The Anonymous Widower

Improving The North Throat Of York Station Including Skelton Bridge Junction

On the thirty mile stretch of the East Coast Main Line, between York and Northallerton stations, the route is mainly four tracks.

But three miles North of York there is Skelton Bridge over the River Ouse, which is shown in this Google Map.

Zooming closer, I clipped this second Google Map.

Note.

  1. There are actually two bridges over the River Ouse.
  2. The East bridge is a double-track bridge and is the original stone arch bridge.
  3. The West bridge was added later and I suspect has little architectural merit.
  4. The tracks on both sides of the bridge are extremely complicated.

If you look at the timings, trains seem to take one of two timings between York and Northallerton.

  • 17-18 minutes, which is almost an average speed of 100 mph.
  • 27 minutes, which is 67 mph.

Incidentally, one of Drax’s long biomass trains managed a time of 27 minutes.

Would going faster save any minutes?

  • A 110 mph average would give a time of 16.4 minutes
  • A 120 mph average would give a time of 15 minutes
  • A 125 mph average would give a time of 14.4 minutes
  • A 140 mph average would give a time of 12.9 minutes

On the face of it, it doesn’t appear that there are very large time savings, to be achieved.

On the other hand, if all trains can pass through Skelton Bridge and its complicated junction, without slowing, delays will be minimised and timetables can be faster.

But there is an anomaly in all the express trains that pass through York station. All stop, except those planned for East Coast Trains. In fact, their trains won’t stop between Stevenage and Newcastle.

The obvious solution to the Skelton Bridge problem, is to do what British Rail didn’t have the courage to do, when they electrified the East Coast Main Line in the 1980s. And that is to demolish the bridge and build a stylish modern four-track bridge!

It would eliminate many of the things, that could go wrong and would surely improve reliability. This could help to maintain a higher operating speed.

But would it be allowed by the Planning Authorities and the Heritage Taliban?

Hopefully, it doesn’t matter!

  • I am a Control Engineer and mathematical modeller, who has programmed some immensely complex systems in the last fifty-five years.
  • I have also flown light aircraft on instruments for many hours, where you control the plane according to what Air Traffic Controllers and the instruments tell you.

My experience tells me that, it would be possible to control a busy junction, like Skelton Bridge safely, by a well-programmed computer system helping the driver, arrive at the junction at the right time to go straight through.

I also believe that if modern in-cab digital ERTMS signalling can handle twenty-four tph on Thameslink going to and from scores of stations, then it can handle Skelton Bridge Junction.

In Could ERTMS And ETCS Solve The Newark Crossing Problem?, I proposed a similar solution to the problem at Newark.

November 24, 2021 Posted by | Transport/Travel | , , , , , , | 4 Comments

Northern Powerhouse Rail – Significant Upgrades Of The East Coast Main Line From Leeds To Newcastle (Via York And Darlington) And Restoration Of The Leamside Line

In this article on Transport for the North, which is entitled Northern Powerhouse Rail Progress As Recommendations Made To Government, one of the recommendations proposed for Northern Powerhouse Rail is significant upgrades to the East Coast Main Line and reopening of the Leamside Line.

Northern Powerhouse Rail’s Objective For The Leeds and Newcastle Route

Wikipedia, other sources and my calculations say this about the trains between Leeds and Newcastle.

  • The distance between the two stations is 106 miles
  • The current service takes around 85 minutes and has a frequency of three trains per hour (tph)
  • This gives an average speed of 75 mph for the fastest journey.
  • The proposed service with Northern Powerhouse Rail will take 58 minutes and have a frequency of four tph.
  • This gives an average speed of 110 mph for the journey.

This last figure of 110 mph, indicates to me that a faster route will be needed.

These are example average speeds on the East Coast Main Line.

  • London Kings Cross and Doncaster – 156 miles – 98 minutes – 95.5 mph
  • London Kings Cross and Leeds – 186 miles – 133 minutes – 84 mph
  • London Kings Cross and York  – 188.5 miles – 140 minutes – 81 mph
  • London Kings Cross and Hull – 205.3 miles – 176 minutes – 70 mph
  • York and Newcastle – 80 miles – 66 minutes – 73 mph

I also predicted in Thoughts On Digital Signalling On The East Coast Main Line, that with full digital in-cab ERTMS signalling and other improvements, that both London Kings Cross and Leeds and York would be two-hour services, with Hull a two-and-a-half service.

