The Anonymous Widower

Fairytales Do Sometimes Come True!

Well Done! Emma!

September 11, 2021 Posted by | Sport | , | 4 Comments

My Ticket To Ride

I’ve just picked up my ticket to ride to Edinburgh on the 27th of next month from Dalston Junction station.

All very conventional!

September 11, 2021 Posted by | Transport/Travel | , | 5 Comments

Lumo: Why Won’t The New Train Service Stop At Yorkshire Stations?

The title of this post, is the same as that of this article on the Yorkshire Post.

This is the first article, I’ve found about Lumo, that has a negative headline.

The reason is probably very simple, in that most Lumo services are planned to stop at only at Newcastle and Morpeth, with two services having an extra stop Stevenage.

They are intending to run the service in as short a time as possible between London King’s Cross and Edinburgh.

As each stop has a time penalty, not stopping in Yorkshire will give potential to go cut the journey time.

But the positive message that comes from the writer of the Yorkshire Post article is that Yorkshire likes the concept.

This paragraph is their take on the service.

The goal is to encourage a more environmentally friendly mode of transportation and affordable travel. Lumo will provide low-carbon emissions, affordable long-distance travel for more than one million passengers every year.

Perhaps they would like their own Yorkshire flyer.

The obvious way for this to happen would be for the Open Access operator; Grand Central to convert themselves into a train operator like Lumo.

  • The ten diesel Class 180 trains would be replaced by new electric trains.
  • The trains would need a 140 mph capability under digital signalling to fit in with the plans of Network Rail, LNER and Lumo to create a top-class high-speed high-capacity East Coast Main Line.
  • The trains would need a battery capability as Grand Central’s routes are not fully electrified.
  • They could copy Lumo’s green marketing philosophy, ticketing and catering offering.

As to the trains, I’m sure that Hitachi could offer a version of their Intercity Tri-Mode Battery Train, the specification of which is shown in this Hitachi infographic.

The trains would need a range of fifty miles on battery-power.

Charging facilities wold be needed at Bradford Interchange and Sunderland stations, as neither has suitable 25 KVAC overhead electrification.

Conclusion

The conversion of Grand Central to work on the Lumo model is possible and as the trains will need to be changed to zero-carbon ones soon to meet decarbonisation objectives, I would suspect that at least that will happen.

 

 

 

September 11, 2021 Posted by | Transport/Travel | , , , , , , , , | 1 Comment

Twenty Years On!

On the eleventh of September in 2001, I had three jobs to do in London.

  • I had to visit my press cuttings client near Borough tube station to talk about something, which I have long forgotten.
  • I had to deliver a thousand Al Stewart CDs to his manager, as the singer was going on tour. The handover was to be performed in Waterloo station.
  • I was then going on to Soho to see a Chinese bookmaker, for whom I offered computer advice.

I parked my car on a meter and went to visit the first client at about two.

When I returned to the car, I needed to phone my wife; C about something. My phone was installed in my Discovery and it didn’t have any calling list, as I remembered numbers and just typed them in.

But for some reason I couldn’t remember her mobile phone number or the Office number at home, so I didn’t make the call.

This was very unlike me, as I’ve always had an excellent memory. Especially for numbers.

I did remember to deliver the parcel to Al Stewart’s manager and made my way to Soho, where I parked in an underground car park.

It was only when I got to the bookmakers did I realise what was going on in New York, as they had the televisions on and were watching the drama continuously.

I have a feeling, that I made my excuses and returned quickly to Suffolk.

By this time, my memory had returned and I was able to phone C.

But the worst terrorist attacks of recent memory were probably over.

Did my brain pick up the bad news or was it due to being close to the City of London, where there would have been a large amount of electronic communication to New York?

I have no idea.

But there is another incident, where I may have picked up tragic news through the ether.

On Sunday, the 31st August 1997, I woke up about five as I generally do and remarkably said to C. “Something tragic has happend! I think Tony Blair has been assassinated!”

She told me to stop being silly and I went downstairs to make a cup of tea and do some programming. It was then that I turned on the radio and heard that Princess Diana had died in the traffic accident in Paris.

