The Anonymous Widower

Avanti West Coast Looks To Recover

The title of this post is the same as an article in the March 2022 Edition of Modern Railways.

These are some points from the article.

Passengers Numbers Are Recovering

This is a paragraph.

Mr. Wittingham says the recovery has been strongest on the Anglo-Scottish and Liverpool corridors, while Manchester have begun to bounce back. Slowest to recover is the London to West Midlands market; ‘there’s several operators here and we were the main carrier of business passengers, and that sector has been recovering more slowly than leisure’ says Mr. Whittingham.

Phil Whittingham is MD of Avanti West Coast.

Train Numbers Are Recovering

Avanti are building up train numbers from Euston after the pandemic.

Frequencies are as follows in trains per hour (tph)

  • Pre-Covid – 9
  • During the pandemic – 4
  • From December 2021 – 7
  • Omicron – 4
  • From February 2022 – 6
  • From May 2022 – 6+

Avanti have reacted to demand.

Three Classes Of Travel

This is a paragraph.

Avanti’s business has historically been driven by leisure travel – before Covid this accounted for broadly 60 % of passengers, with most of the rest travelling for business plus a smaller number of commuters. ‘The demand is there, and we think by next year we’ll be on the way to full recovery’ says Mr. Whittingham. ‘Leisure has been strong, especially at weekends, but the missing bit is the corporate market.’

Avanti have been running a marketing campaign and it appears to have been successful.

This paragraph describes Avanti’s new Standard Premium class.

Last year, Avanti West Coast launched a new class of travel – Standard Premium. This was first introduced in May on an upgrade-only basis before going fully live in September with the option to book online in advance. The new class sits between Standard and First, giving passengers larger seats and greater space but without some of the extras that come with First Class Travel such as complimentary refreshments and lounge access.

These are Mr. Whittingham’s comments on the three classes.

The current split of passengers is 84% Standard, 12 % First and 4 % Standard Premium, but given the latter has been in place for less than a year there is clearly scope for growth. ‘Our research shows people have been upgrading to Standard Premium rather than downgrading from First’.

I have yet to try Standard Premium, but I will next time I use Avanti.

Refreshments

Avanti have decided to serve different refreshments in Standard Premium and First classes.

  • In Standard Premium, they are now offering At Seat Orders.
  • In First, they have updated the menu.

Both seem to have been well-received.

I like this statement from Mr. Whittingham.

We’ve tried to make it a more personalised service with a less rigid structure, so we give customers what they want, when they want it, rather than when we want to give it to them.

A Consistent Offer

This is a paragraph.

Mr. Whittingham says Avanti has not yet confirmed whether t will offer three classes of travel on the new Hitachi trains it has ordered, but says the aim is to provide a more consistent offer. Assisting this will be changes in the ongoing Pendolino refurbishment, where 11-car sets are having Coach G converted from First to Standard accommodation, meaning all Pendolinos, whether nine-car or 11-car, will have three coaches for First and Standard Premium passengers.

My instinct says that the four trains will be something like.

  • Class 390 train – Pendolino – Nine-car – three First/Standard Premium cars – six Standard cars
  • Class 390 train – Pendolino – Eleven-car – three First/Standard Premium cars – eight Standard cars
  • Class 805 train – Hitachi – Five-car – one First/Standard Premium car – four Standard cars
  • Class 807 train – Hitachi – Seven-car – two First/Standard Premium car – five Standard cars

Note.

  1. The Class 805 and Class 807 Hitachi trains are very much plug-and-play and can be lengthened or shortened as required.
  2. A regular passenger between London and Liverpool, who regularly upgrades from Standard to Standard Premium in a Class 390 train could be a bit miffed if he couldn’t, because the service was being run by a Class 807 train.
  3. Hitachi would probably be very happy to add extra cars to the Class 805 and Class 807 trains.

As the Class 390 Pendolino trains are being refurbished, I do wonder if they will be receiving some fittings from the Hitachi trains to make sure the trains are consistent to both on-board staff and passengers.

Pendolino Investment

The Pendolino refurbishment is comprehensive.

  • It is one of the largest such programmes ever undertaken in the UK.
  • Leasing company; Angel Trains are funding the work.
  • Alstom are doing the work at Widnes.
  • There appears to be a smooth plan to refurbish all trains.
  • Coach G will be converted from First to Standard accommodation in eleven-car trains.
  • Mr. Whittingham says that all trains will come out looking like a new train.

