The Anonymous Widower

The Crossrail Tunnel Portal At Pudding Mill Lane

This 3D Google Map shows the Crossrail tunnel portal at Pudding Mill Lane.

The Crossrail tunnel portal is in the middle of the image.

  • Pudding Mill Lane station on the DLR is in the top-left corner of the image.
  • The tracks to the right of the portal lead to and from Liverpool Street station.
  • The circular building in the top right of the image is the sewage pumping station for the Queen Elizabeth Olympic Park.

Note the single track on the left side of the portal, which allows Crossrail trains to go to Liverpool Street station.

Th

August 12, 2021 Posted by | Transport/Travel | , , , , | Leave a comment

Will Whitechapel Station Have The Widest Platform On The Underground?

I took this picture across the island platform for the Sub Surface Lines at Whitechapel station, this morning.

It will certainly be a wide platform, when the station is completed.

It is also shown on this map from carto metro of the lines through the station.

Note.

  1. Crossrail is shown in purple.
  2. The Overground is shown  in orange.
  3. The Sub Surface Lines are shown in green and red.

Platforms 1 and 2 form a very wide island platform.

The station is unique in that three full-size high-capacity and high-frequency lines connect at the station.

  • Crossrail – East-West – 24 tph – 1,500 passengers per train.
  • Sub Surface Lines – East-West – 21 tph – 1209 passengers per train
  • Overground – North-South – 16 tph – 170 passengers per train

A lot of passengers will change trains at Whitechapel station, so the spacious platform will be useful.

Will passengers also use the platform to reverse direction.

The quickest way between Liverpool Street and Blackfriars stations is to get a Circle Line train, but passengers could go two stops on a Hammersmith and City train to Whitechapel, walk across the platform and then take the District Line to Victoria.

Alternatively, you could take Crossrail to Whitechapel to get the District Line.

But the latter is in the advanced course on Ducking and Diving.

 

August 10, 2021 Posted by | Design, Transport/Travel | , , , , | 5 Comments

The Location Of Sunset Studios In Broxbourne

This article on HertsLIve discloses the location of the new Sunset Studios in Broxbourne.

This is said.

Land to the west of Waltham Cross has been bought and is allocated in Broxbourne Borough’s Local Plan 2018 – 2033.

It’s just off J25 on the M25 and is thought to be land on either side of the A10 Great Cambridge Road.

James Seppala, Head of Blackstone Real Estate Europe, said: “The site is on the north-west corner of the M25-A10 junction. It’s ideal given its accessibility across Hertfordshire, into Central London, to London’s airports due to its proximity to the M25, and it has the scale for the scheme we’re planning to develop.

“Highways England are expanding the motorway junction currently which is helpful as well.

This Google Map shows the location.

Note.

  1. The M25 runs across the bottom of the map.
  2. The A10 runs North-South between the two roundabouts.
  3. Newsprinters Broxbourne sits on a forty-acre site and is the largest newspaper printing site in the world.

I would expect that the brown agricultural site is where Sunset Studios will be located.

I have one big question.

Is It The Right Place For The Studios?

I know nothing about making films, but from what has been said, this development will produce up to 4,500 jobs.

How are all these people going to get in to work every day?

The site may have a good road network, but it doesn’t have a nearby rail connection.

But in my quote from Herts Live, this is said.

It’s just off J25 on the M25 and is thought to be land on either side of the A10 Great Cambridge Road.

Does that mean it includes the Newsprinter site as well?

This Google Map shows that site.

The site seems to be closed in by roads and on the Eastern side by the Cheshunt branch of the London Overground.

  • It is a double-track railway.
  • It runs between London Liverpool Street and Cheshunt stations.
  • It only runs two trains per hour (tph) at present, but it has been designed to handle upwards of four tph.
  • The trains on the route are new eight-car Class 710 trains, each of which can hold up to 1,300 passengers.

Could Sunset Studios be thinking about a rail-connected studio complex?

  • Liverpool Street will be well-connected through Crossrail to much of London including Heathrow and Canary Wharf.
  • Cheshunt is connected to Cambridge and Stansted.
  • There are fifteen stations between Liverpool Street and Cheshunt, which must surely mean easy access to the complex for a massive number of potential employees.

A station at the complex, would certainly seem a possible move to cut the amount of road traffic travelling to and from the complex.

Riding Past The Sunset Studios Site On The London Overground

I took these pictures of the area around the Sunset Studios site from a train going North to Cheshunt.

Note, that when the line was reopened in 1960, British Rail left wide margins and from my pictures and the Google Map indicates that building a station on this stretch of line wouldn’t be the most challenging of tasks.

