Walking From Finsbury Square To Liverpool Street Station
In Finsbury Square Car Park Becomes British Land Hub For Delivery Drivers, I wondered if
.
So today, I walked the route from Finsbury Square To Liverpool Street Station.
Note.
- The roads around Finsbury Square are probably the narrowest on the route between Finsbury Square and Liverpool Street station.
- Sun Street, Appold Street and Primrose Street are wide roads and didn’t strike me as too busy for eleven in the morning.
- The Old Cab Road is a high capacity route into Liverpool Street station between Platforms 10 and 11.
If Finsbury Square Car Park is be used to distribute parcels and light freight that is to be handled in Liverpool Street station, the roads between the car park and the station are more than adequate for an electric shuttle truck designed for the task.
But
- I suspect that Finsbury Square Car Park would need remodelled access ramps.
- There might be a need for a second entrance or exit on the East side of the site.
- The gardens on top probably need a makeover.
I wouldn’t be surprised if British Land dug another floor or two beneath the car park.
Wimbledon Park Station – 27th August 2021
Wimbledon Park station has now gone step-free so I went to have a look.
Note how the lift has been squeezed in neatly alongside the staircase.
I suspect this lift layout can be copied at a lot of stations.
Finsbury Square Car Park Becomes British Land Hub For Delivery Drivers
The title of this post, is the same as that of this article on The Times.
It is a surprising headline or is it a logical development given some of the projects in the rail freight business.
In A Freight Shuttle For Liverpool Street Station Planned. I talked about Rail Operations Group and their plans to run a freight shuttle between London Gateway and Liverpool Street station.
- Trains will be Class 769 bi-mode trains.
- The trains will be fitted with roller doors, roller cages and strengthened floors.
- Three services will leave Thames Gateway at 0029, 1208 and 1856.
- They will return from Liverpool Street at 0242, 1421 and 2100.
- Services will use Platforms 9 and 10 in Liverpool Street station.
- Goods would be delivered to the customer by e-bikes or electric vans.
This a very detailed plan.
But would it be better, if it had a logistics hub close to or even in the station?
These pictures show the Old Cab Road at Liverpool Street station.
This would probably be the only area in the station, that can be used. But it is not very large. Although it does have an access road at the back of the station.
This Google Map shows the area between Finsbury Square and Liverpool Street station.
Note.
- Finsbury Square is in the North West corner of the map.
- Liverpool Street station is in the South East corner of the map.
- There is an entrance to the Old Cab Road Liverpool Street station on Primrose Street.
- Amazon UK’s corporate office is in the North East corner of the msp.
Could roller cages be rolled into electric vans and taken to Finsbury Square for sorting and onward distribution?
- The car park has a height limit of 1.98 metres.
- It has 258 parking spaces.
- Could it be expanded downwards?
- How many e-bikes would it hold?
It think that this could be the reason for the purchase.
But I would be very surprised if a siding was dug that connected to the nearby Northern City Line that runs into Moorgate station.
Alstom’s Coradia iLint Hydrogen Train Makes Its Swedish Debut
The title of this post, is the same as that of this article on Global Railway Review.
This picture shows a hydrogen-powered Alstom Coradia iLint train near Hamburg
If you’re ever in Hamburg, take a ride to Buxtehude and take a ride to Cuxhaven.
These trains are now in service in Germany and have been ordered in quantity in Germany and have been demonstrated in Austria, Italy and The Netherlands.
The Diagnosis Of My Gallstones
I arrived at Homerton hospital as instructed today for the endoscopy.
Strangely, it was C’s birthday.
The procedure would involve passing an ultrasound probe down my throat and through my stomach to take an ultrasound image of the lump close to my liver.
I’d had two endoscopies before in the late 1990s at Addenbrookes to check for coeliac disease. One was a normal one, but in the second, I was also providing a sample of fluid for a research project at Cambridge University.
I seem to remember at Addenbrookes, I had been instructed to turn up in something like a tee-shirt and shorts, which is what I did. In this case, I took my shirt off and put a hospital gown over my cord trousers.