The eleven-car trains are being converted first, as the conversion of Coach G gives a capacity benefit of around thirty seats.

The awful seats in Standard Class will be replaced with Lumo-style seats and laptop-friendly fold-down tables.

These seats will be a big improvement!

New Trains Coming

This paragraph introduces the new trains.

The second major fleet investment from Avanti is the £350 million for new trains from Hitachi, financed by Rock Rail. These comprise 13×5-car Class 805 bi-modes, ordered for destinations off the electrified route including North Wales and Shrewsbury and 10×7-car Class 807 electrics. Deployment plans for the latter are still being worked through but are likely to include services to Birmingham and Liverpool, and potentially to Blackpool.

What is not said in this paragraph, is that all trains have a redesigned front end, which I suspect is more aerodynamic.

The all-electric Class 807 trains have no diesel engines or batteries, so have they been put on a diet, to improve the acceleration?

In Will Avanti West Coast’s New Trains Be Able To Achieve London Euston and Liverpool Lime Street In Two Hours?, I came to these conclusions.

  • A two hour service between London Euston and Liverpool Lime Street will be possible with Avanti West Coast’s new Class 807 trains.
  • The current Class 390 trains could go a bit faster and if they cut out a couple of stops could probably break two hours.

I also calculated that a two tph service between London and Liverpool in two hours would need nine trains.

Timetable Changes

This paragraph introduces the article’s section on timetable changes.

The project in turn feeds into a major timetable change planned by Avanti and other West Coast main line operators. This will be the first significant change to West Coast main line schedules since 2008; ‘the world has changed, and we need to think about how we best serve our markets’ says Mr Whittingham.

This paragraph sums up the major changes.

Of note are the planned changes to the pattern of London to West Midlands services; the pre-Covid 20-minute interval would be amended to offer faster journey times and greater connectivity. Also featuring in the new timetable aspirations would be additional Trent Valley calls in some Liverpool and Manchester services; Mr Whittingham cites as one benefit of this the potential for improved journey times between the North West and the East Midlands via a change of train at Nuneaton. The Hitachi trains, with their better acceleration, will be particularly useful on services with more frequent stops.

The next three sections will look at some timetable changes in a bit more detail.

London And West Midlands Services

Replacement of twenty diesel Class 221 trains with thirteen bi-mode Class 805 trains will mean a major reorganisation of services to the West Midlands.

  • Some current diesel services will now be electric.
  • All services between Birmingham New Street and Euston will now be electric.
  • No services will run on diesel under live electrification.
  • Avanti have promised to serve Walsall.
  • There will be extra services to Shrewsbury and other places.

The electric services will also speed up some services to the West Midlands.

North West And East Midlands Services

I will look at train times for services between the North West (Liverpool Lime Street and Manchester Piccadilly) and the East Midlands (Leicester, Nottingham and Lincoln), where passengers change at Nuneaton.

These are the current fastest possible times according to the National Rail journey planner.

  • Liverpool Lime Street and Leicester -2:24 with changes at Crewe and Nuneaton,
  • Manchester Piccadilly and Leicester – 2:11 with change at Sheffield
  • Liverpool Lime Street and Nottingham – 2:42 with no changes
  • Manchester Piccadilly and Nottingham – 1:51 with no changes
  • Liverpool Lime Street and Lincoln- 3:42 with changes at Sheffield and Doncaster
  • Manchester Piccadilly and Lincoln – 2:38 with change at Sheffield

Note that times are in hours:minutes.

These are all current times for the various legs if the route is via Nuneaton.

  • Avanti West Coast – Liverpool Lime Street and Nuneaton – 1:18
  • Avanti West Coast – Manchester Piccadilly and Nuneaton – 1:13
  • CrossCountry – Nuneaton and Leicester – 0:27
  • East Midlands Railway – Leicester and Nottingham – 0:48 – Time from Leicester and Lincoln service.
  • East Midlands Railway – Leicester and Nottingham – 0:20 – Time from St. Pancras and Nottingham service.
  • East Midlands Railway – Leicester and Lincoln -1:42 – Time from Leicester and Lincoln service.
  • East Midlands Railway – Nottingham and Lincoln -0:52 – Time from Leicester and Lincoln service.

