Horden Station – 28th October 2020

I took these pictures at the new Horden station, as I passed through.

 

Probably, the most significant fact about this station, is that it was built quickly.

October 30, 2020 Posted by | Design | , | 1 Comment

Megawatt Charging System Set To Rapidly Reduce Fuelling Time For Commercial EVs

The title of this post, is the same as that of this article on Electric Autonomy Canada.

This is the sub-title.

An international task force says their recent high power “charge-in” event has yielded promising results with successful testing of novel connector prototypes that could overhaul the long-haul industry.

The problem of charging heavy freight trucks is a big market in North America and it seems that the event attracted some big players, like ABB, Daimler and Tesla.

  • In the trucking industry, speed and range count for a lot.
  • Trucks need to be charged during a driver’s rest break of about thirty minutes.
  • In the U.S., transport made up 28 per cent of greenhouse gas emissions.
  • Charging lots of trucks on typical state-of-the-art car chargers would probably crash the system.

The Megawatt Charging System aims to solve the problems.

How Would It Work?

This paragraph from the article, outlines the problems.

But how, one may ask, could such a massive electrical draw — as much as 4.5 megawatts — be supported by a grid, especially when the usage scale is not just one truck charging up, once a day, but thousands of 18-wheelers rolling and charging across the country.

The MCS Task Force seem to be suggesting that these systems will work as follows.

  • A large battery or energy storage system will be trickle charged.
  • The truck will be connected and the electricity will flow into the truck.
  • It could all be automated.

It sounds very much like Vivarail’s Fast Charge system, which uses batteries as the intermediate store.

As an Electrical and Control Engineer, I would use a battery with a fast response.

I think I would use a Gravitricity battery. This page on their web site describes their technology.

Gravitricity™ technology has a unique combination of characteristics:

  • 50-year design life – with no cycle limit or degradation
  • Response time – zero to full power in less than one second
  • Efficiency – between 80 and 90 percent
  • Versatile – can run slowly at low power or fast at high power
  • Simple – easy to construct near networks
  • Cost effective – levelised costs well below lithium batteries.

Each unit can be configured to produce between 1 and 20MW peak power, with output duration from 15 minutes to 8 hours.

 

October 30, 2020 Posted by | Energy, Energy Storage, Transport | , , , , , , | Leave a comment

Teeside’s Refurbished Trains

On my trip around Teeside, I took four trains.

There was none of the usual rubbish, that I have endured in the North like this scrapyard special at Carlisle.

All trains were refurbished Class 158 trains.

They were a lot better, with tables and clean, working toilets.

But will they get replaced with hydrogen or updated to zero-carbon trains?

Hydrogen Trains

In Fuelling The Change On Teesside Rails, I talked about the local services on Teesside being run by a fleet of hydrogen trains, based on an article in RAIL Magazine.

But the order has not been placed and it must be getting tight if trains are going to run in a few years.

There was this report in the November 2020 Edition of Modern Railways, which is entitled Tees Valley Hydrogen Hub.

This is the first paragraph.

Mott MacDonald is to create a masterplan for the development of a hydrogen transport hub  in the Tees Valley. Transport Secretary Grant Shapps made the announcement as he travelled on the HydroFLEX on the 29th of September.

It appears the masterplan could be published in January and would cover several modes of transport.

Battery Electric Trains

There have been developments in the battery electric train field over the past few months.

Hitachi at Newton Aycliffe and Hyperdrive Innovation at Sunderland have partnered up to produce Hitachi’s Regional Battery Train. Three-car trains based on Hitachi’s Class 385 trains would be ideal for trundling around the North East.

The trains would need charging and what better charging system is there than Vivarail’s Fast Charge system? And they could be produced at Vivarail’s factory at Seaham just up the coast towards Sunderland.

As I indicated in £100m Station Revamp Could Double Local Train Services, where I said this about the location of chargers to power battery electric trains in the Tees and the Tyne.

There will need to be strategically-placed battery chargers around the North-East of England. These could include.

