The Anonymous Widower

Devizes Station Would Need To Be Part Of Wider Rail Plan

The title of this post, is the same as that of this article on Railway Gazette.

These two paragraphs outline the current status.

The construction of a Devizes Gateway station at Lydeway is unlikely to represent value for money as a standalone project, but it could be viable as part of a wider rail improvement programme, a study has concluded.

The feasibility study undertaken by Wiltshire Council, Devizes Development Partnership, GWR and Network Rail built on a strategic outline business case submitted to the Department for Transport under the Restoring Your Railway Fund programme in November 2021.

The Department for Transport will now decide what to do next.

I think there are other issues on the route between Reading and Taunton.

The Current Train Service

The only passenger services using the Reading and Taunton route are these three trains, which all have a frequency of one train per two hours (tp2h).

  • London Paddington and Exeter St. Davids – Calling at Reading, Newbury, Hungerford, Pewsey, Westbury, Castle Cary, Taunton and Tiverton Parkway
  • London Paddington and Plymouth – Calling at Reading, Taunton, Tiverton Parkway and Exeter St Davids
  • London Paddington and Penzance  – Calling at Reading, Taunton, Tiverton Parkway and Exeter St Davids

Note.

  1. London Paddington and Exeter St. Davids takes a few minutes over two hours.
  2. London Paddington and Plymouth takes a few minutes over three hours.
  3. London Paddington and Penzance takes a few minutes over five hours.
  4. The Reading and Taunton route is a double-track railway with a 110 mph operating speed.
  5. London Paddington and Newbury is electrified.
  6. The last two trains alternate to give Plymouth an hourly service.
  7. After Exeter St. Davids, trains have a sophisticated stopping pattern to give all stations served a good service.

From several trips along the line, I have the impression, that it’s a route, where drivers can get the best out of the trains.

Electrification

The line would benefit from electrification, in terms of journey times and decarbonisation.

But could this route be run by battery-electric trains?

  • It is 89.7 miles between Newbury and Taunton.
  • It is 120.4 miles between Newbury and Exeter St. Davids.
  • It is 52.1 miles between Exeter St. Davids and Plymouth.
  • It is 79.4 miles between Plymouth and Penzance.
  • London Paddington and Newbury is electrified.
  • Taunton, Exeter St. Davids, Plymouth and Penzance stations could have a charging system of some sort.

This Hitachi infographic shows the specification of the Hitachi Intercity Tri-Mode Battery Train.

Consider.

  • Two trains go between Newbury and Taunton without stopping.
  • The Exeter St. Davids service stops three times.
  • Newbury and Taunton non-stop took 75 minutes at an average speed of 72 mph
  • Newbury and Taunton with three stops took 78 minutes.
  • All trains currently appear to be nine cars.

I suspect that Hitachi’s Intercity Tri-Mode Battery Train could go between Newbury and Taunton with a great deal of ease.

How many diesel engines and batteries would the train have?

Normally, nine-car Class 800/802 trains have five diesel engines.

So how many will be replaced by batteries?

The infographic says one engine will be replaced, so if that is a five-car train, it looks likely that a nine-car train could have two batteries.

But Hitachi could be playing a long game!

In Stadler FLIRT Akku Battery Train Demonstrates 185km Range, I wrote about how the FLIRT Akku has a range of 115 miles.

If Hitachi can squeeze 125 miles out of a nine-car Class 800 with two or three battery packs, they will outrange the FLIRT Akku and be able to run between London Paddington and Penzance on batteries, with some topping up on the way.

We mustn’t forget the engineers at Hyperdrive Innovation, who are designing and building Hitachi’s battery packs.

They will be ultracompetitive and know the range required to get battery-electric trains to Penzance.

I suspect that when the range of the nine-car battery-electric Class 800/802 is revealed, it will astonish everybody!

Bedwyn Station

Bedwyn station is served by an hourly shuttle train to and from Newbury, run by a diesel train.

The station used to have a direct service from London, but now passengers change at Newbury.

A Station For Marlborough

I investigated this in A Station For Marlborough, where this was my conclusion.

With the next generation of electric train with onboard energy storage or IPEMUs, a Marlborough station on a new Marlborough Branch Line can be used to create a two tph service to and from Paddington to replace the current one tph service from Bedwyn.

So a new Marlborough station would be a win for all those using stations on the Reading to Taunton Line to the East of Pewsey.

