The Anonymous Widower

Union Pacific Railroad Makes Largest Investment In Wabtec’s FLXdrive Battery-Electric Locomotive

The title of this post, is the same as that of this press release from Union Pacific.

This is the first three paragraphs.

Union Pacific Railroad (NYSE: UNP) today announced the purchase of 10 FLXdrive battery-electric locomotives from Wabtec Corporation (NYSE: WAB). The order, which marks the largest investment in battery technology by a North American railroad, will upgrade Union Pacific’s rail yard infrastructure and support its commitment to significantly reduce greenhouse gas emissions.

“As an industry leader, Union Pacific is pioneering a major application of battery power in its rail yards,” said Rafael Santana, President and CEO for Wabtec. “Battery power is an ideal solution to reduce the environmental impact and costs of yard operations. Using the FLXdrive in the rail yard can significantly improve local air quality, as well as reduce noise by up to 70% for neighboring communities.”

The approximately 2.5-MWh locomotives are each powered solely by 7,000 battery cells, providing Union Pacific a zero-emission solution for its yard operations. The 10 FLXdrives will enable the railroad to eliminate 4,000 tons of carbon annually from its rail yards, the equivalent of removing 800 cars from the highway. The new locomotives will be manufactured in the United States with the first units being delivered to Union Pacific in late 2023.

It would appear that the major use will be in their rail yards.

There is also this second press release from Union Pacific, which is entitled Union Pacific Railroad To Assemble World’s Largest Carrier-Owned Battery-Electric Locomotive Fleet.

This is the first paragraph.

Union Pacific Railroad (NYSE: UNP) today announced plans to purchase 20 battery-electric locomotives for testing in yard operations. The combined purchases and upgrades to yard infrastructure are expected to exceed $100 million, representing the largest investment in battery-electric technology by a U.S. Class I railroad. The locomotives will be acquired from Progress Rail, a Caterpillar company, and Wabtec Corporation (NYSE:WAB), two companies at the forefront of locomotive innovation, and will be the world’s largest carrier-owned battery-electric locomotive fleet in freight service.

The press release also says that Union Pacific will be netzero by 2050.

Conclusion

All of this action in the United States and Australia with battery-electric locomotives, from two manufacturers; Progress Rail and Wabtec, leads me to the conclusion, that proposals to create battery-electric locomotives from Class 66 or Class 68 locomotives in the UK, will soon be being discussed by the owners of the locomotives and Wabtec and Stadler.

January 29, 2022 Posted by | Transport/Travel | , , , , , , , | 6 Comments

Novac Djokovic Is Screwed, Glued And Tattooed By The BBC

This article on the BBC is entitled Novak Djokovic: Doubts Over Timing Of Covid Test.

This is the introductory paragraph.

BBC research has cast doubt on the timing of the positive Covid test Novak Djokovic used to enter Australia to try to compete in the Australian Open.

The BBC have done some impeccable research on the tests and their dates.

Read it, as nothing they did was difficult, once they had details of all the tests.

As my old company accountant would say.

Novac Djokovic Is Screwed, Glued And Tattooed.

But then the accountant had ways of making money and numbers talk and perform!

In my life, I’ve had three accountants as friends and all have shown me simple ways to detect fraud.

One even showed me how to dress up a spreadsheet, so that a banker would believe it. As he had been Chief Accountant of one the most famous names in British industry, I always wrote my software to his rules.

January 28, 2022 Posted by | Computing, Sport | , , , , | 8 Comments

Hydrogen Refuelling Station For Vehicles Lands At Teesside Airport

The title of this post, is the same as that of this article on the Northern Echo.

This is the introductory paragraph.

A refuelling station that will serve hydrogen-powered vehicles based in the Tees Valley is now up and running at Teesside Airport as part of a £2.5million region-wide trial.

A selection of vehicles and equipment is being trialled, including some for the emergency services.

The trial will be overseen by Teesside University.

The University also runs the Tees Valley Hydrogen Innovation Project, which is described on this page on the University web site.

January 28, 2022 Posted by | Hydrogen, Transport/Travel | , , , , , | Leave a comment

Expansion Plan To Take World’s Biggest Battery Storage Project To 3GWh Capacity

The title of this post, is the same as that of this article on Energy Storage News.

These are the first two paragraphs.