September 11, 2021 Posted by | Business, Computing, News, World | , , , , | 3 Comments

A Fairytale Of New York

I  am 74 and got my interest in sport from my father. He used to take me to football at Spurs and Enfield Town and regularly would get me out of bed to watch quality sport like athletics, when it was shown live on television. I can remember watching Derek Ibbotson breaking the World mile record in black-and-white in 1957.

Over the years, I’ve watched many great sporting achievements. If Emma Raducanu wins in New York tomorrow, it’s up there with England’s two World Cups in football and rugby, Botham’s exploits at Headingley, Moss’s victory at Monaco in 1961 and Wiggins and friends’ victories in the Tour de France.

And if it happens on the twentieth anniversary of one of the worst atrocities in human history, it will be a true fairytale of New York.

September 10, 2021 Posted by | Sport | , , , , , | Leave a comment

New East Linton Station Development Given The Go Ahead

The title of this post, is the same as that of this article on Rail Technology Magazine.

This is the first paragraph.

Proposals to open a station in the village of East Linton, for the first time in over half a century, have just been approved by East Lothian Council’s planning committee.

In The Scottish Borders Have Caught London Overground Syndrome, I said this.

It would also appear that because of the success of the Borders Railway, that there are suggestions to add new stations on the East Coast Main Line at Reston and East Linton. This is said under Future in the Wikipedia entry for East Linton station.

Proposals to reopen the station, along with the former station at Reston, have received the backing of John Lamont MSP, who has taken the case to the Scottish Parliament. A study published in 2013 proposed that East Linton and Reston stations be reopened. Since Abellio ScotRail took over the franchise in April 2015, they have now committed to reopening East Linton and Reston Stations as part of the local Berwick service by December 2016 but due to the shortage of rolling stock this will now commence in December 2018.

So it would appear there is a high chance it will happen.

Reston station is well on the way to completion and the site is shown in this Google map.

Note.

  1. The East Coast Main Line running between the North-West and South-East corners of the map.
  2. The brown scars around the railway indicate the site of the station.
  3. The main A1 road is just off this map to the North.

In New Rail Service From Newcastle To Edinburgh To Stop At These Northumberland Stations, I indicated that a new service from TransPennine Express will start running in December 2021 and will call at Reston station, when it opens.

Now East Linton station is on its way.

This Google Map shows the village of East Linton.

Note.

  1. The East Coast Main Line going through the middle of the village.
  2. The A1 curves South of the village.

Will the station be built in the middle of the village?

The page on Scotland’s Railway, indicates it will be.

East Linton and Reston stations seem to be progressing at speed, but then so did Horden and it appears Soham will be open this year.

Network Rail seem to have at last got their project management right.

 

September 10, 2021 Posted by | Transport/Travel | , , , , | Leave a comment

The London And Edinburgh Travel Market

This paragraph comes from of this article on Railway Gazette.

Lumo is aiming to carry more than 1 million passengers per year. It is particularly targeting people who currently fly between Edinburgh and London; in June it says there were 74 764 air journeys on the route, compared to 82 002 by rail.

Lumo’s million passengers per year, will equate to around 83,300 passengers per month.

What these figures don’t show is the number of rail journeys made to intermediate stations like Newcastle, York, Doncaster and Peterborough.

These are a few thoughts.

Rail Capacity Between London And Edinburgh

Consider.

  • LNER is currently the only rail carrier offering a daytime service between London and Edinburgh.
  • LNER run approximately 26 trains per day (tpd) in both directions between London and Edinburgh.
  • A nine-car Class 801 train can carry 510 Standard Class passengers and 101 First Class passengers.

That means that LNER had a capacity of just over 950,000 seats in June.

It might seem poor to have only sold 82,002 seats in June between London and Edinburgh, which is just 8.6 % of the available seats.

On the other hand, LNER’s two trains per hour (tph) are a lot more than London and Edinburgh trains, as they connect towns and cities all the way up the East Coast Main Line between London and Aberdeen.

Lumo’s capacity of a million seats per year, works out at 83,300 seats per month, which is another 8.7 % of capacity.

  • Lumo will sell seats on price initially and I suspect they’ll end up running about 85-95 % full.
  • It has been stated that they need to run 80% full to break even.
  • I also think, that they would like to have a few seats for late bookers.

But even so, they will surely affect LNER’s bookings.

What Will LNER Do?

Several of the things, that Lumo are doing can be easily copied by LNER.