I also wonder how many other similar services can be developed by extending a service past a main line terminal to a new or reopened branch line, which is built without electrification and run using trains with onboard energy storage.

In answer to my posed question in the last paragraph, I suspect it is quite a few!

Devizes Gateway Station At Lydeway

I wrote about this proposed Devizes Gateway station in Reinstatement Of Rail Access To Devizes Via A New Station At Lydeway.

After writing Was Baldrick An Essex Man? about the building of an avoiding line at the new Beaulieu Park station North of Chelmsford, I do wonder, if it would be an idea to incorporate one in this proposed station, if there is a need to increase capacity.

This Google Map shows the station site, where the A342 crosses the railway.

I suspect a third track can be squeezed in.

Westbury Station

Westbury station is a busy station, where the Reading and Taunton Line crosses the Wessex Main Line.

This map from OpenRailwayMap shows the lines in the station.

Note.

  1. The blue lettering indicates Westbury station.
  2. The two major rail routes are shown in orange.
  3. The Reading and Taunton Line goes East-West across the map.
  4. Note the avoiding line South of Westbury station.
  5. Reading is in the East and Taunton is in the West.
  6. The Wessex Main Line goes North-South across the map.
  7. Bristol is in the North.
  8. Salisbury and Southampton is in the South.

In Westbury Station – 30th July 2020, there are some pictures I took of Westbury station.

This section in Wikipedia says this about the Future of Westbury station.

The line to Westbury is not due to be electrified as part of the 21st-century modernisation of the Great Western Main Line. Although local councillors support it, the extension of electrification beyond Newbury to Westbury was assessed as having a benefit–cost ratio of only 0.31.

On the other hand this document on the Network Rail web site, which is entitled the Devizes Gateway Interim
Feasibility Study, suggests that another platform might be added at Westbury station.

Castle Cary Station

Castle Cary station doesn’t seem to have any well-publicised problems, so please tell me if you know of any.

Frome Station

Frome station is described in its Wikipedia entry as an unusual station and one that is Grade II Listed.

I suspect, it could do with some more services.

Somerton Station

I wrote about a new Somerton station in Somerset: Plans For New Railway Station On Levels.

Track Improvements

I suspect if Network Rail were improving the route between Reading and Taunton, they know of some places, where they could do some work.

Service Improvements

Consider.

  • There is probably a need for a stopping train between Newbury and Taunton, which calls at all stations.
  • It might terminate at the London end, at either London Paddington or Reading.
  • It might be a battery-electric train.
  • An hourly frequency would be ideal, if the track and signalling could handle it.
  • Charging systems would be positioned as needed.

The train would interface with other Great Western services to Bristol, London Paddington, Gloucester, Salisbury, Southampton and Weymouth.

Oy could also interface with the Transwilts services.

Conclusion

This could be developed into a very useful network for Wessex.

April 19, 2023 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , | 1 Comment

The Construction Of The New Thanet Parkway Station Is Substantially Complete And It Will Open To Passengers On 31 July 2023

The title of this post, is the same as that of this page on the Network Rail web site.

The opening date is the most important information, but the rest of the page is worth a read, as it gives details of the work, that is still to do.

Much concerns sorting out the kevel crossings.

April 11, 2023 Posted by | Transport/Travel | , , , | Leave a comment

UK And Welsh Governments To Explore New Rail Links Between South Wales And England

The title of this post, is the same as that of this press release from the UK Government.

These are the three bullet points.

  • UK and Welsh governments today (2 February 2023) announce a new study to improve transport connectivity between south-east Wales and west of England
  • the study, backed by £2.7 million of UK government funding, will look at options for new railway stations and rail services on the South Wales Main Line
  • this project will focus on relieving congestion on the M4, a vital connector between south Wales and the rest of the UK

The stations are not named, but it is said that they could be between Cardiff and the Severn Tunnel.

The last paragraph changes direction a bit.

Lord Peter Hendy also proposed reviewing the route connecting north Wales to the north-west of England, better connectivity with HS2 and a package of railway improvements to increase connectivity and reduce journey times between Cardiff, Birmingham and beyond.

I find this development very interesting, but typical of the sensible approach one would expect from Lord Peter.

In Could High Speed Two Serve Holyhead?, I looked at the route and came to this conclusion.

London Euston and Holyhead could be a serious proposition.

With some development and a new fast ferry, it could also open up a practical zero-carbon route between Great Britain and Ireland.

