EV Owners To Pay London Congestion Charge From January 2026
The title of this post, is the same as that of this article in The Times.
I asked, Google AI, who will pay the Congestion Charge and received this answer.
Most drivers of petrol or diesel vehicles must pay the London Congestion Charge when driving within the central zone during charging hours. Exemptions apply to those with specific vehicles, such as motorcycles, emergency vehicles, and breakdown service vehicles, as well as individuals with disabilities who have a Blue Badge and are in the “disabled” tax class. Some groups, like residents who applied before August 2020, also receive a significant discount.
Note that the Congestion Charge will increase from £15 a day to £18 a day on January 2.
I can’t see the Labour Party winning the next London elections.
Does Ginger Make You Feel Good?
I ask this question, as yesterday, I ran out of the Marks & Spencer’s gluten-free stem ginger snap biscuits.
So after buying some this morning, I have just had three biscuits dunked in tea for my lunch.
I sometimes eat as many as four packets a week, so out of curiosity I asked Google AI, the question in the title of this post and received this reply.
Yes, ginger can make you feel good due to its many benefits, including easing nausea and indigestion, reducing inflammation, and improving circulation. It may also help relieve pain, boost energy levels, and promote relaxation, although it’s always best to consult a healthcare professional before taking supplements.
Google seems to be using this web page from Johns Hopkins Medicine, which is entitled Ginger Benefits, as a source.
I have a few extra thoughts about ginger.
Several Of The Posts On This Blog Have Mentioned Ginger
This link displays them all.
Ryanair Refuses To Refund Hero Passenger Injured During Cambridgeshire Train Stabbing
The title of this post, is the same as that of this article on Simple Flying.
These two paragraphs add details to the story.
Ryanair has doubled down on its decision not to issue a refund for a passenger injured while risking his life to stop a mass stabbing assailant. Stephen Crean, 61, suffered stab wounds as he fought a knife-wielding man attacking passengers on a train, leaving his unable to catch his Ryanair flight to Austria.
The Irish ultra-low-cost carrier has responded to the public outrage, insisting that all of its fares are non-refundable and advising customers to pay for travel insurance. However, many are calling on the airline to make an exceptional case for Crean.
I feel Ryanair have been very mean.
In fact, I feel Ryanair could have used the story for a bit of free advertising.
Because of the fact, that my ongoing medical condition; uncomplicated pancolonic diverticular disease could flare up at any time and I might need the toilet urgently, I wouldn’t fly Ryanair, as they might put restrictions on access to the facilities, between my booking and the flight.
All Recyclable Blades Installed At RWE’s 1.4 GW UK Offshore Wind Farm
The title of this post, is the same as that of this article on offshoreWIND.biz.
This is the sub-heading.
All 150 recyclable blades have been installed at the 1.4 GW Sofia offshore wind farm, with more than half of the wind turbines now in place at the UK construction site.
These three paragraphs add more details.
All 150 recyclable blades are now installed, with each turbine utilising 50 sets of three blades, marking the UK’s first large-scale use of this technology at an offshore wind farm, RWE, the developer, said.
The recyclable rotor blades used at Sofia are manufactured by Siemens Gamesa at its Hull factory and use a unique resin that enables easy separation of component materials at the end of each blade’s operational life cycle.
In addition, 62 out of 100 Siemens Gamesa 14 MW turbines have now been installed at the site located 195 kilometres off the UK’s east coast. Each turbine features 108-metre blades and a 222-metre rotor diameter. Cadeler is responsible for the installation of the wind turbines.
Note.
- The Sofia wind farm has a hundred turbines, each with the customary three blades.
- Currently the 13 MW Siemens Gamesa turbines in Dogger Bank A and Dogger Bank B are the largest turbines in British waters.
- Sofia’s at 14 MW will be larger.
- But 15 MW monsters are on their way, with RWE’s Norfolk zone appearing to favour 15 MW Vesta turbines.
At the present time, turbine size seems to be creeping up. I would expect this to happen, as turbines become more affordable.
CO2 to SAF: A One-Step Solution
The title of this post is the same as that of this article on the Chemical Engineer.
This is the sub-heading,
Oxford spinout OXCCU has launched a demonstration plant at London Oxford Airport to trial its one-step process of turning CO2 into sustainable aviation fuel (SAF). Aniqah Majid visited the plant to investigate the benefits of its “novel” catalyst
One word in this sub-heading caught my eye.
When I was a young engineer in the Computer Techniques section in the Engineering Department at ICI Plastics Division, I did a small mathematical modelling project for this chemical engineer, using the section’s PACE 231-R analogue computer.

