will be capable of 110 mph on the West Coast Main Line.
  • Alstom’s Coradia iLint hydrogen train has a range of around a 500-800 kilometres on hydrogen.
  • The WSMR trains will probably be 100 mph trains using hydrogen on a route, where that speed is possible.

So if a Hydrogen Aventra has a similar range to the Coradia iLint, it will be able to do two round trips before refuelling.

How Long Will The Service Take?

West Midlands Trains, who use the similar Class 730 trains take one hour and eleven minutes between London Euston and Nuneaton with a single stop at Milton Keynes Central.

As the WSMR trains will use the same route, I suspect the same time can be used.

As Nuneaton and Wrexham General are 93.4 miles apart a table can be created showing the time for the rest of the journey for different average speeds

  • 50 mph – 1 hour 52 minutes – 3 hours 3 minutes.
  • 60 mph – 1 hour 33 minutes – 2 hours 44 minutes.
  • 70 mph – 1 hour 20 minutes – 2 hours 31 minutes.
  • 80 mph – 1 hour 10 minutes – 2 hours 21 minutes.

Note.

  1. The first time is the Nuneaton and Wrexham General time and the second time is the overall journey time.
  2. Typical Avanti West Coast services via Crewe and a change at Chester, take between two-and-a-half and three hours.

I suspect, if the WSMR trains can keep the speed up through the Midlands, that two hours and 30 minutes could be possible.

Could The Hydrogen Aventra Run At 125 mph Under The Wires?

In March 2018, I wrote Bombardier Bi-Mode Aventra To Feature Battery Power, which was based on this article in Rail Magazine.

These are a few points from the article.

  • Development has already started.
  • Battery power could be used for Last-Mile applications.
  • The bi-mode would have a maximum speed of 125 mph under both electric and diesel power.
  • The trains will be built at Derby.
  • Bombardier’s spokesman said that the ambience will be better, than other bi-modes.
  • Export of trains is a possibility.
  • Bombardier’s spokesman also said, that they have offered the train to three new franchises. East Midlands, West Coast Partnership and CrossCountry.

Have Alstom looked at what they bought from Bombardier and decided the following train is possible?

  • Five-cars or what the customer needs.
  • 125 mph under the wires.
  • Running on hydrogen away from the wires.
  • 100 mph on tracks without electrification.

Obviously, maximum speeds  would depend on track limits.

Looking at 125 mph Avanti West Coast trains that have a Milton Keynes stop between London Euston and Nuneaton, they can reach Nuneaton ten minutes quicker than West Midlands Trains 110 mph Class 730 trains.

Two hours and 30 minutes between London Euston and Wrexham is looking increasingly possible.

Are we seeing an audacious proposal from Alston to sell new trains to CrossCountry and a host of other franchises?

Conclusion

London Euston and Wrexham would appear to be an excellent route for an Aventra-based hydrogen train.

  • It can probably cruise at 110 mph on the West Coast Main Line between London Euston and Nuneaton.
  • All switchovers between electrification and hydrogen can be performed in electrified stations.
  • Hydrogen would only be used North of Nuneaton.
  • The train can be refuelled at Wrexham General, with fuel supplied from INEOS at Runcorn.
  • Given the typical 1000 km. range of hydrogen trains, a train can probably do three round trips without refuelling.

I can see this being a service with an excellent operational record.

 

March 15, 2024 Posted by | Hydrogen, Transport/Travel | , , , , , , , , , , , , , , , , , , , | 2 Comments