Plans to nearly double the output and capacity of the world’s biggest battery energy storage system (BESS) project to date have been announced by its owner, Vistra Energy.

The Texas-headquartered integrated utility and power generation company said it wants to add another 350MW/1,400MWh BESS to the Moss Landing Energy Storage Facility in California’s Monterey Bay.

The project is based at the Moss Landing Power Plant, which was once the largest power plant in the state of California, with a generation capacity of 2560 MW.

There appear to be three phases.

  • Phase 1 is 300MW/1,200MWh and went online at the end of 2020
  • Phase 2 is 100MW/400MWh and went online in August 2021.
  • Phase 3 will be 350MW/1,400MWh.

This gives a maximum power output of 750 MW and prospective total capacity of 3 GWh. At full power, the battery could supply 750 MW for four hours.

For comparison, the two Scottish batteries I talked about in Amp Wins Consent For 800MW Scots Battery Complex, have a combined output of 800 MW and a total capacity of 1600 MWh, which would give a full power run of two hours.

Could the difference be that Scotland has 9.3 GW of installed windpower, whereas the much larger California has only 6 GW?

Both Scotland and California also have some pumped storage power stations.

This all shows the complex integrated nature of electricity networks.

January 28, 2022 Posted by | Energy, Energy Storage | , , , , , , | Leave a comment

ITM Power’s 24MW Electrolyser Sale to Yara

The title of this post, is the similar to that of this press release from ITM Power. I just added a few words.

These are the first three paragraphs.

ITM Power (AIM: ITM), the energy storage and clean fuel company, is pleased to provide details of the sale of a 24MW electrolyser to Linde Engineering contained in the Company’s Half Year Report issued yesterday. The electrolyser is to be installed at a site operated by Yara Norge AS (“Yara”) located at Herøya outside Porsgrunn, about 140 km southwest of Oslo. The site covers an area of approximately 1.5 square kilometres and is the largest industrial site in Norway. The Porsgrunn site produces 3 million tons of fertiliser per year.

The hydrogen required for ammonia production is currently produced from SMR. Yara intends to start replacing this grey hydrogen with green hydrogen produced from renewable energy and electrolysis. The 24MW system supplying 10,368 kg/day of hydrogen will account for approximately 5% of the plant’s consumption and serve as a feasibility study for future upscaling. Yara has received a grant of up to NOK 283m (£23.6m,pending ESA approval) from Enova SF, a Government funding body, to invest in green solutions for hydrogen used for industrial purposes in Norway.

The electrolyser equipment is due to be ready for shipment from ITM Power in Q4 2022 with revenue realised in the Company’s 2022/2023 financial year.

These are my thoughts.

The Size Of The Electrolyser

A 24 MW electrolyser, that produces 10,368 Kg of hydrogen/day may sound a large device.

This is an extract from the press release.

In January 2021, the Company received an order for the world’s then largest PEM electrolyser of 24MW from Linde. In October 2021, the Company, with Linde, announced the deployment of a 100MW electrolyser at Shell’s Rhineland refinery, following the start-up of an initial 10MW facility at the site.

It appears that ITM Power have built one before and one four times the size has been ordered.

What Size Of Electrolyser Would Yara Need To Fully Decarbonise Ammonia Production?

According to the press release, a 24 MW electrolyser will produce five percent of the plant’s consumption, which means that a 480 MW electrolyser will be needed, if Yara use an ITM electrolyser to produce all their hydrogen.

Will manufacture of an electrolyser of this size be a problem for ITM Power?

The press release says this about electrolyser production.

ITM Power operates from the world’s largest electrolyser factory in Sheffield with a capacity of 1GW (1,000MW) per annum, with the announced intention to build a second UK Gigafactory in Sheffield with a capacity of 1.5GW expected to be fully operational by the end of 2023. The Group’s first international facility, expected to have a capacity of 2.5GW per annum, is intended to be operational by the end of 2024, bringing total Group capacity to 5GW per annum.

It also says that the company has raised £250m to accelerate expansion.

The Delivery Date

The delivery date of the electrolyser is stated as Q4 2022.

I find this rather quick, which makes me believe that one of the reasons for the success of ITM Power is their production process.

How Much Ammonia Is Produced Worldwide?

This is an extract from this publication from the Royal Society, which is entitled Ammonia: Zero-Carbon Fertiliser, Fuel And Energy Store.

