The Anonymous Widower

West Coast Main Line Electro-Diesels On Test

The title of this post, is the same as that of this article on Railway Gazette.

This is the first paragraph.

The first two of 13 Hitachi Class 805 electro-diesel trainsets ordered for Avanti West Coast services are undergoing testing on the West Coast Main Line ahead of entry into service later this year.

These Class 805 trains will go to places like Chester, Bangor and Holyhead via Crewe.

It is interesting to look at various Crewe to London Euston services this morning.

  • 0740 – Class 390 train – From Liverpool – One Stop – 1 hour 40 minutes
  • 0755 – Class 221 train – From Holyhead – One Stop – 1 hour 40 minutes
  • 0832 – Class 390 train – From Manchester – One Stop – 1 hour 37 minutes
  • 0844 – Class 390 train – From Glasgow – 1 hour 28 minutes

Note.

  1. The first field is the four-figure time that the train left Crewe.
  2. The last field is the journey time between Crewe to London Euston.
  3. The Class 390 and 805 trains will use electricity to run between Crewe and London Euston, whereas the Class 221 train will use diesel.
  4. Crewe and London Euston is 158 miles.
  5. The Glasgow train covers the 158 miles at an average speed of 107.7 mph.

I have some thoughts.

What Will Be The Time For A Class 805 Train Between Crewe And London Euston?

Consider.

  • From Crewe, the Class 805 train will be using the electrification to London Euston.
  • The Class 390 train can tilt, whereas the Class 805 train can’t!
  • The Class 805 train is at least three tonnes lighter per car, than the Class 390 train.
  • The lighter weight and possibly more power of the Class 805 trains, will give better acceleration.
  • There is twenty-one years of difference in the build dates of the two trains. In that time, I also suspect that Network Rail have improved the track between Crewe and London Euston.
  • Norton Bridge junction has been improved to avoid conflicts.
  • It would be very convenient for Avanti West Coast and Network Rail, if the performance under electrification of the two trains were similar.

For these reasons, I believe that the performance of a non-stop Crewe And London Euston service using a Class 805 train will be such that it can match that of a Class 390 train.

I would also expect that with a similar stopping pattern between Crewe And London Euston, there would be little to choose between the two trains.

I can see with its better acceleration and lighter weight that the time between Crewe and London Euston will be perhaps a dozen minutes faster than the current time.

Using the electrification will also save a lot of diesel fuel with all its emissions.

Along The North Wales Coast Line

Consider.

  • Crewe and Holyhead is 105.5 miles and takes two hours and two minutes in a typical service.
  • These figures give an average speed of 52 mph.
  • There are six stops, which are scheduled to take a total of ten minutes.
  • About half the North Wales Coast Line has a maximum operating speed of 90 mph, but through Chester, Llandudno Junction and West of Bangor, the operating speed is 75 mph or less.

I am fairly sure, that with both the current Class 221 trains and the new Class 805 trains, it will be the track, rather than the train that determines the average speed.

It would therefore appear that if the average speed can be raised by track improvements these time savings could be achieved.

  • 60 mph – 105.5 mins – 16.5 mins
  • 70 mph – 90 mins – 32.5 mins
  • 80 mph – 79 mins – 43 mins
  • 90 mph – 70 mins – 52 mins
  • 100 mph – 63 mins – 59 mins
  • 110 mph – 58 mins – 64 mins
  • 120 mph – 53 mins – 69 mins
  • 130 mph – 49 mins – 73 mins
  • 140 mph – 45 mins – 77 mins

Note.

  1. The first column is the average speed.
  2. The second column is the time between Holyhead and Crewe.
  3. The third column is the saving.
  4. I suspect that 90 or 100 mph would be the highest possible practical average speed.
  5. Trains average 100 mph on several long sections of the Great Eastern Main Line.
  6. I put in the higher speeds to show what is possible, if the North Wales Coast Line were to be converted into a 140 mph electrified line with digital signalling.

Even at these relatively slow speeds compared to High Speed Two, there are considerable time savings to be made, just by improving the tracks.