  • Early booking.
  • Improve onboard service.
  • Better seating.

They could even reduce prices.

I think it is very likely we could end up with a price and service war between LNER and Lumo.

Would The Airlines Be The Losers?

This could be an outcome of competition between LNER and Lumo.

We are now talking about times of around four hours and twenty-five minutes between London and Edinburgh, but there are improvements underway on the East Coast Main Line.

  • The remodelling of the approach to Kings Cross station has not been reflected in the timetables.
  • The Werrington Dive Under has not been completed yet.
  • Digital signalling is being installed South of Doncaster.
  • The power supply is being upgraded North of Newcastle.

When these and other improvements are complete, I can see journey times reduced below four hours.

But would that only be for starters?great b

If a 1970s-technology Intercity 225 train, admittedly running as a shortened train formation, could achieve a time of just under three-and-a-half hours for the 393.2 miles between Kings Cross and Edinburgh stations in September 1991, what could a modern Hitachi train do, if all of the improvements had been completed and perhaps half of the route could be run at 140 mph under the watchful eyes of full digital signalling and an experienced driver.

Consider.

  • London and York is nearly two hundred miles of fairly straight railway, that is ideal for high speed.
  • Current trains run the 393.2 miles in four hours 25 minutes, which is an average speed of 89 mph.
  • A train running at 89 mph would take two hours and fifteen minutes to cover 200 miles.
  • A train running at 125 mph would take one hour and thirty-six minutes to cover 200 miles.
  • A train running at 140 mph would take one hour and twenty-six minutes to cover 200 miles.

When Network Rail, Great British Railways or the Prime Minister renames the East Coast Main Line as High Speed East Coast, I think we can be sure that trains between London and Edinburgh will be able to achieve three-and-a-half hours between the two capitals.

High Speed Two is only promising three hours and forty-eight minutes.

What About LNER’s New Trains?

LNER Seeks 10 More Bi-Modes, was written to explore the possibilities suggested by a short article in the December 2020 Edition of Modern Railways.

There has been no sign of any order being placed, but Hitachi have moved on.

  • They are building the prototype of the Hitachi Intercity Tri-Mode Battery for testing on the Great Western Railway.
  • They have completed some of the Class 803 trains for East Coast Trains, which has now been renamed Lumo. These trains have a battery for hotel power in case of catenary failure, but no diesel engines.
  • They are building the Class 807 trains for Avanti West Coast, which appear to be designed for high speed and have no batteries or diesel engines.
  • The latest versions of the trains will have a reshaped nose. Is it more aerodynamic at high speeds?

It does seem that there is an emphasis on speed, better acceleration and efficiency.

  • Could the lessons learned be used to improve the performance of the existing trains?
  • Could a small high performance sub-fleet be created to run LNER’s Scottish services?

There are certainly possibilities, that would cut journey times between London and Edinburgh.

Conclusion

I can see the airlines flying between London and Edinburgh suffering a lot of collateral damage, as the two train companies slug it out.

 

September 10, 2021 Posted by | Transport/Travel | , , , , , , , , , , , , | 4 Comments

LNER’s Terrible Tickets

On my last trip on LNER to Spalding, I had to buy the tickets in the Booking Office, as I can’t get the hang of their machines at King’s Cross.

Like several other companies, they have changed to thermal tickets.

They are awful!

  • You can’t put them in a typical pocket in a wallet.
  • They curl up.
  • I constantly drop them, because my left hand doesn’t work properly.
  • Is thermal paper as environmentally-friendly as the credit-car-sized card tickets?

They should be banned as soon as possible!

 

September 10, 2021 Posted by | Transport/Travel | , , | 5 Comments

The Definitive Seating Layout Of Lumo’s Class 803 Trains

This article on Economy Class and Beyond is entitled Enter Lumo – The New East Coast Railway Competitor.

It contains a drawing from Lumo,  which shows the layouts of the seats on the train.

  • Coach A – 44 Standard seats – 8 Priority seats – 2 Wheelchair spaces – 2 Tip up seats – Accessible toilet – 56 Total seats
  • Coach B – 84 Standard seats – 12 Priority seats – Bike store – Toilet – 96 Total seats
  • Coach C – 84 Standard seats – 12 Priority seats – 96 Total seats
  • Coach D – 84 Standard seats – 12 Priority seats – Bike store – Toilet – 96 Total seats
  • Coach E – 52 Standard seats – 8 Priority seats – 2 Tip up seats – Accessible toilet – 62 Total seats

Note.

