The Anonymous Widower

The Areas Where Labour Wants To Build Onshore Wind Farms, Mapped

The title of this post, is the same as that of this article on inews.

This is the sub-heading.

Ten onshore wind projects have been proposed to help keep UK on track to have at least 95 per cent clean power by 2030.

This is the first paragraph.

The Government is bracing for its biggest nimby battle yet as onshore wind farm companies work on a flurry of proposals after an effective ban on development was lifted in England.

I suggest you take the time to read the well-written informative article, if you are worried about onshore wind farms being parked on the hill behind your house.

The first ten are provocative and there is a map of their locations, which are mainly in Scotland and Wales, on the Pennines and in Lincolnshire.

This paragraph in the article, quotes government data on the cost of various forms of energy.

They estimate that over the entire course of a project’s life, onshore wind costs £38 per mega watt hour of energy, compared to £44 for offshore and £41 for solar. Gas, meanwhile, is £114, while nuclear is £128.

I don’t have any other real data, but it does appear that floating offshore wind farms have a higher capacity factor, which should tip the cost comparison back in its favour.

But I do suspect that Ed Miliband will use these figures to increase the amount of onshore wind in the ?UK and especially n England.

As larger turbines are being tested by the Chinese and Siemens, I suspect too, that we’ll see larger turbines installed onshore.

I also believe as a Control Engineer, that as the number of large turbines increases,  we will see more energy storage built alongside wind farms.

December 24, 2024 Posted by | Energy, Energy Storage | , , , | 2 Comments

Redundant Coal Wagons To Be Converted For Construction Traffic

The title of this post is the same as that of this article on Railway Gazette.

These three paragraphs describe the project.

WH Davis is to convert coal wagons owned by leasing company Porterbrook for use by Freightliner to transport aggregates.

’This is a fantastic opportunity to demonstrate what can be achieved by giving redundant fleets a purpose for the next 30-plus years’, said WH Davis Managing Director Andy Houghton on December 19. ‘It’s a truly sustainable option that also gives UK manufacturing a boost to enable the creation of UK jobs in the industry. I really can’t wait to see our latest box wagon design in traffic for Freightliner in 2025.’

Mark Wyborn, Head of Freight at Porterbrook, said freight volumes in the construction sector were expected to continue growing, and the deal ’highlights our commitment to investing in the long-term growth of rail freight while providing affordable, innovative and sustainable rolling stock for the UK railway’.

We need more recycling projects like these.

In the article, there is a picture of a Class 66 locomotive like this one.

Except this one, which is named after Benjamin Gimbert GC, is different in that it is running on Hydrotreated Vegetable Oil (HVO). which is a more sustainable fuel.

Unfortunately, there is only so much second-hand vegetable oil from the likes of McDonalds and Burger King and it is also a component of Sustainable Aviation Fuel (SAF).

But in the UK, we have engineers at Cummins, JCB, Ricardo and a number of other companies, research organisations and universities, who could create a conversion for the American two-stroke diesels of the Class 66 locomotive so they could run on hydrogen.

These posts detail attempts to create a zero-carbon or dual-fuel locomotive in the UK and some of my thoughts.

The Bi-Mode Class 99 locomotive is coming, but we need action now.

I estimate it would probably cost up to £2million to convert a Class 66 locomotive to hydrogen.

So why not have a competition with a prize of perhaps £10million to see who, can produce the best Class 66 or Class 68 locomotive conversion by the end of 2025?

Conclusion

We need urgent action to cut pollution, noise and emissions from heavy freight locomotives and market forces and government grants don’t seem to have produced a solution, so perhaps a competition with a big prize might do it.

It could even be televised,

 

December 24, 2024 Posted by | Transport/Travel | , , , , , , , , , | Leave a comment

Kentish Town Station – 24th December 2024

Kentish Town station reopened today after the fitting of two new escalators.

It appears that only the two escalators have been replaced and the station has been redecorated.

The Guy With The Hat

Note in the pictures(18-24) going down the escalator, I was following a guy in a checked shirt and a wide-brimmed hat.

When a train was entering the station below he was having difficulty because of the updraft keeping hold of the hat.

Does This Station Need A Lift?

This article on the BBC is entitled Kentish Town Tube Station Reopens After 18 Months.

Nothing is said about why the eighteen months wasn’t used to fit a lift to make the station fully step-free.