Incidentally, High Speed Two is quoted in Wikipedia as aiming for a Crewe and London Euston time of 56 minutes, so by averaging 100 mph between Crewe and Holyhead, London Euston and Holyhead could be under two hours.

Batteries And Class 805 Trains

I wouldn’t be surprised that soon after the Class 805 trains are delivered, they could be converted to a version of Hitachi’s Intercity Tri-Mode  Battery Train, the specification of which is shown in this Hitachi infographic.

Note.

  1. I suspect that the batteries will be used to handle regenerative braking on lines without electrification, which will save diesel fuel and carbon emissions.
  2. The trains accelerate faster, than those they replace.
  3. The claimed fuel and carbon saving is twenty percent.
  4. It is intended that these trains will be introduced in 2023.

But Hitachi have not given any predictions of the range of these trains on battery power alone.

However, they do claim a battery range of 56 miles for the Hitachi Regional Battery Train, which is based on similar technology.

These trains could help in speeding the stops between Crewe and Holyhead.

  • Batteries would be charged at Holyhead and on the electrification to the South of Crewe.
  • At each stop, trains would use a proportion of the power in the battery to accelerate faster and save fuel and cut emissions.
  • Battery power would be used in stations for train hotel power.
  • Westbound trains would arrive in Holyhead and Southbound trains would arrive in Crewe, with not much power in the battery.

I suspect that, whether diesel or battery power is used, will be controlled by a sophisticated computerised control system.

Electrification Along The North Wales Coast Line

I think this will eventually happen to allow High Speed Two Classic-Compatible trains to run to Chester and along the North Wales Coast Line to Llandudno, Bangor and Holyhead.

But there is no benefit to be gained in electrifying until higher speeds are possible, after track improvements.

I believe these times will be possible with track improvements and the opening of High Speed Two.

  • Holyhead and Crewe – Class 805 train and 80 mph average – 79 mins
  • Holyhead and Crewe – Class 805 train and 90 mph average – 70 mins
  • Holyhead and Crewe – High Speed Two Classic-Compatible train, electrification and 100 mph average – 63 mins
  • Crewe and London Euston – Class 805 train – 80 mins
  • Crewe and London Euston – High Speed Two Classic-Compatible train – 56 mins

Note, electrification will be needed, to run High Speed Two Classic-Compatible trains along the North Wales Coast Line.

I am confident that these times will be possible.

  • Holyhead and London Euston – Class 805 train and 90 mph average  along the coast – 2 hours 30 mins
  • Holyhead and London Euston – High Speed Two Classic-Compatible train and 100 mph average  along the coast – 2 hours

The current time between Holyhead and London Euston is over three hours 45 minutes.

Conclusion

These trains will certainly speed up trains to North Wales.

 

February 15, 2023 Posted by | Transport/Travel | , , , , , , , , , , , , , , | 11 Comments

Through Settle And Carlisle Service Under Consideration

The title of this post, is the same as that of an article in the June 2021 Edition of Modern Railways.

This is the first paragraph.

Plans for a new Leeds to Glasgow through service via the Settle and Carlisle line are being developed, with CrossCountry and the Department for Transport starting to look at the possible scheme.

It sounds like a sensible idea to me.

The article also suggests the following.

  • CrossCountry is a possible operator.
  • CrossCountry are keen to improve services between Leeds and Glasgow
  • The trains could be InterCity 125s, freed up, by a the arrival of Class 221 trains from Avanti West Coast, when they receive their new Class 805 trains.
  • Maintenance of the trains wouldn’t be a problem, as this could be done at Neville Hill in Leeds or Craigentinny in Edinburgh.
  • Services could start in December 2023.

I have a few thoughts of my own!

The Route

The route between Leeds and Carlisle is obvious, but there are two routes between Carlisle and Glasgow.

Trains would probably choose a route and call at stations to maximise passenger numbers.

These stations are on the various routes.

  • Settle and Carlisle – Shipley, Bingley, Keighley, Skipton, Gargrave, Hellifield, Long Preston, Settle, Horton in Ribblesdale, Ribblehead, Dent, Garsdale, Kirkby Stephen, Appleby, Langwathby, Lazonby & Kirkoswald and Armathwaite
  • Glasgow South Western – Dunlop, Stewarton, Kilmaurs, Kilmarnock, Auchinleck, New Cumnock, Kirkconnel, Sanquhar, Dumfries, Annan and Gretna Green
  • West Coast Main – Motherwell, Carstairs and Lockerbie

There are certainly a lot of possibilities.

