World’s Largest-Of-Its-Kind Power Line To Deliver Clean Power To 1.8m UK Homes And Boost Energy Security

The title of this post, is the same as that as this press release from the UK Government.

These are the three bullet points of the press release.

  • LionLink power line between UK and Netherlands will deliver enough electricity to power more homes than Manchester and Birmingham combined.
  • Agreement made as Grant Shapps leads delegation of leading businesses to key North Sea Summit.
  • Part of renewed Government drive to work with business to help grow the economy.

These three paragraphs outline the project.

The world’s largest multi-use electricity power line will be built under the North Sea, boosting UK energy supplies with enough to power 1.8 million homes – more than Birmingham and Manchester combined.

The new LionLink will connect the UK and the Netherlands with offshore wind farms, providing clean affordable and secure energy to Britain which will help cut household bills and drive Putin’s Russia further out of the energy market.

The cross-border electricity line will be only the second of its kind in the world, with the first having been built by Germany and Denmark. However, it will be able to carry more than four times the amount of electricity as its predecessor – making it the largest of its kind in terms of capacity anywhere in the world.

Note.

  1. I suspect the LionLink will go via the Dogger Bank, where Danish, Dutch, German and UK territorial waters meet an we are already building 8 GW of fixed foundation offshore wind. The other countries are also active in the area.
  2. The press release doesn’t mention, where the LionLink will make landfall in the UK.
  3. Much of the connection will probably use the cables being laid for the Dogger Bank wind farms.
  4. There is also no mention of the North Sea Wind Power Hub, which could be an artificial island on the Dogger Bank.

There is also a press release on the National Grid web site, which is entitled National Grid And TenneT Collaborate On Proposed First-Of-A-Kind Anglo-Dutch Electricity Link, which gives more details.

  • The capacity is stated to be 2 GW.
  • Like the current BritNed interconnector, the project will be a cooperation between National Grid And TenneT.
  • TenneT is a limited liability company owned by the Dutch government, that is a transmission system operator in the Netherlands and in a large part of Germany.

There is also a diagram, showing how the LionLink will work, which includes these components.

  • On the Dutch side, there is an offshore AC>DC Converter Station, which is connected to the Dutch electricity grid and one or more offshore wind farms.
  • Across the border between the Dutch and UK Exclusive Economic Zones, there will be a HVDC cable.
  • The HVDC cable will terminate in an onshore DC>AC Converter Station in the UK, which will be connected to the UK electricity grid.

No details of the two landfalls have been given.

More information is given in this article on offshoreWIND.biz, which is entitled UK And Netherlands Unveil Multi-Purpose Interconnector Plans.

  • This shows a map of the North Sea with an interconnector running in a straight line between possibly Rotterdam and Bacton in Norfolk.
  • A wind farm is shown connected to this interconnector.

This paragraph describes the windfarm and the interconnector.

LionLink, a multi-purpose interconnector that was announced today at the North Sea summit, could connect a Dutch offshore wind farm with a capacity of 2 GW to both countries via subsea interconnectors.

If the wind farm has a capacity of 2 GW, I would assume it can supply up to 2 GW to the UK and The Netherlands.

This is a classic system, that can be optimised by the application of sound principles.

All electricity generated by the wind farm must be used, stored or converted into green hydrogen.

Electricity will be distributed as to need.

Energy storage  or electrolysers could be sited at either end or even in the wind farm.

I would suspect that more wind farms could be connected to the interconnector.

The team, that write the control system for the grid will have a lot of fun!

BritNed

I have a feeling that National Grid and TenneT have taken a long hard commercial look at the electrical and financial performance of BritNed over the last year and decided, that a second connection would be to the mutual benefit of both companies, their customers and the UK and The Netherlands in general.

It would also be twice as difficult for terrorists sponsored by Putin to cut two cables.

Conclusion

This is a great leap forward for wind power in the North Sea and Europe.

April 24, 2023 Posted by | Energy | , , , , , , , , , , , , , , | 13 Comments

Businesses Back Hydrogen Trials To Accelerate Net Zero Ambitions

The title of this post, is the same as that of this news item on Centrica.

These are the three main findings of a business survey, to ascertain attitudes to hydrogen.

