The Anonymous Widower

Thoughts On Splitting The Northern Line

In Battersea Power Station Station Opens, I talked about the scale of the new Battersea Power Station station.

  • It looks like it could have three entrances.
  • It’s got four escalators and two lifts to go to down to platform level.
  • It has two terminal platforms.

I feel it has been designed to handle as many passengers and trains as Morden station.

  • Morden station has five platforms.
  • The station is step-free.
  • The station handles ten million passengers per year.

The signalling can handle up to thirty trains per hour (tph) to Morden.

It looks to me that Battersea Power Station station has been designed to be big enough to take half the trains from North London with ease.

The Bank Station Upgrade

In the Bank Station Upgrade, nearly a mile of new train tunnel and several shorter pedestrian tunnels were built.

They were dug not with a tunnel boring machine, but by traditional methods, that would have been understood by Brunel and the ancient Egyptians; pick and shovel, but probably assisted by the best modern electrical diggers and trucks.

I would expect that any tunnelling needed to split the Northern Line will not use an expensive tunnel boring machine.

The Northern Line will be going back to the future.

The Proposed Split

There has been talk of splitting the Northern Line into two separate lines for some years.

  • The Western Line (Charing Cross Line) would run between Edgware and Battersea Power Station via Camden Town, Euston, Charing Cross and Kennington.
  • The Eastern Line (Bank Line) would run between High Barnet and Morden via Camden Town, Euston, Bank and Kennington.

Note.

  1. I will call the two lines the Bank and Charing Cross Lines.
  2. Both lines could have Victoria Line frequencies of at least thirty tph.
  3. It is generally felt that the split would need a rebuild at Camden Town station to handle the extra passengers.
  4. Camden Town station also needs better access between the trains and the street.
  5. There would need to be better connections at Kennington and Euston stations.

Surely, the main advantages of the split would be as follows.

  • Trains on both lines would go end-to-end without crossing a junction, where signals and points were constantly switching trains. This is why the Victoria Line can handle more than thirty-three tph.
  • Trains will run at Victoria Line frequencies on both lines.
  • All trains at Camden Town and Kennington stations would use a route without points to go as fast as possible through the station.
  • Eliminating the points, would make both lines more reliable.
  • Euston station will have upwards at least sixty tph connecting it to Crossrail.

Effectively, the new Bank and Charing Cross Lines would be able to perform just like Dear Old Vicky.

I will now look at where work needs to or could be done to successfully split the two lines.

Kennington Station

In Could Access Between Platform And Train Be Improved At Kennington Station?, I outlined how passengers might use Kennington station to change between the Bank and Charing Cross Lines.

I developed this rule.

The rule would appear to be if you’re on one line and are going to a station on the other, you change at Kennington station.

Staff would need to be on the platform to help those, who were changing direction.

But I do think changing can be made to work well with step-free access between train and platform on all four platforms at Kennington station.

It will be interesting to see, what proportion of train changes at Kennington are simple cross-platform changes, where there is no use of the steep stairs. I think it could be quite high.

I believe Kennington station will grow into a very smooth interchange between the Bank and Charing Cross Lines.

Although, there’ll be a problem for some time, if you’re in a wheelchair and want to go between Morden and Battersea Power station.

This could be solved by lifts between each pair of platforms and the intermediate level passage, which connects to the lifts to the surface.

The Camden Town Problem

This map from cartometro.com shows the lines around and through Camden Town station.

Note.

  1. Camden Town station has four platforms.
  2. The Eastern pair are under Kentish Town Road and connect to High Barnet in the North.
  3. The Western pair are under Camden High Street and connect to Edgware in the North.
  4. In each pair of tracks the Northbound track is above the Southbound track.
  5. There is a level passage between the two Northbound tracks, so it is an easy interchange, if you’re on the wrong train going North.
  6. The passage between the two Southbound tracks has stairs at either end, if you want to change Southbound trains at the station.

But the real problem lies South of the station; the horrendously complicated Camden Town Junction.

The junction must be able to handle trains going between the following stations.

  • Bank and Edgware
  • Bank and High Barnet
  • Charing Cross and Edgware
  • Charing Cross and High Barnet

Note in the map, that the High Barnet tracks dive under the Edgware tracks so they can form two separate pairs of tracks to Euston, only one of which goes via Mornington Crescent.

If there was a similar junction on the motorways of the UK or the Interstate Highways of the US, it would have years ago been simplified.

The split will mean the following.

  • The Eastern pair of platforms will still be connected to High Barnet as now, but will also be directly connected to the tracks that go directly to Euston and on to Bank.
  • The Western pair of platforms will still be connected to Edgware as now, but will also be directly connected to the tracks that go to Euston via Mornington Crescent and on to Charing Cross.
  • Camden Town Junction could be seriously simplified, with perhaps the ability to swap between routes only available for depot and engineering movements.

