The Anonymous Widower

Will JCB And Alton Towers Like The New Manchester Piccadilly And St. Pancras Rail Service At Uttoxeter Station?

Grand Central Trains have applied for an open access service between Manchester Piccadilly and St. Pancras stations.

  • This service will call at Stockport, Macclesfield, Congleton, Stoke-on-Trent, Uttoxeter, Derby, Loughborough, Leicester, Wellingborough and Luton Airport Parkway.
  • Grand Central Trains are asking for five trains per day.
  • JCB and Alton Towers are the two largest employers in the area and employ more than a few thousand between them.
  • The JCB headquarters and factory are 5.6 miles from Uttoxeter station.
  • Alton Towers is 10 miles from Uttoxeter station.
  • Alton Towers have given the new train service their backing.
  • The current local train service through Uttoxeter is only an hourly diesel service between Crewe and Lincoln, with additional calls at Stoke-on-Trent, Derby and Nottingham.
  • Trains seem to call at Uttoxeter between 07:00 and 22:00.

I suspect that this train service may not be enough.

I have some questions and thoughts.

What Trains Will Be Used For The Manchester Piccadilly And St. Pancras Rail Service?

Initially, it is likely, that hand-me-down Class 180 trains will be used.

  • They are five-car diesel trains.
  • As they are only 116.52 metres long,  they are less than 120 metre, so they will fit the platforms at St. Pancras.
  • They are 125 mph trains.

I have problems with their air-conditioning.

I am sure, that JCB, Alton Towers and all their employees and visitors would prefer a mouse-quiet zero-carbon train and Grand Central Trains have some Class 820 trains on order from Hitachi.

  • They are five-car tri-mode trains.
  • They will have to have 24 metre cars, so they will fit the platforms at St. Pancras.
  • They are 125 mph trains.

They will use battery power between Kilby Bridge junction and Stoke-on-Trent station, which is about 71 miles.

How Long Will St. Pancras And Uttoxeter Take?

Consider.

  • The fastest time between St. Pancras and Derby stations takes 87 minutes
  • A Class 170 train takes 26 minutes between Derby and Uttoxeter.

I believe that with a few minutes for the driver to change ends at Derby, that St. Pancras and Uttoxeter stations will be under two hours.

I asked Google AI, how long it would take to drive and received this reply.

Driving between Uttoxeter and London takes approximately 2 hours and 44 minutes to 3 hours and 4 minutes, depending on the route you choose.

That is an impressive saving.

 

Do Alton Towers And JCB Have Difficulty Getting Local Employees?

I asked this question of Google AI and received this answer.

Yes, Alton Towers and JCB face persistent and unique challenges when it comes to recruiting and retaining local employees. Both companies are the dominant, marquee employers in the rural area of Staffordshire Moorlands, but their location and operational models create distinct logistical and competitive hurdles.

The two primary factors causing recruitment and retention difficulties include:

  1. Inaccessible Rural Locations & Public Transport Barriers

According to local planning and infrastructure assessments published by Staffordshire Authorities, both Alton Towers and JCB operate vast facilities in highly rural pockets of the county.

The Public Transport Gap: Local public transport options are heavily limited and typically do not run late enough or early enough to match the shift patterns of either employer.

The Commute Burden: Reviews from local workers on platforms like SimplyHired note that non-driving local staff face highly stressful or prolonged commutes (sometimes taking up to two hours via limited staff shuttle buses), which quickly makes entry-level or minimum-wage roles financially non-viable.

2. Wage and Poaching Competition Between the Two

Because they pull from the exact same local labor pool in neighboring towns like Cheadle and Uttoxeter, they often find themselves in direct competition for workers, creating a localized hiring tug-of-war.

The Pay Disparity: Users on Reddit’s AltonTowers forum point out that Alton Towers struggles heavily to retain staff in certain operational positions because nearby JCB acts as a “better payer,” poaching local talent away with higher industrial wages.

Seasonal vs. Year-Round Stability: Alton Towers’ recruitment model relies heavily on hiring roughly 1,500 to 2,500 seasonal workers annually who are let go between November and March. Local school-leavers and workers frequently jump from Alton Towers to JCB when looking for permanent, year-round manufacturing contracts.

There are some obvious things, that could be done to ease getting to Alton Towers and JCB.

Do Alton Towers And JCB Have Visitors From London And The Nearby Continent?

I asked this question of Google AI and received this answer.

Yes, both Alton Towers and JCB attract significant numbers of visitors from London and mainland Europe. Because both attractions are located close to each other in Staffordshire, England, they draw heavily from the capital city as well as international tourists through well-established transportation links.

Alton Towers Resort

As the UK’s largest theme park, Alton Towers welcomes over 2.5 million visitors annually.

Visitors from London: Londoners make up a large segment of the park’s domestic traffic. Travelers frequently make the trip from London Euston to Stoke-on-Trent via Avanti West Coast trains, which takes approximately 1 hour and 40 minutes before a short connecting taxi ride to the gates. Numerous direct coach excursions also depart regularly from London neighborhoods like Wembley and East Ham.