Times of four and a half hours between London Euston and Dublin could be possible.

I suspect that time would appeal to green tourists, especially those in First with a good meal.

February 3, 2023 Posted by | Transport/Travel | , , , , , , , , , , , | 4 Comments

Brent Cross West Station – 22nd January 2023

T took these pictures as I passed the site this morning.

I’m not sure about the work of art.

Changing At Farringdon To And From Northbound Thameslink Trains

For my trip this morning, I took the Lizzie Line one stop from Moorgate station to Farringdon, and then straight up the escalator to the Northbound Thameslink platform.

Changing to Northbound Thameslink services at Farringdon is very easy, if you make sure you arrive in the Western end of your Lizzie Line train.

These pictures show the change.

Note.

  1. You can only change at the Western end of the Lizzie Line platforms.
  2. At the top of the escalator, keep to the left and walk through to the Northbound platform.

You will be arrive on the Northbound platform at the back of the train.

The reverse change is also easy, so if I was coming home from Gatwick Airport or Brighton, I’d change at Farringdon to the Lizzie Line for Moorgate, from where I can get a bus to my home.

The change to the Lizzie Line will be easier, if you are in the back of your Thameslink train.

Pit Stops At Farringdon Station

One unique feature of the Northbound Thameslink platform at Farringdon station, is that unusually for a sub-surface station, it has full facilities, which are located by the escalators for the Lizzie Line.

I would very much like to see more of these.

Changing At Farringdon To And From Southbound Thameslink Trains

Changing to Southbound Thameslink services at Farringdon is similar to changing to Northbound Thameslink services, if you make sure you arrive in the Western end of your Lizzie Line train.

These pictures show the change.

Note.

  1. You can only change at the Western end of the Lizzie Line platforms, where you go up the escalator.
  2. At the top of the escalator, keep to the right and take the escalator to the station entrance.
  3. Then descend to the Southbound platform using the stairs or the lifts.

You will arrive on the Southbound platform at the front of the train.

The reverse change is also easy, so if I was coming home from Bedford or Cambridge, I’d change at Farringdon to the Lizzie Line for Moorgate, from where I can get a bus to my home.

The change to the Lizzie Line will be easier, if you are in the front of your Thameslink train.

January 22, 2023 Posted by | Transport/Travel | , , , , , , , | Leave a comment

A Thought On Broughton Station

This Google Map shows Hawarden Airport to the West of Chester.

Note.

  1. Airbus make wings for their aircraft at their Broughton factory on this airport.
  2. The wings are flown to Europe for final assembly.
  3. The North Wales Coast Line passes the Northern end of the runway.

When I bought my return ticket between Chester and Holyhead, which was good value at £25.25 with my Senior Railcard, I got chatting with the clerk about Airbus and their Broughton factory.

He felt it needed a station and afterwards I checked and found that the Welsh Government had been trying to build one for some time.

Thinking back, I wonder if he keeps getting asked about getting to the Airbus factory and wishes that the government and Airbus would make his job easier by building a  Broughton station.

A station at Broughton might also cut the factory’s carbon footprint, by allowing more staff to go to work by train.

A Merseyrail Extension To Shotton

Shotton is already served by the Borderlands Line which connects Wrexham and Bidston.

This line is shown on the West side of this map, which shows how the Merseyrail network might look in the future.

Note.

  1. Chester could have services that terminate in the East at Crewe and Runcorn East stations.
  2. Chester already has electric services from Liverpool, which will receive new Class 777 trains in the next few months.
  3. The new trains can be fitted with a battery electric capability.

I just wonder, if a Cross-Chester Metro could be built.

  • Eastern termini would be Runcorn East or possibly Warrington Bank Quay and Crewe.
  • Shotton is only 7.9 miles from Chester.
  • Shotton low-level station used to have four tracks.
  • I suspect that Shotton or even Flint could be the Western terminus.
  • Extra stations could be added as required.

Note.

It would probably be best, if the trains were battery-electric that could use 25 KVAC overhead electrification, as this would allow them to charge at the Eastern termini.

I also feel that Crewe and Chester should be electrified, so that Chester could be reached by the new Class 805 trains running under electric power.

This would also allow Chester to become a High Speed Two destination, that was served by High Speed Two Classic-Compatible trains.

I believe that a Cross-Chester Metro is a possibility.

