The Anonymous Widower

How Will The East Coast Main Line Timetable Change Affect Sheffield?

This article in the October 2025 Edition of Modern Railways is entitled Industry Gears Up For December ECML Timetable Change.

This is the first paragraph.

Major changes are planned to trains along the East Coast main line from 14 December as the long-heralded timetable takes effect.

In this post, I will see how the changes detailed in the article in Modern Railways will affect Sheffield and Doncaster.

Aberdeen-Edinburgh

This is said about Aberdeen and Edinburgh services.

Monday-Saturday services will not change between Aberdeen and Edinburgh, with all intermediate stations served at similar times.

The LNER service to and from King’s Cross will call additionally at Doncaster, Newark Northgate and Peterborough; the last LNER Monday-Friday departure from Aberdeen will terminate at Doncaster instead of Leeds, and the first LNER Monday-Saturday train to Aberdeen will start from King’s Cross at 05:48 instead of Leeds.

Note.

  1. An hourly fast train between Edinburgh and King’s Cross will have a journey time of 4 hours and 10 minutes, which is a saving of at least 12 minutes.
  2. There is an Aberdeen-Manchester air service, but no Edinburgh-Manchester or Leeds-Scotland air services.
  3. In Could London And Central Scotland Air Passengers Be Persuaded To Use The Trains?, I speculated about how air passengers could be tempted to use the trains between London and Central Scotland.
  4. It looks to me, that LNER are strengthening their services between Doncaster and Scotland.
  5. Will that 05:48 King’s Cross departure for Aberdeen, enable a working day in Aberdeen and return?

Is LNER’s aim to get travellers to use the trains between Doncaster and Scotland, as an alternative to driving or trains from Leeds?

Alnmouth and Berwick

This is said about Alnmouth services.

Quicker LNER journey times are promised to stations South of York, with King’s Cross-Alnmouth journey times up to 15 minutes quicker.

More TPE trains will run between Newcastle, Morpeth, Alnmouth, Berwick, Reston, Dunbar, East Linton and Edinburgh Waverley.

The number of trains calling at Durham on weekdays will fall from 18 to 13 Southbound and from 15 to 10 Northbound.

This is said about Berwick services.

LNER trains will call every two hours during the middle of the day, and the number of weekday trains to King’s Cross falls from 15 to 11 Southbound with a 13 to nine fall Northbound. More TPE trains will call.

Note.

  1. Lumo serves Newcastle, Morpeth and Edinburgh.
  2. Reston and East Linton are new stations.
  3. The stations between Newcastle and Edinburgh need adequate parking to attract commuters.

It looks to me, that LNER are timing the trains to attract day trips along the East Coast Main Line.

Bradford Forster Square/Interchange

This is said about Bradford Forster Square services.

The number of weekday trains will remain as per May 2025, but on Sundays, the number of trains serving Forster Square increases from two to six each way on a two-hourly interval. LNER stopping patterns change, with fewer trains calling at Peterborough and none at Grantham or Retford.

Trains currently stop at Peterborough, Doncaster, Wakefield Westgate, Leeds and Shipley, but surely a more regular six trains per day (tpd) is preferable.

 

This is said about Bradford Interchange services.

At Interchange, Grand Central Trains will run at different times to the May 2025 timetable, with King’s Cross journeys up to 20 minutes quicker. One GC each way will call at Peterborough, while some will stop at Pontefract Monkhill on Sundays for the first time.

Note.

  1. Trains currently stop at Peterborough, Doncaster, Pontefract Monkhill, Wakefield Kirkgate, Mirfield, Brighouse, Halifax and Low Moor
  2. Is the twenty minutes time saving due to the new digital signalling to the South of Doncaster?
  3. Is this another open access operator being allowed to do what they do best?

This looks to be a very useful service, which serves several stations, with no other service to London.

Doncaster

This is said about Doncaster services.

Additional trains calling at destinations including Birmingham New Street, Sheffield, York, Newark and Berwick-upon-Tweed. LNER Aberdeen/Inverness trains will call at Doncaster. EMR trains will be retimed at Doncaster to provide better connections with LNER’s revised timetables, but journeys from Doncaster to Sleaford and Spalding will require a change at Lincoln. This change has been made to “enable improved connections” at Peterborough, Sleaford, Lincoln and Doncaster. The number of trains calling at Stevenage falls from 24 to 19 Southbound and 24 to 21 Northbound, with Grantham stops dropping by seven trains to 28 Southbound and 4 to 29 Northbound.