 

 

 

August 4, 2021 Posted by | Business, Finance, World | , , , , , | 11 Comments

Crossrail’s New Opening Plan

This article on the excellent and well-informed IanVisits is entitled Crossrail Changes Its Staged Opening Plans.

Ian states that Crossrail will be split into two routes.

  • Shenfield and Paddington
  • Abbey Wood and Heathrow/Reading

Frequencies will be reduced, but Ian states there could be two positive benefits.

  • Abbey Wood and Paddington could open earlier in 2022.
  • The full integrated service could be brought forward six months.

Why is this possible?

These are my thoughts.

The Covid-19 Pandemic

The current TfL Rail service between Shenfield and Liverpool Street stations coped well before the pandemic  and now with reduced passenger numbers it is able to handle current passenger loads without a problem.

I have used Crossrail from Paddington to Heathrow and Reading during the pandemic and Crossrail’s nine-car trains are handling passenger numbers with ease.

It would appear to me, that by using two platforms at Liverpool Street and Paddington stations, the benefits of Crossrail have been delivered to the East and West of the massive Greater London conurbation.

Stratford Station

Stratford station is more or less complete with respect to Crossrail.

  • It can handle ten-car trains, if they run in the future.
  • The two dedicated platforms for Crossrail, can probably handle the maximum frequency of trains, the line will ever carry.

But Stratford’s biggest advantage is the connections to the Central and Jubilee Lines, and the North London Line of the London Overground, which between them give access to most of Central and North London.

Ealing Broadway Station

A few weeks ago, a fully step-free Ealing Broadway station opened, as I wrote about in Ealing Broadway Station – 31st May 2021.

As with Stratford station, Ealing Broadway station is ready for any future Crossrail service.

It also has connections to the Central and District Lines to give access to most of Central London.

Can The Underground Cope In Central London?

All Lines except the Northern and Piccadilly Lines have seen improvement to signalling and/or trains in recent years and in my meandering around London, they seem to be coping well with the current passenger levels.

Liverpool Street Station

I use Liverpool Street station regularly and changes are happening at the station.

  • Platforms have been lengthened so that ten-car Crossrail trains can be handled.
  • The main entrance to the Underground was updated a few years ago and has a very wide gateline.
  • A wider gateline is being installed for Crossrail and other suburban services on the East side of Liverpool Street station.
  • A new entrance to Crossrail has been completed in front of Broadgate and appears ready to open, as I observed in Crossrail’s First Inclined Lift Is Now Available To View!.

A second high capacity step-free entrance has opened on Moorgate. When Crossrail opens through Liverpool Street station opens it will enable the following.

Passengers will be able to walk underground between Liverpool Street and Moorgate, with a substantial section of the route up and down escalators. I described the route in detail in London’s First Underground Roller Coaster.

The Crossrail entrance inside the Underground station at Liverpool Street station is now visible.

Note.

  1. Crossrail is behind the two pairs of massive stainless-steel doors.
  2. Peeping through the window, construction appeared to be almost at completion.
  3. If you turn right here, you take the escalator down to the Central Line.

Eventually, Liverpool Street and Moorgate stations could even be considered a single station with a massive escalator connection between the two original stations.

Liverpool Street And Stratford Stations Together Give Crossrail A Comprehensive Under/Overground Connection

These Under/Overground lines connect to either or both stations.

  • Central Line – Connects to both stations, but at Stratford it’s a cross-platform interchange with Crossrail. Ideal for Oxford Street, the City of London and St. Paul’s.
  • Circle Line – Connects to Liverpool Street. Ideal for Euston, Kings Cross, Paddington, St. Pancras, Victoria and large parts of South Central and West London.
  • Hammersmith And City Line – Connects to Liverpool Street. Ideal for Euston, Kings Cross, Paddington, St. Pancras and large parts of West London.
  • Jubilee Line – Connects to Stratford. Ideal for Bond Street, Canary Wharf, London Bridge, Waterloo and Westminster.
  • Lea Valley Lines – These Overground Lines connect to Liverpool Street. Ideal for Enfield, Hackney, Haringey, Waltham Forest and North East London and South East Hertfordshire.
  • Metropolitan Line – Connects to Liverpool Street. Ideal for Euston, Kings Cross, Paddington and St. Pancras, Wembley Stadium and North-West London.
  • North London Line – This Overground Line connects to Stratford. Ideal for Acton, Brent, Dalston, Hackney, Hampstead and a large proportion of North and West London.

Liverpool Street and Stratford certainly have comprehensive connections to the Underground and Overground.

Liverpool Street And Shenfield Is Signalled With TPWS

TPWS is the only signalling system used on the section of Crossrail between Liverpool Street And Shenfield stations.

