The Anonymous Widower

Eurostar Announces Launch Date For Amsterdam Service

The title of this post is the same as this article in Global Rail News.

This is said.

  • The service will start on April the 4th.
  • London to Amsterdam will take three hours and forty-one minutes.
  • London to Rotterdam will take three hours and one minute.
  • Trains will leave London at 08.31 and 17.31.

But going to London will require a stop at Brussels to clear UK Immigration and security.

Hopefully, by the end of 2019, they’ll be a direct service in both directions.,

February 9, 2018 Posted by | Transport/Travel | , | Leave a comment

Will Some Of The New Buildings For Heathrow Be Built In Scotland?

It’s all explained in this article on the Offsite Hub website, which is entitled Heathrow To Offer Offsite Hubs To Other Mega Projects.

This is the first two paragrahs.

Airport says schemes such as HS2 and Hinkley could make use of planned offsite manufacturing hubs

Heathrow Airport has said it hopes its idea for a series of offsite manufacturing hubs to help with its £16bn expansion plans will be used by other major projects, including the new nuclear power station at Hinkley and the HS2 railway.

Sounds a good idea to me.

A few other points.

  • Offsite accounts for 10% of the construction industry.
  • Heathrow are aiming for between 25% and 40%.
  • It will reduce the peak on-site workforce at Heathrow.
  • Offsite was safer, cleaner and less weather dependent.
  • Four hubs are plans, with one definitely in Scxotland.

A few months ago I talked to one of the managers building Custom House station, which was largely built offsite in Sheffield.

He told me, that the quality was so much better, than if it had been built traditionally.

The quality certainly wasn’t traditional pre-fab either.

Could this be part of the solution to our housing crisis?

 

 

 

February 9, 2018 Posted by | World | , , , , | 1 Comment

Funding Gives Weight To Idea For Storing Electricity

The title of this post, is the same as that of an article on Page 45 of today’s copy of The Times.

It talks of a company called Gravitricity, which has used the same principle as every weight-operated clock to store energy and especially energy generaed from intermittent sources like wind and solar power.

The company has just secured a £650,000 grant from Innovate UK.

In Solar Power Could Make Up “Significant Share” Of Railway’s Energy Demand, I looked at how solar farms and batteries could be used to power third-rail railway electrification.

Because of energy losses, third-rail electrification needs to be fed with power every three miles or so. This gives a problem, as connection of all these feeder points to the National Grid can be an expensive business.

A series of solar farms, wind turbines and batteries, controlled  by an intelligent control system, is an alternative way of providing the power.

In an article in the October 2017 Edition of Modern Railways, which is entitled Celling England By The Pound, Ian Walmsley says this in relation to trains running on the Uckfield Branch.

A modern EMU needs between 3 and 5 kWh per vehicle mile for this sort of service.

If I assume that trains are five cars and will be efficient enough to need only 3 kWh per vehicle mile, then to power a train along a ten mile section of track will take 150 kWh.

As the control system, only powers the track, when a train needs it, the whole system can be very efficient.

So why will Gravitricity battery ideas be ideal in this application?

Appropriate Size

By choosing the right weight and depth for the Gravitricity battery , appropriate energy storage can be provided at different points on a line.

Some parts of a journey, like accelerating away from stations will need more electricity than others, where trains are cruising along level ground.

Supposing my five-car example train is travelling at 60 mph, then to cover ten miles will take 10 minutes, with 15 kW being supplied in every minute.

If the train weighs 200 tonnes, then accelerating the train to 60 mph will need about 20 kWh.

I’m sure that a Gravitricity battery could handle this.

I would suspect that batteries of the order of 100 kWh would store enough power for the average third-rail electrified line.

A proper dynamic simulation would need to be done. I could have done this calculation in the 1960s, but I don’t have the software now!

Response Time

For safety and energy-efficiency reasons, you don’t want lines to be switched on, when there is no train present.

I suspect that if there is energy in the battery, response would be fast enough.

Energy Efficiency

The system should have a high efficiency.

How Big Would A 100 kWh Gravitricity Battery Be?

A quick calculation shows the weight would be 400 tonnes and the depth would be 100 metres.