  • London Kings Cross and Leeds in two hours would be an average speed of 93 mph.
  • London Kings Cross and York in two hours would be an average speed of 94.2 mph.
  • London Kings Cross and Hull in two-and-a-half hours would be an average speed of 94.2 mph.

I am fairly certain, that to achieve the required 110 mph average between Leeds and Newcastle to meet Northern Powerhouse Rail’s objective of four tph in under an hour will need, at least the following.

  • Full digital in-cab ERTMS signalling
  • Completion of the electrification between Leeds and York.
  • Ability to run at up to 140 mph in places.
  • Significant track upgrades.

It could also eliminate diesel traction on passenger services on the route.

High Speed Two’s Objective For The York and Newcastle Route

At the present time, High Speed Two is not planning to run any direct trains between Leeds and Newcastle, so I’ll look at its proposed service between York and Newcastle instead.

  • Current Service – 80 miles – 66 minutes – 73 mph
  • High Speed Two – 80 miles – 52 minutes – 92 mph

Note.

  1. High Speed Two will be running three tph between York and Newcastle.
  2. Northern Powerhouse Rail have an objective of 58 minutes for Leeds and Newcastle.

High Speed Two and Northern Powerhouse Rail do not not have incompatible ambitions.

Current Direct Leeds And Newcastle Services

These are the current direct Leeds and Newcastle services.

  • TransPennine Express – 1 tph – Liverpool Lime Street and Edinburgh
  • TransPennine Express – 1 tph – Manchester Airport and Newcastle.
  • CrossCountry – 1 tph – Plymouth and Edinburgh

Timings appear to be between 81 and 91 minutes.

What Would A Leeds And Newcastle In Under An Hour Do For London Kings Cross And Edinburgh Timings?

This question has to be asked, as a 58 minute time between Leeds and Newcastle will mean that timings between York and Newcastle must reduce.

York And Newcastle at various average speeds give the following times.

  • 73 mph (current average) – 66 minutes
  • 80 mph – 60 minutes
  • 90 mph – 53 minutes
  • 92 mph – 52 minutes (High Speed Two promise)
  • 100 mph – 48 minutes
  • 110 mph – 44 minutes

If any speed over 90 mph can be averaged between York and Newcastle, this means that with a London and York time of under two hours the following times are possible.

  • London Kings Cross and Newcastle in under three hours. – High Speed Two are promising two hours and seventeen minutes.
  • London Kings Cross and Edinburgh in under four hours. – High Speed Two are promising three hours and forty minutes.

Consider.

  • An InterCity 225 achieved a time of under three-and-a-half hours between London and Edinburgh. in 1991.
  • That record journey was at an average speed of 112 mph.
  • There must be opportunities for speed improvements North of Newcastle.
  • Train and signalling technology is improving.
  • High Speed Two is promising three hours and forty minutes between London and Edinburgh.

I can see a fascinating rivalry between trains on High Speed Two and the East Coast Main Line, developing, about who can be faster between London and Edinburgh.

Current Projects Between Leeds And Newcastle

These projects are in planning or under way on the section of the East Coast Main Line between Leeds and Newcastle.

Phase 2 Of The East Coast Main Line Power Supply Upgrade

Phase 1 between London and Doncaster should have been completed, if the covids allowed and now work can be concentrated on Phase 2 to the North of Doncaster.

This page on the Network Rail web site describes the project. These paragraphs are the introduction to Phase 2.

Phase 2 of the project will involve the installation of feeder and substations along the route, capacity upgrades, new 132kv connection at Hambleton junction and upgrades to existing power supply connections.

The second phase of the project is currently in design stages and dates for carrying out the work are still being finalised.

Phase 2 will be delivering upgraded power to the East Coast Mainline railway between Bawtry and Edinburgh.

This project may not improve speeds on the railway, but it will certainly improve reliability and reduce the use of diesel power.