Note that the two Avanti West Coast times have been estimated by taking the time from Real Time Trains and adding three minutes for the acceleration or deceleration at Nuneaton.

These would be possible times between the North West and the East Midlands via Nuneaton.

  • Liverpool Lime Street and Leicester – 1:47
  • Manchester Piccadilly and Leicester – 1:42
  • Liverpool Lime Street and Nottingham – 2:37
  • Manchester Piccadilly and Nottingham – 2:32
  • Liverpool Lime Street and Lincoln- 3:31
  • Manchester Piccadilly and Lincoln – 3:26

Note that I am assuming changes at Nuneaton and Leicester are cross-platform or same platform changes that take two minutes.

But there is another level of improvement possible.

Suppose that East Midlands Railway’s Lincoln and Leicester service were to be extended to Nuneaton and run by a train with this specification.

  • 125 mph operating speed.
  • Battery-electric power.
  • 100 mph operating speed on battery power.
  • Range of 56 miles on battery
  • Ability to use the Midland Main Line electrification, when it is erected.

Charging stations would be needed at Nuneaton and Lincoln.

These would be possible times between the North West and the East Midlands via Nuneaton with the one change at Nuneaton.

  • Liverpool Lime Street and Leicester – 1:45
  • Manchester Piccadilly and Leicester – 1:40
  • Liverpool Lime Street and Nottingham – 2:05
  • Manchester Piccadilly and Nottingham – 2:00
  • Liverpool Lime Street and Lincoln- 2:57
  • Manchester Piccadilly and Lincoln – 2:52

Note.

I am assuming that the timings for the Nuneaton and Leicester and the Nottingham and Lincoln legs are as for the current trains.

I am assuming the change at Nuneaton is a cross-platform or same platform change that takes two minutes.

Trains run on battery where tracks are not electrified.

I can build a table of current times, times via Nuneaton and savings.

  • Liverpool Lime Street and Leicester -2:24 – 1:45 – 0:39
  • Manchester Piccadilly and Leicester – 2:11 – 1:40 – 0.31
  • Liverpool Lime Street and Nottingham – 2:42 – 2:05 – 0:37
  • Manchester Piccadilly and Nottingham – 1:51 – 2:00 – 0.09 slower
  • Liverpool Lime Street and Lincoln- 3:42 – 2:57 – 0.45
  • Manchester Piccadilly and Lincoln – 2:38 – 2:52 – 0:14 slower

It does appear that by using the 125 mph speed of the West Coast Main Line has a positive effect on some times from the North West to the East Midlands.

But times could be reduced further.

  • Installing full digital signalling, that would enable 140 mph running between Crewe and Nuneaton, could save ten minutes.
  • Improving the Nuneaton and Leicester and the Nottingham and Lincoln legs could allow faster running.

The more I look at changing at Nuneaton, I feel it is a good idea.

  • It improves the connections between East Midlands Parkway and Loughborough and the North West.
  • It improves the connections between Cambridge, Peterborough and Stansted Airport and the North West, if the change at Nuneaton is to CrossCountry’s Stansted Airport and Birmingham New Street service.
  • It improves the connections between Coventry and Leamington Spa and the North West.

Avanti have come up with a cunning plan, worthy of Baldrick at his best.

A Second Hourly Service Between London And Liverpool

A paragraph talks about the second hourly service between London and Liverpool.

Avanti still has ambitions to introduce a second hourly service between Euston and Liverpool, but when this will come in will depend on demand recovery.

Consider.

  • If would be desirable if some or all trains running on the route could achieve a timing of two hours between London and Liverpool.
  • It is felt that the second service should stop at Liverpool South Parkway station, where the platforms are too short for eleven-car Class 390 trains.
  • Avanti have stated they would like more stops in the Trent Valley, especially at Nuneaton, where they would connect to services to the East Midlands.
  • Nuneaton is almost exactly halfway between London and Liverpool.
  • Running two tph with Class 807 trains would need nine trains and Avanti have only ordered ten in total.

I believe that a practical timetable like this could work.

  • Class 390 train – one tph – Non-stop or perhaps a single stop in the Midlands – Under two hours
  • Class 807 train – one tph – Stopping at Nuneaton, Stafford, Crewe, Runcorn and Liverpool South Parkway – Current time or better

An hourly service between London and Liverpool in under two hours would surely be a passenger magnet.