As I’d had the two endoscopies at Addenbrookes without a sedative, I suggested strongly, that they do the investigation without one this time as well.
The doctor, who was of an age to be very experienced, said he was up for it and we went for it without a sedative.
There was two big differences to the procedure at Addenbrookes.
- There were more staff, than Addenbrooke’s doctor and a technician.
- They were fully gowned up, as opposed to normal clothes.
But, then I got the expression at Addenbrooke’s they were aiming for speed and they were only confirming their earlier diagnosis of coeliac disease. that had been made by a genetic test.
Everything this time, went without a hitch.
- I was laying on my left side.
- I had oxygen tubes up my nose.
- With my right hand I can feel the probe in my stomach.
- To calm me down, a nurse was stroking my beard.
After not a long time, everything was done and I was walked back to recovery area.
Within half an hour, I was informed by the second doctor, that I had got gallstones and they would be taken out by endoscopy on September the 30th. Later they will take out my gall bladder by surgery.
I got the impression, it was the first time, that he’d seen this procedure without a sedative, as he described me as the Star-Of-The-Day. But then I’m a London Mongrel, with more survival genes than a garden full of Japanese knotweed.
I went home the way I came – On the bus!
After Effects
The only after effects were that the air in the theatre had dried me out and my left left arm hurt because I’d been lying on it.
So I vowed to drink a lot of fluids before the operation and do something to improve the strength of my damaged left arm.
Dwell Time On High Speed Two Trains
This document on the Government web site is the Train Technical Specification for High Speed Two trains.
There is a Section 7.15.6, which is entitled Dwell Time
This is said.
The Unit shall deliver 95% confidence of achieving a Dwell Time of 2 minutes at intermediate stations, calculated in accordance with the Static Dwell Time Model in Appendix I using the 1SL.
The rationale is also given.
Achievement of a two-minute Dwell Time is key to achievement of HS2 railway capacity and journey times.
The Static Dwell Time Model evaluates the key architectural elements of the interior layout that impact the Passenger exchange part of Dwell Time.
Dwell time is mentioned many times in the Technical Specification.
There is a Section 9.7.3.4, which is entitled Train Captain Changeover Time
This is said.
The Unit shall facilitate a changeover of Train Captains within a two-minute Dwell Time.
In this time period there shall be time for the exiting Train Captain to:
-
- Release and opening doors.
- Log out of the Cab
- Exit the Cab and Unit.
In this time period there shall be time for the entering Train Captain to:
-
- Enter the Unit and Cab
- Log in to the Cab
- Adjust Cab setting to the Train Captain’s personal preferences
- Fulfil the Train Captain’s role in closing doors, which does not include checking the PTI.
Note how all these actions must be performed in a two-minute dwell time.
The Technical Specification is certainly very detailed.
ATO Stop and Safe Location On High Speed Two Classic-Compatible Trains
This document on the Government web site is the Train Technical Specification for High Speed Two trains.
There is a Section 8.6.2, which is entitled ATO Stop and Safe Location
This is said.
ATO Stop is an additional function compared to the ATO over ETCS SRS. The purpose of
this function is to enable the Train Captain to command the Train to stop at the next Safe
Location. A Safe Location is a pre-defined location on the HS2 Network where Trains can
wait safely, and evacuation can be carried out if necessary. If it is not necessary to make an
emergency brake application, this enables more control of where Trains make un-planned
stops.
Perhaps all vehicles on motorways need to be fitted with a similar system.
The Cross-Section Of A High Speed Two Classic-Compatible Train
This document on the Government web site is the Train Technical Specification for High Speed Two trains.
There is a Section 7.14.3, which is entitled Maximum Cross Section
This is said.
The Unit shall have a maximum cross-section of 11m².
The rationale is also given.
HS2 interface – This maximum cross-section has been used in the design of the tunnels.
