The Anonymous Widower

Do Hitachi Battery Electric InterCity Trains Have Problems?

I asked Google the question in the title of this post and got this answer.

While Hitachi’s battery-powered intercity trains have shown promising results in trials, particularly regarding fuel savings and emissions reduction, there are some potential challenges and considerations. These include safety concerns related to lithium battery fires, especially in the event of a crash or derailment, as well as range limitations for longer journeys. However, the technology is continuously evolving, and Hitachi is actively working to address these issues.

That seems fairly positive.

There is also this article on the BBC, which everybody should read, which is entitled Will New Battery-Powered Trains Replace Diesel, And Are They Safe?.

In The Data Sheet For Hitachi Battery Electric Trains, I look at the data sheet, that Hitachi published in late 2023.

These were my conclusions about the data sheet.

These are my conclusions about Hitachi’s battery packs for Class 80x trains, which were written in November 2023.

  • The battery pack has a capacity of 750 kWh.
  • A five-car train needs three battery-packs to travel 100 miles.
  • A nine-car train needs five battery-packs to travel 100 miles.
  • The maximum range of a five-car train with three batteries is 117 miles.
  • The maximum range of a nine-car train with five batteries is 121 miles.

As battery technology gets better, these distances will increase.

Hitachi have seen my figures.

They also told me, that they were in line with their figures, but new and better batteries would increase range.

125 mph trains with a 120 mile range on batteries, would revolutionise UK train travel.

LNER’s Class 897 Trains

In the Wikipedia entry for LNER, this is said about LNER’s new ten CAF tri-mode trains.

In November 2023, LNER placed an order for 10 ten-car tri-mode (electric, diesel and battery power) Civity trains from CAF. In August 2024, it was announced that the units will be designated Class 897 under TOPS.

According to their Wikipedia entry, it appears the Class 897 trains will be delivered from 2027.

Can I Build A Schedule For The Introduction Of New Trains, Services and Batteries?

I think that I can from the information that is out there.

  • East Coast Main Line – December 2025 – Introduction of Lumo between London King’s Cross and Glasgow
  • West Coast Main Line – Spring 2026 – Introduction of Lumo between London Euston and Stirling
  • Midland Main Line – 2026-2027 – Introduction of EMR Class 810 trains between London St. Pancras and Leicester, Derby, Nottingham and Sheffield.
  • East Coast Main Line – From 2027 – Introduction of LNER Class 897 trains between London King’s Cross and Yorkshire.

Note.

  1. The two Lumo services use trains already in service.
  2. The Class 810 trains for EMR are being debugged and introduced at the present time.
  3. The only new trains are the Class 897 trains for LNER.
  4. The introduction of the Class 897 trains will allow LNER to withdraw some trains for refurbishment and fitting of batteries.

This would mean that before the next general election, almost the full timetable between London and the North of England and Scotland would have been implemented using diesel-electric technology.

Is it a low-risk start to the full electrification of services to the North?

The second-phase would see battery-electric trains introduced.

I believe that Grand Central’s new trains would be brought into service first.

  • The new trains are scheduled to be introduced in 2028.
  • Grand Central will still have the diesel trains for backup.
  • Their new trains would be similar to the other Hitachi trains.
  • It looks like they could be doing some splitting and joining.

After the Grand Central trains had been introduced successfully, the trains for the other Hitachi operators would have batteries fitted.

I suspect short routes like Lincoln would be electrified with battery-electric trains first.

There would also need to be short lengths of electrification erected, so that trains could be charged to send them on their way.

Other routes could also be electrified in the same way.

  • Basingstoke and Exeter
  • Birmingham and Aberystwyth
  • Bristol and Penzance
  • Cardiff and Swansea
  • Crewe and Holyhead
  • Edinburgh and Aberdeen
  • Edinburgh and Inverness
  • Reading and Taunton
  • Swindon and Gloucester

If this technique could work for main lines, surely a scaled down version with smaller trains would work for branch lines.

Conclusion

Consider.

  • It looks to me, that someone has planned this thoroughly.
  • It all fits together extremely well.

It could be the first phase of a cunning plan to use battery-electric trains to electrify the UK’s railways.

Passengers will also see benefits, from when Lumo runs its first train into Glasgow Queen Street station.

I don’t think Hitachi’s trains have any problems, but there is enough float in this plan to make sure, it can be implemented on time and on budget.

 

August 6, 2025 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , , , | Leave a comment

Could London And Central Scotland Air Passengers Be Persuaded To Use The Trains?

How Many Passengers Fly Between London And Edinburgh?

Wikipedia gives these figures for 2024 for passengers from Edinburgh to London

  • London City – 334,873
  • London Gatwick – 476,152
  • London Heathrow – 1,148,634
  • London Luton – 338, 729
  • London Stansted – 693,953

This gives a total of 2,992,341.

As Wikipedia doesn’t give complete figures for from London to Edinburgh, for the purpose of this analysis, I’ll assume they are the same.

How Many Passengers Fly Between London And Glasgow?

Wikipedia gives these figures for 2024 for passengers from Glasgow to London

  • London City – 208,405
  • London Gatwick – 456,002
  • London Heathrow – 954,027
  • London Luton – 255,095
  • London Stansted – 225,110

This gives a total of 2,098,639.

As Wikipedia doesn’t give complete figures for from London to Glasgow, for the purpose of this analysis, I’ll assume they are the same.

How Many Passengers Fly Between London And Scotland’s Central Belt?

Adding the two figures gives 5,090,980. in both directions.

Which is an average of 97,903 per week or 13,948 per day.

How Many Train Seats Run Between London And Scotland’s Central Belt?

These figures are for Friday the 1st of August.