February 23, 2022 Posted by | Transport/Travel | , , , , , , , , , , , , , | 3 Comments

Calls For Study Into Reopening Of Leeds Railway Station To Expand Capacity

The title of this post, is the same as that of this article on Rail Technology Magazine.

This is the introductory paragraph.

Local politicians in Leeds have called for the revival of Marsh Lane railway station to ease some of the pressure on the city’s busy main station, seeking viability studies to be carried out on it and other sites as a first step.

This Google Map shows the area of the proposed Leeds Marsh lane station.

Note.

  1. The Leeds Playhouse, Leeds Conservatoire, Northern Ballet  and large NHS offices in the centre of the circle of roads.
  2. Marsh Lane runs down the East side and crosses under the Leeds and Hull via Selby railway line.
  3. I would assume that the station will be built, where the road goes under the railway.

This second map is an enlargement of where the station used to be.

It looks like there would be space to put two platforms outside the double-track line.

Services Through Leeds Marsh Lane Station

The following services appear to run through the site of Leeds Marsh Lane Station.

  • CrossCountry – Plymouth and Edinburgh/Glasgow
  • LNER – Leeds and Edinburgh
  • Northern – Blackpool North and York
  • Northern – Halifax and Hull
  • Northern – Leeds and York
  • TransPennine Express – Liverpool Lime Street and Newcastle
  • TransPennine Express – Liverpool Lime Street and Scarborough
  • TransPennine Express – Manchester Airport and Newcastle
  • TransPennine Express – Manchester Airport and Redcar
  • TransPennine Express – Manchester Piccadilly and Hull

Note.

  1. All trains are hourly in both directions.
  2. There are also up to two freight trains per hour (tph) through the area.

There’s certainly scope for a balanced timetable through the station, but will there be enough time for all to stop?

Conclusion

Building this station looks to feasible and a good service could be provided.

Whether it is built would depend on passenger numbers and the cost of building.

Hence the need for a comprehensive study!

 

February 22, 2022 Posted by | Transport/Travel | , , , | Leave a comment

Was Storm Franklin Named By An Old Minchendenian?

This press release from the Met Office is entitled Storm Franklin Named.

When I first heard yesterday, that the storm was to be named, I must admit, that I allowed myself a small smile.

I went to Minchenden Grammar School in Southgate, leaving in 1965.

One teacher, that we looked upon with a degree of affection was our German teacher, who was Frank J Stabler, who some pupils referred to as Franklin J Stabler. I don’t know whether that was his real name or whether it was fellow pupils making it up.

But he did have one story, that he used to liven up one of the lessons, where he taught me enough German to get by in the country.

Apparently, he was returning from France to the UK on the night of Saturday, the 31st of January in 1953, using the ferry from Dieppe in France to Newhaven in Sussex.

That ferry route used to have a reputation for being rough and on one bad crossing around 1975, my five-year-old son fell and cut himself just above his eye. He was skillfully cleaned up and plastered by one of the chefs. Luckily the chef had been a soldier, who had been well-trained in first aid.

Back in 1953, Mr. Stabler could have chosen a better night for his trip, as that day was the night of devastating East Coast Floods, which killed over five hundred people in the UK.

The captain of the ferry decided to sit the storm out and crew and passengers spent twenty-four hours being tossed about like a cork in the English Channel, which was a tale Mr. Stabler told with great drama.

He finished the tale, by saying that in the end, he prayed for the boat to go down to put everybody out of their misery.

Conclusion

I have to ask if someone on the committee that decides storm names, either directly or indirectly, has heard this tale and decided that Franklin would be an appropriate name for a storm beginning with F.

 

 

February 21, 2022 Posted by | Transport/Travel, World | , , , , , , , | 1 Comment

The Big Beast In Your Electric Bus

This article on electrive.com is entitled BAE Systems Takes Orders For 340 Hybrid Drive Systems.

This is the first paragraph.

The Southeastern Pennsylvania Transportation Authority (SEPTA) has selected BAE Systems to supply up to 340 hybrid electric drive systems for its new fleet of low emission transit buses. BAE Systems will provide 220 electric drive systems to New Flyer of America, with an option for 120 additional systems, over the next three years.