HS2’s gauging analysis has shown that a Vehicle compatible with the CRN infrastructure will probably
have a cross-section closer to 10m²
A Class 800 train is 2.70 metres wide, so if a High Speed Two Classic-Compatible train is the same width, the height based on the 10m² figure will be around 3.7 metres or about the same as an Electrostar.
The next section 7.14.4 gives an interesting piece of information.
Tunnels on the HS2 Network include porous tunnel portals in the infrastructure design to mitigate the adverse effects of micro-pressure waves. Therefore it will not be necessary to include micro-pressure wave mitigation features in the Unit design.
Interesting that they are tackling what is best described as tunnel-plop in the design of the tunnels, rather than catering for it on the train. I wrote about this in HS2 Way Out In Front In Tunnel Design For High-Speed Rail.
Thoughts On The Eastern Leg Of High Speed Two
These are a few thoughts on the Eastern Leg of High Speed Two.
Serving The North-East Quarter Of England From London
In Anxiety Over HS2 Eastern Leg Future, I gave a table of timings from London to towns and cities in the North-East quarter of England from Lincoln and Nottingham Northwards.
I’ll repeat it here.
- Bradford – Will not be served by High Speed Two – One hour and fifty-four minutes
- Cleethorpes – Will not be served by High Speed Two – Two hours and fifty-one minutes
- Darlington – One hour and forty-nine minutes – One hour and forty-nine minutes
- Doncaster – Will not be served by High Speed Two – One hour
- Edinburgh – Three hours and forty minutes via Western Leg – Three hours and thirty minutes.
- Grimsby – Will not be served by High Speed Two – Two hours and thirty-six minutes
- Harrogate – Will not be served by High Speed Two – One hour and fifty-two minutes
- Huddersfield – Will not served by High Speed Two – Two hours and eight minutes
- Hull – Will not be served by High Speed Two – One hour and fifty minutes
- Leeds – One hour and twenty-one minutes – One hour and thirty minutes
- Lincoln – Will not be served by High Speed Two – One hour and fifty-one minutes
- Middlesbrough – Will not be served by High Speed Two – Two hours and twenty minutes
- Newcastle – Two hours and seventeen minutes – Two hours and sixteen minutes
- Nottingham – One hour and seven minutes – One hour and fifty minutes
- Scarborough – Will not be served by High Speed Two – Two hours and fifty-seven minutes
- Sheffield – One hour and twenty-seven minutes – One hour and twenty-seven minutes
- Skipton – Will not be served by High Speed Two – Two hours and seven minutes
- Sunderland – Will not be served by High Speed Two – Two hours and thirty minutes
- York – One hour and twenty-four minutes – One hour and twenty-four minutes
Note.
- I have included all destinations served by Grand Central, Hull Trains and LNER.
- I have included Nottingham and Sheffield for completeness and in case whilst electrification is installed on the Midland Main Line, LNER run services to the two cities.
- I suspect LNER services to Bradford, Harrogate, Huddersfield and Skipton will split and join at Leeds.
There are a total of nineteen destination in this table.
- Twelve are not served by High Speed Two.
- Six are not more than fifteen minutes slower by the East Coast Main Line.
Only Nottingham is substantially quicker by High Speed Two.
Serving The North-East Quarter Of England From Birmingham
Fenland Scouser felt the above table might be interesting to and from Birmingham with or without the Eastern Leg of High Speed Two.
I think, I can give more information than that and it should be possible to give for each destination the following.
- Whether of not the route exists on High Speed Two.
- Time on High Speed Two from Birmingham.
- Time on High Speed Two and Northern Powerhouse Rail from Birmingham via Manchester
- Time by current trains from Birmingham
In the following table, the fields are in the order of the previous table.