If CrossCountry Trains were to switch their trains to Hitachi InterCity Battery trains, I believe that a version of these trains could handle routes like Plymouth and Aberdeen.

  • This would speed up services.
  • Trains would run close together and thus increase capacity.
  • Services could even be faster.

So expect a replacement order for CrossCountry Trains diesel multiple units soon.

Glasgow

LNER gave up serving Glasgow Central from King’s Cross in the December 2024 timetable change.

In Lumo Will Extend Its King’s Cross And Edinburgh Service To Glasgow, I talked about Lumo extending their King’s Cross and Edinburgh service to Glasgow Central station.

Hull

This is said about Hull services.

On Mondays-Fridays, Hull Trains will provide an extra train from London.

The LNER Monday-Friday Hull-Doncaster train will be withdrawn;

Northern will operate a 20:25 departure to Doncaster; calling at Brough and Selby.

Note.

  1. It looks like Great British Railways have surrendered Hull and Beverley to Hull Trains.
  2. Hull Trains are converting their Class 802 trains to battery-electric power.
  3. It is likely that Hull Trains upgraded trains will be able to use the Great Northern and Great Eastern Joint Line via Lincoln on battery power.

The new timetable appears to be ready for the future of Hull Trains.

Leeds

This is said about Leeds services.

LNER services will depart to King’s Cross at xx.10 and xx.40.

Northern will introduce an extra mostly hourly service between  Leeds and Sheffield calling at Wakefield Westgate. They will depart about 30 minutes earlier or later than the CrossCountry service.

Note.

  1. I would expect the two King’s Cross and Leeds services which would both stop at Doncaster and Wakefield Westgate would set the timings between Doncaster and Leeds.
  2. Currently, of the four trains that run to and from Leeds every two hours, two are planned to terminate at Leeds, one at Harrogate and one at Bradford Forster Square.
  3. There is also a daily service between King’s Cross and Skipton via Leeds.
  4. I can envisage another service between  King’s Cross and Ilkley via Leeds, Kirkstall Forge, Guiseley, Burley-in-Wharfedale and Ben Rhydding.
  5. I can envisage another service between King’s Cross and Huddersfield, via Leeds, White Rose, Morley, Batley, Dewsbury, Ravensthorpe, Mirfield and Deighton.
  6. I can envisage another service between King’s Cross and Hebden Bridge, via Leeds, White Rose, Morley, Batley, Dewsbury, Ravensthorpe, Mirfield, Sowerby Bridge, Mytholmroyd and Brighouse.
  7. An alternative to Hebden Bridge would be Rochdale, which already has four platforms and is on the Manchester Metrolink
  8. It appears that Bradford Forster Square, Harrogate, Huddersfield, Leeds and Skipton stations can turn nine or ten-car trains and Ilkley can turn five-car trains.
  9. I also believe that one of Hitachi’s InterCity Battery trains could use battery power to take the spectacular Settle and Carlisle Line to Carlisle or even Glasgow Central.
  10. If needed pairs of five-car trains could split and join at Leeds, with one train waiting at Leeds and the other train going on to another destination.
  11. The CrossCountry and Northern Trains services on the Sheffield and Leeds route via Doncaster and Wakefield Westgate would probably need to be modern battery-electric trains to maximise the capacity on the route.

There certainly seem to be opportunities to give a number of stations in Yorkshire an all-electric service to King’s Cross with a two-hourly frequency, in a time of a few minutes over two hours.

Lincoln

This is said about Lincoln services.

One more LNER train from King’s Cross will run, with the first train arriving earlier and the last train later. There will no longer be an LNER train serving Stevenage with passengers having to change at Newark Northgate or Peterborough. An improved service will run to and from Nottingham, with an increase from one to two trains per hour on Mondays-Saturdays. An hourly service will run to Crewe, and a new Matlock-Nottingham-Lincoln-Cleethorpes service will run. EMR will cease all bar morning peak direct trains to/from Leicester. Newark Northgate-Lincoln trains will be reduced from five to four on Mondays-Fridays, eight to four on Saturdays and ten to eight on Sundays.