 Upgrading The InterCity 125 Trains

CrossCountry appear to have enough InterCity 125 trains to muster five in a two Class 43  power car and seven Mark 3 coach formation.

They may not be fully in-line with the latest regulations and there may be a need for a certain degree of refurbishment.

These pictures show some details of a refurbished Great Western Railway Castle, which has been fitted with sliding doors.

Will The InterCity 125 Trains Be Shortened?

Scotrail’s Inter7City trains and Great Western Railway’s Castle trains have all been shortened to four or five coaches.

This picture shows a pair of Castles.

Journey Times, Timetable And Frequency

The current journey time between Leeds and Glasgow Central stations via the East Coast Main Line is four hours and eight minutes with nine stops.

The Modern Railways article says this about the current service.

The new service would be targeted at business and leisure travellers, with through journey times competitive with road and faster than the current direct CrossCountry Leeds to Glasgow services via the East Coast main line.

I would expect that CrossCountry are looking for a time of around four hours including the turn round.

  • Stops could be removed to achieve the timing.
  • The trains could run at 125 mph on the West Coast Main Line.

This could enable a train to have the following diagram.

  • 0800 – Depart Leeds
  • 1200 – Depart Glasgow Central
  • 1600 – Depart Leeds
  • 2000 – Depart Glasgow Central
  • Before 2400 – Arrive Leeds

Note.

  1. A second train could start in Glasgow and perform the mirrored timetable.
  2. Timings would probably be ideal for train catering.
  3. Trains would leave both termini at 0800, 1200, 1600 and 2000.
  4. The timetable would need just two trains.

I also think, if a second pair of trains were to be worked into the timetable, there could be one train every two hours on the route, if the demand was there.

I certainly believe there could be a timetable, that would meet the objectives of attracting business and leisure passengers away from the roads.

Tourism And Leisure Potential

The Settle and Carlisle Line is known as one of the most scenic railway lines in England, if not the whole of the UK.

There are important tourist sites all along the route between Leeds and Glasgow

Many of the stations are used by walkers and others interested in country pursuits.

I believe that it is a route that needs a quality rail service.

Travel Between London and Towns Along The Settle And Carlisle Line

In Thoughts On Digital Signalling On The East Coast Main Line, I said this.

I think it is highly likely that in the future, there will be at least one train per hour (tph) between London Kings Cross and Leeds, that does the trip in two hours.

It may seem fast compared to today, but I do believe it is possible.

With a timely connection at Leeds station, will this encourage passengers to places along the Settle and Carlisle line to use the train?

What About the Carbon Emissions?

The one problem with using InterCity 125 trains on this route, is that they are diesel-powered, using a pair of Class 43 locomotives.

But then there are over a hundred of these diesel-electric locomotives in service, nearly all of which are now powered by modern MTU diesel engines, which were fitted in the first decade of this century.

Consider.

  • The locomotives and the coaches they haul have an iconic status.
  • Great Western Railway and Scotrail have recently developed shorter versions of the trains for important routes.
  • There are over a hundred of the locomotives in service.
  • Companies like ULEMCo are developing technology to create diesel-powered vehicles that can run on diesel or hydrogen.
  • There is plenty of space in the back of the locomotives for extra equipment.
  • MTU have a very large number of diesel engines in service. It must be in the company’s interest to find an easy way to cut carbon emissions.
  • I believe that the modern MTU diesel engines could run on biodiesel to reduce their carbon footprint.

And we shouldn’t forget JCB’s technology, which I wrote about in JCB Finds Cheap Way To Run Digger Using Hydrogen.

If they could develop a 2 MW hydrogen engine, it could be a shoe-in.

I believe that for these and other reasons, a solution will be found to reduce the carbon emissions of these locomotives to acceptable levels.

Conclusion

In this quick look, it appears to me that a Glasgow and Leeds service using InterCity 125 trains could be a very good idea.