Installing the batteries

Each battery will need a 100 metre deep hole of an appropriate diameter.

This sequence of operations would be performed.

  • A rail-mounted drilling rig would drill the hole.
  • The heavy weight of the battery would arrive by train and would be lifted into position using a rail-mounted crane.

As the equipment will generally be heavy, doing all operations from the railway will be a great help.

 

 

 

February 9, 2018 Posted by | Energy, Energy Storage, Transport/Travel | , , , | 1 Comment

Finland-Estonia Rail Tunnel Feasibility Study Completed

The title of this post is the same as that of this article in the International Railway Journal.

This is the first two paragraphs.

A feasibility study into the construction of a rail tunnel under the Baltic Sea between the Finnish capital Helsinki and the Estonian capital Tallinn estimates the cost of the project at €13-20bn.

The FinEst Link tunnel would be constructed as two 10m-diameter single bores connected at intervals with an 8m-diameter central service tunnel. The concept includes two artificial islands, and three stations in Helsinki – City Centre, Pasila and Vantaa Airport – and one station at Ülemiste in Tallinn. The tunnel would be standard gauge to connect with the new Rail Baltica high-speed line linking Estonia, Latvia, Lithuania and Poland.

The article also goes on to say this about the economics of the tunnel.

While the project has a low cost:benefit ratio of 0.45 due to the high capital cost, its wider economic impact on GDP ranges from €4bn for the low scenario to €6.9bn for the base scenario.

Would the projected cost and economics of the FinEst Tunnel be a rough guide to what would happen if a fixed link were to be built between Scotland and Ireland?

The FinEst Tunnel will be standard gauge to be compatible with Rail Baltica, despite both Finland and Estonia using different railway gauges.

Just like the difference between Great Britain and the island of Ireland.

 

February 9, 2018 Posted by | Transport/Travel | , , , | 1 Comment

Calculating Kinetic And Potential Energies

I used to be able to do this and convert the units, manually and easily, but now I use web calculators.

Kinetic Energy Calculation

I use this kinetic energy calculator from omni.

Suppose you have a nine-car Crossrail Class 345 train.

  • It will weigh 328.40 tonnes, according to my detective work in Weight And Dimensions Of A Class 345 Train.
  • There will be 1,500 passengers at 90 Kg. each or 135 tonnes.
  • So there is a total weight of  463.4 yonnes.
  • The train has a maximum speed of 90 mph.

Put this in the calculator and a full train going at maximum speed has a kinetic energy of 104.184 kWh.

The lithium-ion battery in a typical hybrid bus, like a New Routemaster has a capacity of 75 kWh.

So if a full Class 345 train, were to brake from maximum speed using regenerative braking, the energy generated by the traction motors could be stored in just two bus-sized batteries.

This stored energy can then be used to restart the train or power it iin an emergency.

Out of curiosity, these figures apply to an Inter City 125.

  • Locomotive weight – 2 x 70.25 tonnes
  • Carriage weight – 8 x 34 tonnes.
  • Train weight – 412.5 tonnes
  • Passengers – appromiximately 700 = 63 tonnes
  • Speed – 125 mph

This gives a kinetic energy of 206.22 kWh

And then there’s Eurostar’s original Class 373 trains.

  • Weight- 752 tonnes
  • Speed 300 kph

This gives a kinetic energy of 725 kWh.

If a 75 kWh battery were to be put in each of the twenty cars, this would be more than adequate to handle all the regenerative braking energy for the train.

There would probably be enough stored energy in the batteries for a train to extricate itself from the Channel Tunnel in the case of a complete power failure.

Potential Energy Calculation

I use this potential energy calcultor from omni.

Suppose you have the typical cartoon scene, where a ten tonne weight is dropped on a poor mouse from perhaps five metres.

The energy of the weight is just 0.136 kWh.

I’ve used kWhs for the answers as these are easily visualised. One kWh is the energy used by a one-bar electric fire in an hour.

February 9, 2018 Posted by | Energy, Energy Storage, World | , , , , | Leave a comment

Sainsbury’s Now Sell Celias!

I took this picture in the Angel branch of Sainsbury’s.