Note.

  1. Travellers between Lincoln/Nottingham and the North/Scotland will have two trains per hour to Newark Northgate, where there will be two tph to the North/Scotland.
  2. The hourly Crewe service will give access to Liverpool Manchester and the West Coast Main Line.
  3. Will there still be a Liverpool and Norwich service or will this be replaced by East-West Rail?

There seems to be a big sort out to EMR services.

Newcastle

This is said about Newcastle services.

The number of trains serving King’s Cross increases from 35 to 53 Southbound on weekdays and from 36 to 52 Northbound. One train every hour will run non-stop to York. More TPE trains will run Northbound (see Alnmouth and Berwick), while Northern is retiming services on the Northumberland Line in anticipation of Northumberland Park and Bedlington stations opening in early 2026. A semi-fast hourly service between Newcastle and Middlesbrough will run on Mondays-Saturdays and there will be an hourly stopping service between them.

Note.

  1. There will be a big increase in services between King’s Cross and Newcastle.
  2. Is the aim to persuade travellers to use trains rather than airlines?
  3. LNER also runs one train per day (tpd) between King’s Cross and Middlesbrough.
  4. Grand Central Trains will be running at a frequency of six tpd between King’s Cross and Sunderland via Thirsk, Northallerton, Eaglescliffe, Hartlepool and Seaham.

Hull appears to have been left to Hull Trains and Glasgow to Lumo, and Sunderland appears to be left for Grand Central Trains.

Conclusions

I am coming to some conclusions about services on the East Coast Main Line, with respect to Sheffield.

Doncaster Is A Well-Equipped Station

Doncaster is the nearest station to Sheffield on the East Coast Main Line.

  • Over the last few years, Doncaster station has been improved.
  • It has a subway with a more than adequate number of lifts.
  • The station has nearly 600 parking spaces.
  • There is a taxi rank.
  • There is no Marks & Spencer’s food store, which is important for a coeliac like me.
  • There are thirty bus stands close to Doncaster station.
  • Doncaster station is well-equipped with cafes, a pub and coffee stalls.
  • All trains to Aberdeen, Bradford Forster Square, Bradford Interchange, Edinburgh, Hull, King’s Cross, Leeds, Sheffield and Wakefield seem to stop at the station.
  • There are several local trains per hour.
  • Changing trains is not a strenuous exercise.

Doncaster is one of the UK’s better regional stations.

Doncaster Needs A Connection To The Sheffield Supertram

One of the first things, I do when I arrive in a strange town or city is look for the local public transport network.

In 2019, Sheffield published an ambitious plan for their tram network, which I wrote about in Sheffield Region Transport Plan 2019 – Doncaster Sheffield Airport.

The post contained this map, of Sheffield’s plans for the trams.

Doncaster and Doncaster Sheffield Airport are connected to the current end of the tram-train route at Rotherham Parkgate.

This OpenRailwayMap shows the rail lines between Rotherham Parkgate and Doncaster.

Note.

  1. Doncaster station is in the North-East corner of the map.
  2. Rotherham Central station is in the South-West corner of the map.
  3. The blue arrow in the South-West corner indicates Rotherham Parkgate tram stop.
  4. Swinton, Mexborough and Conisbrough stations can be picked out.
  5. The dotted red line running North-South across the map is the route of the ill-fated Eastern Leg of High Speed Two.

It is a simple application of tram-train technology to connect Doncaster station and Doncaster Sheffield Airport to the Sheffield Supertram.

With all the comings and goings on the East Coast Main Line at Doncaster station, I believe that the tram-train connection to Sheffield and Rotherham is essential.

The Cities Of Bradford, Doncaster, Leeds, Sheffield and Wakefield Can Have a High-Frequency Rail Connection

Consider.

  • Four stations are all step-free with a bridge or subway served by lifts.
  • Bradford Forster Square station has level access to the platforms from the street.
  • The rail lines between the five stations are electrified, with the exception of Sheffield and Doncaster.
  • Services between the cities are run by CrossCountry Trains, Grand Central Trains, Hull Trains, LNER and Northern Trains.
  • Most maximum speeds are not unduly slow.

Consequently the five cities can have a high-frequency rail connection in excess of four tph.

Could this be the basis of a Five-Cities Metro?