There have been two Mayor’s Questions about putting in lifts at Kentish Town station and both answers were similar. This was the first answer.

TfL has carried out a high-level investigation into installing lifts at Kentish Town. It has indicated that the scheme would involve digging new tunnels and installing a new lift shaft in a very constrained worksite adjacent to the main road and busy operational railways. Due to the complexity of this project and therefore high estimated cost, in the region of £40m, Kentish Town is not being considered as part of the £200m five-year programme.

This Google Map shows Kentish Town station.

Note the footbridge over the station leading over the National Rail station to the Underground station marked by the red logo.

In any scheme to make all of Kentish Town station step-free, this bridge would surely be made step-free or replaced by perhaps a tunnel under the railway.

Costs would be very high, even with a very expensive development on top, which was making a contribution.

Unless an architectural genius comes up with a better scheme, I think what has just been installed, will be the best that can be provided.

Camden Council will probably find it better to send disabled taxis.

December 24, 2024 Posted by | Transport/Travel | , , , , | 6 Comments

The Ultimate Open Access Service

London and Windermere are 223 miles away by train with a single change at Oxenholme Lake District.

In a straight line the distance between Amsterdam and Hamburg is 227 miles.

I’ve done both journeys by train and the continental journey was a pain.

I’ve also tried splitting the route at Groningen.

  • The first leg was a train to Groningen, where I spent the night.
  • I spent the second day exploring and wrote about my experiences in The Train Station At The Northern End Of The Netherlands.
  • On the third day, I started by going between Groningen and Leer in Germany.
  • This section of the route at present is under repair after a ship destroyed the swing bridge over the River Ems.
  • I describe its rebuilding in From Groningen To Leer By Train.

Once at Leer, you’re on the German main line and the route is electrified all the way to Bremen and Hamburg.

I believe that the route would be within the scope of a battery-electric high speed train, such as both Hitachi and Siemens are developing.

Some thoughts on the route.

The Competition

The trains need a change at Osnabruck to go between Amsterdam and Hamburg.

I suspect many travellers fly, as there are thirty-nine flights per week.

The service could be better.

Why Would I Run It As An Open Access Route?

Consider.

  • If what I have experienced on the current Amsterdam and Hamburg via Osnabruckservice, then surely an experienced open access operator using trains designed for the route could do much better.
  • This service could be run almost as a shuttle between two terminal stations. Several open access services like Hull Trains, Lumo and Grand Central are run this way.
  • If a government service fails, governments get the blame, but if an open access service fails, the government gets no blame.

So would some governments, prefer open access operators to take the risk?

Would Any New Infrastructure Be Needed?

Very little if any!

Although, I do feel, that some of the level crossings and bridges could be improved or removed.

Where Is The Route Not Electrified?

The section without electrification is at the Dutch end.

This OpenRailwayMap shows the lines around Groningen station.

Note.

  1. Lines in black are not electrified.
  2. Lines in blue are electrified at 1.5 KVDC overhead.
  3. The mass of blue lines is Groningen station.
  4. Hamburg is to the East.
  5. Eemshaven us to the North.
  6. Harbinger is to the West.

Amsterdam trains use the electrified lines to the East.

This second OpenRailwayMap shows a wider view of the lines around Groningen.

Note.

  1. Lines in black are not electrified.
  2. Lines in blue are electrified at 1.5 KVDC overhead.
  3. Groningen is in the North-West corner of the map.
  4. Trains between Groningen and Amsterdam use the electrified line to the South via Zwolle.
  5. Trains between Groningen and Bremen and Hamburg use the unelectrified line to the East.
  6. There is a single track chord, that would allow trains to go between Amsterdam and Germany.

I suspect that a battery-electric high speed train could be fully recharged before leaving Groningen for Germany.

This third OpenRailwayMap shows between the chord to the East of Groningen and the German railway system at Leer.

Note.

  1. Lines in black are not electrified.
  2. Lines in blue are electrified at 1.5 KVDC overhead.
  3. Lines in green are electrified at 15 KVAC overhead.
  4. Groningen is off the Western side of the map.
  5. The chord connecting the Amsterdam and German lines from Groningen can be picked out.
  6. The unelectrified line East from Groningen seems to end in the middle of nowhere.
  7. The green lines in the East of the map are the electrified German railway system.
  8. Leer station, which is indicated by the tangle of lines in the North-East cornet of the map, has services to Bremen and Hamburg.