Visitors from the Continent: European theme park enthusiasts routinely include Alton Towers in UK vacation packages to experience its world-renowned “white-knuckle” rollercoasters (like The Smiler or Nemesis Reborn). International tourists commonly fly into nearby hubs like Manchester Airport (MAN) or travel up via the Eurostar and London rail connections.

JCB World Headquarters & Factory Tours

Located in Rocester, the JCB World Headquarters operates a highly popular VIP Visitor Centre and public factory tour experience.

Visitors from London: Industrial tourism and corporate groups frequently travel from London for the 2.5-hour “Story of JCB” manufacturing walkthrough. The company heavily markets to the London crowd, recently launching major public showcases directly outside London’s King’s Cross Station to celebrate its milestones.

Visitors from the Continent: Because JCB is a global powerhouse in construction and agriculture, its Staffordshire headquarters is a major destination for European dealership delegations, commercial buyers, and equipment enthusiasts from France, Germany, and the Netherlands.

On this cursory look, it would appear that for both attractions, a direct train service from Uttoxeter station could make travel easier.

Would Early And Late Trains Between Say Leicester And Stockport Via Derby Help Alton Towers’s And JCB’s Recruitment?

Yes, introducing early and late train services between Leicester and Stockport via Derby would significantly boost recruitment for both Alton Towers and JCB. Both major employers are located in semi-rural Staffordshire, and their primary staffing constraint is the severe lack of viable public transport matching their unsociable shift patterns.

A rail service connecting Leicester and Stockport via the Crewe-Derby line passes directly through Uttoxeter, which serves as the main transit gateway for both companies.

Alleviating the Alton Towers Commute Crisis

Alton Towers relies on thousands of seasonal workers, ride hosts, and hospitality staff who are often younger and do not drive due to high insurance costs. On platforms like Reddit, staff agree that the limited existing employee bus schedules result in grueling 16-hour days due to poorly timed drop-offs and pick-ups.

Late-Night Events: Key seasonal periods like Scarefest require staff to work late cleaning and hospitality shifts ending past 11:00 PM.

Urban Talent Pools: Early and late trains would allow workers living in major urban hubs like Derby, Stoke-on-Trent, and the surrounding regions to commute reliably without needing to rely on expensive taxis or restricted private buses.

Unlocking Shift Coverage for JCB

JCB’s main manufacturing and logistics clusters are centered around Rocester and Uttoxeter. A major portion of their workforce operates on rigid shift patterns (such as 6:00 AM starts or late evening finishes).

Apprentice Mobility: JCB runs joint mechatronics apprenticeships where students spend their first 22 months training at Toyota in Derby before transitioning to the Uttoxeter sites. Better early/late rail links between Derby and Uttoxeter would directly ease this cross-county relocation friction.

Widening the Demographic: Reviews from recruitment groups on Facebook emphasize that confirming shift logistics is the hardest part of securing employment at JCB for younger workers. Reliable, early-morning transit expands their hiring radius to encompass South Manchester (Stockport) and the East Midlands (Derby/Leicester).

It certainly looks like early and late trains would be valuable to both attractions.

But it doesn’t have to be a full London Manchester service with an expensive train. I’m sure Alstom at Derby could build a four-car Adessia battery-electric train, that could handle the route, which would also be suitable for the local Crewe and Lincoln service.

 

 

 

 

 

 

 

 

 

 

October 13, 2026 Posted by | Artificial Intelligence, Manufacturing, Transport/Travel | , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Have Alstom Given Up On Their Euston And Wrexham Open Access Service?

I last wrote about this planned service in Direct London Trains ‘Could Start In 2026’.

But, as I wrote in Network Rail Objects To Wrexham To London Service, Network Rail had objected.

I asked Google AI, the question in the title of this post and received this reply.

No, Alstom has not given up on the Wrexham, Shropshire and Midlands Railway (WSMR) open-access project.

After the Office of Rail and Road (ORR) rejected their initial application in July 2025 due to capacity and congestion concerns on the network, WSMR resubmitted a revised bid in late November / December 2025.

Key Updates on the Resubmitted Bid

Reduced Services: The revised plan trimmed the proposed frequency from five daily return trips down to three guaranteed daily returns (with an option for a fourth).

Route Adjustments: The new application added a stop at Wellington (Shropshire) and sought to utilize newly available or spare capacity paths.

Timeline: A decision from the rail regulator (ORR) was anticipated in Spring 2026, with hopes for the service to launch towards the end of 2026.

The Route

The map downloaded from a BBC article, which is entitled Direct London trains ‘Could Start In 2026’ shows the route.

Note.

  1. There are now ten intermediate stops.
  2. Wellington and Darlaston have been added between Wolverhampton and Shrewsbury.
  3. Euston and Wolverhampton is 124.9 miles and fully electrified.
  4. Wolverhampton and Wrexham General is 59.9 miles and is not electrified.
  5. The section of the route without electrification is 120 miles return, which could be too far for battery-electric trains.

But I believe that the battery-electric trains, that TransPennine Express have ordered from Alstom could handle the route with charging at Wrexham General station.

I have some further thoughts.