  • Aventi West Coast – London Euston and Glasgow Central – 5 x 9-car Class 390 train – 2,345 seats
  • Aventi West Coast – London Euston and Glasgow Central – 16 x 11-car Class 390 train – 6,677 seats
  • LNER – London King’s Cross and Edinburgh – 26 x 9-car Class 801 train – 15,886 seats
  • Lumo – London King’s Cross and Edinburgh – 5 x 5-car Class 803 train – 2,010 seats

Note.

  1. All services are all-electric.
  2. All services are fairly new or have recently been refurbished,

This gives a total of 26,918 train seats.

Adding Lumo’s Service To Glasgow

In Lumo Will Extend Its King’s Cross And Edinburgh Service To Glasgow, I suggested that the Glasgow service would be run as follows from December 2025.

  • Two existing Lumo services will leave London as pairs of five-car trains.
  • The pairs will split at Edinburgh.
  • The leading train will go on to Glasgow Queen Street calling at Edinburgh Haymarket and Falkirk High stations.
  • The trailing train will return to London King’s Cross.
  • At the end of the day, the two trains in Glasgow will do a fast run back to London King’s Cross as a pair of 5-car trains.

This will add 804 seats per day between London and Glasgow Queen Street in both directions.

The daily total would now total 27,722 train seats, which compares with a daily average of 13,948 passengers per day, who travel by air.

Adding Lumo’s Service To Stirling

In Lumo To Expand Scotland’s Rail Network With New London-Stirling Rail Route From Spring 2026, I talk about Lumo’s new service to Stirling.

  • There will be five trains per day (tpd) in each direction.
  • Lumo’s new route will link London Euston directly to Stirling, also calling at Milton Keynes, Nuneaton, Crewe, Preston, Carlisle, Lockerbie, Motherwell, Whifflet (serving Coatbridge), Greenfaulds (serving Cumbernauld) and Larbert.
  • The service will use 6-car Class 222 trains, which in the linked post, I estimate will have a similar one-class capacity to the Class 803 trains between London King’s Cross and Edinburgh.
  • If the capacity of the two train types is similar, this should give operational advantages and allow some more Class 803 trains to run the Euston and Stirling route.

This second Scottish route will add 2010 train seats per day between London Euston and Stirling in both directions.

The daily total would now total 29,732 train seats, which compares with a daily average of 13,948 passengers per day, who travel by air.

Could More Capacity Be Added Between London And Scotland’s Central Belt?

I believe some of the Lumo services between London King’s Cross and Edinburgh could be doubled up to a pair of trains.

There would have to be no platform length issues at London King’s Cross, Stevenage, Newcastle and Morpeth stations.

If three trains could be doubled up, that would add 1,206 train seats per day between London and Edinburgh in both directions.

The daily total would now total 30,938 train seats, which compares with a daily average of 13,948 passengers per day, who travel by air.

I also suspect, that some of the Stirling services could be doubled up.

Connectivity Of England’s Northern Airports To London And Central Scotland

Birmingham Airport

Consider.

  • There are easyJet flights to Edinburgh and Glasgow
  • There are 1.5 trains per hour (tph) between Birmingham New Street and Edinburgh.
  • There are 6 tpd between Birmingham New Street and Glasgow.

You would make your choice and pay the money.

East Midlands Airport

There are no flights or trains to Edinburgh and Glasgow.

Leeds Airport

Consider.

  • There are no flights to Edinburgh or Glasgow.
  • There is one tph between Leeds and Edinburgh
  • There is one tpd between Leeds and Glasgow

Could Leeds and Glasgow get better connectivity?

Liverpool Airport

Consider.

  • There are no flights to Edinburgh or Glasgow.
  • There is one tph between Liverpool Lime Street and Edinburgh
  • There is three tpd between Liverpool Lime Street and Glasgow

The Liverpool area is well connected to Crewe, Warrington Bank Quay, Wigan North Western and Preston stations on the West Coast Main Line for alternative services to Glasgow.

Manchester Airport

Consider.

  • There are no flights to Edinburgh or Glasgow.
  • There is one tph between Manchester Airport and Scotland via Manchester Piccadilly and Manchester Oxford Road, which alternates between Edinburgh and Glasgow.

The Manchester area is well connected to Crewe, Warrington Bank Quay, Wigan North Western and Preston stations on the West Coast Main Line for alternative services to Glasgow.

Omio gives this summary of flights between Heathrow and Manchester airports.

Flights from Manchester Airport to London Heathrow Airport depart on average 8 times per day, taking around 1h 6m. Cheap flight tickets for this journey start at £63 but you can travel from only £16 by coach.

Wrightbus and others will be producing mouse-quiet hydrogen-powered coaches in a couple of years. I suspect these will give short flights a good kicking.

Newcastle Airport

Consider.

  • There are no flights to Edinburgh or Glasgow.
  • There is three tph between Newcastle and Edinburgh with an additional 5 tpd from Lumo.
  • There is two tpd between Newcastle and Glasgow.
  • There is one tpd between Newcastle and Stirling.
  • From December 2025, Lumo will add two tpd from Newcastle to Glasgow and one tpd from Glasgow to Newcastle.
  • In Lumo Will Extend Its King’s Cross And Edinburgh Service To Glasgow, I stated that I believe that Lumo’s Glasgow to Newcastle service will be a late evening ten-car train, so travellers can have a long day in Glasgow, Edinburgh and Newcastle and still return to London.

Lumo would appear to fill in the gap between Newcastle and Glasgow.

Google AI gives this summary of flights between Heathrow and Newcastle airports.

There are usually 5-6 direct flights per day between Newcastle and Heathrow airports. These flights are operated by British Airways. The average flight time is around 1 hour and 10 minutes.

Note.