  1. This is a total of 406 seats.
  2. Judging by the position of the tip-up seats they are for staff and perhaps emergency use, if say a coffee gets spilled on a seat.
  3. Each car has a pair of tables, where four can sit. As Lumo’s business model allows early booking, if you and your partner want to take the kids to see granny on her birthday, you should be able to get a table, by booking early.
  4. There are two bike stores in Coaches B and D.

These are some further thoughts.

Toilet Provision

I was on an LNER Class 800 train earlier this week and needed to go to the toilet.

  • I wasn’t sure which way I needed to go, as I couldn’t see a sign pointing me to the toilet, but in the end I struck lucky.
  • You don’t have that problem with Lumo’s trains, as there appears to be a toilet at both ends of the three middle coaches, either in your car or the next.
  • If you’re in one of the driver cars, there is an accessible toilet at the blunt end.

I don’t think anybody will argue with the toilet provision on Lumo’s trains.

Can The Trains Be Lengthened?

If you look at the diagram of the train, Coaches B and D appear to be identical with a toilet and a bike store at one end.

These ends are connected to the centre car, which doesn’t have its own toilet, but passengers can use the toilets in the next coaches.

One of the advantages of this layout is that although it is a five-car train, it only has four coach types, which must help in both manufacture and maintenance.

But it also helps, if the train service is successful and more capacity needs to be provided.

An extra coach just needs to have a toilet at one end and when it is slotted into the formation. The train software, then automatically acknowledges the additional car.

The rule of having a toilet at both ends of the centre coaches will not be broken.

These trains are certainly designed for a service that could be more successful, than the train operator has initially planned.

The maths of lengthening are very simple.

  • Each new coach will add another 96 seats.
  • The five trains (25 coaches) cost £100 million.
  • That is £4 million per coach.
  • All stations on the route are capable of handling at least nine-car trains.

Different lengths of trains would give the following increases.

  • Six-car trains would hold 502 seats and increase capacity by 24 %.
  • Seven-car trains would hold 598 seats and increase capacity by 47 %.
  • Eight-car trains would hold 694 seats and increase capacity by 71 %.
  • Nine-car trains would hold 790 seats and increase capacity by 94 %.

The ability to lengthen trains so easily, must mean that Lumo can match their train size to demand, without needing any extra expensive train paths.

Bicycle Storage

There are two bike storage racks in Coaches B and D.

As there has been complaints about bicycle storage on these Hitachi trains, I would assume that Lumo have got the provision right for the target market.

Wheelchair Travellers

These are positioned next to one of the accessible toilets, which is standard practice.

How Will These Trains Compare To Budget Airliners?

This is not a great picture of even a boring subject like the A14 going over the East Coast Main Line.

But it was taken from an airline-style seat through the wide window of an LNER Hitachi train, that is in the same family as the trains purchased by Lumo.

Try taking a decent picture through the porthole on a budget airliner.

If Lumo have used decent seats for the trains, they will have the budget airlines screwed, glued and tattooed on the London and Edinburgh route.

Conclusion

These are certainly trains designed for their market.

September 9, 2021 Posted by | Design, Transport/Travel | , , | 1 Comment

Lumo Aims To Be The Green Alternative To Edinburgh – London Flights

The title of this post, is the same as that of this article on Railway Gazette.

Some points from the article.

Lumo Is Targeting Flyers

This is a paragraph.

Lumo is aiming to carry more than 1 million passengers per year. It is particularly targeting people who currently fly between Edinburgh and London; in June it says there were 74 764 air journeys on the route, compared to 82 002 by rail.

I find it interesting that the number of passengers using air and rail are within nine percent. I thought it would have been more of a difference.

The Service Will Ramp Up

This is a paragraph.

Services will ramp up over a period of months to the planned timetable of five trains each way per day. A small increase is envisaged at the December timetable change, followed by full implementation in Q1 2022.

There is a lot of training to do and some more Class 803 trains to be delivered.

Viability Level

Industry sources are quoted that at the prices charged, the trains will need to be eighty percent full to be viable.