  • Three quarters (77%) of businesses back hydrogen as part of their energy improvement strategy with a quarter (27%) intending to trial or implement it in the next two years.
  • Almost one in ten (8%) respondents say they have already installed hydrogen-ready combined heat and power (CHP) units.
  • A third (33%) of firms say energy costs are motivating them to adopt hydrogen.

This paragraph details who were surveyed.

We surveyed 500 executives in December 2022 and January 2023 across food and beverage manufacturing, healthcare, hospitality and travel, pharmaceutical manufacturing, heavy industry, horticulture and light industry. 24% of respondents were from the UK, 16% Ireland, 20% Netherlands, 20% Italy, 20% Hungary.

It certainly looks to be a well-constructed survey, with a wide range of respondents.

I have some thoughts.

Centrica And Combined Heat And Power

I was initially surprised that eight percent of respondents had already installed hydrogen-ready combined heat and power units.

But according to Centrica Announces Hydrogen Ready Combined Heat And Power Partnership With 2G, Centrica are preparing themselves for selling systems in this area.

Businesses Are Certainly Looking At Hydrogen

A figure of 77 % of businesses are looking at hydrogen and 27 % are investing in hydrogen.

But I don’t think the average man on the Clapham Omnibus would be so enthusiastic.

Costs Are Motivating Firms To Adopt Hydrogen

I would be surprised if costs didn’t have an effect.

But if costs are driving them towards hydrogen, then hydrogen must be more affordable.

Which is one in eye for hydrogen deniers, who always tell me it is more expensive.

Are Centrica Working To Drop Their Costs?

These posts would suggest they are.

They are doing deals with start-ups and repurposing old plants and pipelines.

Conclusion

Centrica seem to be leading the charge to hydrogen in the UK.

April 19, 2023 Posted by | Energy, Hydrogen | , , , , , , | Leave a comment

N-Sea To Connect German Offshore Wind Farm To Dutch Gas Platform

The title of this post, is the same as that of this article on offshoreWIND.biz.

This is the sub-heading.

Dutch upstream oil and gas company, ONE-Dyas, has awarded N-Sea with a contract to install a subsea power cable between the Riffgat offshore wind farm in the German North Sea and the new, to-be-built N05-A gas production platform.

At a first look it appears that wind power is being used to power the gas production platform.

Other points from the article include.

  • The distance of the connecting cable is ten kilometres.
  • The Dutch government approved the scheme in June 2022.
  • A final investment decision was made in September 2022.

I have some thoughts and further information.

Borkum, Rottumerplaat and Schiermonnikoog

The article says this about the position of the gas platform.

The N05-A platform will be installed some 20 kilometres north of the islands of Borkum, Rottumerplaat and Schiermonnikoog, and approximately one and a half kilometres from German waters.

This Google Map shows the three islands.

Note.

  1. Borkum is the horseshoe-shaped German island in the North-East corner of the map.
  2. Schiermonnikoog is the long and thin island in the West.
  3. Rottumerplaat is the larger of the two Dutch islands in middle map.
  4. Eemhaven, which I wrote about in The Train Station At The Northern End Of The Netherlands, is in the South-East corner of the map.

Shipping routes run up the River Ems and German-Dutch border in the East of the map

Riffgat Wind Farm

This web page on the EWE web site, gives this description of the wind farm.

EWE has built the first commercial wind farm in the German North Sea in summer 2013 with Riffgat. The modern wind farm has a total capacity of 108 megawatts of power and can supply around 120,000 households with environmentally friendly electricity. In just 14 months of construction, the 30 wind turbines of the 3.6 megawatt class have been installed 15 kilometers off the north seas of Borkum. The rotor diameter of the units is 120 meters, while the hub height is 90 meters, which corresponds to the height of the Bremen dome. Overall, the plants are 150 meters high from the water surface to the top rotor blade tip. They are founded on 70 meter long steel foundations (monopiles), 40 meters deep in the sea bottom. The water depth in the wind farm is between 18 and 23 meters. In addition to the wind power plants, Riffgat also consists of a substation which transports the generated electricity to a better transportable voltage level.

It looks a pretty standard 100 MW wind farm with fixed foundations.

The N05-A Platform

The article says this about the N05-A project.