  1. In 2024, 497, 469 passengers flew between between Heathrow and Newcastle airports, which is an average of 681 passengers in each direction every day.
  2. This was an increase of 13.6 % on 2023.
  3. From December Lumo will be running extra London King’s Cross and Newcastle services, with each train having 402 seats.
  4. The improvements in rail services in and around Newcastle in recent months, will surely bring more passengers to use trains from Newcastle station.
  5. Will Lumo also target adverts at airline passengers?

London and Newcastle could be another route for mouse-quiet hydrogen-powered coaches.

Conclusion

These numbers summarise my calculations.

  • Currently an average of 13,948 passengers per day fly between London and Central Scotland.
  • Currently, there are 26,918 train seats available per day between London and Central Scotland.
  • In December 2025, Lumo will add another 804 low-cost train seats between London King’s Cross and Glasgow Queen Street.
  • In Spring 2026, Lumo will add 2010 low-cost train seats between London Euston and Stirling.
  • From Spring 2026, there will be 29,732 train seats available per day between London and Central Scotland.
  • This represents a 10 % increase of seats on the trains between London and Central Scotland.

How many passengers, who normally fly, will switch to using the train?

  • Lumo may only offer one class, but you get a trolley and can order food from M & S and others to be delivered to your seat.
  • Both LNER and Lumo accept dogs. I don’t know about Avanti.
  • All services will be all-electric, when Lumo gets its new electric trains for Stirling, in a few years.
  • It looks to me like Lumo could be offering a late train back to London from Edinburgh and Glasgow.
  • Digital signalling on the East Coast Main Line should speed up services.

If Lumo to Glasgow and Stirling works out, it could also cut the total carbon footprint of travel between London and Central Scotland.

August 4, 2025 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | 4 Comments

Lumo Will Extend Its King’s Cross And Edinburgh Service To Glasgow

This article on the BBC is entitled New Train Services Approved On East Coast Main Line.

This is the sub-heading.

Additional train services will run on the East Coast Main Line from December, the rail regulator has said.

This will be the additional services for Lumo according to this document from the Office of Road and Rail.

  • Lumo (Newcastle): one additional return service between London King’s Cross and Newcastle on weekdays and one additional service in opposing directions on a Saturday and Sunday.
  • Lumo (Glasgow extensions): the extension of existing London King’s Cross-Edinburgh services so that Lumo can provide two northbound services and one southbound service between London King’s Cross and Glasgow on weekdays and one in each direction on Sundays.

I have some thoughts.

Train Lengths

The Office of Road and Rail document doesn’t mention train lengths.

  • Hull Trains have been running most services as five-car trains, with some running as ten-car trains.
  • In Ten-Car Hull Trains, I talked about Hull Trains and their mixing of 5- and 10-car trains and how it increased the number of seats on the route by 16.7 %.

I suspect that Lumo will use pairs of trains on some services to increase and also balance the number of seats.

A Possible Timetable

Consider.

  • Currently, there are five Northbound trains every day with five Southbound trains on Monday to Saturday and four on Sunday.
  • Lumo seem to run a reliable service.
  • Would it be a safe and sensible idea to base the new timetable on the current timetable?
  • Perhaps, the Glasgow services could be add-ons to the current timetable.

So it looks to me, that the extra trains will be scheduled using an innovative timetable.

  • I wouldn’t be surprised if the Glasgow to London King’s Cross train was a pair of trains in the evening to balance the service and get two trains to London King’s Cross for the start of the next day’s services.
  • This would also give travellers as long a day as possible in Glasgow.
  • Would the two London King’s Cross to Glasgow trains, start as a pair of trains at London King’s Cross that split at Edinburgh, with one train returning to London King’s Cross and the other going on to Glasgow?
  • Glasgow gets ten cars per day from London King’s Cross and sends ten cars back to London King’s Cross.
  • Could the Sunday services both be a pair of trains?

The only new paths needed for the service, would be.

  • Two between Edinburgh and Glasgow.
  • One Southbound between Glasgow and London King’s Cross at the end of the day.

Otherwise the main timetable is as it is now.

How Long Will London King’s Cross and Glasgow Take?

Consider.

  • The fastest Lumo trains take around 4 hours and 23 minutes between London and Edinburgh.
  • The fastest ScotRail trains take around 50 minutes between Edinburgh and Glasgow Queen Street stations.

I would expect a time of around 5 hours and 13 minutes is possible.

This is slower than the typical 4 hours and 31 minutes of Avanti West Coast between Euston and Glasgow Central stations, but improvements to the signalling may reduce the time that Lumo takes between London and Edinburgh.

What Time Are The Last Train From Glasgow and Edinburgh To London?

These would appear to be the last trains from Glasgow and Edinburgh to London.

  • The last Avanti West Coast train would appear to be the 18:40 from Glasgow Central, which gets in to London Euston at 23:40.
  • The Caledonian Sleeper leaves at 23:40 from Glasgow Central, which gets in to London Euston at 07:00.
  • The last LNER train for London King’s Cross, would appear to be the 19:37 from Edinburgh, which gets in to London King’s Cross at 01:14.
  • The last LNER train for Leeds, would appear to be the 21:00 from Edinburgh, which gets in to Leeds at 00:42.
  • The last LNER train for Newcastle, would appear to be the 22:00 from Edinburgh, which gets in to Newcastle at 01:14.
  • The Caledonian Sleeper leaves at 23:40 from Edinburgh, which gets in to London Euston at 07:00.

Note.

  1. The timetable seems to assume, that if you are spending a day in Edinburgh or Glasgow and need to return to London, you will use the Caledonian Sleeper.
  2. Unless you use the Sleeper, you can’t see an evening football match and easily go home to anywhere South of Edinburgh.
  3. One of the last trains to arrive in London King’s Cross station is the 19:58 Lumo service from Edinburgh, which arrives at 01:00 in London King’s Cross station.
  4. Surprisingly, London King’s Cross station seems to have several trains moving in and out all night.