May 21, 2021 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , , | 3 Comments

DfT and Arriva CrossCountry Sign Agreement

The title of this post, is the same as that of this article on Railway News.

This is the introductory paragraph.

The franchisee CrossCountry, which is owned by Arriva, has signed a three-year agreement with the Department for Transport to bring the franchise in line with the Emergency Recovery Measures Agreements (ERMAs).

CrossCountry has the following trains in its fleet.

34 x Class 220 trains

24 x Class 221 trains

This gallery shows Class 220 trains and the closely related Class 222 trains, which are in service with East Midlands Railways.

Note that these three fleets of Bombadier Voyager trains are now twenty years old and will probably need a makeover soon.

If they have a problem it is that they are diesel multiple units and create a lot of noise and pollution in stations and depots.

This is said in the Railway News article.

One element of this new contract is a focus on reducing the environmental impact of the operator’s diesel fleet.

, Two separate projects are mentioned.

  • Using a separate electrical supply to Turbostars during cleaning.
  • Use of on-train batteries on the Voyagers in stations.

In Have Bombardier Got A Cunning Plan For Voyagers?, I gave my thoughts on the second project, when Bombardier proposed it in 2018.

I can see the following scenario happening.

  • When the new Class 805 trains are delivered, Avanti West Coast’s Class 220 trains are transferred to Arriva CrossCountry.
  • When the new Class 810 trains are delivered, East Midland Railway’s Class 222 trains are transferred to Arriva CrossCountry.
  • CrossCountry update their Voyagers with batteries.
  • CrossCountry retire their InterCity 125 trains.

CrossCountry may have enough trains to run a mainly Voyager fleet, backed up by a few Turbostars.

Could Bombardier’s Plan Be Revived In A Different Form?

If CrossCountry had all the Voyages, they would have the following fleet.

  • 34 x four-car Class 220 trains – Currently with CrossCountry.
  • 20 x five-car Class 221 trains – Currently with Avanti West Coast
  • 20 x five-car Class 221 trains – Currently with CrossCountry
  • 4 x four-car Class 221 trains – Currently with CrossCountry
  • 6 x seven-car Class 222 trains – Currently with East Midlands Trains
  • 17 x five-car Class 222 trains – Currently with East Midlands Trains
  • 4 x four-car Class 222 trains – Currently with East Midlands Trains

This totals to eighty-five trains with a total of 285 intermediate cars, of which 128 were built with tilt for Class 221 trains.

Currently CrossCountry has a total of 58 four- and five-car Voyagers and enough Class 43 power cars for six InterCity 125 trains.

If they rearranged the non-tilting intermediate cars of the Voyagers, 157 intermediate cars is enough for one of the following.

  • 78 – four-car trains
  • 52 – five-car trains
  • 39 – six-car trains
  • 26 – eight-car trains
  • 22 – nine-car trains

Add in forty five-car Class 221 trains and there is more than enough trains for CrossCountry to run their current services without the retired InterCity 125s.

CrossCountry would also be able to form the trains into the lengths they needed for efficient services.

This formation photographed at Basingstoke could be formed of a single train, if they wished, as they have more than enough coaches.

I suspect in true design engineering fashion, engineers at CrossCountry have got the toy trains or Lego bricks out to shuffle the coaches on a big table to see what are the best train lengths for their network.

If they decided to go the eight-car route, which could give up to twenty-six trains, this would be more than enough to be able to retire the InterCity 125s.

Could one of the Intermediate cars be converted into a pantograph and battery car?

  • If the diesel engine and the associated gubbins were to be removed, this would save around two tonnes in weight.
  • A two-tonne battery could probably have a capacity of 200 kWh.
  • Bombardier probably have ideas about how a car could be converted.

Someone could have a lot of fun playing musical carriages and the following trains could be created.

  • A fleet of Voyager bi-mode  trains of optimum length for CrossCountry’s route network.
  • Most services would be run by single trains, which must give advantages to the operator, their staff and passengers.
  • All braking would be regenerative braking to battery to save energy.
  • Where electrification exists, the trains could use it.
  • All station stops would be performed on battery power.

There might even be some left over driving cars and some intermediate cars to be converted into battery electric trains for another route.