I only buy the odd bottle these days, as the Adnams Southwold Pale Ale 0.5%, which is available in Marks and Spencer is more to my taste.

 

February 8, 2018 Posted by | Food, Health | , , , | Leave a comment

Here Are 31 Better Names For City Thameslink, The Worst Name For A Railway Station Ever Devised

The title of this post, is the same as that of this article on CityMetrics.

I tend to agree, as the name doesn’t give too much information about the location, unless you’re a Londoner or someone, who knows about Thameslink.

Look at the passenger statistics for 2013-14 for the station and its neighbours.

They are in line with their neighbours, but nothing special.

So would a renaming help.

Of the thirty-one names proposed by CityMetric, one name stands out to me. This is St. Paul’s West.

These pictures show City Thameslink station.

Note.

  • It is a double-ended station.
  • The Northern entrance is on Holborn Viaduct.
  • The Southern entrance is on Ludgate Hill.
  • There are escalators and lifts at both ends.
  • The station name is given on the platform as City Thameslink for St. Paul’s Cathedral.

This is a Google Map of the area.

Note St. Paul’s cathedral and Southern entrance to City Thameslink station are connected by Ludgate Hill. As Ludgate Hill suggests, it is uphill to the cathedral.

So perhaps a name like Ludgate and St. Paul’s West, might be better.

There could always be a referendum or an on-line vote. But some wag would come up with an unsuitable name that would win.

City Thameslink station is a modern high-capacity station.

  • The station is fully accessible.
  • The platforms accept twelve-car Class 700 trains.
  • Thameslink will soon be running twenty-four trains per hour (tph) in both directions.
  • Northern destinations include Bedford, Cambridge, Luton Airport, Peterborough, Saint Pancras International and Stevenage.
  • Southern destinations include Brighton, Gatwick Airport, Littlehampton, London Bridge, Maidstone, Rainham and Sevenoaks.
  • There is commercial development over much of the station, some of which is better than others.

I have also read that the signalling of Thasmeslink could accept thirty tph through the Snow Hill Tunnel. So the station could see a twenty-five percent increase in train capacity.

What the station needs is better East-West connections to make better use of the station.

Crossrail

Crossrail connects to Thameslink, one station to the North at Farringdon station, which is not a long walk.

A Pedestrian Connection To St. Paul’s Tube Station

I believe this is possible and I wrote about it in A Pedestrian Connection Between City Thameslink Station And St. Paul’s Tube Station.

A Connection To The Docklands Light Railway

This map from Transport for London, shows the possible Western extension of the DLR.

I wrote about this extension in detail in A Connection Between City Thameslink Station And The Docklands Light Railway.

Conclusion

City Thameslink station could grow significantly in importance.

As to the name, if it grows in importance, perhaps it deserves a more important name?

The French would name it after an important politician, artist, philosopher or soldier!

We don’t do that!

If City Thameslink station ends up with a good pedestrian connection to St. Paul’s station and the cathedral, perhaps the whole station complex should just be called St. Paul’s.

 

 

 

 

February 8, 2018 Posted by | Transport/Travel | , , , , , | 4 Comments

How Do Hydrogen-Powered Trains Work?

This promotional video shows how Alstom’s Coradia iLint works.

Note that it’s really a battery train, where the batteries are charged from the electrification or the hydrogen power-pack.

 

February 7, 2018 Posted by | Energy Storage, Hydrogen, Transport/Travel | , | 2 Comments

Alstom To Join Stagecoach’s Southeastern Franchise Bid

The title of this post is the same as that of this article in Global Rail News.

This is the first two paragraphs.

Stagecoach has announced that Alstom is to become part of its bid for the new Southeastern franchise.

The move, which is subject to approval by the Department for Transport (DfT), will make Alstom a 20 per cent shareholder in the new train operating company.

I think the pairing of a train manufacturer with a train operator could be something that we’ll see more often. Remember that two of Abellio’s UK franchises; Greater Anglia and West Midlands Trains, have placed substantial orders for Bombardier Aventras.

UK rail franchises are not very similar, with often a mixture of different types of route.

In the case of the Southeastern franchise, there are the following.