There’s certainly a large gap in the evening, where an extra service could run between Glasgow and London King’s Cross.

I wonder how late Lumo could bring a train into King’s Cross station?

  • I came in once to King’s Cross  at about 01:30 and still got a taxi home.
  • There are also lots of 24-hour buses.
  • There is little or no car parking.

I still think Lumo will operate a train as late as Network Rail will allow them.

Could Passengers Sleep In Lumo’s Seats?

I’ve certainly managed it. But then I’ve never had a problem falling asleep.

Does The Extended Service To Glasgow Pass The Granny’s Birthday Test?

Suppose it’s your granny’s birthday and you want to go to her family party, which is in the afternoon.

You should be able to take a morning train up to Glasgow and then take the late train back afterwards.

Conclusion

Lumo have spotted a gap in the timetable and they intend to fill it.

 

 

 

July 30, 2025 Posted by | Transport/Travel | , , , , , , , , , , , | 6 Comments

Darlington Station – 26th June 2025

I visited Darlington station, three times on my trip.

These pictures are in chronological order.

Note.

  1. The station is being given a major upgrade, so it can handle more trains.
  2. The station has a large number of top-quality Victorian features.
  3. The station is Grade II* Listed.
  4. Inside the enormous train-shed are two long platforms, that handle most of the trains and two South-facing bay platforms.
  5. Two new platforms, which are numbered 5 & 6,  and possibly a double-track avoiding line are being added outside the train-shed on the East side.
  6. In images with a comment saying Note Platform 5, the new long electrified Platform 5 can be seen.
  7. Platform 5 appears to be already electrified at its Southern end.

These three OpenRailwayMaps shows the future layout.

 

The first OpenRailwayMap shows the junction, where the branch to Newton Aycliffe, Shildon and Bishop Auckland connects.

Note.

  1. The red tracks are electrified and indicate the East Coast Main Line.
  2. The track curving off to the North-West is the Bishop Auckland Branch.
  3. The black tracks are not-electrified.
  4. The Bishop Auckland Branch is shown dotted black and red, as it will be electrified, so that Hitachi can get their new trains to the East Coast Main Line.
  5. The two tracks of the East Coast Main Line are very straight and the map shows them to have a 125 mph operating speed.

The second OpenRailwayMap, shows the lines immediately to the South of Darlington station.

 

Note.

  1. The red tracks are electrified.
  2. The black tracks are not electrified.
  3. Tracks are number 4, 3, 2 and 1 from the West.
  4. The Southern ends of Platforms 1 and 4, and Platforms 2 and 3, which are inside the current train-shed appear to be virtually unchanged.
  5. Platform 1 is electrified and will probably still cater for Southbound trains.
  6. Platforms 2 and 3 are bay platforms without electrification for trains terminating at Darlington.
  7. Platform 4 is electrified and will probably still cater for Northbound trains.
  8. There is an electrified avoiding line to the East of Platform 1.
  9. The brick wall of the current train shed is in the white space to the East of Platform 1.
  10. Outside the current train shed are two electrified 125 mph lines, an electrified through platform and a South-facing bay platform without electrification.
  11. The  new electrified platform looks very long. Could it be long enough to handle a pair of High Speed Two Classic-Compatible trains? I suspect though it is long enough to handle the splitting and joining of a pair of five-car Hitachi Class 80x trains.
  12. The new bay platform looks longer that the current bay platforms 2 & 3. Is it long enough to handle a five-car Hitachi Class 80x train?
  13. It does appear from the track layout, that the new electrified platform is connected to the East Coast Main Line, the Saltburn branch and stabling sidings to the North of the station.
  14. The new bay platform appears to be connected to the Saltburn branch.

The two new platforms also appear to be adjacent to an area of the station, which is labelled Darlington Station Gateway East. I would assume, that this proximity will be used to make the station easy for changing trains.

The third OpenRailwayMap shows the section of the station between the two previous maps.

Note.

  1. The red tracks are electrified.
  2. The black tracks are not-electrified.
  3. The Darlington end of the Bishop Auckland Branch is shown dotted black and red, as it will be electrified, so that Hitachi can get their trains to and from the East Coast Main Line.
  4. Both Platforms 1 and 4 appear to connect to the East Coast Main Line, so high speed services can operate as they do now, by taking a diversion through the current Darlington station.
  5. To the East of the East Coast Main Line, there appear to be some very useful stabling sidings.

I have some general thoughts about Darlington station.

Will Trains Not Stopping At Darlington Station Use The New 125 mph Lines Through the Station?

It does appear that the two 125 mph lines through the new part of the station are very straight.

  • They are shown as 125 mph, but could be faster.
  • It should be remembered that according to Wikipedia, British Rail built the Selby Diversion for 160 mph in 1983.
  • Between Durham and York stations is 66.2 miles of mainly 125 mph railway.

I believe that cutting out the need for trains to slow to go through Darlington station could save several minutes.

Will Trains Stopping At Darlington Station Use The Current Platforms 1 And 4 As They Do Now?

The track layout would seem to allow this and those changing to another train, would not have to walk a long way.

Can Trains Stopping At Darlington Station Use The New Eastern Platforms?

I have examined the second and third maps in detail and it looks as if the track layout will allow trains on the East Coast Main Line in both directions to stop at the long electrified platform.

The shorter bay platform appears to be only connected to the Tees Valley Line to Middlesbrough and Saltburn.

How Long Are The New Eastern Platforms?

Estimating against the scale on the map, I reckon these are the likely lengths.

  • Long electrified platform – 400 metres – Appears to be numbered 5
  • Bay platform – 200 metres – Appears to be numbered 6.