The article also reveals that the company is working with AlexanderDennis.

The system appears to be hybrid, with a lot of intelligent choosing of when to use a polluting engine.

February 21, 2022 Posted by | Energy, Transport/Travel | , , , , , | 5 Comments

LNER Launches International Website Making Travel Simpler For Overseas Tourists

The title of this post, is the same as that of this press release on LNER.

These four paragraphs describe the new website.

The new website coincides with the removal of pre-departure testing and quarantine rules for vaccinated people arriving in England or Scotland from 11 February 2022.

In a move that expands LNER’s global market, customers in 10 countries, including China, Japan, Spain, South Korea and Italy, are among the first to benefit when booking directly online.

LNER’s new search and booking engine offers international customers in those countries an option to purchase train tickets using their language and currency. The LNER.co.uk website will automatically detect those customers who are searching outside of the UK and will redirect them to the customised site to improve their online booking experience. The website launch comes as LNER reintroduces its full timetable, excluding pre-planned engineering works, meaning customers can discover destinations across the full 956-miles of East Coast route.

LNER has been working with travel tech company and rail retailer, Omio, to develop the site, which has the capability to operate in up to 20 languages and 26 currencies, including Euros, Korean Won and Japanese Yen or by using a payment method recognised in the home country.

Surely, if you run a travel company, your web site must be accessible to buy tickets from everywhere.

February 20, 2022 Posted by | Transport/Travel | , , , | 5 Comments

A Thought On The Prospects For Crossrail

Someone asked the question, in a discussion group, that I visit, if Crossrail will be a success.

I believe that you only have to look at the success of the London Overground to realise that Crossrail will be a success.

When the North London Line reopened as the first route of the London Overground with new Class 378 trains, it used to run four-car trains at a frequency of six trains per hour (tph) between Stratford and Willesden Junction stations.

Now the line runs eight tph on that route and the trains are five cars.

That is a capacity increase of 66% in terms of cars per hour.

And still at times, the trains are full and Transport for London are looking at ways of adding extra trains and/or cars.

Crossrail will have the factors going for it, which helped to make the Overground that success. It is new and has a novelty value, but above all like the Overground, it is built for full-sized people, who could be pushing bikes and buggies and trailing baggage.

Crossrail, also increases options for alternative routes for Londoners , who are World Champions at ducking-and-diving.

Crossrail has also been designed so that the trains can be extended.

If Crossrail has a problem, other than the lateness and budget overrun, it is that it doesn’t connect to the Victoria or Piccadilly Lines.

February 18, 2022 Posted by | Transport/Travel | , , , , , , | 12 Comments

Embraer, Widerøe And Rolls-Royce Announce Partnership To Research Innovative Technologies For Sustainable Regional Aircraft

The title of this post, is the same as that of this press release from Rolls-Royce.

This is the body of the press release.

Embraer, Widerøe and Rolls-Royce have today announced plans to study a conceptual zero-emission regional aircraft.

The 12-month cooperation study – in the context of pre-competitive research and development – will address passenger requirements to stay connected in a post Covid-19 world, but do so sustainably, and seeks to accelerate the knowledge of the technologies necessary for this transition. Such technologies will allow national governments to continue to support passenger mobility while reusing most of the existing infrastructure in a more sustainable way.

Advances in scientific research can make clean and renewable energy a major enabler of a new era of regional aviation and the three companies will share their combined in-depth knowledge of aircraft design, market demand, operations and propulsion solutions to further develop their understanding of zero-emission technologies and how they can be matured and applied to future regional aircraft.

Among other topics, the study will cover a wide range of applications for new propulsion technologies to examine a range of potential solutions – including all-electric, hydrogen fuel cell or hydrogen fueled gas turbine powered aircraft.

These are my thoughts.

An Aircraft For Existing Infrastructure

This is an extract from the press release.

Such technologies will allow national governments to continue to support passenger mobility while reusing most of the existing infrastructure in a more sustainable way.

If I was the CEO of an airline, I’d want an aircraft that fitted the airports and their facilities, where I wanted to fly.

No Propulsion System Is Ruled Out

This is an extract from the press release.

Among other topics, the study will cover a wide range of applications for new propulsion technologies to examine a range of potential solutions – including all-electric, hydrogen fuel cell or hydrogen fueled gas turbine powered aircraft.