This forth OpenRailwayMap shows the Dutch and German railways at Leer.

Note.

  1. Lines in black are not electrified.
  2. Lines in green are electrified at 15 KVAC overhead.
  3. Leer station is in the North-East corner of the map.
  4. The green lines in the East of the map are the electrified German railway system.
  5. The River Ems runs down the middle of the map.

The unelectrified line East from Groningen seems to link up with the German railway system.

It used to link up until a German freighter called the Emsmoon demolished the Freisenbrücke over the River Ems.

In From Groningen To Leer By Train, I link to two videos and give the history of the accident.

The Freisenbrücke should be rebuilt in the next few months.

It looks like less than fifty miles of the route between Groningen and Leer is not electrified.

As all the other sections of Amsterdam and Hamburg are electrified, a battery-electric train with a range of less than fifty miles would be needed,

But the train would need to be compatible with both the Dutch and German electrification systems.

What Mode Of  Trains Would Be Needed?

Trains would need three methods of operation.

  • Using 15 KVAC overhead.
  •  Using 1.5 KVDC overhead.
  • On battery power.

Batteries would be charged using regenerative braking or overhead wires, where they exist.

Lumo’s recently ordered Hitachi trains will probably work the same way.

Conclusion

This could be an open access service that could work.

 

December 23, 2024 Posted by | Transport/Travel | , , , , , | 1 Comment

Is Internet Security Sometimes Over Secure?

On Friday the 13th December, I received a Purchase Confirmation from eBay by e-mail.

As I get lots of spam e-mails, I decided it was just the usual spam and ignored it.

But then I got thinking.

  • I have never bought anything on eBay.
  • I sold a lot of surplus things, when I last moved house on eBay and was very satisfied with their service.
  • The purchase was for a watch and I don’t wear one.
  • It was also an Apple watch and as the company has given me so much grief on their non-standard co9mputer and file formats , when I was a programmer, I never buy or use any Apple products.
  • It was also for £650, which is never the sort of sum, I ever would pay for a watch.

So I did all the safety checks on my bank accounts and credit cards and found everything was as it should be.

On the Purchase Confirmation from eBay is a 0204 phone number offering help . So I rang it on the Saturday.

My call was answered by a male operator with a slight accent, but speaking good English.

  • After I gave him the Order ID, he said that eBay had closed my account because of inactivity.
  • I have since found an e-mail from eBay saying they were closing my account and I remember answering it, but as I felt I didn’t need the account, I took no action.
  • The operator, then said that someone had reactivated the account and told me that this needed documents like Council Tax to prove I lived at the house.
  • He then asked if anybody lived with me. I told him no, as I’m a widower in perhaps a rather curt manner, as I don’t like being accused of a crime.
  • I then realised that this was an inside job, from my experience of working with police forces, banks and consultants in stopping crime.
  • I told him my thoughts in a quiet way.

He then said he’d close the account and the conversation ended.

On the Monday, I decided I wanted to go to see the new Northumberland Line on the Wednesday.

  • So I decided to book online using Lumo to Newcastle.
  • Before entering your bank/credit card number, Lumo ask for your name and address.
  • I didn’t get past the name and address entry, probably because, I suspect eBay had put my name and address on a black-list!

In the end, I bought my tickets at the King’s Cross station ticket office using a credit card. At least they were the same as the on-line price.

It was a good trip and I wrote about it in London And Newcastle In A Day By Lumo and My First Trip On The Northumberland Line – 18th December 2024.

Conclusion

I have phoned Lumo, most of my banks and credit cards, Action Fraud, the BBC, the police  and I still can’t find out how I get myself off this accursed black-list.

The only good thing, is that I have not had ay money taken out of my bank account.

I have also reported the fraud to the Metropolitan Police and got a crime number for it.

 

December 21, 2024 Posted by | Finance & Investment | , , , , , , , , , , | 2 Comments

My First Trip On The Northumberland Line – 18th December 2024

Yesterday, I took Lumo to Newcastle and took my first ride to Ashington on the Northumberland Line.

These are some of the pictures I took.

Note.

