The Anonymous Widower

Dewsbury Station

I broke my journey between Leeds and Huddersfield at Dewsbury station, where I had a very acceptable gluten-free pizza and a glass of cider.

I took these pictures of the station.

Note.

  1. There appears to be an avoiding line, through the station, which means that faster trains can pass slower ones stopped in the station.
  2. The station has a step-free bridge, but no toilets.
  3. The square outside the station has been recently landscaped.
  4. The station is Grade II Listed.
  5. The station has four TransPennine Express trains per hour (tph) in both directions.

Overall it is an excellent station with a touch of class, that probably deserves a few more trains.

Electrification

I cover possible electrification between Leeds and Huddersfield in Is There Going To Be Full Electrification Between Leeds And Huddersfield?.

Electrification as far as Leeds, which would offer faster acceleration and shorter station dwell times could offer the following.

  • The solution to the problems at Morley station. using longer and faster trains.
  • A faster journey time between Leeds and Huddersfield for the stopping trains.

Northern’s new Class 331 trains would probably do just fine.

If the stopping trains could run between Leeds and Huddersfield in perhaps twenty-five minutes, which may or may not be possible after the upgrade, just two trains would be needed for a two tph service.

I could see electrification opening up the following services on the electrified route, through Dewsbury.

  • Two tph – Leeds and Huddersfield – Stopping at all stations
  • One tph – Leeds and Wigan North Western – Stopping at all stations
  • Four tph – Leeds and Huddersfield – Stopping only at Dewsbury and other selected stations.

All except the Wigan service would be electric trains.

Conclusion

Dewsbury station is going to get a much-improved train service.

 

August 30, 2019 Posted by | Transport/Travel | , , , , , | Leave a comment

The Bridges At Mirfield

The tracks through Mirfield station are due to be upgraded as part of Network Rail’s £2.9billion project to upgrade the Huddersfield Linebetween Huddersfield and Dewsbury stations, that I wrote about in Network Rail Reveals Detailed £2.9bn Upgrade Plans For TransPennine Route.

This Google Map shows the railway bridges, a road bridge and the surrounding land.

These pictures show the bridges.

The bridge is in two parts and the original stone bridge is Grade II Listed. The entry on Historic England contains this description of the bridge.

Railway bridge. Circa 1840. Engineer George Stephenson, supervisor T. L. Gooch, for the Manchester and Leeds Railway. Rock-faced stone with rusticated dressings. Four segmental arches over river and a further five arches to west and two to east, all on bull-nosed abutments. String course at base of stone parapet. Later steel bridge on south side, not included in the item.

I suspect that it will be needed to be treated very sensitively, because of the age, the Listed status and the builder.

I also feel, that any work won’t be easy, due to the restricted site and the River Calder underneath.

I feel that the most likely track layout through Mirfield station will be the reduced four-track layout, that I found in this document on the Digital Railway web site is entitled Transpennine Route Upgrade SDO1 ETCS – Analysis.

Note.

  1. There are four tracks between Mirfield station and Heaton Junction, where trains go South-West towards Deighton and Huddersfield.
  2. The older stone bridge would appear to be carrying the slow trains and those going between Brighouse and Wakefielld.
  3. The steel bridge on the South side would appear to be carrying the fast trains.

It looks to me, that the track layout has been designed, so that the steel bridge can be replaced if required, without too much disruption.

The Weight Limit Of The Existing Bridges

TransPennine Express have bought a series of trains, that will be running over the existing bridges.

So they can’t be that weak!

Electrification

Electrification could be a problem on the older stone bridge, as it is the sort of project like the Steventon Bridge, that the Heritage Lobby like to attack!

August 30, 2019 Posted by | Transport/Travel | , , , | Leave a comment

From Green Gin To Sustainable Steel, Government Fires Up £140m Hydrogen Push

The title of this post, is the same as that of this article on Business Green.

The projects are wide ranging.

Green Gin

This is said about gin production by Orkney Distilling Ltd.

The successful projects feature a number of eye-catching initiatives, including the HySpirits project which has been awarded just under £200,000 to explore how the European Marine Energy Centre could work with local gin producer Orkney Distilling Ltd to convert its distillery from using liquid petroleum gas to hydrogen produced using renewable power.

I have been told that making whisky produces carbon dioxide. Does gin?