It would appear no propulsion system is ruled out.

In LNER Seeks 10 More Bi-Modes, where I talked about LNER ordering ten new trains, they also said they would accept any type of power, that was suitable.

Embraer

Embraer are a successful Brazilian aerospace company, who according to Wikipedia, are the third largest producer of civil aircraft, after Boeing and Airbus.

I first flew in one of their EMB 110 Bandeirantes in the 1970s from Norwich to Stavanger and I’ve flown on several of their aircraft since.

Embraer’s current jet aircraft line-up includes.

  • Embraer E-Jet – Twin-jet regional airliner – 66-124 passengers – 1596 produced
  • Embraer E-Jet E2 – Twin-jet regional airliner – 88-146 passengers – 50 produced

Note.

  1. The E-Jet E2 is the successor to the E-Jet with new engines, new avionic, fly-by-wire controls and other improvements.
  2. Production numbers are as of 31st March 2021.
  3. Embraer don’t seem to produce turboprop aircraft any more, although a lot of their former products are still flying.

I certainly wouldn’t avoid flying in Embraer products, as I would in other aircraft and on some airlines.

Have Embraer identified a market for a smaller sustainable or even zero-carbon aircraft that could extend their product range below the jets?

Widerøe

Widerøe are a long-established and well-respected Norwegian airline.

Their fleet consists of forty De Havilland Canada Dash 8 turboprop aircraft of various variants and three Embraer E-Jet E2 jet airliners.

Wikipedia says this about their fleet.

Widerøe plans to replace most of its Dash-8 by 2030.

Given that the Dash 8 seats between 40 and 80 passengers, I wonder if a sustainable or even zero-carbon aircraft with an appropriate number of seats and the STOL performance of the Dash 8, would suit Widerøe’s route network, which includes many small airfields.

Rolls-Royce

In What Does 2.5 MW Look Like?, I talked about Rolls-Royce’s development of a 2.5 MW Generator.

I am inserting the start of the linked post.

This press release on the Rolls-Royce web site is entitled Rolls-Royce Generator Delivered For Most Powerful Hybrid-Electric Propulsion System In Aerospace.

This Rolls-Royce picture shows the generator installed on a test bed.

These are the first three paragraphs of the press release.

The generator that will be at the heart of the most powerful hybrid-electric aero power and propulsion system in aerospace has arrived for installation at our specialist testbed.

The generator, and related power electronics, was delivered to the newly-renovated Testbed 108 in Bristol, UK, from the Rolls-Royce facility in Trondheim, Norway, having completed an extensive development test programme. It will form part of the 2.5 megawatt (MW) Power Generation System 1 (PGS1) demonstrator programme, for future regional aircraft. In addition to hybrid-electric propulsion, the generator could also be used as part of a “more-electric” system for larger aircraft or within future ground or marine applications.

PGS1 forms an important element of our sustainability strategy, which includes developing innovative electrical power and propulsion systems.

I must say that as an engineer this 2.5 MW generator really excites me, as I see so many possibilities.

Could this engine become the power unit of a hydrogen-powered regional airliner?

Rolls-Royce, Tecnam And Widerøe

In Rolls-Royce And Tecnam Join Forces With Widerøe To Deliver An All-Electric Passenger Aircraft Ready For Service In 2026, a similar deal to the Embraer, Widerøe and Rolls-Royce deal is discussed.

I am inserting the start of the linked post.

The title of this post, is the same as that of this press release from Rolls-Royce.

This is the first paragraph.

Rolls-Royce and airframer Tecnam are joining forces with Widerøe – the largest regional airline in Scandinavia, to deliver an all-electric passenger aircraft for the commuter market, ready for revenue service in 2026. The project expands on the successful research programme between Rolls-Royce and Widerøe on sustainable aviation and the existing partnership between Rolls-Royce and Tecnam on powering the all-electric P-Volt aircraft.

This picture from Rolls-Royce shows the proposed aircraft.

The P-Volt aircraft is based on the Tecnam P2012 Traveller.

Conclusion

Perhaps, the first deal is progressing so well, Rolls-Royce and Widerøe decided to repeat the exercise.

 

 

February 18, 2022 Posted by | Transport/Travel | , , , , , | Leave a comment

Battery Train And Fast Charger To Be Tested In London

The title of this post is the same as that of this article on Railway Gazette.