Open Access Services

There are six open access services running on the East Coast Main Line.

  • Grand Central Trains – King’s Cross-Bradford Interchange via Peterborough, Doncaster, Pontefract Monkhill, Wakefield Kirkgate, Mirfield, Brighouse, Halifax and Low Moor – 4 tpd
  • Grand Central Trains – King’s Cross-Sunderland via Peterborough, York, Thirsk, Northallerton, Eaglescliffe and Hartlepool – 6 tpd
  • Hull Trains – King’s Cross-Hull via Stevenage, Grantham, Retford, Doncaster, Selby, Howden, Brough – 4 tpd
  • Hull Trains – King’s Cross-Beverley via Stevenage, Grantham, Retford, Doncaster, Selby, Howden, Brough, Hull and Cottingham  – 2 tpd
  • Lumo – King’s Cross-Edinbugh via Stevenage, Newcastle and Morpeth – 5 tpd
  • Lumo – King’s Cross-Glasgow Queen Street via Stevenage, Newcastle, Morpeth, Edinburgh and Falkirk High – 2 tpd

Note.

  1. tpd is trains per day.
  2. All seem to serve an exclusive area, except Lumo.
  3. In a couple of years, all could be using Hitachi trains.
  4. I suspect some services will swap their diesel generators for batteries.

Battery-power would allow some services to be zero-carbon, even when using the GNGE diversion.

 

 

 

 

September 22, 2025 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Would A Train Manufacturer Save CrossCountry’s Iconic Aberdeen And Penzance Route?

The article in The Times about the cancelling of CrossCountry’s iconic Aberdeen and Penzance route was entitled After 104 Years UK’s Longest Train Route Is Cancelled For Ever, I gave my post the same name and both received a number of nostalgic comments, from those, who had ridden the route or wished they had.

The Characteristics Of The Line

This article on the BBC is entitled We Had To Be On Last Run Of UK’s Longest Train Route.

This is said in the BBC article.

The connection – first established back in 1921 – is 775 miles (1,247km) long.

But electrification is rather thin on the ground.

Between Leeds and Edinburgh stations is electrified and I suspect that some of the route through Birmingham New Street and Bristol Parkway stations are also electrified, so perhaps, a battery-electric train could get a top-up on the way.

But as Leeds and Edinburgh is around 220 miles, there’s about 550 miles of the route or 70 % without electrification.

Battery Power, Hydrogen Power Or Both?

If diesel is ruled out on environmental grounds, it means that only battery or hydrogen power could be used for the route.

Despite some of the progress made by battery-electric trains in the last few years, I feel that unless the route has a large number of charging stations, then battery-electric trains will not be a practical solution.

This is a paragraph from The Times article.

Rail bosses said one of the reasons for ending the train was the difficulty keeping such a long journey on time. The fact that most customers made only short journeys along the route was also a consideration.

And this is another.

As an “express” service it was severely challenged, partly because of the long waits at a number of stations along the way, including 14 minutes at both Edinburgh Waverley and Bristol Temple Meads, and seven minutes at Birmingham New Street and Exeter St Davids.

Stopping regularly to charge the batteries, is going to make timekeeping more difficult and will probably end up with irritable passengers, after all the waiting.

So I suspect, hydrogen would be the ideal power for such a long service over a route with such sparse electrification.

But the trains, would be fitted with regenerative breaking to battery, so that kinetic energy is conserved as much as possible in the station stops.

I believe, that the trains should effectively be tri-mode or hydrogen-hybrid trains, but then many drivers praise the frugality of their hybrid cars.

Would Efficient Hydrogen-Hybrid Trains Attract More Passengers?

Consider.

  • All the battery and hydrogen trains and buses, with one exception, that I have ridden on, have been mouse-quiet.
  • The exception was a German hydrogen train, that had a very noisy mechanical transmission.
  • I also would expect that the trains would be capable of keeping up a cruising speed of 100 mph or perhaps even 125 mph.
  • This would enable them to handle the current timetable, which is written for 125 mph Class 222 diesel trains.

An efficient, unobtrusive, reliable and speedy service would surely attract passengers.

What’s In It For The Manufacturer?

Consider.