The N05-A project is part of the so-called GEMS area, an area approximately 20 to 80 kilometres north of the Ems estuary. ONE-Dyas, together with partners Hansa Hydrocarbons and EBN, aims to extract natural gas from the N05-A field as well as surrounding fields in the German and Dutch North Sea.

The GEMS area has a web site with a URL with a .co.uk extension.

It has an informative video, which I don’t think would go down with Dutch chapter of Just Stop Oil.

The North Sea’s First Gas Platform To Run Entirely On Wind Power

The article says this about the N05-A project.

While the N05-A platform will not be the first in the North Sea to run on wind energy, it will be the first to do so entirely.

Hywind Tampen floating wind farm will be the first.

Conclusion

This looks like a good pragmatic solution to me.

I can see more connections between offshore wind farms and oil and gas facilities all over the world.

 

April 13, 2023 Posted by | Energy | , , , , , , , , , | Leave a comment

The Netherlands Chooses Site For World’s Largest Offshore Wind-to-Hydrogen Project

The title of this post, is the same as that of this article on offshoreWIND.biz.

This is the sub-heading.

The Dutch government has designated an area for what will become the world’s largest offshore hydrogen production project. That area is Ten noorden van de Waddeneilanden (the North of the Wadden Islands), identified earlier for offshore wind development and deemed most suitable for providing 500 MW of electrolysis capacity and for the transport of hydrogen to land.

This Google Map shows the Wadden Islands.

Note.

  1. Groningen is in the South-East corner of the map.
  2. I wrote about Eemshaven, which is to the North-East of Groningen in The Train Station At The Northern End Of The Netherlands.
  3. The Wadden or Frisian Islands are along the coast.

The Wadden Islands of the Netherlands, Germany and Denmark are a World Heritage Site.

In Can The UK Have A Capacity To Create Five GW Of Green Hydrogen?, I said the following.

Ryze Hydrogen are building the Herne Bay electrolyser.

  • It will consume 23 MW of solar and wind power.
  • It will produce ten tonnes of hydrogen per day.

The electrolyser will consume 552 MWh to produce ten tonnes of hydrogen, so creating one tonne of hydrogen needs 55.2 MWh of electricity.

If the Dutch build a 500 MW electrolyser it will produce 217 tonnes of hydrogen per day.

The Dutch Plan For Hydrogen

This 500 MW electrolyser fits well with the The Dutch Plan For Hydrogen.

 

March 20, 2023 Posted by | Hydrogen | , , , , , , , , , | Leave a comment

First-Of-Its-Kind Electriq Powder Manufacturing Plant To Be Built In Amsterdam

The title of this post, is the same as that of this article on Hydrogen Fuel News.

This is the sub-heading.

The powder plant can provide a safe end-to-end hydrogen solution.

The home page of their web site has this bold statement.

Meet the Safe & Practical Hydrogen Powder

Underneath is this explanation.

Electriq is a hydrogen carrier that acts like coffee powder for a coffee machine – simplifying storage, transport, and use of hydrogen in off-grid applications and long-term storage.

Similar processes have been proposed for hydrogen in the past, but no-one has compared them to coffee before.

This Technology page gives a lot more details.

These two paragraphs outline the chemistry used.

Electriq’s Fuel and Release technologies turn hydrogen into a coffee-like powder form, then back into electricity through a proprietary catalyst and release system.

Our hydrogenation process reacts hydrogen gas with KBO2 to produce a powdery coffee-like compound (KBH4), ready for easy storage and transportation. Our dehydrogenation process releases the hydrogen – and KBO2 as a by-product – thus forming a full cycle.

The Electriq Release system uses a proprietary catalyst to release hydrogen from the Electriq Fuel, after mixing it with water. The dehydrogenation (release) process provides fuel-cell grade hydrogen and zero-emissions electricity.

Note.

  1. KBO2 is a chemical compound formed of one potassium, one boron and two oxygen atoms.
  2. KBH4 is a chemical compound formed of one potassium, one boron and four hydrogen atoms.
  3. As is with often the case with these processes, It appears that there may be a clever catalyst doing some hard work.

The Technology page finishes with a comparison with other methods of transporting hydrogen.

This Press & Insights page has more information on the company and some interesting videos.

It would certainly be something new, if you filled up your electric bike with a canister of dry powder.

But they have a video of that!