Conclusion

There is a route there for CrossCountry to have a much more environmentally-friendly fleet, better suited to their needs

  • The Turbostars would be given a local electricity supply to cut noise and pollution during overnight cleaning.
  • The InterCity 125s would be retired.
  • CrossCountry acquires as many Voyagers as it needs after Avanti West Coast and East Midlands Railway get their new trains.
  • The Voyagers carriages would be shuffled so that they could handle all routes and replace the InterCity 125s.
  • The design exists to convert the Voyagers into diesel-electric-battery tri-mode high speed trains.

Note.

  1. There are enough trains to do a gradual conversion, with CrossCountry having enough trains for a full service at all times.
  2. All trains will probably have been built this century or nearly so!

I also feel, that the fleet would be a marketing asset, rather than a bit of a discouragement to use CrossCountry’s services again.

 

 

 

October 16, 2020 Posted by | Transport/Travel | , , , , , , , , , | 5 Comments

Birmingham-Black Country-Shrewsbury

On the Midlands Connect web site, they have a page, which is entitled Birmingham-Black Country-Shrewsbury.

This is the introductory paragraph.

We’re examining the case to increase services from three to four per hour, made possible by capacity released post-HS2.

They then give the outline of their plans, which can be summed up as follows.

  • Services on the corridor are slow and unreliable.
  • Network Rail say the service is in danger of acute overcrowding.
  • Services will be increased from three trains per hour (tph) to four.
  • A direct hourly service from Shrewsbury, Wellington and Telford to London will be introduced.
  • Services to Birmingham International will be doubled.
  • The economic case will be examined for speeding up services between Shrewsbury and Birmingham from 56 to 45 minutes, via track upgrades and possible electrification.

It seems a safe, and not overly ambitious plan.

These are my thoughts.

Shrewsbury’s Unique Position

These are distances and times from important stations.

  • Birmingham International – 51 miles and 83 minutes
  • Birmingham New Street – 42.5 miles and 71 minutes
  • Chester – 42.5 miles and 53 minutes
  • Crewe – 33 miles and 53 minutes
  • Hereford – 51 miles and 59 minutes
  • Telford – 14 miles and 21 minutes
  • Wellington – 10 miles and 13 minutes
  • Welshpool – 20 miles and 25 minutes
  • Wolverhampton – 30 miles and 50 minutes

In Sparking A Revolution, I quoted this Hitachi-specification for a battery-electric train.

  • Range – 55-65 miles
  • Performance – 90-100 mph
  • Recharge – 10 minutes when static
  • Routes – Suburban near electrified lines
  • Battery Life – 8-10 years

I can’t see any problem, for a train with this specification being able to reach Shrewsbury from Birmingham International, Birmingham New Street and Crewe on battery power.

In Hitachi Trains For Avanti, I quote an article with the same title in the January 2020 Edition of Modern Railways as saying this.

Hitachi told Modern Railways it was unable to confirm the rating of the diesel engines on the bi-modes, but said these would be replaceable by batteries in future if specified.

I wouldn’t be surprised to see Shrewsbury served from Birmingham and Crewe by fast electric trains, that used battery power. Avanti West Coast certainly seem to have that thought in mind.

Zero Carbon Trains Between Shrewsbury And Wales

It will be a formidable challenge to run battery trains from Shrewsbury to the Welsh destinations.

  • Aberystwyth – 81.5 miles
  • Cardiff – 107 miles
  • Carmarthen – 185 miles
  • Holyhead – 133 miles
  • Milford Haven – 225 miles
  • Swansea – 121.5 miles

Note.

  1. These are challenging distances for battery-electric trains.
  2. South Wales destinations served via Newport and Cardiff could use the electrification on the South Wales Main Line.
  3. Many of these services start from East of Shrewsbury and can use the electrified lines that connects to Birmingham New Street and Manchester Piccadilly.

Unless someone like Riding Sunbeams, makes a breakthrough, I can’t see battery-electric trains running to Welsh destinations from Shrewsbury.

Transport for Wales New Trains

Transport for Wales have ordered seventy-seven new Class 197 trains, and these diesel trains will be used for services through Shrewsbury, mainly on services to Birmingham New Street and Birmingham International stations.