    • Hexham
    • Nunthorpe
    • Redcar or Saltburn – This would also be used by TransPennine Express’s Class 802 trains, if they were to be fitted with batteries.
    • Whitby

If Grand Central did the right thing and ran battery electric between London and Sunderland, there would probably be a need for a battery charger at Sunderland.

It appears that Adrian Shooter of Vivarail has just announced a One-Size-Fits-All Fast Charge system, that has been given interim approval by Network Rail.

I discuss this charger in Vivarail’s Plans For Zero-Emission Trains, which is based on a video on the Modern Railways web site.

Vivarail might just have another card or should it be train to play.

In the video, Mr. Shooter discusses using Vivarail’s technology to convert British Rail era diesel multiple units to battery electric trains.

Northern have already refurbished the Class 158 trains, so it would surely be an economical route to convert them to battery electric operation.

October 30, 2020 Posted by | Hydrogen, Transport | , , , , , , , | 1 Comment

Northern Announce On Train Permit Scheme For Scooter Users

The title of this post, is the same as that of this article on Rail Advent.

This is the opening paragraph.

A new scheme has been launched by train operator Northern which will allow mobility scooter users to travel to and from over 100 stations on the network.

Sounds like if you live in the North and have a mobility scooter, you should investigate the scheme.

October 30, 2020 Posted by | Transport | , | Leave a comment

Middlesbrough Station – 20th October 2020

I took These pictures at Middlesbrough station on my trip to Teesside.

These are my thoughts on the station.

Station Track Layout

This Google Map shows the layout of the station.

Note.

  1. The pair of freight lines passing around the North side of the station.
  2. Platform 1 is the Westbound platform on the South side of the tracks.
  3. Platform 2 is the Eastbound platform on the North side of the tracks.

Both platforms would appear to be about 150 metres long, which is long enough for a five-car Class 80x train, but not for a 234 metre long nine-car train.

Period Features

The station has a lot of period features, like cast-iron columns and brackets, and good Victorian stonework.

Much seems to have received good TLC.

Northern Entrance

I have seen comments about improving the Northern entrance on various web sites.

It certainly, isn’t in bad condition.

Improving The Station

In £35m Station Transformation Launched By Tees Valley Mayor, I wrote about the current plans to transform the station. I started with these paragraphs.

The title of this post, is the same as that of this article on Rail Technology Magazine.

This is the introductory paragraph.

Tees Valley Mayor Ben Houchen has announced (June 9th) a £35m transformation of Middlesbrough Station to transport more train services to the town, including the first direct rail link to London in decades.

The Rail Technology Magazine article indicates that Platform 2 at Middlesbrough station will be extended to handle Azuma trains. As the current platform looks to be around 150 metres long and this would be long enough for a five-car train, does this mean that in the future nine-car and ten-car Azumas will be able to run services to Middlesbrough?

Having seen since I wrote the related post, that Hull station has handled some nine-car Azumas, I feel that although five-car Azumas could probably use Middlesbrough station, it would seem prudent to make it possible for the longer trains to call.

Let’s suppose Middlesbrough, were playing a big London club in an important post-pandemic FA Cup match. LNER might want to run a nine-car Azuma to Middlesbrough to accommodate extra passengers.

Charging Battery Trains

LNER and TransPennine Express could be running battery electric Class 800 and Class 802 trains to Middlesbrough and/or Redcar Central stations.

This Hitachi infographic describes their Regional Battery Train, which can be created by adding batteries to the current trains.

With a range of 90 km. or 56 miles, these trains could be able to reach Middlesbrough from the electrification on the East Coast Main Line at Northallerton.

With most journeys, they should have sufficient energy in the battery to return without trouble.

But it would probably be prudent to have charging at Middlesbrough and/or Redcar Central to ensure a safe return.

These pictures were taken from the Eastern end of Platform 2, which is down to be lengthened.

Note.

  1. The freight lines behind Platform 2.
  2. There is plenty of space beyond the end of Platform 2.
  3. There appears to be space for a reversing siding with a charger.

I am sure that a suitable form of charging can be provided on Platform 2 at Middlesbrough station.

Conclusion

Middlesbrough station could be turned into a big asset for the town.