These are very useful lengths.

An Aerial View Of The New Platforms

This image from Tees Valley Combined Authority shows the Northern ends of the new platforms and the new footbridge.

Note.

  1. The original four-platform Victorian station is on the right, which is the Western side.
  2. The East wall of the Victorian train shed can be clearly seen.
  3. The two absolutely straight 125 mph lines, that allow trains to bypass the original station are closest to the wall.
  4. The long electrified platform, which appears to be numbered 5, also appears to be absolutely straight.
  5. The unelectrified bay platform, which appears to be numbered 6, is to the left.
  6. Platforms 5 and 6 would seem to be separated by a wide island platform, which would make interchange easy.

This page on the Network Rail web site, gives more information.

Car Parking At Darlington Station

This image from Tees Valley Combined Authority shows the Northern end of the station.

Note.

  1. The three sections of the Victorian station.
  2. The two new platforms ; 5 and 6 at the top of the image.
  3. The two 125 mph lines bypassing the Victorian station.
  4. There are two new footbridges connecting the Victorian station to the land on the other side of the 125 mph lines.

To the left of the station, there appears to be a massive multi-story car-park.

I asked Google about the new car park at Darlington station and got this reply.

The new multi-story car park at Darlington Station will have a capacity of more than 650 vehicles. This is part of a larger £140 million redevelopment of the station, which also includes new platforms and an eastern concourse. The car park will include accessible parking bays and electric car charging points.

This image from Tees Valley Combined Authority shows the car parking from the South.

Note.

  1. The building appears to be a five-story car park.
  2. There appears to be a very easy connection between the car park and the bridge to the station.
  3. From the roof layout, there appears to be several lifts.
  4. It looks like there will be a large area between the platforms and the car park, where travellers can meet and socialise.
  5. The bay platform 6 already has a pair of red buffer stops.

Railways may have come to Darlington two hundred years ago and it looks like they are getting the car parking at the station ready for at least the next two hundred.

Further Electrification

If as I expect, the UK embraces battery electric technology for local and regional trains, I can see the three South-facing bay-platforms being electrified, so they could charge he battery-electric trains.

This picture shows that bars have been placed across Platforms 2 and 3, that could be used to support the electrification.

This method has been used in Victorian stations in the UK before. I show some installations and discuss electrifying Victorian stations in Could Hull Station Be Electrified?.

 

Darlington Station And High Speed Two

This graphic shows the original service pattern for High Speed Two.

Note.

  1. There are seventeen paths terminating in the South at Euston station.
  2. Six of these paths go to Leeds, Newcastle or York.
  3. As the Eastern leg has been abandoned, that means there will be no High Speed Two trains to Leeds HS2, York, Darlington, Durham and Newcastle via the East Coast Main Line.

Darlington was to be served by these hourly services.

  • Train 17 – Birmingham Curzon Street and Newcastle via East Midlands Hub, York, Darlington and Durham.
  • Train 23 – London and Newcastle via York and Darlington.

Both trains would have been a single 200 metre long High Speed Two Classic-Compatible train.

Joining And Splitting Trains At Darlington

As Platform 5 looks like it would be a 400 metre long platform, it would look like it would be possible to handle a pair of High Speed Two Classic-Compatible trains.

But these trains will not now be serving Darlington in the near future, as the Eastern leg of High Speed Two has been cancelled.

A pair of nine-car Class 801 trains would be 467.4 metres long and might be able to fit into Platform 5.

But a pair of seven-car trains would certainly fit into a 400 metre Platform 5.

In Do Class 800/801/802 Trains Use Batteries For Regenerative Braking?, I found this snippet in an Hitachi document.

To simplify the rearrangement and management of train configurations, functions are provided for identifying the train (Class 800/801), for automatically determining the cars in the trainset and its total length, and for coupling and uncoupling up to 12 cars in
normal and 24 cars in rescue or emergency mode.

So I suspect with software updates two nine-car trains could run together.

Suppose LNER wanted to attack the airlines on the London and Scottish route.

  • Two seven- or nine-car Class 800 or 801 trains would leave Edinburgh working as a pair.
  • First stop would be Platform 5 in Darlington.
  • The trains would split in Darlington.
  • One train would go to King’s Cross stopping at perhaps Doncaster and Peterborough.
  • The other train would go to St. Pancras stopping at perhaps Leeds, Sheffield, Nottingham and Bedford.

Note.

  1. A seven-car Azuma would be under 200 metres long.
  2. Seven-car trains would fit in St. Pancras.
  3. LNER have run an Azuma train into St. Pancras.
  4. The train would interchange with East-West Rail at Bedford.
  5. Travellers to and from East Anglia would change at Peterborough.

Large areas of England would have a fast route to and from Scotland.

 

 

 

 

June 30, 2025 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , | 1 Comment

Train Lengths Between King’s Cross and Edinburgh

If you ask Google, what is the platform length at King’s Cross station, you get the following answers.

  • Platform 0 – 305 metres
  • Platform 1 – 304 metres
  • Platform 2 – 285 metres
  • Platform 3 – 289 metres
  • Platform 4 – 290 metres
  • Platform 5 – 270 metres
  • Platform 6 – 288 metres
  • Platform 7 – 288 metres
  • Platform 8 – 289 metres
  • Platform 9 – 276 metres
  • Platform 10 – 276 metres

This OpenRailwayMap shows the tracks linking to the eleven platforms at King’s Cross.

Note.

  1. The red tracks are the electrified platforms in King’s Cross.
  2. The two pink tracks are the Piccadilly Line underneath the station.
  3. Platform 0 is on the right and Platform 10 is on the left.
  4. The platform number is shown alongside the track.