  • If these trains are similar to Northern’s Class 195 trains, they will be diesel multiple units with a noisy mechanical transmission.
  • I was surprised in these days of global warming that Transport for Wales didn’t buy something more eco-friendly, as they have for South Wales and the services around Chester.
  • The transmission of the Class 197 trains has not been disclosed.

Perhaps, CAF are going to do something innovative.

  • The CAF Civity is a modular train, with either electric or diesel power options.
  • The diesel-powered options use MTU engines.
  • A logical development would be to use an MTU Hybrid PowerPack to reduce diesel consumption and emissions.
  • This PowerPack would also reduce noise, as it has an electric transmission.
  • I wonder, if CAF can raid their parts bin and fit a pantograph, so where 25 KVAC overhead electrification is available, it can be used.
  • If CAF can convert a bog standard diesel multiple unit into a hybrid diesel-electric-battery multiple unit, by performing a heart transplant, it is a neat way of keeping new diesel Civities running until a later date.
  • Remember that Northern and West Modlands Trains have another seventy-four similar new diesel Civities in operation or on order. With trains having a forty year life, they don’t fit with an early phasing out of diesel.

I have no idea, what is actually happening, but my engineer’s nose tells me to expect a surprise from CAF.

Increasing Birmingham And Shrewsbury Services From Three Trains Per Hour To Four

Four trains per hour or one train every fifteen minutes seems to be a preferred frequency on several UK suburban lines.

These services seem to provide four tph or better on most, if not all of their routes.

  • Birmingham Cross-City Line
  • London Overground
  • Merseyrail
  • Tyne and Wear Metro

Four tph seems to be a very handy Turn-Up-And-Go frequency that encourages people to use rail services.

So I am not surprised to see Midlands Connect wanting four tph between Birmingham and Shrewsbury.

Currently, the following services seem to operate between Shrewsbury and Birmingham.

  • Avanti West Coast – 2 trains per day (tpd) – Shrewsbury and London Euston via Birmingham New Street and Birmingham International.
  • Trains for Wales – 1 train per two hours (tp2h) – Holyhead and Birmingham International via Birmingham New Street.
  • Trains for Wales 1 tph – Aberystwyth/Pwllheli and Birmingham International via Birmingham New Street
  • West Midlands Trains – 2 tph – Shrewsbury and Birmingham New Street – One semi-fast and one stopper.

Note.

  1. All services call at Wolverhampton, Telford and Wellington.
  2. Shrewsbury and Birmingham New Street is a 3.5 tph service.
  3. Shrewsbury and Birmingham International is a 1.5 tph service.

It relies heavily on services from Trains for Wales, who probably don’t put Shrewsbury and Birmingham services at the top of their priorities.

I remember, when local services in the North-East of London were run by Greater Anglia from Norwich. Moving some services to Transport for London, brought about a large improvement

Quite frankly, the current service is best described as pathetic.

Should Trains for Wales Services Terminate As Shrewsbury?

I suspect some local politicians in Shrewsbury and Birmingham, think it would be best to adopt this sort of strategy.

  • All Welsh services terminate at Shrewsbury.
  • Birmingham and Shrewsbury mandate West Midlands Trains and Avanti West Coast to provide a frequent service between Shrewsbury and Birmingham.

It might be the way to go, but many travellers from the Marches, would probably want direct connections to Birmingham, Birmingham Airport and in the future High Speed Two.

Introducing A Direct Hourly Service From Shrewsbury, Wellington And Telford To London

On the face of it, it looks like a much needed service to and from Shrewsbury.

  • It will be hourly.
  • Initially it will use Class 221 diesel multiple units, but these will be replaced with bi-mode Class 805 trains.
  • The current infrequent service calls at Watford Junction, Rugby, Coventry, Birmingham International, Birmingham New Street, Sandwell and Dudley, Wolverhampton, Telford Central and Wellington.
  • There are also six other stations between Shrewsbury and Wolverhampton, which might like an improved service.
  • The service will be run by Avanti West Coast.

There might also be the possibility of using battery power between Wolverhampton and Shrewsbury, which is only thirty miles each way.