He was impressed and gave the 23-year-old self some advice. “You should apply that beast to catalysts.”
I have never had the chance to do any mathematically modelling of catalysts either at ICI Plastics or since, but I have invested small amounts of my own money in companies working with advanced catalysts.
So when OXCCU was picked up by one of my Google Alerts, I investigated.
I like what I found.
The three raw ingredients are.
- Green Hydrogen
- Carbon dioxide perhaps captured from a large gas-fired powerstation like those in the cluster at Keadby.
- OXCCU’s ‘novel’ catalyst, which appears to be an iron-based catalyst containing manganese, potassium, and organic fuel compounds.
I also suspect, that the process needs a fair bit of energy. These processes always seem to, in my experience.
This paragraph outlines how sustainable aviation fuel or (SAF) is created directly.
This catalyst reduces CO2 and H2 into CO and H2 via a reverse water gas shift (RWGS) process, and then subsequently turns it into jet fuel and water via Fischer-Tropsch (FT).
The Wikipedia entry for Fischer-Tropsch process has this first paragraph.
The Fischer–Tropsch process (FT) is a collection of chemical reactions that converts a mixture of carbon monoxide and hydrogen, known as syngas, into liquid hydrocarbons. These reactions occur in the presence of metal catalysts, typically at temperatures of 150–300 °C (302–572 °F) and pressures of one to several tens of atmospheres. The Fischer–Tropsch process is an important reaction in both coal liquefaction and gas to liquids technology for producing liquid hydrocarbons.
Note.
- I wouldn’t be surprised that to obtain the carbon monoxide and hydrogen or syngas for the Fischer-Tropsch process, excess hydrogen is used, so the OXCCU process may need a lot of affordable hydrogen, some of which will be converted to water in the RWGS process.
- The high temperatures and pressures for the Fischer-Tropsch process will need a lot of energy, as I predicted earlier.
But I don’t see why it won’t work with the right catalyst.
The Wikipedia entry for the Fischer-Tropsch process also says this.
Fischer–Tropsch process is discussed as a step of producing carbon-neutral liquid hydrocarbon fuels from CO2 and hydrogen.
Three references are given, but none seem to relate to OXCCU.
OXCCU have a web site, with this title.
Jet Fuel From Waste Carbon
And this mission statement underneath.
OXCCU’s mission is to develop the world’s lowest cost, lowest emission pathways to make SAF from waste carbon, enabling people to continue to fly and use hydrocarbon products but with a reduced climate impact.
It looks like they intend to boldly go.
Conclusion
My 23-year-old self may have been given some good advice.
A Trip To The Northumberland Line – 7th November 2025
On Friday, I went to Newcastle to have a look at the new Blyth Bebside station.
I took these pictures between Newcastle and Ashington stations.
Note.
- The impressive slim bridge over the railway at Newsham station. Other places could imitate this. See Bicester Village Station – 28th May 2025.
- The well-filled car park at Newsham station.
- The large amount of new housing.
- The recently-opened Blyth Bebside station.
- The crossing of the River Blyth.
- The under-construction Bedlington station.
- The crossing of the River Wansbeck.
- The single platform Ashington station.
- The train took 36 minutes for the 18 miles.
- According to staff, there is no hostelry close to the station at Ashington, but there is a good gluten-free pub at Seaton Delaval station, that I wrote about in Seaton Delaval Station – 30th March 2025.
I then returned to Blyth Bebside station and took these pictures.
Note.
- Blyth Bebside station is fully step-free.
- There is a sizable car park.
- The wind turbines of Blyth Harbour wind farm can be seen in the distance from the station bridge.
- I estimate the platforms at the station will take a five-car Hitachi Class 802 train or a pair of two-car Class 158 trains.
These are some further thoughts.
The Platforms On The Northumberland Line Are Long
Consider.
- As I said earlier the platforms in the stations appear to be long enough to handle a five-car Hitachi Class 802 train or a pair of two-car Class 158 trains.
- From what some have said about the line, I suspect four-car trains will be needed soon for Newcastle matches.
- But would this be enough, if a local hero like Sting decided to have a Summer concert on the beach?
- Lengthening platforms is often a pain, if you don’t make them long enough.
So were Network Rail just making sure that the track was fit for all eventualities?
Could The Northumberland Line Be Electrified?
These pictures show Platform 1 at Newcastle station, where Northumberland Line trains usually terminate at Newcastle.
Note.
UK Economy To Reap GBP 6.1 Billion From 3.6 GW Dogger Bank Offshore Wind Farm
The title of this post, is the same as that of this article on offshoreWIND.biz.
This is the sub-heading.