Current global ammonia production is about 176 million tonnes per year and is predominantly achieved through the steam reforming of methane to produce hydrogen to feed into ammonia synthesis via the Haber Bosch process.

Ammonia production is a highly energy intensive process consuming around 1.8% of global energy output each year (steam methane reforming accounts for over 80% of the energy required) and producing as a result about 500 million tonnes of carbon dioxide (about 1.8% of global carbon dioxide emissions)2,3,4. Ammonia synthesis is significantly the largest carbon dioxide emitting chemical industry process. Along with cement, steel and ethylene production, it is one of the ‘big four’ industrial processes where a decarbonisation plan must be developed and implemented to meet the netzero carbon emissions target by 2050.

It looks like Linde and ITM Power have a fairly simple plan to decarbonise world ammonia production. And they have started with one of the easier targets; Yara in the very environmentally-correct Norway.

I estimate that to produce 176 million tonnes of green ammonia will need over 28 GW of electrolyser capacity.

Conclusion

If Linde and ITM Power can persuade the world, that their technology is the way to go, then they’ve got it made.

January 28, 2022 Posted by | Hydrogen | , , , , , , | 1 Comment

Green Hydrogen Companies Are Going Public To The Delight Of Investors

The title of this post, is the same as that of this article on Hydrogen Fuel News.

The article discusses the IPO of the ThyssenKrupp subsidiary; Nucera.

There is more in this article on Reuters, which is entitled Betting On Hydrogen Hype, Thyssenkrupp Eyes $687 mln In IPO Cash.

I have a feeling, that this would not be an investment for widows and orphans, but this widower may know enough to have a small punt at the right price.

 

 

January 27, 2022 Posted by | Finance & Investment, Hydrogen | , | 4 Comments

Face Coverings Your Choice

In England from today, you don’t legally have to wear masks.

This notice was on the door of Marks and Spencer at The Angel.

These are the words at the bottom.

Face coverings are not legally required but the Government recommends them in indoor crowded areas. If you have any symptoms of COVID-19 please refrain from entering the store.

How sensible!

It will be interesting to analyse the takings of Marks & Spencer, Waitrose and Sainsburys as they are all close together on Liverpool Road.

I was standing outside Marks & Spencer, when I took the picture.

 

January 27, 2022 Posted by | Health | , , , , , , | Leave a comment

A Tale Of Two Cataract Operations

I have now had two cataract operations.

There was a few weeks between the operations and in the interval they changed the machines.

  • The first was a Leica and the second was a Zeiss.

There were no problems with either operation, but there were differences, particular in how I felt afterwards.

  • With the first, I was slightly more uncomfortable and had a slight amount of pain in my left eye. But the pain was nothing that a few ginger biscuits couldn’t cure.
  • With the second, I’ve had no pain at all and the eye looks less red. I was able to take the dressing off in the evening and go out the next day, which I couldn’t do after the first.

Now fifty-four hours after the operation, my eyes are back to normal. I can even type this without putting on my glasses.

Conclusion

I would suggest that before you have a cataract operation, you make sure the surgeon will be using the latest machines.

January 26, 2022 Posted by | Health | , , , | Leave a comment

Amp Wins Consent For 800MW Scots Battery Complex

The title of this post, is the same as that of this article on renews.biz.

These are the first two paragraphs.

Canadian storage player Amp Energy has revealed that its 800MW battery portfolio in Scotland has secured planning consent.

The portfolio is due to be operational in April 2024 and will comprise two 400MW battery facilities, each providing 800 megawatt-hours of energy storage capacity.

Some other points from the article.

  • The two facilities will be located at Hunterston and Kincardine.
  • They will be the two  largest grid-connected battery storage facilities in Europe.
  • The two batteries will be optimised by Amp Energy‘s proprietary software.

This Google Map shows the Hunterston area.

Note.

  1. The Hunterston A and Hunterston B nuclear power stations, which are both being decommissioned.
  2. Hunterston B only shut down on the 7th of January, this year.
  3. There is also a large brownfield site in the North-East corner of the map.

This second Google Map shows the South-East corner of the nuclear power station site.

It’s certainly got a good grid connection.

But then it had to support.