But there are other collateral benefits.

  • The service increases the frequency between Shrewsbury and Birmingham New Street stations by one tph to 4.5 tph
  • The service increases the frequency between Shrewsbury and Birmingham International by one tph to 2.5 tph.
  • The service increases the frequency between Wolverhampton and London Euston by one tph.
  • The service increases the frequency between Sandwell and Dudley and London Euston by one tph
  • The service increases the frequency between Birmingham New Street and London Euston by one tph.
  • The service increases the frequency between Birmingham International and London Euston by one tph.
  • The new service will provide an hourly quality connection to High Speed Two at Birmingham International for stations between Shrewsbury and Coventry.
  • It appears that the Class 390 trains to Birmingham New Street and being replaced by new Class 807 trains, so Birmingham will have three out of four tph, run by new trains.
  • The new Shrewsbury service , has a similar calling pattern to that of the current Scottish service through Birmingham. Will it replace that service, when High Speed Two opens?

Note.

  1. Midlands Connect’s objective of four tph between Shrewsbury and Birmingham has been met.
  2. Several stations get a better direct service to London.
  3. Connectivity to High Speed Two is improved.
  4. Birmingham New Street and London is now a Turn-Up-And-Go frequency of four tph.
  5. The Class 805 train will also mean that Avanti West Coast could be zero-carbon in Birmingham. Especially, if it used battery power between Wolverhampton and Shrewsbury stations.

The hourly direct service between Shrewsbury and London will make a lot of difference to train services between Shrewsbury and Birmingham.

Avanti’s London Euston and Birmingham New Street Service

Consider.

  • There are two tph that terminate in Birmingham New Street station, that take 88-89 minutes, from London Euston
  • There is one tph that goes through Birmingham New Street station to Edinburgh, Glasgow, Preston, or Shrewsbury, that takes 82-84 minutes, from London Euston.
  • Currently, the two terminating trains are Class 390 trains, whereas the through train can be a Class 221 train as well.
  • Through trains are allowed  5-10 minutes to pass through Birmingham New Street.
  • Trains that terminate at Birmingham New Street station are allowed 20-30 minutes to arrive and leave.
  • Avanti West Coast have said, that they will be running Class 807 trains between London and Birmingham New Street.

It doesn’t seem to be the best use of scarce platform resources in a busy station to park a train there for half-an-hour.

In Will Avanti West Coast’s New Trains Be Able To Achieve London Euston and Liverpool Lime Street In Two Hours?, I came to the conclusion that the Class 807 trains have been designed as simple, fast, lightweight all-electric trains with no heavy batteries, diesel engines or tilt mechanism.

  • I think they’ll be able to shave a few minutes on the timings between London Euston and Birmingham New Street station.
  • I would suspect that they will match the 82-84 minutes of the through trains
  • The ultimate would be if they could do a round trip between London Euston and Birmingham New Street in three hours.
  • Two tph run by what would effectively be a London-Birmingham shuttle would need just six trains.

It might mean new methods of manning the trains, to reduce turnround times.

Doubling Of Services Between Shrewsbury And Birmingham International

The hourly direct London and Shrewsbury Avanti West Coast service will raise the current 1.5 tph service between Shrewsbury and Birmingham International to 2.5 tph, so will be a good start.

  • Perhaps Trains for Wales could find the missing 0.5 tph.
  • West Midlands Trains might be able to squeeze in another train.

But I suspect that the crowded line between Birmingham New Street and Birmingham International is the problem.

Shrewsbury And Birmingham In Forty-Five Minutes

This is the last objective and saving eleven minutes on this route would suggest that the best way would surely be to fully electrify the route.

  • Between Wolverhampton and Birmingham International stations is fully electrified.
  • Electric trains have faster acceleration and deceleration, so would probably achieve the required savings if they stopped more than five times.
  • From my virtual helicopter it doesn’t appear to be the most challenging of routes to electrify.
  • Only about thirty miles of double track would need to be electrified between Wolverhampton and Shrewsbury stations.
  • Both Trains for Wales and West Midlands Trains would have to obtain new electric trains.
  • Avanti West Coast have already got bi-mode Class 805 trains, that could use the electrification.