- Bradford – No direct route – No time – One hour and three minutes – Two hours and twenty-seven minutes
- Cleethorpes – No direct route – No time – Three hours and eight minutes – Three hours and eighteen minutes
- Darlington – Route Exists – One hour and twenty-three minutes – One hour and forty minutes – Two hours and fifty-five minutes
- Doncaster – No direct route – No time – One hour and thirty-six minutes – Two hours and nineteen minutes
- Edinburgh- Route Exists – Three hours and fourteen minutes – Four hours – Four hours and thirteen minutes
- Grimsby – No direct route – No time – Two hours and fifty-three minutes – Three hours and three minutes
- Harrogate – No direct route – No time – One hour and twenty-eight minutes – Three hours
- Huddersfield – No direct route – No time – Fifty-six minutes – Two hours and eleven minutes
- Hull – No direct route – No time – One hour and forty-four minutes – Three hours and two minutes
- Leeds – Route Exists – Forty-nine minutes – One hour and six minutes – One hour and fifty-nine minutes
- Lincoln – No direct route – No time – Two hours and fifty-three minutes – Two hours and thirteen minutes
- Middlesbrough – No direct route – No time – Two hours and twenty-nine minutes – Three hours and thirty-two minutes
- Newcastle – No direct route – No time – Two hours and four minutes – Three hours and twenty-six minutes
- Nottingham – Route Exists – Fifty-seven minutes – Two hours and fifty-five minutes – One hour and ten minutes
- Sheffield – Route Exists – Thirty-five minutes – One hour and thirty-four minutes – One hour and fifteen minutes
- Skipton – No direct route – No time – One hour and forty-three minutes – Two hours and fifty-two minutes
- Sunderland – No direct route – No time – Two hours and fifty-nine minutes – Three hours and fifty-eight minutes
- York – Route Exists – Fifty-seven minutes – One hour and twenty-eight minutes – Two hours and twenty-seven minutes
Note.
- No time means just that!
- One of the crucial times is that Birmingham Curzon Street and Leeds is just an hour and six minutes via High Speed Two and Northern Powerhouse Rail. This time gives good times to all destinations served from Leeds.
- Nottingham and Sheffield are both around an hour and fifteen minutes from Birmingham New Street, by the current trains.
I’ll now look at some routes in detail.
Birmingham And Leeds
The time of one hour and six minutes is derived from the following.
- Birmingham Curzon Street and Manchester Piccadilly by High Speed Two – Forty-one minutes
- Manchester Piccadilly and Leeds by Northern Powerhouse Rail – Twenty-five minutes
It would be seventeen minutes slower than the direct time of forty-nine minutes.
But it is quicker than the current time of one hour and fifty-nine minutes
Note.
- As Manchester Piccadilly will have a time to and from London of one hour and eleven minutes, Leeds will have a time of one hour and twenty-six minutes to London via Northern Powerhouse Rail and Manchester.
- If the Eastern Leg is built, The London and Leeds time will be one hour and twenty-one minutes.
- The Eastern Leg would therefore save just five minutes.
The Northern Powerhouse route could probably mean that Huddersfield, Bradford and Hull would be served by High Speed Two from London.
Manchester Airport, Manchester Piccadilly and Leeds would be connected by a tunnel deep under the Pennines.
- Manchester Piccadilly, Huddersfield and Bradford could be underground platforms added to existing stations.
- Piccadilly and Leeds would have a journey time of under 25 minutes and six trains per hour (tph).
- The tunnel would also carry freight.
- It would be modelled on the Gotthard Base Tunnel in Switzerland.
I wrote full details in Will HS2 And Northern Powerhouse Rail Go For The Big Bore?
Birmingham And Nottingham
The time of two hours and fifty-five minutes is derived from the following.
- Birmingham Curzon Street and Manchester Piccadilly by High Speed Two – Forty-one minutes
- Manchester Piccadilly and Leeds by Northern Powerhouse Rail – Twenty-five minutes
- Leeds and Nottingham – One hour and forty-nine minutes
It would be one hour and fifty-eight minutes slower than the direct time of fifty-nine minutes.
The current time of one hour and ten minutes is much quicker.
Birmingham And Sheffield
The time of two hours and thirty-four minutes is derived from the following.