  • High speed commuter routes.
  • Intense metro services.
  • Long-distance commuter routes.
  • Branch lines with low frequencies.
  • Extensions over lines without electrification.

Having a train manufacturer involved in the process, must help in formulating a high-class bid.

So how will Alstom’s expertise help in the formulation of the bid?

Highspeed Commuter Trains

The current fleet of Class 395 trains will need to be expanded, as the new franchise will be offering extra services to Hastings and Eastbourne, with the possible addition of a second London terminal.

The easy route would be to go to Hitachi and order some extra Class 395 trains. But these would have to be built with some method of using the Marshlink Line, which is not electrified. In Hitachi’s Thoughts On Battery Trains, I discussed Hitachi’s published thoughts on using battery trains on this line.

I don’t doubt that Hitachi could provide the trains.

Alstom have a lot of expertise in high speed trains and would have no problem producing a train with the following performance.

  • 140 mph on high speed lines.
  • 100 mph on third rail DC lines.

Could they have done the calculations and found that their hydrogen power technology could drive a train from Ashford to Ore at the 60 mph operating speed of the Marshlink Line?

In an article in the October 2017 Edition of Modern Railways, which is entitled Celling England By The Pound, Ian Walmsley says this in relation to trains running on the Uckfield Branch.

A modern EMU needs between 3 and 5 kWh per vehicle mile for this sort of service.

If I assume that the extra trains will be five cars and will be efficient enough to need only 3 kWh per vehicle mile for the 25 miles without electrification of the Marshlink Line, this gives an energy requirement of 375 kWh.

  • Electrification between London and Ashford would charge the batteries at the Ashford end.
  • Electrification between Hastings and Eastbourne would charge the batteries at the Hastings end.
  • Hydrogen-power would continuously top up the batteries en-route between Ore and Ashford.
  • Electrification at Ashford and Hastings would probably be able to do a lot of the acceleration to the 60 mph operating speed.
  • Rye station could be electrified to make the stop easier.

Only Alstom know what size of battery and hydrogen power-pack would be needed.

If they could produce a high speed train, that could extend its range by the use of hydrogen power, it would be a very public demonstration of the capabilities of the technology.

Commuter Fleet Replacement

A lot of the current fleet is coming to the end of its life and I would expect the new franchise will replace the trains. A proportion of the trains also have an operating speed of 75 mph and are lacking in some of the features passengers like.

So perhaps, Alstom would be looking forward to building trains for the new franchise.

They’ve even got a suitable design in Siemens Class 707 train, that was built for South West Trains, which was run by Stagecoach.

Conclusion

It looks to me, that Alstom have two trains; one in reality and one on the drawing board, that could enable Stagecoach to put forward a creditable bid for the Southeastern franchise.

But these trains will not be one-off specials for the Southeastern franchise.

The high speed train with a range extended by hydrogen would be a unique bi-mode train for 125 mph routes like the East Coast Main Line, Great Western Main Line, Midland Main Line and West Coast Main Line.

Think.

  • London Euston to Chester
  • London Euston to Barrow-in-Furness
  • London Kings Cross to Hull
  • London Kings Cross to Sunderland
  • London Paddington to Oxford

And that’s just the UK!

London St. Pancras to Hastings and Eastbourne would be the ideal route for a demonstrator. Especially, for the French!

The commuter unit may not be as unique, but the Siemens design is proven and it would be a competitor to Bombardier’s Aventra.

 

February 6, 2018 Posted by | Transport/Travel | , , | Leave a comment

Alstom Wins The Europe 1 Mobility Trophy For Its Hydrogen Train

The title of this post is the same as that of this article on WebWire.

This is the first paragraph.

Alstom has been awarded the Mobility Trophy for Coradia iLint, its hydrogen train, in the context of the French leading radio Europe 1 Trophies of the Future.

Winning an award can be a mixed blessing.

For some it is a precursor to outstanding success.

But for others, the reverse is true!

I’ve never ridden on or even seen a Coradia iLint, but the theory behind the train is sound.

As soon as these trains are taking passengers in Germany, I’ll go and have a ride.

 

 

February 6, 2018 Posted by | Transport/Travel | , , , | Leave a comment