Platform 0 is the newest platform, which opened in 2010 and also the longest at 305 metres.

Many of the trains using the station are Hitachi Class 800, 801, 802 and 803 trains, which have cars of the following lengths.

  • Driving car – 25.85 metres
  • Intermediate car – 26 metres

These lengths mean that individual trains have the following lengths.

  • Five-car – 129.7 metres
  • Nine-car – 233.7 metres
  • Ten-car – Pair of five-cars – 259.4 metres

Note.

  1. It would appear that nine- and ten-car trains can use all platforms 0-8 in the main station.
  2. Platform 5 may be short at 270 metres, but Real Time Trains shows it can handle nine- and ten-car trains.

Real Time Trains doesn’t seem to show any nine- and ten-car trains using Platforms 9 and 10. Is the approach just a bit tight?

These are some further thoughts.

LNER’s New Class 897 Trains

I asked Google how long will be LNER’s new ten-car Class 897 trains. This is the answer I received.

The Class 897 train will be 218.7 meters (717 ft 6 in) long, according to Wikipedia. These trains will be ten-car units.

Have these trains been designed, so they can fit in Platforms 9 and 10 at King’s Cross and other shorter platforms, that LNER serve?

Other train classes, that could use Platforms 9 and 10 at King’s Cross include.

  • Five-car Class 800, 801, 802 and 803 trains – 129.7 metres
  • Five-car Class 180 trains – 116.52 metres
  • Five-car Class 222 trains – 116.16 metres
  • Six-car Class 717 trains – 121.7 metres
  • Eight-car Class 379/387 trains – 163.12 metres
  • Eight-car Class 700/0 trains – 162 metres
  • Twelve-car Class 700/1 trains – 242.6 metres

Real Time Trains or my eyes have observed all these trains, except for the twelve-car Class 700 trains in Platforms 9 and 10 at King’s Cross.

It does appear that the shorter ten-car Class 897 trains improve utilisation of the platforms at King’s Cross station.

Could Twelve-Car Class 800, 801, 802 and 803 Trains Run Into King’s Cross?

Consider.

  • LNER and Lumo have both said, they want to win passengers from the airlines on Anglo-Scottish routes.
  • Extra paths on the East Coast Main Line are at a premium and hard to come by.

In Do Class 800/801/802 Trains Use Batteries For Regenerative Braking?, I found this extract in a Hitachi document on their web site.

To simplify the rearrangement and management of train configurations, functions are provided for identifying the train (Class 800/801), for automatically determining the cars in the trainset and its total length, and for coupling and uncoupling up to 12 cars in
normal and 24 cars in rescue or emergency mode.

So if say LNER or Lumo wanted a twelve-car train, it would be possible. It also looks like one twelve-car train can rescue another.

Train lengths would be as follows.

  • Five-car Class 800, 801, 802 and 803 trains – 129.7 metres
  • Six-car Class 800, 801, 802 and 803 trains – 155.7 metres
  • Nine-car Class 800, 801, 802 and 803 trains – 233.7 metres
  • Twelve-car  Class 800, 801, 802 and 803 trains – 311.7 metres
  • Twelve-car – Pair of six-car Class 800, 801, 802 and 803 trains – 311.4 metres

As Platform 0 is 305 metres and Platform 1 is 304 metres, I suspect that King’s Cross  station could accept twelve-car formations of Hitachi Class 800, 801, 802 or 803 trains, with fairly minor modifications.

But what about other stations?

Berwick-on-Tweed

Both platforms are around 233/234 metres, so twelve-car trains couldn’t call, unless the platforms were lengthened.

Bradford Forster Square

From the pictures, that I took in Bradford Forster Square Station – 20th May 2025, of a pair of LNER five-car trains, I suspect that the new Platform 0 and the extended Platform 1 will accept twelve-car trains, or could easily be modified.

Darlington

Both platforms, where LNER call are over 350 metres long, so Darlington can handle twelve-car trains.

Doncaster

Doncaster has four long platforms and I am fairly sure, the station could be easily modified to handle twelve-car trains.

Durham

Both platforms are over 260 metres, so twelve-car trains couldn’t call, unless the platforms were substantially lengthened.

Edinburgh Waverley

Platform 5 and 6 at Edinburgh Waverley station were both lengthened to 275 metres to accept ten-car LNER trains in 2016. I suspect more lengthening will be needed.

Leeds

Platforms 8 and 11 at Leeds station are both over 320 metres, so should be long enough to accept twelve car LNER trains.

Newark Northgate

Platforms 1 and 2 at Newark Northgate station are only 133 metres. Some platform lengthening would be needed for twelve-car trains to be able to call.

Newcastle

Platforms 2, 3 and 4 at Newcastle station are 362, 304 and 268 metres respectively. I believe with small improvements, that the station could be easily modified to handle twelve-car trains.

Northallerton

Both platforms are around 261/270 metres, so twelve-car trains couldn’t call, unless the platforms were lengthened.

Peterborough

Platforms 3, 4 and 5 at Peterborough station are only 265 metres. Some platform lengthening would be needed for twelve-car trains to be able to stop.

Wakefield Westgate

Both platforms at Wakefield Westgate station are only 255 metres. Some platform lengthening would be needed for twelve-car trains to be able to stop.

York

Four platforms at York station are over 315 metres.

Could A Twelve-Car Class 800, 801, 802 and 803 Trains Run Between King’s Cross And Edinburgh?

This would surely be the ultimate competition for the airlines.

Consider.