My source, also said carbon dioxide frpm Scotch whisky production has been used in the growing of soft fruit.

I found this article on The Courier, which is entitled Time To Cut Back On Whisky’s CO2 Emissions and this article on Scottish Capture and Storage, which is entitled Carbon Capture In The Heart Of The City.

Both are worth reading.

This is a paragraph from the second article.

The carbon capture process at this site is relatively simple, because the off gas from fermentation is already very pure in CO2. The process is not about enhancing CO2 concentration, but more about removing impurities. That involves a number of washing stages to remove water and impurities from the gas given off during fermentation, before it is compressed, stored, and eventually transported by road.

The article also says that the distillery produces four tonnes of carbon dioxide per day, which compared to the emissions of Chinese, Indian and United States coal-fired power stations is small beer, but it does show how in some industrial processes capturing the carbon dioxide can be relatively easy in some industrial processes and of a high quality for perhaps using in food and medical products.

But I can’t find a article connecting carbon dioxide from whisky to food production.

The Dolphyn Project

This is said about the Dolphyn Project.

A further £427,000 has been awarded to the Dolphyn project, which plans to mount electrolysers onto floating wind turbine platforms to produce hydrogen. One wind turbine alone has the potential to produce enough low carbon hydrogen to heat around 2,500 homes, fuel over 120-240 buses, or run eight to 12 trains,” the government said

I can’t find much on the Internet about this project, except this extract from this document on the Institution of Engineering and Technology web site, which is called Transitioning To Hydrogen.

The Deepwater Offshore Local Production of Hydrogen
(Dolphyn) project will consider large-scale retrofit
hydrogen production from offshore floating wind
turbines in deep water locations (Figure 19).

This is a partnership project led by ERM with Engie,
Tractebel Engie and ODE. The project looks to
utilise the vast UK offshore wind potential to power
electrolysers to produce hydrogen from the water the
turbines float on. Large 10MW turbines consisting of
desalinisation technology and PEM electrolysers will
feed hydrogen at pressure via a single flexible riser to
a sub-sea manifold with other turbines’ lines. The gas
is then exported back to shore via a single trunkline.
A 20-by-20 array array would have a 4GW capacity,
producing sufficient hydrogen to heat more then 1.5
million homes.

This project may include the offshore wind supply
of hydrogen supported with hydrogen from steam
methane reformation with carbon capture technology.
This project is well aligned to work the ACORN75
project at St Fergus.

Note that the project is talking about gigawatts of energy and providing enough hydrogen to heat millions of homes.

I think that the Dolphyn Project is badly named, as Google thinks you’re looking for projects about aquatic animals.

Gigastack

This is said about Gigastack.

Meanwhile, a consortium featuring Ørsted, ITM Power, and Element Energy is celebrating after securing just shy of £500,000 to help move forward with its Gigastack feasibility study, a six-month project to investigate the potential for delivering bulk, low-cost, and zero-carbon hydrogen.

There’s more here on this page on the ITM Power web site, where this is the first paragraph.

Project to demonstrate delivery of bulk, low-cost and zero-carbon hydrogen through gigawatt scale PEM electrolysis, manufactured in the UK.

As you’d expect from the name, they are looking at creating gigawatts of hydrogen.

Steel

This is said about steel.

The funding awards came as the government also launched a new call for evidence seeking views on how the government should structure and manage a planned £250m Clean Steel Fund. The government said the proposed fund would help the industry embrace clean technologies and move on to “a pathway that is consistent with the UK Climate Change Act” and its new net zero emission goal.

So what has hydrogen got to do with steel?

Search for hydrogen steelmaking on Google and you get lots of articles including this article from the Stockholm Environmental Institute, which is entitled Hydrogen Steelmaking For A Low-Carbon Economy.

This is a paragraph.

In the spring of 2016, three Swedish companies – LKAB (iron ore mining), SSAB (steel manufacturer) and Vattenfall (power utility) – announced their ambition to develop and implement a novel process for fossil-free steel production in Sweden. This process would use hydrogen (instead of coal) for the direct reduction of iron oxide/ore (H-DR), combined with an electric arc furnace (EAF). It would be almost completely fossil-free when the hydrogen is produced from electrolysis of water by use of renewable electricity. The concept is called Hydrogen Breakthrough Ironmaking Technology, or HYBRIT for short.