It offers these benefits, as opposed to the ETCS used in Crossrail’s core tunnel.

  • It eased the replacement of the original Class 315 trains with new Class 345 trains.
  • It allows Crossrail’s trains to share tracks with other trains not fitted with ETCS.
  • Drivers only have to handle one signalling system on the route.

The single signalling system must make commissioning and operating the service between Liverpool Street And Shenfield stations easier.

Liverpool Street Station Gives Crossrail Flexibility In The East

The distance between the two current Crossrail platforms at Liverpool Street station and the steel doors will probably be no more than a couple of minutes walk with just a couple of steps down into the Underground station, which can be by-passed by a lift.

Currently, the service between Liverpool Street and Shenfield station has a frequency of eight trains per hour (tph)

  • These trains are currently nine-cars long.
  • The two Crossrail platforms at Liverpool Street have been lengthened to handle ten-car trains.
  • The gateline for the Crossrail platforms is being improved to handle a higher volume of passengers.

If overcrowding should become a problem between Liverpool Street and Shenfield, then there is a quick fix of adding a tenth car to the trains, which would increase capacity by eleven percent.

The extra cars would be borrowed from Crossrail trains sitting in sidings, that are not needed because of the reduced train frequencies.

When Crossrail opens between Abbey Wood and Paddington stations, passengers needing to go between say Ilford and Paddington will be able to take the short walk between both pairs of Crossrail platforms at Liverpool Street station.

But the big advantage comes, when Crossrail starts running between Shenfield and Paddington.

Trains can be gradually swapped between Liverpool Street and Paddington as a terminus.

If there is a problem in Crossrail’s central tunnel, then services can be swapped back to Crossrail’s two current platforms in the National Rail station.

It looks to be a well-designed system.

Could The Pedestrian Route Between Liverpool Street And Moorgate Stations Be Opened Early?

This article on IanVisits is entitled Northern Line Bank Branch To Close For 4 Months Next Year.

The Northern Line will be closed between Moorgate and Kennington stations from the 15th January to mid-May.

Extra buses will obviously be run between Moorgate and Kennington to help during the closure.

  • Finsbury Square is already used to turn buses and could be used as a Northern terminal.
  • London Bridge has a bus station and could be used to turn buses.
  • In his article Ian talks of buses between Oval and the City.
  • The 21 and 141 bus routes run between Moorgate and London Bridge.

Would opening the pedestrian link help a lot of people by providing an easier route between Bank and Moorgate stations, by using the Central Line to Liverpool Street and then the tunnel?

  • It would be fully step-free.
  • Passengers from say St. Paul’s or Chancery Lane stations on the Central Line needing to get to say Angel station might find it an easier route.
  • The weather isn’t always good enough for a walk.

It would be an escalator connection par excellence.

I suspect that this pedestrian route could open before January 15th.

  • It will obviously need to be open when Crossrail opens between Abbey Wood and Paddington.
  • As a pedestrian route, it will improve connectivity at both Liverpool Street and Moorgate stations.
  • The Crossrail station at Liverpool Street, has been handed over to Transport for London.
  • It could allow the opening up of the step-free tunnel from the Northern and Northern City Lines to the new entrance at Moorgate station.

Could the last point be the most significant, as it would make the Northern Line platforms at Moorgate station fully step-free in time for the blockade between Moorgate and Kennington stations?

As Transport for London have accepted Liverpool Street station, opening of the pedestrian route is surely their sole decision.

Could The Pedestrian Route Between The Bakerloo Line And Crossrail Be Opened Early?

Access to the Bakerloo Line at Paddington is being transformed by two projects.

  • The addition of a step-free pedestrian tunnel, which will be around eighty metres long, that will link the Bakerloo Line and Crossrail.
  • A new step-free entrance and booking hall for the Bakerloo Line,that will replace the current Praed Street entrance.

This page on the Transport for London web site, which is entitled Paddington Bakerloo Ticket Hall, gives more details of the new entrance.

Transport for London indicate that the second project will be completed by mid-2022.

But I do wonder, if after Paddington station is handed over to Transport for London, if this tunnel could be opened to give interim step-free access to the Bakerloo Line, until either Crossrail or the new entrance opens.

When Crossrail and these two projects are completed, will this mean that the Bakerloo Line will see a lot more passengers?

Abbey Wood And Paddington

Crossrail between Abbey Wood And Paddington has the following characteristics.

  • It is a new twin-track railway, that it doesn’t share with other trains.
  • Most of the route is in tunnel, with just three sections on the surface.
  • The route is signalled with ETCS.
  • All new underground stations will have platform-edge doors.