  1. Much of the route is double-track.
  2. Bridges over the tracks indicate, that some stations will have two platforms.
  3. I suspect some stations could take a five-car train.
  4. One guy said that there is a lot of landscaping to do.
  5. The standard is very similar to the Borders Railway.

I have some other thoughts.

The Blyth Valley Is Well Supplied With Electricity

Several high-capacity connections to wind farms and Norway are planned to come ashore at Blyth and it appears from the pictures  that the area is well connected to the grid.

This must have nudged Britishvolt to put their battery plant at Blyth.

But no matter for those jobs, as with a rail service to Greater Geordieland and lots of electricity, there must be other energy-hungry businesses like datacentres or small modular reactor factories, who would want the site.

The Long Platforms

I am fairly sure that some of the platforms have been sized to take a five-car Hitachi Class 80x train, which are only 130 metres long and can carry around 400 passengers.

This must enable the ability to use the Northumberland Line as a diversion for the East Coast Main Line.

Some services could perhaps stop at Blyth for the large factories and/or Northumberland Park for the Metro.

It looks to me, that the Northumberland line was designed for large factories or businesses with lots of workers, that needed lots of electricity.

Development North Of Ashington

This OpenRailwayMap shows the area North of Ashington.

 

Note.

  1. The orange line going up and down the map is the East Coast Main Line.
  2. Morpeth station is in the South-West corner of the map.
  3. Ashington station is in the South-East corner of the map.

I think there might be scope to develop this area to make the heavy components needed for wind farms and small modular reactors,

December 19, 2024 Posted by | Energy, Transport/Travel | , , , , , , , | 5 Comments

H2Rescue Truck Smashes World Record With 1,806 Miles On A Single Hydrogen Fill!

The title of this post, is the same as that of this article on Hydrogen Fuel News.

This is the sub-heading.

H2Rescue Truck Sets New World Record in Hydrogen Transportation

These first two paragraphs add more detail.

A groundbreaking milestone in hydrogen-powered transportation has been achieved by the H2Rescue truck, a prototype heavy-duty vehicle capable of addressing energy challenges during disaster relief. Built by Accelera (a division of Cummins), with support from the U.S. Department of Energy (DOE) and other federal agencies, the truck recently achieved a Guinness World Record by traveling an astonishing 1,806 miles on a single fill of hydrogen fuel.

What makes this feat remarkable is the environmental implications of the technology. While a traditional internal combustion engine would have emitted 664 pounds of carbon dioxide (CO2) over the same distance, the hydrogen-fueled H2Rescue truck produced zero CO2 emissions. Hydrogen-powered vehicles like this one exemplify cutting-edge innovation in decarbonizing transportation.

This last paragraph describes the use of the vehicle in emergencies.

More than just a long-distance performer, the H2Rescue truck is an essential tool during emergencies. It can provide 25 kilowatts of power for critical relief operations, such as lighting, medical equipment, and communication systems, for up to 72 hours without refueling. This capability could make a significant difference in disaster zones, where reliable energy sources are often scarce.

Cummins are certainly serious about the innovative use of hydrogen.

December 19, 2024 Posted by | Hydrogen, Transport/Travel | , , , | Leave a comment

London And Newcastle In A Day By Lumo

On Monday, the weather for yesterday in the North-East seemed set fair, I was able to get tickets on Lumo both ways for a reasonable price and the new Northumberland Line had opened.

So I decided to go for it.

My outward journey was on the 10:45 and the return was on the 17:52, which gave me more than enough time to take a train to Ashington and back.

I took these pictures as I arrived in and changed cmy trains at Newcastle.

Note.

  1. The weather in Geordieland was gorgeous.
  2. Is there another station in the UK, with an approach with such a large number of bridges over a large river.
  3. I took the bridge pictures from the lobby of the train.
  4. The blue railway bridge is on the East side of the train.
  5. The modern road bridge is on the West side of the train.
  6. In The Bridges of Newcastle, there are more pictures of Newcastles’s bridges.
  7. To change trains, I had to cross from one side of the station to the other on a stiff bridge without lifts.
  8. The Northumberland Line trains run every thirty minutes.

These are some further thoughts on Newcastle station, which I will write later.

Timings Going North

The train left Kings Cross at 10:45½, which was just thirty seconds late.

It arrived in Newcastle at 13:48, which was four minutes late.

The journey time had been three hours and two and a half minutes.