 

March 3, 2023 Posted by | Hydrogen, Transport/Travel | , , , , , | 2 Comments

Belgians To Start Building World’s First Artificial Energy Island Next Year (VIDEO)

The title of this post, is the same as that, of this article on offshoreWIND.biz.

This is the sub-heading.

Belgian offshore construction companies Jan De Nul and DEME, through their consortium TM EDISON, have won the tender for the construction of the Princess Elisabeth Island in their home country and the first artificial energy island in the world.

And this first paragraph outlines the project.

The artificial island, which will be built some 45 kilometres off the Belgian coast and will occupy an area of approximately five hectares above the waterline, will serve as the link between the offshore wind farms in the country’s second, 3.5 GW Princess Elisabeth offshore wind zone and its onshore high-voltage grid.

Initial plans don’t seem to be putting any wind turbines or solar panels on the island.

The most impressive part of the article is the video, which shows how the island will be constructed.

To some people of my age, the construction of the island will seem familiar, as the island will be built in a similar way to the Mulberry harbours of World War II.

A few years ago, I went inside some of the giant Pheonix caissons in The Netherlands, where they were initially used to plug the dykes after the North Sea Flood of 1953. They are now a museum of the floods called the Watersnoodmuseum.

Engineering is repeating itself.

 

 

March 2, 2023 Posted by | Design, Energy | , , , , , , , , , , | 1 Comment

Dutch Take Aim At Lower Green Hydrogen Costs By Combining Offshore Wind And Floating Solar

The title of this post, is the same as that of this article on offshoreWIND.biz.

This is the sub-heading.

A consortium of Dutch companies has launched a government-backed project to explore the synergies between offshore wind, offshore solar and hydrogen production at sea for improved sustainability of North Sea renewable energy projects.

T thought about calling this post, The Dutch Go For The Full Monty, but there is no mention of wave or tidal power.

These two paragraphs outline the project.

The four-year project, dubbed Solar Enhanced North Sea Energy Hub (SENSE-HUB), is expected to accelerate the rollout of offshore solar into offshore renewable energy systems.

Let by TNO, short for Netherlands Organization for Applied Scientific Research, the project will address the integration of various energy system modules for the Dutch North Sea by understanding and removing the implementation barriers for future SENSE-HUBs from a technical, economical, ecological, legal and societal perspective.

I wouldn’t be surprised to see more integrated systems like this in the waters around our coasts.

I also believe that the ultimate offshore energy production system will also use wave and tidal power to generate electricity and have inbuilt energy storage.

March 1, 2023 Posted by | Energy, Hydrogen | , , , , , , | Leave a comment

Netherlands Plans Its Biggest Offshore Wind Tender Next Year with Four IJmuiden Ver Sites Likely to Be Auctioned Off In One Go

The title of this post, is the same as that of this article from offshoreWIND.biz.

December 8, 2022 Posted by | Energy | , , , | Leave a comment

Gasunie Investigates Hydrogen Network In North Sea

The title of this post, is the same as that of this news article on the Gasunie web site.

December 5, 2022 Posted by | Energy, Hydrogen | , , , , , , , , | Leave a comment

EuroLink, Nautilus And Sea Link

EuroLink, Nautilus and Sea Link are three proposed interconnectors being developed by National Grid Ventures.

EuroLink

EuroLink has a web site, where this is said.

To support the UK’s growing energy needs, National Grid Ventures (NGV) is bringing forward proposals for a Multi-Purpose Interconnector (MPI) called EuroLink, which will deliver a new electricity link between Great Britain to the Netherlands. 

EuroLink could supply up to 1.8 gigawatts (GW) of electricity, which will be enough to power approximately 1.8 million homes, as well as contribute to our national energy security and support the UK’s climate and energy goals. We’re holding a non-statutory public consultation to inform you about our EuroLink proposals, gather your feedback to help refine our plans and respond to your questions.​

Note, that EuroLink is a Multi-Purpose Interconnector (MPI) and they are described on this page of the National Grid website.

In EuroLink’s case, this means it is basically an interconnector between the UK and The Netherlands, that also connects wind farms on the route to the shore.

  • Coastal communities get less disruption, as the number of connecting cables coming ashore is reduced.
  • Less space is needed onshore for substations.
  • Electricity from the wind farms can be directed to where it is needed or can be stored.