It is very much a railway designed to the highest modern standards.

The Surface Section At Abbey Wood

The surface section at Abbey Wood has these purposes.

  • To provide an interchange station with the North Kent Line.
  • To turn back trains towards the West.
  • To provide stabling for trains and service trains to enable a smooth operation of the Abbey Wood and Paddington section of Crossrail.

This map from cartometro shows the track layout to the East of Plumstead station.

Note.

  1. Crossrail is shown in purple.
  2. Abbey Wood station has two platforms for Crossrail and two for the North Kent Line.
  3. The platforms appear to be numbered one to four from the South.
  4. There appears to be a turnback for Crossrail trains in Platform 3, which also appears to have crossovers to connect to the North Kent Line.
  5. Crossovers to the West of Abbey Wood station allow trains to use either Crossrail platform.
  6. These crossovers also allow access to the sidings at Plumstead.
  7. The Plumstead tunnel portal can be seen below Plumstead Depot.

If Abbey Wood station follows the two National Rail platforms at Liverpool Street in handling a total of 8 tph, then initially Abbey Wood could handle this frequency of trains.

Ian says this in the first article about the frequencies of Crossrail during testing.

Before the blockade, Crossrail was testing the line with an 8 trains per hour (8tph) service, but this week they are going to be ramping that up to 12tph, which will mirror the timetabled service that the line will offer when it opens early next year.

Note that 12 tph will require Abbey Wood station to handle 6 tph on each platform.

Transport for London also intend to simulate 24 tph through the central section, which will be the Peak frequency when the line fully opens.

The Surface Section At Custom House

This map from cartometro shows the track layout around Custom House station.

Note.

  1. Crossrail is shown in purple.
  2. The DLR is shown in light green.
  3. The tunnel portal for the central Crossrail tunnel is to the West of Custom House station.
  4. The tunnel portal for the Connaught tunnel is in the area of the former Connaught Road station.
  5. Between the other end of the Connaught tunnel and Woolwich station, some of the route is in a cutting.
  6. There are crossovers either side of Custom House station.

I suspect a lot of the complications are because an old route was reused.

The Surface Section At Paddington

This map from cartometro shows the track layout around Paddington station.

Note.

  1. The Crossrail station at Paddington is a straight-through two platform station.
  2. The Royal Oak portal, where Crossrail comes to the surface is just to the West of Royal Oak Underground station.
  3. Two lines are labelled CRL Eastbound and CRL Westbound are connected to the Crossrail lines.
  4. Between and around these lines is Paddington New Yard
  5. There are two full crossovers between Paddington New Yard and the Royal Oak portal.

To reverse at Paddington, trains proceed to Paddington New Yard, where the driver changes ends and then returns to Paddington, when needed.

Trains for Reading and Heathrow use the CRL Eastbound and CRL Westbound lines to connect to Crossrail’s Western surface tracks and the Central core tunnel.

It all looks well-designed to my untrained eye.

Platform Edge Doors

This page on the Crossrail web describes the platform edge doors.

This is the first paragraph.

Crossrail has installed floor-to-ceiling platforms screen doors at each of the eight new underground stations on the Elizabeth line – that’s roughly 4 kilometers of platform edge screens in total.

The new stations between Abbey Wood and Paddington are,

  • Paddington
  • Bond Street
  • Tottenham Court Road
  • Farringdon
  • Liverpool Street
  • Whitechapel
  • Canary Wharf
  • Custom House
  • Woolwich

This is eight underground stations and one surface station; Custom House.

So does it mean that Custom House station doesn’t have platform edge doors?

 

I took these pictures of Custom House station today.

Note.

  1. The Crossrail trains were running at a frequency of 8 tph.
  2. , The pictures don’t show any platform edge doors or structures capable of supporting platform edge doors.

Could the regulations allow a surface station like Custom House to be built without doors, or were they left out to save money?

Safety is assured by being able to shut off all entrances to the platforms.

But it does appear that between Custom House and Paddington stations, passengers and trains are separated by platform edge doors.

  • Platform edge doors are controlled by the signalling, so with the correct interlocking a lot of things are possible.
  • Suppose, a station is not ready for passengers, then by locking the doors closed, trains can still pass through.
  • Does this mean that at stations like Liverpool Street, where passengers might need to walk between the Moorgate and Liverpool Street ends of the station to change trains, that these pedestrian routes could be opened? I think it does?

It does appear to me, that platform edge doors are the key to opening a partially-completed railway.

When Could Abbey Wood And Paddington Open?

It strikes me that the following conditions must be met.