  • It would use a single twelve-car Hitachi train or a pair of six-car trains.
  • It could be fitted with batteries, so it could use the Great Northern and Great Eastern Joint Line diversion, through Lincoln, when there is engineering works or overhead wiring troubles.
  • It would use either Platform 0 or Platform 1 at King’s Cross.
  • It would use a lengthened platform at Edinburgh.
  • Peterborough, Doncaster, York, Darlington and Newcastle could be possible stops.
  • I estimate an LNER layout would carry 696 Standard Class and 86 First Class passengers.
  • I estimate that a Lumo layout would carry 965 Standard Class passengers.

Note that an Airbus A321neo single-aislr airliner can carry 244 passengers.

 

June 4, 2025 Posted by | Transport/Travel | , , , , , , , , , , | 1 Comment

An Extreme Day Out – Bradford Forster Square Station

It seems to be the fashion to go and visit somewhere far away in a day. So why not?

For my first trip in this vein, I decided on the spur of the moment to go to Bradford Forster Square station.

Why Did I Choose Bradford Forster Square Station?

There are three main reasons.

  1. A new platform has just opened at the station to handle the longest LNER trains.
  2. LNER are now running a seven trains per day (tpd) service via Leeds.
  3. I wanted to see how LNER’s walk-up ticketing performed on the route.

In addition, I wanted to see how the service performed, now that Bradford is this year’s UK City of Culture.

King’s Cross To Bradford Forster Square Station For £43.00 With A Railcard

I just missed the 11:03, so I booked the 13:03 for £43.00 with my Senior Railcard, from one of the numerous ticket machines in King’s Cross.

The train arrived on time in two hours 47 minutes for the 199.4 miles, which was an average speed of 72 mph.

In What Will Be The Fastest Times Possible Between London King’s Cross And Leeds?, I predicted this.

I wouldn’t be surprised to see with full digital signalling and a 125 mph average between London King’s Cross and Leeds.

  • 125 mph Base Time – 89 minutes.
  • Four Acceleration/Deceleration sections at 6 minutes each – 24 minutes.
  • Three Dwell Times at 2 minutes each – 6 minutes

This would mean a total time of one hour and 59 minutes.

As my Bradford service took two hours and 28 minutes between London King’s Cross And Leeds, that would mean, that a time close to two hours and fifteen minutes could be possible between London King’s Cross and Bradford Forster Square stations.

There Weren’t Many Passengers Between Leeds And Bradford Forster Square Stations

These pictures show the nearly empty train and the small numbers, who alighted at Bradford Forster Square station.

But I don’t think three in the afternoon is a time, when many passengers will need to go between Leeds and Bradford Forster Square stations.

Bradford Forster Square Station

I described that station, with its new Platform 0 in Bradford Forster Square Station – 20th May 2025, where I said the station needed these additions.

The station needs a few additions, like a proper coffee shop, a better shop, ticket machines and toilets.

But it’s not been open very long.

Bradford Forster Square Station To King’s Cross For £25.70 With A Railcard

I bought this ticket from a Yorkshire Lass in the Ticket Office.

There Weren’t Many Passengers Between Bradford Forster Square And King’s Cross Stations

Only about a dozen passengers boarded the train at Bradford Forster Square and some got out at Leeds.

In fact the train wasn’t very busy all the way to London with perhaps twenty passengers in my carriage, when we arrived in King’s Cross.

Will This Service Develop Into A Two-Hourly London King’s Cross And Leeds Or Bradford Forster Square Service With A Trans-Yorkshire Service Tacked On?

Currently, it is the following.

  • An express service between King’s Cross and Leeds with stops at Peterborough, Doncaster and Wakefield Westgate.
  • An express service between King’s Cross and Bradford Forster Square with stops at Peterborough, Doncaster, Wakefield Westgate and Leeds.
  • A local service between Doncaster and Bradford Forster Square with stops at Wakefield Westgate and Leeds.
  • Additional calls on some services are at Stevenage, Grantham, Retford and Shipley.

In addition the following would be possible.

  • Pairs of trains could split at Leeds, with one train going to Bradford Forster Square and the other train to somewhere like Harrogate, Huddersfield or Skipton.
  • Additional stops could be added between Leeds and Bradford Forster Square without slowing services between Leeds and King’s Cross.

But then where does this fit with LNER buying ten CAF tri-mode trains?

Surely they would get better flexibility, if they’d bought more Azumas, which could run on the electrification all the way to Bradford Forster Square, Huddersfield and Skipton. If some had batteries, they could run all the way to Harrogate.

LNER’s Disabled-Unfriendly Refreshments System

I am not disabled, but I only have one fully-working hand, as the school bully broke my left humerus and I have difficulty doing certain things with my left hand, due to the quality of the care I received in Highlands Hospital in Winchmore Hill.

Having a left-sided stroke didn’t help either.

One of the things, I can’t do is take pictures on my mobile phone, so I always carry a proper camera. Because of the injury, I have also never read a QR code with my phone.

On LNER’s trains to get a drink, you either have to order it by reading a QR code or walking to the buffet.

As on the train going North, the buffet was closed, I went thirsty.

In future, if I have a choice of trains, I’ll choose one with a trolly service.

Are The CAF Tri-Mode Trains Part Of A Plan To Drive Open Access Operators Out Of Yorkshire?

This is possibly the only scenario that makes sense.

The ten-car tri-mode trains would be used to take over Grand Central’s services to Bradford Interchange and Sunderland, and Hull Trains services to Hull.

After Monday, LNER are now running more daily services to Bradford Forster Square, than Grand Central are to Bradford Interchange.

If like my return to London on Tuesday, you can buy a walk-up ticket on LNER, then why would you travel on Grand Central.

Conclusion

£68.70 is not a bad price for what is in effect a walk-up day return to Bradford Forster Square.

I’ve just looked how much, I would be charged for an advance ticket on Friday, using the trains I used on Tuesday.

I could get a ticket for £25.70 going North and £28.95 going South  or a total of £54.65. All are with my Senior Railcard.