My knowledge of process engineering, tells me, that even if the Swedes don’t succeed, someone will and here in the UK, we’re ideally placed to take advantage, as we have the wind power to produce the hydrogen.

Conclusion

The future’s bright, the future’s green hydrogen!

, The North Sea can provide us with more than enough hydrogen, so long as the wind blows and there’s water to electrolyse..

August 30, 2019 Posted by | World | , , , , , , | Leave a comment

Upgrading Mirfield Station

Mirfield station is due to be upgraded as part of Network Rail’s £2.9billion project to upgrade the Huddersfield Line between Huddersfield and Dewsbury stations, that I wrote about in Network Rail Reveals Detailed £2.9bn Upgrade Plans For TransPennine Route.

This Google Map shows the station and the surrounding land.

These pictures show the station.

Currently, it is a three-station platform, with a wide island Platform 1/2 and a separate platform 3. The platforms are used as follows.

  • Platform 1 for all Eastbound trains.
  • Platform 2 for Westbound through trains.
  • Platform 3 for Westbound stopping trains.

This document on the Digital Railway web site is entitled Transpennine Route Upgrade SDO1 ETCS – Analysis.

It is mainly about using digital signalling called ETCS on the Transpennine Route, but it does give these track layouts between Huddersfield and Dewsbury.

This is the current layout.

This is a reduced four-track layout.

In Proposed Track Layouts Between Huddersfield And Dewsbury, I came to the conclusion, that the reduced four-track layout or something better could handle the current trains through the area.

If the reduced four-track layout is used, the requirements for a new Mirfield station can now be stated.

  • Platforms 1/2 sharing an island on the slow tracks.
  • Platforms 3/4 sharing an island on the fast tracks.
  • Some better shelters than at present.
  • Step-free footbridges or a tunnel

In Winner Announced In The Network Rail Footbridge Design Ideas Competition, I wrote how the competition was won by this bridge.

So could a factory-built bridge like this be installed at Mirfield station?

  • There is plenty of space.
  • The bridge would have the correct clearance for the electrification.

It could also replace the subway to Platform 1/2.

August 29, 2019 Posted by | Transport/Travel | , , , , | Leave a comment

Upgrading Ravensthorpe Station

Ravensthorpe station is due to be upgraded as part of Network Rail’s £2.9billion project to upgrade the Huddersfield Line between Huddersfield and Dewsbury stations, that I wrote about in Network Rail Reveals Detailed £2.9bn Upgrade Plans For TransPennine Route.

This Google Map shows the station and the surrounding land.

Note.

  1. The lines through the station go between Huddersfield in the East and Dewsbury in the North-East.
  2. The line going East goes to Wakefield.

These pictures show the station.

I did try to get a picture of the bridges over the River Calder, but I was unable to find the route and the weather was about to deteriorate.

The station is currently just two platforms on the lines between Huddersfield and Dewsbury, with a terrible overbridge, a poor shelter and a couple of seats.

The Wikipedia entry for Ravensthorpe station says this.

Ravensthorpe station is adjacent to Thornhill LNW (London North Western) Junction, where a line branches to Wakefield Kirkgate. There are plans to extend the station by building new platforms on this line, which was built by the former Manchester and Leeds Railway.

This document on the Digital Railway web site is entitled Transpennine Route Upgrade SDO1 ETCS – Analysis.

It is mainly about using digital signalling called ETCS on the Transpennine Route, but it does give these track layouts between Huddersfield and Dewsbury.

This is the current layout.

This is a reduced four-track layout.

In Proposed Track Layouts Between Huddersfield And Dewsbury, I came to the conclusion, that the reduced four-track layout or something better could handle the current trains through the area.

If the reduced four-track layout is used, the requirements for a new Ravensthorpe station can now be stated.

  • Two platforms on the tracks to and from Dewsbury.
  • Two platforms on the tracks to and from Wakefield.
  • Some better shelters than at present.
  • Step-free footbridges.

In Winner Announced In The Network Rail Footbridge Design Ideas Competition, I wrote how the competition was won by this bridge.

So could a factory-built bridge like this be installed at Ravensthorpe station?

  • The platforms from Dewsbury and to Wakefield, could probably be arranged as a walk-across interchange.
  • This would mean that the flexible nature of the bridge design would enable a single bridge with three lifts and three sets of stairs to be erected to join all the platforms together.
  • The bridge would have the correct clearance for the electrification.