  • Paddington station must be handed over to Transport for London.
  • Platform edge doors at all stations must work reliably.
  • The trains must work reliably with the signalling.

It looks like Bond Street, Paddington and Whitechapel stations, are the only stations that have not been handed over to Transport for London.

  • I suspect, as Paddington is a terminal station, it must be handed over.
  • Crossrail have said they could live with Bond Street opening later.
  • Whitechapel appears to have been a difficult station to build, so perhaps it could open later.

Could Crossrail open partially, earlier than anyone thinks?

Perhaps this post called Your First Crossrail Service May Arrive In Time For Christmas, was based on fact and not rumour in the Sunday Times.

 

 

 

 

 

July 14, 2021 Posted by | Transport/Travel | , , , , , , , , | 1 Comment

Crossrail’s First Inclined Lift Is Now Available To View!

The entrance to Crossrail in front of Broadgate has now had most of its hoarding removed.

You can now walk around it and view the escalators and inclined lift, that will take passengers to and from the booking hall.

It’s probably the most up-market fosterito, that I’ve seen so far. Even more so, than the pair at Tottenham Court Road station, that I wrote about in Tottenham Court Road Station Gains A Giant Fosterito.

  • It has three escalators and an inclined lift.
  • It oozes quality with lots of steel, glass and quality lighting.
  • It shows the arms of the City of London in recognition to their contribution to Crossrail.
  • It sits in the middle of a large traffic-free square.

WilkinsonEyre were the architects.

Fosteritos

Norman Foster faced a similar problem in Spain of how to protect staircases and escalators emerging from the Bilbao Metro.

These pictures show his elegant solution.

The Spaniards obviously liked them, as they called them fosteritos.

June 17, 2021 Posted by | Transport/Travel | , , , | 2 Comments

Crossrail’s Inclined Lifts

This page on variably, shows the inclined lifts on Crossrail, at Liverpool Street station.

Take a look, as they are impressive. To my built-in video camera with an enormous instant-access store, they look like modern versions of the first inclined lift, I ever saw, which was on the Stockholm Metro.

If I remember correctly, the Swedish one was installed on if not an Angel-sized set of escalators, certainly one of a good length.

It looks like it was at Duvbo station.

Enjoy the video.

It’s not this set of escalators at Duvbo, as it is the other way round, but it certainly is very similar.

Are they available in bronze for the Northern reaches of the Piccadilly Line, where I suggested inclined lifts for step-free access in Thoughts On Step-Free Access At Manor House Station.

One could be built in like this short one at Greenford station.

I shall replace this picture with a better one.

June 17, 2021 Posted by | Transport/Travel | , , , , , , | Leave a comment

Is Liverpool Street Getting Ready For Crossrail?

I took these pictures in front of Liverpool Street station, this morning.

It does look that in a week or so, the area in front of the station will be ready for people to use the glass entrance to the new station.

  • The whole area in front of the station and the next door building; 100 Liverpool Street has been converted into a new traffic-free square.
  • The only vehicles are the taxis to the East in front of the old station and the buses using the bus station between the station and 100 Liverpool Street.
  • 100 Liverpool Street will have a roof-top restaurant.
  • I do like the City of London’s stylish red and black bollards.
  • The station sign is in front of the station.

Obviously, we don’t know the completion state of the massive below-ground station, that reaches all the way to Moorgate.

 

February 2, 2021 Posted by | Transport/Travel | , , | Leave a comment

All Change At The Broadgate Entrance To Liverpool Street Station

Everything seems to have changed at the Broadgate Entrance To Liverpool Street Station, as these pictures show.

Note.

  1. You now enter at street level, rather than through a subway.
  2. You ascend a gentle ramp to walk through some upmarket shops and then descend into the station using an escalator.
  3. You can also walk through the shops to the bus station between the rail station and Broadgate.

The only thing, that hasn’t changed is the rusty smoking shelter.

October 16, 2020 Posted by | Design, Transport/Travel | , , , , , | Leave a comment

Liverpool Street Station – New Entrance

These pictures show the new entrance taking shape in front of Broadgate and the original Liverpool Street station.

It looks like the entrance is going to be a large fosterito.

They seem to be cropping up all over London.

Judging by the fact, that bikes seem to be parked in front of the entrance, I would suspect that this entrance could be finished soon.

July 24, 2020 Posted by | Transport/Travel | , , , | 1 Comment

Walking To Liverpool Street Station

I took these pictures yesterday, as I walked from my home to Liverpool Street station.

I had intended to buy the latest edition of Modern Railways at W H Smith’s in the station, but it was shut.

April 4, 2020 Posted by | World | , , | 3 Comments