The 3.6 GW Dogger Bank Wind Farm, which will become the world’s largest offshore wind farm once fully operational, will boost the UK economy by GBP 6.1 billion (approximately EUR 6.9 billion) during its lifetime and support thousands of UK jobs over the next decade, according to a report written by BVG Associates.
The first three phases of the Dogger Bank wind farm are scheduled to be delivered as follows.
- Dogger Bank A – 1235 MW – 2025
- Dogger Bank B – 1235 MW – 2026
- Dogger Bank C – 1218 MW – 2027
The planned dates in the North Sea are generally kept, because we’ve been building structures there since the days of World War Two.
These two paragraphs from the article add more detail.
The economic impact report was commissioned by Dogger Bank Wind Farm’s equity partners SSE, Equinor and Vårgrønn, who are currently constructing the offshore wind farm in three 1.2 GW phases at adjoining sites in the North Sea, more than 130 kilometres from the Yorkshire Coast.
Direct spend with companies in the Northeast of England and in the counties of North Yorkshire and the East Riding of Yorkshire is expected to total over GBP 3 billion, with hundreds of jobs supported in these regions.
But these three wind farms are just the hors d’oeuvre.
This article on offshoreWIND.biz is entitled SSE, Equinor Move Forward with 1.5 GW Dogger Bank D Project and it has this sub-heading.
SSE and Equinor have finalised a seabed lease with the Crown Estate to progress Dogger Bank D, the proposed fourth phase of the world’s largest offshore wind farm, the 3.6 GW Dogger Bank Wind Farm, currently under construction off the coast of England in the North Sea.
These two paragraphs from the article add more detail.
The lease allows Dogger Bank D shareholders to maximise renewable generation from the eastern part of the Dogger Bank C seabed area, located around 210 kilometres off the Yorkshire coast, with future potential to unlock an additional 1.5 GW.
SSE Renewables and Equinor previously established terms for the wind farm with the Crown Estate in July 2024. Implementation of these commercial terms was subject to the conclusion earlier this year of the plan-level Habitats Regulation Assessment (HRA) associated with the Crown Estate’s wider Capacity Increase Programme.
Note.
- The total capacity for the first four phases of the Dogger Bank Wind Farm are 5,188 MW.
- But if the Crown Estate’s wider Capacity Increase Programme is carried out, the total capacity will be 6,688 MW.
- Hinckley Point C is planned to be only 3,260 MW and is likely to be fully delivered between 2029 and 2031.
So if the Crown Estate, Equinor and SSE go for the full Dogger Bank D, I believe it is likely that we’ll get a wind farm with a capacity of two Hinckley Point Cs delivered before the nuclear power station.
.
Danish CIP To Pour USD 3 Billion Into Philippines’ Offshore Wind Push
The title of this post, is the same as that of this article on offshoreWIND.biz.
This is the sub-heading.
Denmark’s Copenhagen Infrastructure Partners (CIP) will commit USD 3 billion (approximately EUR 2.6 billion) to build its first offshore wind farm in the Philippines.
This opening paragraph gives a few more details.
In a press briefing, Presidential Communications Office Undersecretary and Palace Press Officer Claire Castro said that the company is committed to investing in the Philippines through its partner, ACEN – Renewable Energy Solutions.
It does seem that the Philippines are putting out the red carpet for Copenhagen Infrastructure Partners and no wonder if you look at the first paragraph of the Danish firm’s Wikipedia entry.
Copenhagen Infrastructure Partners P/S (“CIP”) is a Danish investment firm specializing in infrastructure investments, particularly wind power.[1][2] CIP is one of the world’s largest dedicated renewables investment firms with €32 billion raised and a project pipeline of 120 GW.
But, are these two articles on offshoreWind.biz hinting at delay in the approval of UK projects?
- UK Delays Permit Decision for CIP’s Morecambe Offshore Wind Farm
- Permit Decision Delayed for 1.5 GW UK Offshore Wind Farm
Although the second project, which is the Outer Dowsing Wind Farm, is not a Copenhagen Infrastructure Partners project delaying decisions surely doesn’t give confidence to investors.
So have Copenhagen Infrastructure Partners decided to test the new virgin waters of the Philippines?
Managing Earthworks In A Changing Environment
This image shows the train derailment at Shap at 06:10 on Monday.
The BBC and others were talking about the cause of the derailment being a landslide.
So it was perhaps appropriate that the latest edition of Rail Engineer had a sponsorsed feature with a title of Managing Earthworks In A Changing Environment.
It is well-worth a full read.






































