  • There are not many 775 mile routes in the UK.
  • But, there are many long rail around the world, that need decarbonising or even creating.
  • Some countries, like China, India and France are creating more electrified high speed long-distance lines.
  • Others countries, like Australia and the United States are planning and building high speed long-distance lines.

Perhaps, what is needed is a drop-in solution to decarbonise and/or create new high speed long-distance railways.

Could Aberdeen and Penzance be an ideal test bed to trial and demonstrate, your drop-in hydrogen solution?

I am reminded of a story, told to me, by a guy, who was selling an expensive air traffic control radar to an Arab state.

The initial presentations were done in the company’s offices in London.

The only working radar was installed at Prestwick Airport and had been working successfully for a couple of years, so the Arabs would be taken on a visit.

As they were very important clients, the salesman was told, that he was entitled to borrow the chairman’s executive jet for the trip.

The flight to Scotland was uneventful, but as they left the plane, the pilot said to the salesman. “There’s no finer view, than the Scottish Highlands at this time of year, I could fix it, that I gave them the view of a lifetime on the way home.”

After thinking about it for a few seconds, the salesman asked the pilot to fix it.

When they returned to the plane after a successful demonstration, the pilot said. “It’s on if you want it?”

The tale had a very happy ending, in that the Arabs bought an Air Traffic Control radar.

To return to the hydrogen trains; What better route is there to show off the capabilities of your high speed hydrogen-hybrid trains?

  • There is the spectacular scenery of the North of Scotland, The Pennines and Cornwall.
  • The Firth of Forth is crossed on the Forth Rail Bridge.
  • There is running on the wires between Edinburgh and Leeds.
  • There is the spectacular views of Durham and York from the train.
  • There will be several hours of running on hydrogen.
  • The Saltash Bridge is crossed.

What better route is there to sell trains?

Could CrossCountry Customer Service Be Improved?

I’ve never done a long journey on CrossCountry.

But surely, if the trains were designed for the route and the manufacturer was showing them off, the trains could have a top-of-the-range specification and high-quality service?

If you’re going to be stuck on a train for over a dozen hours the service must be good.

Conclusion

Get everything right and the train service would be an unquestionable asset to the UK and extremely good for the manufacturer.

May 17, 2025 Posted by | Hydrogen, Transport/Travel | , , , , , , , , , , , , | Leave a comment

After 104 Years UK’s Longest Train Route Is Cancelled For Ever

The title of this post, is the same as that of this article on The Times.

These three paragraphs describe the last journey.

With a muted fanfare the UK’s longest train rolled out of Aberdeen on Friday morning for its final sojourn down to Penzance, ending a service that connected both ends of the country for more than 100 years.

The 8.20am CrossCountry train took 13 hours and 20 minutes, with stops at 35 stations along the way, to cover the 774-mile route. Passengers spent more than two hours of the journey in the stations.

The service, which was launched in 1921, headed south through York, Bristol, Taunton and Truro on its way past some of the country’s finest landscapes, and arrived in Penzance at 9.31pm.

Looking at a ticket site and it appears that by using two trains from Aberdeen to King’s Cross and Paddington to Penzance you can be a few minutes faster, if you know your Underground.

This route will get quicker.

  • As the East Coast Main Line rolls out its new digital signalling, this should speed up trains, by allowing some running at 140 mph instead of the current 125 mph.
  • LNER will also be bringing their new tri-mode (electric/battery/diesel) trains into service, which could give some speed improvements on the diesel section North of the Forth Bridge in terms of speed and ride noise, especially as ScotRail will be partially electrifying part of this section.
  • GWR should also be upgrading some of their fleet to tri-mode, which should improve speed and ride noise on the sections, where the route is not electrified.
  • CrossCountry could compete, by buying new trains, but it would be a big financial risk, as the London route should get quicker, as track improvements and increased use of digital signalling speed up services from London to Aberdeen and Penzance.

CrossCountry ‘s owner; Arriva isn’t standing still, but have applied for extra Grand Central open access services on the East Coast Main Line to Scunthorpe and Cleethorpes and a new service from Newcastle to Brighton via Birmingham, which will partly fill the gap caused by the loss of the Aberdeen and Penzance service, by linking with GWR at Reading and LNER at Newcastle.

May 16, 2025 Posted by | Transport/Travel | , , , , , , , , , , , , , , | 4 Comments