Timings Going South

The train left Newcastle at 17:52, which was on time.

It arrived in Kings Cross at 21:17, which was thirty-three minutes late.

The thirty-three minute delay, must raise the possibility of delay repay.

It does!

Three Hours London Newcastle?

These timings must raise the possibility of a sub-three hour time. on the train, between London King’s Cross and Newcastle stations.

The digital signalling that is currently being installed, with perhaps a few timetable tweaks should do it for both Lumo and LNER.

Could The Trains Absorb The Airline Passengers?

Consider.

  • In 2023, 437,735 passengers flew between London Heathrow and Newcastle airports.
  • This is just 1,200 passengers per day.
  • A five-car Class 803 train has 403 seats.

It would appear that a few extra trains and some targeted marketing, could convert London and Newcastle into an all-electric train route.

Seats

Train seats are a bone of contention to many rail passengers these days.

I first rode on Lumo to Scotland in 2021 and wrote about it in London To Edinburgh On Lumo, where I was fairly complimentary about the seats.

They certainly are better than some train seats I have ridden in.

Am I Tired Today?

Not particularly! But I wasn’t very energetic during my four hours in the North.

Tickets For Onward Journeys

The main purpose of my trip was to ride the Northumberland Line to Ashington.

I made the mistake of not buying my ticket for the second train in London, as I hadn’t realised that my train from London and the Ashington train used different sides of the station.

  • It was a stiff walk for me between trains.
  • In order to buy a ticket, you need to pass through the barriers twice to get to the ticket office or a machine.
  • There was no ticket facilities on the far side of the station, where the Lumo train arrived.
  • The ticket machines didn’t accept contactless cards.
  • Information was lacking.

The outcome was that I nearly missed my train to Ashington.

So to be sure of catching your connection, if you are changing trains at Newcastle, make sure you buy your tickets before you leave your first station.

 

December 19, 2024 Posted by | Transport/Travel | , , , , , , , , , , , , , | 1 Comment

Landsec Buys Liverpool One Shopping Centre For £490m

The title of this post, is the same as that of this article on Tje Times.

This is the sub-heading.

Commercial property group adds to its portfolio with another bet on ‘destination’ bricks and mortar

I know Liverpool well and I think this is a smart purchase.

The Mersey Tidal Barrage

If all goes well in a few years time, Liverpool One will be just a short walk from one of England’s most spectacular tourist attractions – The Mersey Tidal Barrage, which will allow you to walk or cycle across the Mersey.

The Pierhead, Waterfront And Merseyrail

Note.

  1. The Mersey Ferry Terminal is to the left,
  2. The Liver Building is in the centre.
  3. The Leeds and Liverpool Canal runs between the two, to give access for narrow boats to the Albert Dock.
  4. There is a Merseyrail station to the right.

The famous waterfront is already a major calling port for cruise ships and is connected to the rest of Merseyside, by one of the world’s best urban railways.

The Improved Rail Service From London

In the new year, Liverpool will get a second hourly rail service from London with new faster Hitachi trains and as Lime Street station is only a couple of stops on Merseyrail or a downhill walk for the average urban walker to Liverpool One, many will go and do their day’s shopping with a meal and some entertainment in the City.

The New Everton Stadium

From next year, that entertainment could be watching football at Everton’s new stadium, which is on the waterfront.

Battery High Speed Trains Across The Pennines

The trains across the Pennines will be improved soon, when new battery-electric high speed Hitachi trains come into service.

Hotels And Golf

The one thing that Liverpool One and the waterfront needs is some world class hotels. The Liverpool area already has a few golf courses good enough for the Open Championship.

The area has marketed itself in the past, as the Golf Coast.

Future Development

Liverpool One, the Pierhead and the Waterfront, can develop massively over the next ten years.

December 17, 2024 Posted by | Sport, Transport/Travel | , , , , , , , , | 7 Comments

America Is Building The World’s Biggest Battery—And It Will Run On Rust

The title of this post, is the same as that of this article on Popular Mechanics.

It is the first article, that I’ve found that gives a good explanation of Form Energy’s battery, that uses iron oxide for energy storage.

Given the backing of the likes of Bill Gates and Jeff Bezos, this could be a serious player in the energy storage market.

The article is certainly worth a read.l

December 17, 2024 Posted by | Energy Storage | , | Leave a comment