I do wonder, that as the reliability of the East Coast Main Line increases, this will reduce the need for the electric Class 801 trains, to have diesel engines for when the power supply fails.

It is known, that the Class 803 trains, that are under construction for East Coast Trains, will have only a small battery for emergency use.

A sensible weight saving would surely improve the acceleration and deceleration of the trains.

York to Church Fenton Improvement Scheme

This page of the Network Rail web site, describes the project. These paragraphs introduce the project.

Our work between York and Church Fenton is in preparation for the Transpennine Upgrade, which will provide more capacity and faster journeys between Manchester Victoria and York, via Leeds and Huddersfield.

The five mile stretch between Church Fenton and Colton Junction – the major junction where trains from Leeds join the East Coast Main Line towards York – sees over 100 trains each day, with up to one freight or passenger train passing through every five minutes. This is one of the busiest stretches of railway in the North.

The work will include.

  • Modernising the signalling.
  • Replacing about five miles of track between Holgate (York) and Colton Junction.
  • Completing the eleven miles of electrification between York and Church Fenton stations.

I estimate that when the project is completed, there will be only around thirteen miles of track without electrification between Church Fenton station and Neville Hill TMD in Leeds.

The route between Church Fenton and Garforth stations, is shown in this map clipped from High Speed Two.

Note.

  1. York is just off the North-East corner of the map.
  2. Garforth is in the South-West corner of the map.
  3. Shown in orange is the new route of High Speed Two from East of Leeds towards York.
  4. Shown in blue is existing tracks, that will be used to take High Speed Two Trains to York and further North.
  5. The rail line running North-South on the edge of the map is the Selby Diversion, which opened in 1983 and  was built to avoid possible subsidence from the Selby coalfield.
  6. The pre-Selby Diversion route of the East Coast Main Line goes South from the join of the blue and orange sections of High Speed Two.
  7. At Church Fenton station, this route splits, with one route going West through Micklefield, East Garforth and Garforth stations to Neville Hill TMD and Leeds.
  8. The main road going North-South is the A1 (M).

It seems to me, that High Speed Two’s and Northern Powerhouse Rail’s plans in this area, are still being developed.

  • There has been no decision on the electrification between Church Fenton and Neville Hill TMD.
  • How do Northern Powerhouse Rail trains go between Leeds and Hull?
  • How do Northern Powerhouse Rail trains go between Leeds and York?
  • How do High Speed Two trains go between Leeds and York?

I suspect, when the full plans are published, it will answer a lot of questions.

Darlington Station Remodelling

A remodelling of Darlington station is under consideration.

I outlined this in £100m Station Revamp Could Double Local Train Services.

This was my conclusion in the related article.

I think that this will happen.

    • The Tees Valley Line trains will be greatly improved by this project.
    • Trains will generally run at up to 140 mph on the East Coast Main Line, under full digital control, like a slower High Speed Two.
    • There will be two high speed platforms to the East of the current station, where most if not all of the High Speed Two, LNER and other fast services will stop.
    • There could be up to 15 tph on the high speed lines.

With full step-free access between the high speed and the local platforms in the current station, this will be a great improvement.

It will create a major interchange, where high speed trains from High Speed Two, LNER and Northern Powerhouse Rail will do the following.

  • Approach at 140 mph or more.
  • Perform a controlled stop in the station.
  • Drop and pick-up passengers.
  • Accelerate back up to linespeed.

The station stop will be highly-automated and monitored by the driver.

One of the objectives would be to save time for all fast trains.

Capacity And Other Problems Between Leeds And Newcastle Listed In Wikipedia

These problems are listed in a section called Capacity Problems in the Wikipedia entry for the East Coast Main Line.

The North Throat Of York Station Including Skelton Bridge Junction

I describe this problem and my solution in Improving The North Throat Of York Station Including Skelton Bridge Junction.

Use Of The Leamside Line

Wikipedia says this about capacity to the South of Newcastle.

South of Newcastle to Northallerton (which is also predominately double track), leading to proposals to reopen the Leamside line to passenger and freight traffic.

I could have included it in the previous section, but as it such a important topic, it probably deserves its own section.

Looking at maps, reopening is more than a a possibility. Especially, as reopening is proposed by Northern Powerhouse Rail and mentioned in the title of this post.