I doubt it would be the most complicated of stations.

 

August 29, 2019 Posted by | Transport/Travel | , , , , , | Leave a comment

Proposed Track Layouts Between Huddersfield And Dewsbury

Tracks between Huddersfield and Dewsbury stations are due to be upgraded as part of Network Rail’s £2.9billion project to upgrade the Huddersfield Line between the two stations, that I wrote about in Network Rail Reveals Detailed £2.9bn Upgrade Plans For TransPennine Route.

This document on the Digital Railway web site is entitled Transpennine Route Upgrade SDO1 ETCS – Analysis.

It is mainly about using digital signalling called ETCS on the Transpennine Route, but it does give these track layouts between Huddersfield and Dewsbury.

This is the current layout.

This is a full four-track layout.

This is a reduced four-track layout.

As I see it, if the reduced layout can handle the required number of services, it has major advantages over the full scheme.

  • There are no changes to track  layout between Ravensthorpe and Dewsbury stations.
  • Rebuilding Ravensthotpe station should be a smaller project.
  • The current and reduced layout have three tracks between Mirfield and Ravensthorpe stations.
  • There are no expensive new bridges to be built.

By using bi-directional running on the centre track between Ravensthorpe and Mirfield stations, which is controlled by ETCS, the track layout is simplified, with three tracks instead of four.

  • Slow trains from Huddersfield to Dewsbury will dive under the Brighouse lines and call in/pass Platform 1 at Mirfield station before going straight on to Ravensthorpe and Dewsbury. This is as trains do now.
  • Slow trains from Dewsbury to Huddersfield will use the centre track from East to West and call in/pass Platform 2 at Mirfield station before turning South-West  on to Huddersfield. This is as trains do now.
  • Fast trains from Huddersfield to Dewsbury will call in/pass Platform 3 at Mirfield station and then cross over to the top track and go straight on to Ravensthorpe and Dewsbury.
  • Fast trains from Dewsbury to Huddersfield will use the centre track from East to West and call in/pass Platform 4 at Mirfield station before turning South-West  on to Huddersfield.
  • Trains from Brighouse  to Wakefield will call in/pass Platform 1 at Mirfield station and then cross to the centre track and go straight on to Wakefield. This is as trains do now.
  • Trains from Wakefield to Brighouse will use the centre track from East to West and call in/pass Platform 2 at Mirfield station and go straight on to Brighouse.

Note.

  1. Platforms at Mirfield station are numbered 1 to 4 from the North
  2. The slow lines between Mirfield and Huddersfield are shown in black.
  3. The fast lines between Mirfield and Huddersfield are shown in blue.
  4. Passengers can use Platforms 1/2 as a cross-platform interchange between slow Huddersfield-Leeds and Brighouse-Wakefield services.

I also think it likely, that the proposed layout will improve the timetable.

Conclusion

I think it is highly likely that the reduced four-track layout will be used.

Unless of course something better is devised.

 

 

 

August 29, 2019 Posted by | Transport/Travel | , , , , , | 2 Comments

Progress At Syon Lane Station – 27th August 2019

At last, something seems to be happening about erecting the new step-free footbridge at Syon Lane station.

Easily spotted are the following.

  • An access road seems to have been fenced off.
  • The tea huts and the toilets have arrived.
  • Some scraping and digging has commenced by the down platform
  • There is a poster saying finish, will be by the end of the year.

Nothing seems to have happened on the up platform.

It also seems strange that no building materials appear to have been delivered.

Could it just be that a concrete slab will be created on the down platform and on the up platform, the two advertising hoarding will be removed to create space for the bridge tower and stairs?

A prefabricated bridge, built off-site, will then be lifted in.

It’s the only way, that the bridge could be built by the promised completion date of the end of the year.

 

 

August 29, 2019 Posted by | Transport/Travel | , , | Leave a comment

Has Boris Shot The Fox?

Has Boris shown Remoaners and the other parties to be bad losers?

They’ll all running around like headless chickens!

He’ll surely win the next election by a street!!

The only person, who can stop Boris, would be a brilliant orator, with total respect from everybody!

August 29, 2019 Posted by | World | , , | 2 Comments

World’s First Solar-Powered Trains Are Coming To England

The title of this post, is the same as that on this article on Lonely Planet.