This is the first paragraph.

Great Western Railway has signed an agreement to test Vivarail’s Class 230 battery multiple-unit and fast charging technology under real-world conditions on the 4 km non-electrified branch between West Ealing and Greenford in West London.

As an engineer, who started designing control systems for rolling mills in the mid-1960s and went on to get a Degree in Control and Electrical Engineering from Liverpool University, before working for ICI applying computers to a variety of problems, I can’t look at a railway line like the Greenford Branch without wanting to automate it.

I had one amateurish attempt in An Automated Shuttle Train On The Greenford Branch Line. I was trying to get four trains per hour (tph) on the branch and I don’t think that is possible, with the Class 230 trains.

Now we know the train we are dealing with, I could plan an automated system, that would drive the train.

  • Each journey on the branch takes around 11-12 minutes.
  • Two tph would take between 44 and 48 minutes shuttling between the two stations in an hour.
  • The article states that recharging takes ten minutes.
  • If the train charged the batteries once per hour, that would leave between two and six minutes for the other three stops.
  • Any freight train using the branch seems to take about six minutes, so they could sneak through, when the shuttle is having a fast charge.
  • I would also use a similar system to that originally used on the Victoria Line. After the driver has closed the doors and ascertained that there were no problems, they would press a button to move the train to the next station and then automatically open the doors.

From this rough calculation to run a two tph service, I suspect that the train needs to be able to go between West Ealing and Greenford stations in ten minutes. Assuming one ten minute Fast Charge per hour, this would give three minutes and twenty seconds to turn the train, at the three terminal station stops.

I certainly feel, that an automatic shuttle would be possible.

February 16, 2022 Posted by | Transport/Travel | , , , , , , , , , , | 2 Comments

Does London Need High Capacity Bus Routes To Extend Crossrail?

If Crossrail has a major problem, it is that some areas of the capital will find it difficult to access the new line.

Up to the age of sixteen, I used to live half-way between Oakwood and Cockfosters stations on the Piccadilly Line.

There are a large number of people who live along the Northern reaches of the Piccadilly Line, who might want to use Crossrail to perhaps go to Heathrow or places in East London.

But the journey will need a double change as there is no interchange between the Piccadilly Line and Crossrail.

I suspect that many will link to Crossrail by taking the Piccadilly Line to Wood Green, Turnpike Lane or Manor House and then get a 141 bus to Moorgate. It is a route, I use if I want to go to Southgate or Cockfosters from my house, which has a 141 stop opposite.

But then as a child to go to Harringay, where my father had an uncle, my mother would use a 641 trolley bus from Wood Green or Turnpike Lane.

Do people follow the public transport habits of their parents?

I know I do!

My father never went on a deep tube. As he several times mentioned the terrible Bank station bombing in the Blitz, which killed 56 people, I always thought that was his problem. But now living as I do along the Northern and Northern City Lines, I suspect it was more to do with air quality, as we were or are both bad breathers.

I suspect that when Crossrail opens, the 141 bus will be heavily used by travellers going between the Northern reaches of the Piccadilly Line and Crossrail at Moorgate.

The 141 bus goes between London Bridge station and Palmers Green and it has a route length of about nine miles.

Currently, buses run every fifteen minutes or so, but I doubt it will be enough in future as Transport for London are rerouting the closely-related 21 bus.

I suspect any route seen as an extension of Crossrail needs to have the following characteristics.

  • High frequency of perhaps a bus every ten minutes.
  • Interior finish on a par with the Class 345 trains.
  • Wi-fi and phone charging.

I would also hope the buses were carbon-free. Given that some of these routes could be quite long, I would suspect hydrogen with its longer range could be better.

Other Routes

According to me, the 141 bus route needs improvement!

But how many other routes could need similar improvement?

February 16, 2022 Posted by | Hydrogen, Transport/Travel | , , , , , , , , , | 6 Comments

A Plea From Michael Portillo

In the latest episode of his Great British Coastal Railways – Helensburgh to Connel, Michael Portillo made a plea to train makers.

Travelling along the scenic West Highland Line, he asked train manufacturers to build a train with a glass roof.

February 15, 2022 Posted by | Design, Transport/Travel | , | 3 Comments