I discussed the Leamside Line in detail in Boris Johnson Backs Station Opening Which Could See Metro Link To County Durham, which I wrote in June this year.

These are some extra thoughts, that update the original post.

Ferryhill Station

I was prompted to write the related post, by something Boris Johnson said at PMQs and it was mainly about Ferryhill station.

In the latest copy of this document on the Government web site, which is entitled Restoring Your Railway: Successful Bids, a new station at Ferryhill has been successful. Another bid in the same area to restore rail services between Consett and Newcastle has also been successful.

This map shows the East Coast Main Line as it goes North South between Durham and Darlington.

Note.

  1. Ferryhill is in the South-West of the map opposite the sand-pits in the South-East
  2. The East Coast Main Line runs North-South between the village an d the sand-pits.
  3. Follow the railway North and you come to Tursdale, where there is a junction between the East Coast Main Line and the Leamside Line.
  4. The East Coast Main Line goes North-Westerly towards Durham and Newcastle.
  5. The Leamside Line goes North to Washington and Newcastle.
  6. There is also the Stillington Freight Line going South-Easterly to Sedgefield and Stockton from Ferryhill.

Could Ferryhill be a useful interchange to local services connecting to Newcastle, Sunderland and Washington in the North and Hartlepool, Middlesbrough and Stockton in the South?

The Leamside Line As An East Coast Main Line Diversion

I didn’t discuss using the line as a diversion for the East Coast Main Line in my original post, but if the infrastructure is to the required standard, I don’t see why it can’t take diverted traffic, even if it is also used for the Tyne and Wear Metro.

It should be remembered, that to create extra capacity on the East Coast Main Line between Peterborough and Doncaster, the route of the Great Northern and Great Eastern Joint Railway, was upgraded. I first wrote about this line six years ago in Project Managers Having Fun In The East and the route seems to be working well. It is now being augmented by the addition of the £200 million Werrington Dive Under. See Werrington Dive-Under – 8th November 2018, for more details of this project, which will speed up all trains on the East Coast Main Line.

After the undoubted success of the upgrade  of the Great Northern and Great Eastern Joint Railway, surely the team responsible for it, should be given the task of devising a similar plan for the Leamside Line, to take pressure off the East Coast Main Line between Newcastle and Northallerton.

Sharing The Leamside Line

The Tyne and Wear Metro also has its eyes on the Leamside Line for an extension.

It should be noted that the Extension To Wearside, uses the Karlsruhe Model to allow the Metro trains to share with freight and other passenger trains.

The new Stadler trains will probably make this even easier, so I wouldn’t be surprised to see a reopened Leamside Line handling a varied assortment of trains of all types.

The Sunderland Example

Sunderland station is a station, which has both Metro and mainline services from the same platforms.

Could a station at Washington be built to similar principles, so that some long distance services to Newcastle used this station?

A Terminal Station On The Leamside Line

Newcastle station may be a Grade One Listed station, but it is built on a curve and would be a nightmare to expand with more platforms.

Sunderland station is already used as a terminal for London trains, so would it be sensible to provide a terminal at somewhere like Washington?

My Final Thought  On The Leamside Line

Reopen it!

A Few Random Final Thoughts

This post has got me thinking.

Newcastle Station Capacity

I have seen reports over the years that Newcastle station, is lacking in capacity.

  • There could be extra services, as High Speed Two is proposing two tph from London Euston stations and one tph from Birmingham Curzon Street station.
  • There may be extra services because of Northern Powerhouse Rail, which has an objective of four tph from Leeds station.
  • There may be extra services because of new services to Ashington and Blyth.
  • There may be extra services because of new services to Consett.

Note.

  1. The first two services could use two hundred metre long trains.
  2. Some platforms can accept 234 metre long Class 800 trains.
  3. The last two services might use the Metro platforms.

As the station has twelve platforms, I feel with careful operation, that the station will have enough capacity.

This Google Map shows the station.

And this second Google Map shows the station, its position with relation to the Tyne and the lines rail routes to and from the station.

Note.