Hydrogen Is Now Not Proposed

In Direct London Trains ‘Could Start In 2026’, I felt that Alstom might use hydrogen trains.

But now that TransPennine Express have ordered Alstom battery-electric trains and the route could be ideal for them, it would seem sensible to use them.

Providing charging at Wrexham General station would probably be easier than providing hydrogen refuelling.

Could Euston and Wrexham General Be A Test Route For The Adessia Battery-Electric Train In The UK?

I asked Google AI and received this reply.

Yes, London Euston and Wrexham General could serve as an ideal test route for Alstom’s Adessia battery-electric train platform.

Route Characteristics and Viability

Electrified Section: The journey from London Euston to Wolverhampton covers roughly 124.9 miles on fully electrified lines.

Uncertified / Non-Electrified Section: The remaining 59.9 miles from Wolverhampton to Wrexham General lacks overhead electrification (via Shrewsbury).

Battery Range Demands: Operating this run requires a battery-electric range capability of roughly 60 miles in each direction beyond the wires, or a charging strategy implemented at Wrexham General station.

Proposed Operations: Wrexham Shropshire and Midlands Railway (WSMR) announced plans to work with Alstom to introduce a bi-mode battery-electric fleet from the Adessia family if their open-access operations are approved.

This is the first time, that I’ve seen linkage between Alstom’s open access operation and development of a bi-mode battery-electric fleet.

Will Wrexham Shropshire and Midlands Railway’s Adessia Trains Be 110 mph Trains?

This would make them compatible with the TransPennine Express trains.

But they will be sharing the West Coast Main Line with 125 mph Class 390, Class 805 and Class 807 trains.

I wonder, if for ease of operation, that the trains will be 125 mph units.

 

September 20, 2026 Posted by | Artificial Intelligence, Design, Manufacturing, Transport/Travel | , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

WSMR Plans Alstom-Built Bi-Mode Sets If Open Access Bid Approved

The title of this post, is the same as that of this article on Rail magazine.

This is the sub-heading.

Wrexham, Shropshire & Midlands Railway (WSMR) has said it will invest in new Alstom battery-electric bi-mode trains if its open access application is successful.

These three paragraphs add some more details.

In December the Alstom-backed operation resubmitted its application to run between the North Wales city and London Euston via Shrewsbury and Walsall after its initial bid was rejected by the Office of Rail and Road (ORR) last year.

In a letter to the regulator and Network Rail, Mobilisation Director Darren Horley said: “Should our application be successful, WSMR will work alongside its parent company, Alstom, and will commit to invest in a new bi-mode battery-electric fleet based on the Adessia platform – Alstom’s new generation passenger train designed specifically for the UK market.

“Initial discussions regarding the procurement of a small new fleet have already commenced with Alstom and a financier.”

The Adessia will be a high speed version, with a maximum speed of 125 mph or 200 kph.

I have some thoughts.

How Much Of The Route Is Without Electrification?

In Alstom Plans To Operate Its Own Passenger Train Service In The UK For The First Time, I gave these distances of the sections of the route.

  • Euston and Nuneaton – 96.7 miles – electrified
  • Nuneaton and Walsall – 26.7 miles – electrified
  • Walsall and Wolverhampton – 6.7 miles – electrified
  • Wolverhampton and Shrewsbury – 29.7 miles
  • Shrewsbury and Wrexham General – 30.3 miles

That looks like there are sixty miles in each direction without electrification.

Either the trains would have a battery range of 120 miles or a battery range of over 60 miles with charging at Wrexham General station, which is shown in these pictures.

Note.

  1. Wrexham General station has four platforms. Two are a pair of long through platforms and there are also a separate long and a short through platform.
  2. The station is step-free.
  3. The last four pictures are Platform 4.

This OpenRailwayMap shows the platform layout at Wrexham General station.

Note.

  1. The blue arrow is between the two through Platforms 1 and 2.
  2. Platform 3 is the platform in the middle.
  3. Platform 4 is the platform on the left.

An overhead charging rail could be used on Platforms 3 and/or 4, as has been used at Caerphilly station.

 

The overhead charging rail could also charge other Wrexham General services.

 

Prospective Routes

I would expect that there would be a need for such a train on the following UK routes.

  • CrossCountry – Class 221 train replacement.
  • East-West Rail – New fleet.
  • Southeastern – London and Hastings.
  • ScotRail – Inter7City replacement.
  • South Western Railway – Class 158 and Class 159 train replacement.
  • Transport for Wales – Some diesel services.

There would be probably be other services too!

Will The Service Call At Willenhall, Darlaston And Walsall?

This OpenRailwayMap shows the three stations.

Note.

  1. Willenhall station is in the North-West corner of the map.
  2. Darlaston station is marked by the blue arrow.
  3. Walsall station is in the North-East corner of the map.
  4. Tame Valley Parkway station is in the South-East corner of the map.
  5. It might also be a good idea to call at the Parkway station.
  6. Red tracks are electrified.
  7. To call at all four stations will need a reverse at Walsall.

There may be some thinking to do, on the best calling pattern in Walsall.

 

 

March 27, 2026 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , | 3 Comments