- Birmingham Curzon Street and Manchester Piccadilly by High Speed Two – Forty-one minutes
- Manchester Piccadilly and Leeds by Northern Powerhouse Rail – Twenty-five minutes
- Leeds and Sheffield – One hour and twenty-eight minutes
It would be one hour and fifty-nine minutes slower than the direct time of thirty-five minutes.
The current time of one hour and fifteen minutes is much quicker.
Conclusions On The Timings
I am led to the following conclusions on the timings.
The building of the Eastern Leg of High Speed Two gives the fastest times between Birmingham and Leeds, Nottingham and Sheffield.
But if the Eastern Leg of High Speed Two is not built, then the following is true, if Northern Powerhouse Rail is created between Manchester and Leeds.
The time of an hour and six minutes between Birmingham Curzon Street and Leeds is probably an acceptable time.
This time probably enables acceptable times between Birmingham Curzon Street and destinations North of Leeds.
But with Nottingham and Sheffield the current CrossCountry service is faster than the route via Manchester.
The speed of the CrossCountry services surprised me, but then there is a section of 125 mph running between Derby and Birmingham, which is used by CrossCountry services between Birmingham New Street and Leeds, Nottingham and Sheffield.
This table gives details of these services.
- Birmingham New Street and Leeds – 116,4 miles – One hour and 58 minutes – 59.3 mph
- Birmingham New Street and Nottingham – 57.2 miles – One hour and 14 minutes – 46.4 mph
- Birmingham New Street and Sheffield – 77.6 miles – One hour and 18 minutes – 59.7 mph
Note.
- The Leeds and Sheffield services are run by 125 mph Class 220 trains.
- The Notting service is run by 100 mph Class 170 trains.
- All trains are diesel-powered.
As there is 125 mph running between Derby and Birmingham, the train performance probably accounts for the slower average speed of the Nottingham service.
CrossCountry And Decarbonisation
Consider.
- CrossCountry has an all-diesel fleet.
- All train companies in the UK are planning on decarbonising.
- Some of CrossCountry’s routes are partially electrified and have sections where 125 mph running is possible.
The only standard train that is built in the UK that would fit CrossCountry’s requirements, would appear to be one of Hitachi’s 125 mph trains like a bi-mode Class 802 train.
- These trains are available in various lengths
- Hitachi will be testing battery packs in the trains in the next year, with the aim of entering service in 2023.
- Hitachi have formed a company with ABB, which is called Hitachi ABB Power Grids to develop and install discontinuous electrification.
When CrossCountry do replace their fleet and run 125 mph trains on these services several stations will be connected to Birmingham for High Speed Two.
The route between Leeds and Birmingham via Sheffield is part of the Cross Country Route, for which electrification appears to have planned in the 1960s according to a section in Wikipedia called Abortive British Rail Proposals For Complete Electrification,
I suspect that the following times could be achieved with a frequency of two tph
- Birmingham New Street and Leeds – 90 minutes
- Birmingham New Street and Nottingham – 60 minutes
- Birmingham New Street and Sheffield – 60 minutes
It is not the Eastern Leg of High Speed Two, but it could do in the interim.
Electrification Of The Midland Main Line
I don’t believe that the Midland Main Line needs full electrification to speed up services to Derby, Nottingham and Sheffield, but I believe that by fitting batteries to Hitachi’s Class 810 trains, that will soon be running on the line and using the Hitachi ABB Power Grids system of discontinuous electrification, that the route can be decarbonised.
I would also apply full digital in-cab signalling to the Midland Main Line.
Conclusion
We will need the Eastern Leg of High Speed Two at some time in the future, but if we do the following we can do more than cope.
- Create Northern Powerhouse Rail between Manchester and Leeds, so that High Speed Two can serve Leeds and Hull via Manchester.
- Decarbonise CrossCountry with some 125 mph battery-electric trains.
- Electrify the Midland Main Line.
I would also deliver as much as possible before Phase 1 and 2a of High Speed Two opens.