  1. Trains from the South arrive over the King Edward VII Bridge and enter Newcastle station from the West.
  2. Trains from England to Scotland go through the station from West to East and then go straight on and turn North for Berwick and Scotland.
  3. Next to the King Edward VII Bridge is the blue-coloured Queen Elizabeth II Bridge, which takes the Tyne and Wear Metro across the Tyne, where it uses two platforms underneath Newcastle station.
  4. The next bridge is the High Level Bridge, which connects the East end of the station to the rail network, South of the Tyne. It connects to the Durham Coast Line to Teeside and the Leamside Line.

History has delivered Newcastle a comprehensive track layout through and around Newcastle station.

  • Services from the East can be run back-to-back with services from the West.
  • The Metro and its two underground platforms removes a lot of traffic from the main station.
  • There are seven through platforms, of which at least three are over two hundred metres long.
  • There are four West-facing bay platforms and one facing East.

But most intriguingly, it looks like it will be possible for trains to loop through the station from the South, by perhaps arriving over the King Edward VII bridge and leaving over the High Level bridge. Or they could go the other way.

Could this be why reoopening the Leamside Line is important?

LNER’s Extra Paths

The sentence, from an article entitled LNER Seeks 10 More Bi-Modes, in the December 2020 Edition of Modern Railways   indicates that more capacity will be available to LNER.

Infrastructure upgrades are due to prompt a timetable recast in May 2022 (delayed from December 2021) from which point LNER will operate 6.5 trains per hour, out of Kings Cross, compared to five today.

I suspect that LNER could use the half path to run a one train per two hour (tp2h) service to Hull.

  • Currently, London Kings Cross and Hull takes a few minutes under three hours.
  • Currently, Doncaster and Hull takes around 55 minutes.
  • I have estimated that once full digital in-cab signalling is operational, that London Kings Cross and Hull could take a few minutes under two-and-a-half hours.

The full path to Hull could be shared with Hull Trains to provide an hourly service between London Kings Cross and Hull.

LNER could do something special with the full extra path.

Consider.

  • Some train operating companies have said, that they’ll be looking to attract customers from the budget airlines.
  • There could be a need for more capacity between London Kings Cross and all of Edinburgh, Leeds and Newcastle.
  • Faster services would be attractive to passengers.
  • York and Leeds will be fully electrified or trains could be fitted with batteries to bridge the thirteen mile gap in the electrification.

A limited-stop service between London Kings Cross and Edinburgh via Leeds could be an interesting addition.

  • The train would only stop at Leeds and possibly Newcastle.
  • One objective would be a time under three-and-a-half hours between London Kings Cross and Edinburgh.
  • What time could be achieved between London Kings Cross and Leeds?

It would certainly give High Speed Two a run for its money!

A New Elizabethan

I can remember The Elizabethan, which was a steam-hauled non-stop express between London and Edinburgh between 1953 and 1961.

I have laid out my ideas for a modern express train of the same name in A New Elizabethan.

It could be an interesting concept, to increase capacity between London and Edinburgh.

As I indicated in the previous section, LNER certainly have a path, that could be used to their advantage.

High Speed Two

The East Coast Main Line and High Speed Two have a lot in common.

  • The two routes will share tracks between a junction near Ulleskelf station and Newcastle station.
  • High Speed Two Classic Compatible trains could be based on Hitachi AT-300 train technology.
  • High Speed Two Classic Compatible trains would probably be able to run on the East Coast Main Line between London Kings Cross And Edinburgh.
  • Trains from both routes will share platforms at York, Darlington, Durham and Newcastle stations.
  • I would hope that the signalling systems on both routes are compatible.

From a project management point of view, this commonality means that in an ideal world the new route of both High Speed Two and Northern Powerhouse Rail, and the upgrades to the East Coast Main Line should be planned together.

I believe there are still details on the design of the joint route, that have not been disclosed, or perhaps not even decided.

  • Will between Church Fenton station and Neville Hill depot be electrified?
  • How will Northern Powerhouse Rail connect Leeds and Hull stations?
  • How will Northern Powerhouse Rail connect Leeds and York stations?
  • Will High Speed Two connect Leeds and York stations?
  • What will be the operating speed of the joint section of the East Coast Main Line?
  • What will be the capacity in trains per hour of the joint section of the East Coast Main Line?
  • Will Newcastle station need an extra platform to handle three High Speed Two tph from London Euston

Two projects have been discussed in this post.

