At last, something seems to be happening about erecting the new step-free footbridge at Syon Lane station.

Easily spotted are the following.

  • An access road seems to have been fenced off.
  • The tea huts and the toilets have arrived.
  • Some scraping and digging has commenced by the down platform
  • There is a poster saying finish, will be by the end of the year.

Nothing seems to have happened on the up platform.

It also seems strange that no building materials appear to have been delivered.

Could it just be that a concrete slab will be created on the down platform and on the up platform, the two advertising hoarding will be removed to create space for the bridge tower and stairs?

A prefabricated bridge, built off-site, will then be lifted in.

It’s the only way, that the bridge could be built by the promised completion date of the end of the year.

 

 

August 29, 2019 - Posted by | Transport | , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.