But it does look to me, that LNER and the Government are trying to drive Grand Central off the Bradford route.

If I am right and Hull Trains and Lumo will be next in LNER’s sights, then what was Starmer and other Government ministers doing at the launch of orders for new trains for Grand Central, Hull Trains and Lumo?

 

 

May 22, 2025 Posted by | Food, Transport/Travel | , , , , , , , , , , , , , , , | 3 Comments

Bradford Forster Square Station – 20th May 2025

I took these pictures during my visit to Bradford Forster Square station today.

Note.

  1. The platforms are numbers 0-3, with the ten-car LNER train in platform 1.
  2. Platforms 0 and 1 can take ten-car LNER Class 800/801 trains.
  3. Platform 0 is the recently-built new platform.
  4. Poundland is alongside Platform 0.
  5. The Coffee seems to have bolted.
  6. As Bradford is this year’s City of Culture, someone has decorated the station’s benches.

I have some further thoughts.

Station Additions

The station needs a few additions, like a proper coffee shop, a better shop and toilets.

Platform Lengths

It would appear that Platforms 0 and 1 are able to take a pair of Class 800, 801 or 802 trains, which are just under 260 metres long and each can carry 604 passengers.

It would also be able to handle a single nine-car Class 800, 801 or 802 train, which are just under 234 metres long.

This would mean, that at a future date, the station could handle a 200 metres long High Speed Two Classic-Compatible half-train.

Number Of Services

It appears there were seven services to and from London, with about one every two hours.Going to London three were nine-car trains and four were ten-car trains.

I travelled both ways in the same ten-car train.

May 20, 2025 Posted by | Transport/Travel | , , , , , | 3 Comments

After 104 Years UK’s Longest Train Route Is Cancelled For Ever

The title of this post, is the same as that of this article on The Times.

These three paragraphs describe the last journey.

With a muted fanfare the UK’s longest train rolled out of Aberdeen on Friday morning for its final sojourn down to Penzance, ending a service that connected both ends of the country for more than 100 years.

The 8.20am CrossCountry train took 13 hours and 20 minutes, with stops at 35 stations along the way, to cover the 774-mile route. Passengers spent more than two hours of the journey in the stations.

The service, which was launched in 1921, headed south through York, Bristol, Taunton and Truro on its way past some of the country’s finest landscapes, and arrived in Penzance at 9.31pm.

Looking at a ticket site and it appears that by using two trains from Aberdeen to King’s Cross and Paddington to Penzance you can be a few minutes faster, if you know your Underground.

This route will get quicker.

  • As the East Coast Main Line rolls out its new digital signalling, this should speed up trains, by allowing some running at 140 mph instead of the current 125 mph.
  • LNER will also be bringing their new tri-mode (electric/battery/diesel) trains into service, which could give some speed improvements on the diesel section North of the Forth Bridge in terms of speed and ride noise, especially as ScotRail will be partially electrifying part of this section.
  • GWR should also be upgrading some of their fleet to tri-mode, which should improve speed and ride noise on the sections, where the route is not electrified.
  • CrossCountry could compete, by buying new trains, but it would be a big financial risk, as the London route should get quicker, as track improvements and increased use of digital signalling speed up services from London to Aberdeen and Penzance.

CrossCountry ‘s owner; Arriva isn’t standing still, but have applied for extra Grand Central open access services on the East Coast Main Line to Scunthorpe and Cleethorpes and a new service from Newcastle to Brighton via Birmingham, which will partly fill the gap caused by the loss of the Aberdeen and Penzance service, by linking with GWR at Reading and LNER at Newcastle.

May 16, 2025 Posted by | Transport/Travel | , , , , , , , , , , , , , , | 4 Comments

The Lack Of Information At Edinburgh Waverley Cost Me £55.10

The ongoing works at Edinburgh Waverley ruined my day. I had intended to come up to the city to take some photographs for this blog and see an old friend, who like me is widowed.

I also wanted to take a train to Leven to see the new stations.

I have a very unusual skin and on some days I can’t use ticket machines, so I need to use a human in a ticket office.

Today was one of those days and to complicate matters, I couldn’t find the ticket office.

I also wasted more time finding platform 17 for Leven.

Going back to London, where I live, my friend advised me to take the escalators from Princes Street to get into the station, which I have used many times before.

But they were shut and I missed the 16:13 Lumo to London by about a minute.

To get home, I had to buy another ticket on LNER for £55.10.

If there had been more information, perhaps in leaflets or from real people around the station, I would have had a much better day.

 

May 15, 2025 Posted by | Transport/Travel | , , , , , , | 1 Comment

Does Innovation Get Mr. Ed Miliband Better Prices To Doncaster?

The East Coast Main Line has ticketing unlike any other in the UK.

Turn up at any LNER station to go to any station that is served by trains from that station and you will be given a choice of the best prices at the ticket machines or at the booking office.

Effectively, you are sold your choice of the cheapest Advance tickets for your journey, at the time of booking.

In the last few months, I have taken three trips from London to Doncaster. All were priced between £20 and £25, with one trip on each of Grand Central, Hull Trains and LNER.

Some might argue it is because of the three Open Access operators on the route, that good value is available. But I would argue that it is down to the fact that because of the Open Access operators there is more seats on the route.

This ticketing model should be adopted on the West Coast Main Line and the Midland Main Line.

The ticketing has certainly modified my behaviour.

If I want to go to Sheffield, I go to Doncaster, as it’s a lot cheaper, then get a local train between Doncaster and Sheffield.

Ed Miliband Is A Doncaster MP

When he is going between his Doncaster North constituency and London, does he use last minute ticketing?

April 15, 2025 Posted by | Transport/Travel | , , , , , , , , , , , , , | 1 Comment