October 12, 2022 Posted by | Transport/Travel | , , , , , , , , , , , | 2 Comments

Schoolchildren Get First Glimpse Of Northumberland Line Train Services

The title of this post, is the same as that of this article on the Northumberland Gazette.

 

The title does say it all, but what a good idea to give the kids a ride first to build up enthusiasm for the new Northumberland Line.

July 22, 2022 Posted by | Transport/Travel | , , | Leave a comment

High Speed Two Publish Rural Footbridge Design

High Speed Two have published their rural footbridge design on this page of their web site.

This image from High Speed Two shows an artist’s impression of the bridge.

 

This is High Speed Two’s own thoughts on the design.

Made of weathering steel, the sides of the lightweight bridges will lean outwards to maximise views of the sky and improve the experience of people crossing the railway.

Weathering steel – which ages naturally to a russet brown colour – was chosen to help match the tone of the surrounding countryside, while the plates that form the structure of the bridges will be angled to appear narrower and lighter.

To emphasise the sense of lightness, each span will be slightly higher in the middle so that they appear to leap over the railway. Most of the bridges will consist of just one 42m span, with extra spans added where necessary to create bridges of up to 102m long.

The design of the bridge would appear to be a good compromise between accessibility, cost, ease of construction and installation and practicality.

The article also covers other topics.

Step-Free

This paragraph explains how the bridges will be step-free.

In order to improve efficiency of manufacturing and assembly, all the bridges will have the same basic form, with the approach paths built into the earthworks on either side of the bridge. This also means that all the footbridges will effectively be step-free.

I can see bridges of this type being built at other rural locations.

A Single-Platform Station

These images show James Cook station in Middlesbrough.

High Speed Two’s rural bridge design could be used as part of a design for a step-free station on a rural line.

Bridleways

The footbridge can be used for a bridge on a bridleway.

Designed with guidance from the British Horse Society, the bridges which carry bridleways will follow the same basic pattern, with a recycled, non-slip rubber deck and the structure acting like a baffle to stop horses being distracted by passing trains.

Footbridges will be 2.5m wide, while bridleways will be 3.5m wide to allow two horses to pass comfortably and safely.

It should be remembered, that horses are flight animals and if they are startled they run, so if say a train went under the bridge, when they were on top, they would most likely go forward and cross the bridge quickly.

I would happily have ridden  my stallion; Vague Shot over a bridge like this.

I also think, the design of the bridge in the landscape should allow riders to approach to a safe distance from the bridge and perhaps watch a train or two go through.

Other Animals

I can see other animals like badgers, foxes and hares using a bridge like this.

I also think, that on classic railways, bridges like these could be used to allow farmers to move sheep or possibly cattle over a railway, with some simple design changes.

Conclusion

This bridge has more applications, than the initial one, for which it was designed.

July 22, 2022 Posted by | Design, Transport/Travel | , , , , , | 2 Comments

A First Trip To Barking Riverside Station

I took a first trip to Barking Riverside station this morning and took these pictures.

I have a few thoughts and observations.

July 18, 2022 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , | 5 Comments

Birth Of A Station

Thanet Parkway station is under construction and should be opened in May next year.

Work is progressing as this Google Map shows.

Note.

  1. The A299 goes across the top of the map.
  2. The Ashford – Canterbury – Ramsgate Line runs diagonally from South-West to North-East across the map.
  3. Ashford and Canterbury are to the South-West.
  4. Ramsgate is to the North-East.

The new Thanet Parkway station appears to be being built on the triangular site between the A299 and the railway.

  • There appear to be two entrances/exits to the station from the A299.
  • The pedestrian bridge over the railway is under construction.
  • The roads and walkways around the station are being laid.

This video gives more details of the station.

Parking At Thanet Parkway

According to the video, there are nearly three hundred parking spaces, with a number of disabled spaces and spaces with charging for electric cars.

Is that going to be enough spaces?

But at least, there may be fields around the station, that could be used to provide additional parking.

Richborough Energy Park

This Google Map shows the area around the station and to the South towards Richborough.

Note.

  1. The under-construction Thanet Parkway station is in the North-East corner of this map to the West of the village of Cliffsend.
  2. The dual-carriageway of the A256 runs North-South down the map to a roundabout.
  3. To the West of the roundabout is Richborough Energy Park.

This Google Map shows the are round the energy park and the roundabout in more detail.

Note.