But will Trains for Wales go along with Midlands Connect, when they tell them to get electric or bi-mode trains to work between Shrewsbury and Birmingham International stations?

It is because of dilemmas like this, that I feel that electric trains using battery or hydrogen power, when away from electrification can be a very good alternative.

  • There is no major disruption raising bridges for the electrification.
  • Stations don’t need to be closed for electrification.
  • The trains have all the comfort and performance of electric trains.
  • Costs and timescales can be reduced.
  • When running on battery or hydrogen power, these trains are very quiet, as there is no pantograph noise.

To run battery-electric trains between Shrewsbury and Wolverhampton, the only infrastructure needed would be a method of charging the train at Shrewsbury station.

This Google Map shows the Southern end of Shrewsbury station.

Note.

  1. The platforms are built over the River Severn.
  2. The five-car Class 221 train in Virgin livery sitting in Platform 5.
  3. When this train leaves it will turn left or to the East for Wolverhampton and Birmingham.
  4. Trains can turn right for Wales.

It is a very unusual station layout.

  • Platform 5 is one of a pair of bay platforms; 5 & 6, that can access either Wales or Birmingham.
  • Outside of the bay platforms are a pair of through platforms; 4 & 7, that can also access Wales or Birmingham, but they can also access Chester by going through the station.
  • The 115 metre long Class 221 train fits easily in the bay platform 5.
  • The 130 metre long Class 805 train would probably need to use Platform 4 or 7.

But with well-planned electrification, it would be ideal for charging electric trains as they pass through or turned back!

Once the train reaches Wolverhampton, it will connect to electrification again.

Shrewsbury And High Speed Two

Currently, Shrewsbury has three connections to stations, where it would be convenient to take a High Speed Two train.

  • Birmingham International, which is 51 miles and 83 minutes away. Plus a ride on a people mover for High Speed Two.
  • Birmingham New Street, which is 42.5 miles and 71 minutes away. Plus a walk to Birmingham Curzon Street for High Speed Two.
  • Crewe, which is 33 miles and 55 minutes away.

Passengers will make their own choice.

Could Shrewsbury Have A Classic-Compatible High Speed Two Service To Manchester Piccadilly?

London To Shrewsbury, Now And Post-High Speed Two

Travel On Monday

If I want to go to Shrewsbury next Monday, one fast journey is taking the 09:10 from Euston and changing at Crewe, which gives a journey time of two hours and thirty-two minutes.

I can also get a train with a change at Birmingham International that takes seven minutes longer.

Travel On High Speed Two

After High Speed Two opens to Birmingham Curzon Street and Interchange in Phase 1 what sort of times to Shrewsbury can be expected?

I estimate the following.

  • Travelling via Birmingham Curzon Street could produce a time of around one hour and fifty minutes, if you’re lucky with the trains.
  • Travelling via Crewe could produce a time of one hour and thirty minutes, if you’re lucky with the trains.
  • Travelling via Interchange could produce a time of around one hour and fifty-five minutes. or forty-four minutes faster.

If I was going to Shrewsbury after High Speed Two has opened, I would probably change at Birmingham Curzon Street, if the walk to New Street station was still within my capabilities, as there will be a Turn-Up-And-Go frequency of four tph between Birmingham New Street and Shrewsbury stations.

Looking at the Midlands Connect objectives, these help with linking Shrewsbury with London.

  • Increasing services between Birmingham and Shrewsbury to four tph, as it’s Turn-Up-And-Go!
  • The direct hourly service to London from Shrewsbury, Wellington and Telford might be the quickest way to London by changing at Birmingham New Street/Curzon Street or Interchange.
  • Doubling the service between Shrewsbury and Birmingham International, may be a good move, as Interchange, which will be connected to Birmingham International by a high capacity people mover, will have five tph between London Euston and Old Oak Common stations.
  • Saving eleven minutes between Shrewsbury and Birmingham will certainly help.

Travelling between London and Telford, Wellington and Shrewsbury will be much improved.

June 27, 2020 Posted by | Transport/Travel | , , , , , , , , , , , , , , | 7 Comments