As a Control Engineer, who has built hundreds of mathematical models, I am fairly certain, that by adjusting ticket prices and getting the marketing right, they’ll hit that level.

Late Bookers

The eighty percent viability level probably means that they can afford to leave a few seats available for those that need to book the day before.

Yesterday, when I went to Spalding, I bought my ticket in the Booking Office half-an-hour before travel and got a seat with a window.

Seat allocation algorithms on LNER seem to be very good and I don’t think Lumo’s will be in any way inferior.

Early Bookers

The article says advance tickets can be bought earlier than the usual twelve weeks.

So say you always travel to Scotland for your mother’s birthday, you can buy the ticket early and not be hit by low availability, as it turns out later that Rangers are playing Celtic on the day you travel.

Mutual Support In Case Of Disruption

This is a paragraph.

Reciprocal contracts providing support in case of disruption have been signed with other operators, including LNER.

I think in all the troubles yesterday, that I wrote about in Azumas Everywhere!, LNER could have done with some help yesterday.

Lumo Want To Grow Rail

This is a quote from the company.

We want to grow rail and bring people to a more sustainable, environmentally way of travelling.

They also seem fairly relaxed if you want to travel in First on LNER.

Luggage

This is a paragraph.

Passengers will be able keep their luggage close by or, for an additional charge, have it delivered to their final station or destination.

Does that mean you’re going to Edinburgh to see the family at Christmas and the New Year, you can take a lot of luggage and get it delivered both ways?

Efficient Running North Of Newcastle

I particularly liked this paragraph.

The trainsets will be able to run with power draw limited to 80% of normal on the northern part of the East Coast Main Line where there is limited power supply, with modelling by FirstGroup’s engineers and Network Rail suggesting that for five-car sets this will not affect sectional running times and will allow electric trains to continue running.

If you’re on time, the passengers won’t mind, but the electricity saved is all profit.

As a Control Engineer, my philosophy would be to have an economy mode for 80 % power sections.

  • Trains would enter these sections with a full battery, that had been charged earlier from the electrification.
  • The battery would provide hotel power in these sections.
  • Traction power would come from the electrification.
  • Trains could leave these sections with an almost flat battery.

The battery is not used for traction, but because it is handling the hotel power, less power is drawn from the electrification for traction.

I always remember Freddie Laker was keen on getting his pilots to save fuel.

Charging The Hotel Power Battery

Obviously this can be charged from the overhead electrification, although I doubt they would charge it in sections where power supplies are limited.

But can the battery be charged using regenerative braking?

In Do Class 800/801/802 Trains Use Batteries For Regenerative Braking?, I tried to answer this question using the information in this document on the Hitachi Rail web site, which is entitled Development of Class 800/801 High-speed Rolling Stock for UK Intercity Express Programme , which was published in 2014 and contains this diagram of the traction system.

Note that BC in the diagram stands for battery charger. So even in 2014, Hitachi were thinking about batteries.

In this diagram it seems to me, that electricity for the Auxiliary Power Supply and charging any batteries, can come from these sources.

  • The Electrification
  • The Generator Unit, if fitted
  • The Drive Converter if it can divert regenerative braking energy to the APS.

It is all very comprehensive.

Handling Engineering Blockades

This is a paragraph.

Lumo has looked at how to manage any engineering blockades involving diversions away from the wires, with options including transfers to Hull Trains or TPE services operated using bimode trainsets, transfer to buses if no alternatives are available, and even the cancellation of a service if passengers indicate they would prefer not to travel if their journey will be disrupted.

Being part of a larger group always helps.

Borrowing Trains

Yesterday, whilst waiting to leave Peterborough, I saw a TransPennine Express Class 802 train go through.

Peterborough isn’t exactly near the Pennines!

On checking today, it appears it was running in one of Lumo’s paths.

So was the train being borrowed for training purposes?

But I can envisage, when a difficult blockade say around Newark is to be enacted, that Lumo would borrow a bi-mode from TransPennine Express, so they could use diesel to run the service via Lincoln.

Conclusion

There’s a lot more to Lumo than has so far been disclosed.

In the meantime read the Railway Gazette article, as there’s more there for starters.

September 9, 2021 Posted by | Transport/Travel | , , , , , , , , | 4 Comments