As an Electrical and Control Engineer, I like the MPI approach.

The technology to implement the MPI approach is very much tried and tested.

There are many references to EuroLink terminating at Friston.

Nautilus

Nautilus has a web site, where this is said.

Nautilus could connect up to 1.4 gigawatts (GW) of offshore wind to each country through subsea electricity whilst connecting to offshore wind farm/s at sea. By combining offshore wind generation with interconnector capacity between the UK and Belgium, Nautilus would significantly reduce the amount of infrastructure and disruption required both onshore and offshore.

With this new technology, we hope to reduce the impact of infrastructure on local communities and the environment, as well as support the government’s net zero and energy security targets. We are already working closely with other developers in the area to coordinate activities and minimise impact on local communities. We believe that through improved coordination, the UK government can achieve and support the co-existence of renewable energy with coastal communities.

Nautilus is another MPI.

This is said on the web site.

Last year, National Grid Ventures ran a non-statutory consultation for Nautilus, which proposed a connection at Friston.

NGV holds a connection agreement on the Isle of Grain in Kent as part of its development portfolio and we are currently investigating if this could be a potential location for Nautilus. Until this is confirmed to be technically feasible, Nautilus will be included as part of our coordination work in East Suffolk.

So it looks like, Nautilus could connect to the UK grid at Friston or the Isle of Grain.

Sea Link

Sea Link has a web site, and is a proposed interconnector across the Thames Estuary between Suffolk and Kent.

This is said on the web site about the need for and design of Sea Link.

The UK electricity industry is evolving at pace to help lead the way in meeting the climate challenge, whilst also creating a secure energy supply based on renewable and low carbon technologies.

The demands on the electricity network are set to grow as other sectors of the economy diversify their energy consumption from using fossil fuels towards cleaner forms, the move towards electric vehicles being just one example.

Where we’re getting our power from is changing and we need to change too. The new sources of renewable and low-carbon energy are located along the coastline. We need to reinforce existing transmission network and build new electricity infrastructure in these areas in order to transport the power to where it’s needed. This is the case along the whole of the East Coast including Suffolk and Kent.

To allow this increase in energy generation, we need to reinforce the electricity transmission system. Sea Link helps to reinforce the electricity network across Suffolk and Kent.

Our proposals include building an offshore high voltage direct current (HVDC) link between Suffolk and Kent with onshore converter stations and connections back to the national electricity transmission system.

On the web site, in answer to a question of What Is Sea Link?, this is said.

Sea Link is an essential upgrade to Britain’s electricity network in East Anglia and Kent using subsea and underground cable. The proposal includes approximately 130km of subsea cables between Sizewell area in East Suffolk and Richborough in Kent. At landfall, the cables would go underground for up to 5 km to a converter station (one at each end). The converter station converts direct current used for the subsea section to alternating current, which our homes and businesses use. A connection is then made to the existing transmission network. In Suffolk, via the proposed Friston substation; in Kent via a direct connection to the overhead line between Richborough and Canterbury.

Note, that from Kent electricity can also be exported to the Continent.

All Cables Lead To Friston In Suffolk

It looks like EuroLink, Nautilus and Sea Link could all be connected to a new substation at Friston.

But these will not be the only cables to pass close to the village.

This Google Map shows the village.

Running South-West to North-East across the map can be seen the dual line of electricity pylons, that connect the nuclear power stations at Sizewell to the UK electricity grid.

Has Friston been chosen for the substation, so that, the various interconnectors can be connected to the power lines, that connect the Sizewell site to the UK electricity grid.

This would enable EuroLink, Nautilus and/or Sea Link to stand in for the Sizewell nuclear stations,  if they are shut down for any reason?

It does appear from reports on the Internet that the Friston substation is not welcome.

Exploring Opportunities For Coordination

The title of this section is a heading in the EuroLink web site, where this is said.

In response to stakeholder feedback, NGV’s Eurolink and Nautilus projects and NGET’s Sea Link project are exploring potential opportunities to coordinate. Coordination could range from co-location of infrastructure from different projects on the same site, to coordinating construction activities to reduce potential impacts on local communities and the environment.

That sounds very sensible.

 

December 2, 2022 Posted by | Energy | , , , , , , , , , , , , , , | 5 Comments