  1. The Richborough substation in the South-West corner of the map.
  2. The Richborough Energy Park sits to the East of the substation.
  3. The solar panels to the North of the roundabout are the 4.9 MW Ebbsfleet Solar Farm, which is part of Richborough Energy Park.

Richborough Energy Park is an ongoing project.

The national grid interconnector from the original power station is still in place, and is now the grid link for the 300 MW offshore Thanet Wind Farm.

It is the terminal for the NemoLink interconnector to Belgium.

Wikipedia says this about future plans.

The current owner of the site, BFL Management Ltd, plan to bring the site back into use as a £750 million green energy park. There are additional plans to create additional recycling and green energy facilities on site, including an anaerobic digester, a waste processing plant, a biomass combined heat and power generator, a pyrolysis plant and a peak demand 30MW diesel generator. When fully operational, the park could provide up to 1,400MW of power, employing 100 full-time equivalent, with up to 500 jobs in the construction phase.

I am surprised, that there is no mention of batteries or energy storage.

This press release from Network Rail is entitled Charge While You Travel With New Electric Vehicle Charging Points At Network Rail Stations.

This the body of the press release

Rail passengers with electric vehicles will be able to charge while they travel thanks to the introduction of 450 new electric vehicle charging points at Network Rail-managed car parks at railway stations.

The charging points, powered by guaranteed renewable energy, provide enough power to fully charge a vehicle in as little as 3-4 hours.

In this phase, Network Rail has powered: 160 charging points in Reading, 111 in Manchester, 84 in Edinburgh, 56 at Leeds and 41 in Welwyn Garden City.

Electric vehicle charging points will be installed across 10% of car parking spaces (approximately 779 spaces) at car parks managed by Network Rail by March 2024.

Rail is already the leading form of green public transport and this marks another milestone in Network Rail’s commitment to a low-emission railway – making sure rail is environmentally-friendly, resilient to climate change and able to provide an excellent service for years to come.

The new Compleo charging points are marked with green parking bays and passengers can pay for what they need quickly and easily via the APCOA Connect app.

Note, that there is no mention, if these are vehicle-to grid (V2G) chargers.

In Airport Plans World’s Biggest Car Parks For 50,000 Cars, I stated my belief that car parks, with hundreds or even thousands of vehicles could be turned into giant grid batteries.

  • All electric vehicles, when they are parked would be plugged in to V2G chargers.
  • The vehicle and the grid, would know your expected return time and how much power you would need. Probably from a parking app, assisted by AI!
  • If the grid borrowed your electricity, whilst you were away, you wouldn’t know, until you received the payment for the loan.
  • If your car runs on hydrogen, the parking could also handle the battery, that all hydrogen-powered vehicles have.

Thanet Parkway station would be an ideal station for such a parking system for electric vehicles.

July 10, 2022 Posted by | Energy Storage, Transport/Travel | , , , , , , , | 1 Comment

Five New Derbyshire Stations Could Be Built Under Rail Plans

The title of this post, is the same as that of this article on the BBC.

These paragraphs outline the schemes.

Up to five new railway stations could be built in Derbyshire as two projects to reopen existing lines to passengers have progressed in a government scheme.

The Barrow Hill line from Chesterfield to Sheffield could be opened to passengers as part of the government’s £500m Restoring Your Railway programme.

It would see stations built at Whittington, Barrow Hill, Eckington/Renishaw and Killamarsh.

It will now go through to the next stage of the scheme.

In addition, Derbyshire County Council said proposals to reopen the Ivanhoe line from Burton-upon-Trent to Leicester were being progressed as part of the project, which would see a new station built at Castle Gresley.

Business cases will now been drawn up to see if the cases will proceed.

Barrow Hill Line

I wrote about the Barrow Hill Line in Reinstatement Of The Barrow Hill Line Between Sheffield And Chesterfield.

Ivanhoe Line

I wrote about the Ivanhoe Line in Reinstatement Of The Ivanhoe Line.

There also is a Wikipedia entry for Gresley station, where this is said.

In the 1990s BR planned to restore passenger services between Leicester and Burton as the second phase of its Ivanhoe Line project. However, after the privatisation of British Rail in 1995 this phase of the project was discontinued. In 2009 the Association of Train Operating Companies published a £49 million proposal to restore passenger services to the line that would include reopening a station at Gresley to serve the town of Swadlincote.

This map shows the possible position of the station.

I suspect it would be to the West of the roundabout.

June 29, 2022 Posted by | Transport/Travel | , , , | 1 Comment