  • The unlocking of the bottleneck at Skelton Bridge.
  • The reopening of the Leamside Line.

I feel that these projects are important and will probably be needed for efficient operation of High Speed Two.

Other early projects could include.

  • Upgrading and electrification of the chosen route between Leeds and Hull,
  • Installation of the chosen system of in-cab ERTMS digital signalling on the route.
  • Electrification between Church Fenton station and Neville Hill depot.

I would deliver these and other joint projects early, so that travellers see a positive benefit from High Speed Two before the main work has even started.

High Speed East Coast

I wonder what is the maximum speed of the Class 80x trains, that are the backbone of services on the East Coast Main Line.

Consider.

  • It is known, that with in-cab digital ERTMS  signalling, these trains will be capable of 140 mph, but could they go even faster.
  • High Speed Two Classic Compatible trains will be capable of 225 mph.
  • Will Hitachi’s offering for these trains, be based on the Class 80x trains?

I would think, that it is fairly likely, that the existing Class 80x trains could be updated to an operating speed in the range of 150-160 mph.

In Thoughts On Digital Signalling On The East Coast Main Line, I said this.

The combined affect of both track and signalling improvements is illustrated by this simple calculation.

    • As Dalton-on-Tees is North of Doncaster, the route between Woolmer Green and Doncaster should be possible to be run at 140 mph
    • Woolmer Green and Doncaster stations are 132.1 miles apart.
    • Non-stop York and London Kings Cross trains are currently timed at 70 minutes between Doncaster and Woolmer Green stations.
    • This is an average speed of 113.2 mph.

If 140 mph could be maintained between Doncaster and Woolmer Green, the section of the journey would take 56.6 minutes, which is a saving of 13.4 minutes.

I can do this calculation for higher speeds.

  • 150 mph would take 52.8 minutes
  • 160 mph would take 49.5 minutes
  • 170 mph would take 46.6 minutes
  • 180 mph would take 44 minutes
  • 200 mph would take 39.6 minutes

Note.

  1. Eurostar’s latest Class 374 trains are capable of operating at 200 mph.
  2. A Class 395 train, which is closely related to the Class 80x trains, has attained a record speed of 157 mph.

There may be worthwhile time savings to be made, on some of the straighter sections of the East Coast Main Line.

Other improvements will also be needed.

Note, that I am assuming, that the Digswell Viaduct section would not be updated, as it would cause too much disruption.

I also believe that by using selective joining and splitting at Edinburgh, Leeds and perhaps Doncaster, Grantham, Newark or York, that a very comprehensive network of direct trains to and from London can be built from Grantham Northwards.

Beverley, Bradford, Cleethorpes, Glasgow, Grimsby, Harrogate, Huddersfield, Hull, Lincoln, Middlesbrough, Nottingham, Perth, Redcar, Sheffield, Skipton, Sunderland and Washington could all be served at an appropriate frequency.

  • Some like Bradford, Glasgow, Harrogate, Hull, Lincoln and Middlesbrough would have several trains per day.
  • Others might have a much more limited service.

What sort of timings will be possible.

  • London Kings Cross and Doncaster could be around an hour.
  • London Kings Cross and Leeds could be around one hour and thirty minutes, using the current Doncaster and Leeds time, as against the one hour and twenty-one minutes for High Speed Two.
  • London Kings Cross and York could be around one hour and twenty-three minutes, using the current Doncaster and York time, as against the one hour and twenty-four minutes for High Speed Two.
  • Timings between York and Newcastle would be the same fifty-two minutes as High Speed Two, as the track will be the limitation for both services.
  • High Speed Two’s timing for York and Newcastle is given as fifty-two minutes, with York and Darlington as twenty-five minutes.
  • London Kings Cross and Darlington could be around one hour and forty-nine minutes
  • London Kings Cross and Newcastle could be around two hours and sixteen minutes.
  • London Kings Cross and Edinburgh would be under three-and-a-half hours, as against the proposed three hours and forty-eight minutes for High Speed Two.