This is the first paragraph

The first ever solar unit to directly supply a railway line with electricity has been put in place in England, paving the way for the world’s first solar-powered trains

I am not sure yet about this technology., powering large sections of the UK’s railways.

But the technology does have applications, if it is combined with energy storage.

Boosting Power With Third-Rail Electrification

Third-rail electrification has a problem, in that it needs to be fed with power every few miles. Inevitably, as timetables get busier, there are areas, where there is not enough power to supply the trains.

These systems can provide that fill-in power.

Note that 25 KVAC overhead electrification doesn’t have the problem, as the wires themselves distribute the electricity.

This means that the Great Western Main Line electrification is only supplied with power from the electricity grid at three places; the two ends and one in the middle.

Electrification In Visually-Sensitive Places

Look at this picture of Brunel’s magnificent Wharncliffe Viaduct.

It has been recently electrified and some groups object to the electrification of Grade I Listed structures like this.

Most modern electric trains can be dual-voltage and can work on both electrification systems used in the UK; 25 KVAC  overhead and 750 VDC third rail. They can also change between electrification systems at maximum speed

So could we see selective use of solar-powered third-rail electrification in visually-sensitive areas?

Possibly! But battery/electric trains may be a better alternative!

Charging Battery-Electric Trains

There are some branch lines, that will be served by battery-electric trains in the future.

These solar-powered systems could be used to provide the energy to charge the batteries for the return journey.

Powering Remote Stations

Stations are increasingly needing better electricity supplies with more lighting and various ticket and parking machines, and charging for electric cars will become more important.

Solar power systems and batteries could be used.

Conclusion

Solar power will be increasingly used on the railways, with a large number of stations like Blackfriars and the recently-opened White Hart Lane.

But that will happen, irrespective of the result of the Aldershot trial, as many stations are easy places to install solar panels, either on the roof or redundant spaces.

This Google Map shows one of my local stations; Haggerston.

It was rebuilt and reopened in April 2010, so solar panels were probably not thought about for the station.

From my helicopter, it appears that the stations at  Dalston Junction, Hoxton and Shoreditch High Street, which were all built at the same time, don’t have solar rooves either.

Perhaps Transport for London and/or Network Rail should rent their roof areas to companies, who run solar farms?

I’m sure there’s a mutually beneficial deal in there somewhere!

As to powering trains, I’m sure they that Riding Sunbeams has a place on third-rail networks, where power needs boosting.

However, electric trains with batteries might be a better option in other applications.

August 29, 2019 Posted by | Transport/Travel | , , , , , , , | 2 Comments

The New White Hart Lane Station Opens

The new White Hart Lane station opened on Monday and I went along this morning and took these pictures.

Some points about the design.

  • The station has three entrances on the stadium side and two on the other.
  • Materials used include terracotta pots and weathered steel.
  • There is a pedestrian tunnel under the railway for those that don’t want to use the trains.
  • There are two sets of stairs to both platforms
  • There are lifts to both platforms.
  • The station can probably handle twelve-car Class 710 trains if required on match days.
  • There are solar panels on the roof.
  • The station  must have some of the tallest overhead electrification gantries in the UK.

From what one of the project managers told me, it appears that the station was built by cleaning, refurbishing and strengthening the viaduct and then erecting an independent steel frame on either side to form the station.

It looks like a technique that could be used on other stations on viaducts.

It’s certainly a better station with a larger capacity, than the previous one, that I used many times back in the 1960s.

The old station is to be demolished, at some point in the future.

Conclusion

It is an excellent station, that should serve its main function of getting supporters to and from Tottenham Hotspur’s new stadium.

But will the station and the soon-to-arrive new trains have other effects.

  • As I said earlier, the design could be repeated with different cladding for other stations on viaducts.
  • I believe that good public transport infrastructure tends to calm crime and anti-social behaviour. Only the statistics will give a verdict.
  • Will the passenger numbers rise through the station?
  • Will the station and the stadium attract some better class retain premises and cafes, as the Emirates has done?

And perhaps most importantly! Tottenham Hotspur now has two new stations to serve the ground! Will this reduce the congestion caused by large crowds?

 

August 28, 2019 Posted by | Sport, Transport/Travel | , , , , | 2 Comments