  • The Hunterston A nuclear power station rated at 360 MW.
  • The Hunterston B nuclear power station rated at 1.2 GW.
  • The Western HVDC Link, which is an interconnector to Connah’s Quay in North Wales, that is rated at 2.2 GW.

I’m sure that National Grid has a suitable socket for a 400 MW battery.

This Google Map shows the Kincardine area.

Note.

  1. The Clackmannanshire Bridge down the Western side of the map.
  2. The Kincardine Substation to the East of the bridge close to the shore of the River Forth.
  3. The 760 MW Kincardine power station used to be by the substation, but was demolished by 2001.

As at Hunterston, I’m sure that National Grid could find a suitable socket for a 400 MW battery.

Amp Energy’s Philosophy

As a trained Control Engineer I like it.

  • Find a well-connected site, that can handle upwards of 400 MW in and out.
  • Put in a 800 MWh battery, that can handle 400 MW in and out.
  • Optimise the battery, so that it stores and supplies electricity as appropriate.
  • Throw in a bit of artificial intelligence.

Old power station sites would seem an ideal place to site a battery. Especially, as many demolished coal, gas and nuclear stations are around 400-600 MW.

It should be noted that Highview Power are building a 50 MW/400 MWh CRYOBattery on an old coal-fired power station site in Vermont.

The Western HVDC Link

I mentioned earlier that the Northern end of the Western HVDC Link, is at Hunterston.

The Wikipedia entry for the Western HVDC Link, says this about the link.

The Western HVDC Link is a high-voltage direct current (HVDC) undersea electrical link in the United Kingdom, between Hunterston in Western Scotland and Flintshire Bridge (Connah’s Quay) in North Wales, routed to the west of the Isle of Man.[2] It has a transmission capacity of 2,250 MW and became fully operational in 2019.

The link is 262 miles long.

This Google Map shows the Connah’s Quay area in North Wales.

Note.

  1. The red arrow indicates the Flintshire Bridge HVDC converter station, which is the Southern end of the Western HVDC Link.
  2. The Borderlands Line between Liverpool and Chester, runs North-South to the East of the convertor station.
  3. To the East of the railway are two solar farms. The Northern one is Shotwick Solar Park, which at 72 MW is the largest solar farm in the UK.
  4. To the West of the converter station, just to the East of the A 548 road, is the 498 MW Deeside power station.
  5. Follow the A548 road to the West and over the River Dee, the road passes South of the 1420 MW Connah’s Quay Power station.
  6. The two power stations burn gas from Liverpool Bay.
  7. There are a lot of wind turbines along the North Wales Coast and Liverpool Bay.

The map also shows a lot of high electricity users like Tata Steel.

I can certainly see why the Western HVDC Link was built to connect Scotland and North Wales.

  • There is a lot of renewable energy generation at both ends.
  • There are heavy electricity users at both ends.
  • The Scottish Central Belt is at the North.
  • Greater Merseyside is at the South.

The Western HVDC Link is an electricity by-pass, that must have avoided expensive and controversial construction on land.

I wouldn’t be surprised to see another 400 MW/800 MWh battery at the Southern end.

Conclusion

The Canadians seem to have bagged two of the best battery sites in Europe.

  • Both sites would appear to be able to handle 400 MW, based on past capabilities.
  • There is lots of space and extra and/or bigger batteries can probably be connected.
  • Scotland is developing several GW of wind power.

I can see Amp Energy building a series of these 400 MW sites in the UK and around Europe.

This is the big news of the day!

 

January 26, 2022 Posted by | Artificial Intelligence, Energy, Energy Storage | , , , , , , , , , , | 1 Comment

BHP To Trial Battery Locos On Pilbara Iron Ore Network

The title of this post, is the same as that of this article on Railway Gazette.

The article summarised all the battery-electric locomotives ordered to bring the iron ore to the coast by mining companies; BHP, Fortescue, Rio Tinto and Roy Hill.

The article indicates some of the innovative operations that will be tried. This is a sentence from the article.

A key element will be to assess the potential for capturing regenerated braking energy on the loaded downhill runs, and storing it to power empty trains back uphill to the mines.

I would hope that the South Wales Metro, the Buxton branch and the East Kilbride branch will use similar energy conservation techniques.

January 26, 2022 Posted by | Energy, Transport/Travel | , , , , , , , , , | 7 Comments