High Speed East Coast would be a serious and viable alternative to High Speed Two for the Eastern side of England and Scotland.

Conclusion

This is an important joint project for Northern Powerhouse Rail, High Speed Two and the East Coast Main Line.

Project Management Recommendations

This project divides neatly into several smaller projects..

  • Upgrade the power supply on the East Coast Main Line.
  • Finish the York to Church Fenton Improvement Scheme
  • Remodel Darlington station.
  • Install of in-cab ERTMS digital signalling.
  • Complete the electrification between Neville Hill TMD and York.
  • Solve the problem of Skelton Bridge and its complicated track layout.
  • Reopen the Leamside Line.

Most of these projects are independent of each other and all would give early benefits to the East Coast Main Line.

When complete, we’ll see the following timing improvements.

  • Leeds and Newcastle will drop from 85 minutes to 56 minutes, with an increase in frequency from three to four tph.
  • York and Newcastle will drop from 57-66 minutes to 52 minutes.
  • There could be ten minutes savings on Edinburgh services.

Passengers and operators would welcome this group of projects being started early.

 

 

 

 

November 30, 2020 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , , , , , , , | 5 Comments

Beeching Reversal – Upper Wensleydale Railway

This is one of the Beeching Reversal projects that the Government and Network Rail are proposing to reverse some of the Beeching cuts.

This map from the Upper Wensleydale Railway web site, shows the location of the proposed reinstated railway.

This is the vision of how the railway will be used, taken from the web site.

It is hoped that a reinstated junction with the existing  Leeds – Settle – Carlisle railway line at Garsdale will allow ‘through’ trains to run from Hawes via Garsdale Junction, past the Yorkshire Three Peaks to Settle, then onwards through Hellifield and Clitheroe into Lancashire for Preston and Greater Manchester.

We are also hoping that some Manchester – Blackburn – Clitheroe trains can be extended to Garsdale and Hawes thereby linking Lancashire to an enhanced service through Settle to the Yorkshire Peaks and Dales.

Connections with other trains could be made at Hellifield (for West Yorkshire & Lancaster) and at Garsdale (for Carlisle, Scotland & the North East of England).

This Google map shows the current state of the railways at Garsdale.

Note.

  1. Garsdale station in the South-West corner of the map.
  2. The Settle and Carlisle Line curving away to the North over the Dandry Mire Viaduct.
  3. The trackbed of the former branch to Hawes stands out as a green scar.

I have followed the route of the railway to Hawes in my helicopter and it doesn’t appear to be a very challenging project to reinstate.

  • Although the comprehensive Routes and Structures page on the Upper Wensleydale Railway, indicates there is a lot to do.
  • It is about six miles long.
  • It is single track with a passing loop at Hawes.

This Google Map shows the town of Hawes,

It certainly looks the sort of place, where Wallace and Gromit might rent a cottage for a week and use as a base to explore the countryside.

  • There’s a Wensleydale Creamery.
  • There’s a traditional ropemaker called Outhwaite, dating from 1905, who have the web site; www.ropemakers.com.
  • The headquarters of the Yorkshire Dales National Park Authority are located in the North of the town and shown by a green arrow.

Next to the Park Authority is a blue arrow marking the Dales Countryside Museum, which incorporates the original Hawes railway station.

Services To Hawes

Looking at the data from Real Time Trains, it looks like trains on the Settle and Carlisle average about fifty mph on that line, which is generally double-track with an operating speed of sixty mph.

  • I would estimate that a modern diesel or hydrogen-powered train could do the return trip between Garsdale and Hawes station in around thirty minutes.
  • This time would probably mean that the Hawes Branch could be worked with only one train operational on the branch.
  • It would also fit in well with the service plans for the Upper Wensleydale Railway.

I am fairly certain that an hourly service could be run between Hawes and Hellifield stations, which could be extended as far South as the operator wanted.

Military Traffic To Redmire

In the Wikipedia entry for Redmire village, this is said.

Redmire is the terminus of the Wensleydale Railway. The Ministry of Defence uses trains to transport armoured vehicles from bases in the south to the Catterick military area using Redmire railway station as its terminus.

It looks like there must be a quality railway between Redmire station and the East Coast Main Line at Northallerton.

This Google Map shows the site of Redmire station.

Note.

  1. At the left hand side of the map, there look to be loading ramps for the military vehicles, at the end of two sidings.
  2. The building on the North side of the tracks appears to be the old Redmire station buildings.
  3. The blue dot to the right, is a Google Maps pointer for the station

If you type Redmire into Google Maps, it’s easy to find..

This Google Map shows the rail lines at Northallerton.

Note.

Northallerton station in the South-East corner of the map.

The East Coast Main Line runs about West-by-North from the station towards Darlington and Scotland.

The line to Middlesbrough branches off in a North-Easterly direction.

The Wensleydale Railway comes in from the West and joins the East Coast Main Line going North.

It also appears there used to be a tight chord that allowed trains to go between the Wensleydale Railway and the South.

It looks like the Army would like that chord for their vehicle trains.

This enlarged Google Map, shows the site of the chord.

It looks to me, that it was once a chord, but now it’s a substantial wood.

A Bigger Plan

In the Wikipedia entry for the Wensleydale Railway, there is a section, which is entitled Upper Wensleydale Railway, where this is said.

In late 2019/early 2020, a separate company was formed to campaign to reinstate the line between Hawes and Garsdale. The groups’ objective is to have a timetabled year-round service run by a train operating company, rather than a heritage service. This scheme was shortlisted for funding in the second round of the government’s Reverse Beeching Fund, in June 2020.

These are my thoughts on various topics.

The Eastern Terminal

There are three possible Eastern terminals.

  • Northallerton
  • Middlesbrough – There is no connection to the Wensleydale Railway.
  • Darlington – Would probably mean slow trains on the East Coast Main Line.

I think we’re left with Northallerton and the tight connection, which requires the chord to be reinstated.

But, it does say in the Wikipedia entry for Northallerton station, that the station is the terminus for the proposed extended Wensleydale Railway.

This Google Map shows the Northern end of Northallerton station.

Would it be possible to sneak a line down the Western side of the East Coast Main Line and into a new bay platform at the station?

It would certainly allow trains from the Wensleydale Railway to terminate at Northallerton station.

The Western Terminal

As I said earlier, it’s the operator’s choice.

Personally, I would choose Blackburn station.

  • It’s about fifty miles from Gardale station.
  • There is a train depot at Blackburn.
  • Blackburn station is in the Town Centre.
  • Blackburn station has good rail connections to Blackpool, Liverpool, Leeds, Manchester and Preston.

Prior to COVID-19, I regularly stayed in the convenient Premier Inn next to the station.

Rolling Stock

The trains will have to be self-powered, as I don’t think the budget will run to electrification and much of the track-bed is owned by a heritage railway.

So that must mean the trains must be self-powered, which will mean either diesel, electric or hydrogen.

  • I think diesel can be ruled out, except as a stop-gap, we are going carbon-neutral on the railways by 2040.
  • Blackburn and Northallerton stations are too far for battery power.

So that means it must be hydrogen power.

But as, it appears that Teesside is going for hydrogen, as I wrote about in Fuelling The Change On Teesside Rails, that should be a convenient fuel.

The route might be a candidate for Vivarail’s Pop-up Metro concept, with fast charging at one or two, of any number of the stations.

Conclusion

I like this scheme, as it sorts a lot of problems.

I also think that there’s a fair chance, it will get the nod.

The local MP is the Chancellor of the Exchequer; Rishi Sunak and this could be a case of he who pays the piper, calls the tune!

July 4, 2020 Posted by | Hydrogen, Transport/Travel | , , , , , , , , , , , | 5 Comments

Northallerton Station To Go Step-Free

This document on the Government web site is entitled Access for All: 73 Stations Set To Benefit From Additional Funding.

Northalleron station is on the list.

This 3D Google Map shows the station.

Currently to cross the tracks, there is a subway with a steep ramp.

Installing Step-Free Access

In Winner Announced In The Network Rail Footbridge Design Ideas Competition, I wrote how the competition was won by this bridge.

So could a factory-built bridge like this be installed on the wide platforms?

April 10, 2019 Posted by | Transport/Travel | , , , | 1 Comment