I do suspect, it would also mean all trains from High Barnet will go via Bank and all trains via Edgware will go via Charing Cross.

  • A proportion of passengers would have to change at Camden Town.
  • Both routes would connect to High Speed Two at Euston.
  • Both routes connect to the Central, Jubilee, Piccadilly and Victoria Lines.
  • Improvements promised for Euston will give better access to the Sub-Surface Lines.

I think it will be a case of winning some good routes and losing others. Disgusted from Finchley might complain.

But then there will be Crossrail, which as it connects to both lines at Tottenham Court Road and Moorgate could give serious advantages.

The split isn’t without passengers who will object to losing their preferred route.

Camden Town Station

This document on TfL’s web site gives more details of the proposed capacity upgrade at Camden Town station. This schematic of the tunnels, platforms and walkways shows how the station could look in a few years time.

Note.

  1. New tunnels are shown in light grey.
  2. Existing tunnels are shown in dark grey.
  3. The Northbound platforms are above the Southbound ones.
  4. The tunnels in the foreground are those of the Charing Cross Line.
  5. The far tunnels are those of the Bank Line.
  6. The new Buck Street entrance is labelled 8.
  7. There is a new pedestrian tunnel between the two Northbound Lines.
  8. Below it is a new tunnel between the two Southbound Lines.
  9. There is an existing passage linking the four lines.

The full upgrade is very much on the back burner, but could Camden Town station be upgraded with the proposed extra cross passages.

  • These would enable passengers to change lines easily on the level.
  • Passengers changing between the Bank and Charing Cross Lines could be kept away from the existing escalators and the space at their bottom.
  • The tunnels would increase the circulation area.
  • The tunnels would be part of the new Buck Street entrance if it were to be built.

I feel with improved cross-platform interchange, Camden Town could function as an interchange station between the Bank and Charing Cross Lines.

A similar rule as I used for Kennington station would apply for passengers.

The rule would appear to be if you’re on one line and are going to a station on the other, you change at Camden Town station.

Staff would need to be on the platform to help those, who were changing direction.

But it would be a more comprehensive and easier interchange than Kennington, as all changes would be without steep stairs.

Once Camden Town station is working well with the new cross passages, I would then get a developer to put a large development on the proposed site of the Buck Street entrance, with a new entrance with lifts and escalators underneath, that reached down to the new cross tunnels.

After what the contractors did at Whitechapel, I suspect this could be achieved, whilst keeping the trains running and leaving the existing Camden Town station intact.

This Google Map shows the area between Camden Road and Camden Town stations.

Note.

  1. Camden Road station on the North London Line is in the North-East corner of the map.
  2. Camden Town station is at the bottom of the map towards the West.
  3. The Charing Cross Line to Edgware is under Camden High Street.
  4. The Bank Line to High Barnet is under Kentish Town Road.
  5. Buck Street is to the North of Camden Town station connecting Camden High Street and Kentish Town Road.
  6. The red-roofed building in Buck Street is the former Hawley School, which is now owned by Transport for London and is earmarked for the new station entrance.
  7. The Regent’s Canal, which has a convenient towpath, runs East-West across the map.
  8. A lot of development is happening on the North bank of the canal.

The map doesn’t show how difficult it is to walk between the two stations along the busy Camden Road.

In Between Camden Road And Camden Town Stations Along The Canal, I walked between the two stations along the canal and then up Kentish Town Road. It took me fourteen minutes in total with seven minutes between the canal and Camden Town station.

I believe the following will happen.

  • People living and working in the new developments will need access to Camden Town station.
  • The Regent’s Canal towpath will be updated into a safer walking route between Camden Lock and Camden Road station, that serves a lot of the developments.
  • More tourists will need to get to Camden Lock and the markets.

These will increase the need for extra capacity at Camden Town station.

The only way it will get built is by a private developer, who puts a lot of housing on the Buck Street site and sells it as quality housing in an iconic location.

A lot of politicians won’t like it, but solving the problems at Camden Town station, which is an overcrowding accident waiting to happen, is more important than their egos.

These pictures show some of the features of Camden Town station.

I believe Camden Town station could grow quickly into a very smooth interchange between the Bank and Charing Cross Lines.

In a few years time, when the Buck Street entrance is built, the capacity problems will be on their way to solution.

Finally, once the Buck Street entrance is complete, the original station can be refurbished.

 

Euston Station, Crossrail, Crossrail 2 and the Northern Line

Consider.

  • Euston station is a very busy station and it will be even busier, when High Speed Two opens.
  • Crossrail 2 will not be built before High Speed 2 opens.
  • The Victoria Line doesn’t connect to Crossrail.
  • The only connection between Euston station and Crossrail are the two branches of the Northern Line.

Splitting the Northern Line into the Bank and Charing Cross Lines will increase the number of Northern Line trains through Euston to at least sixty tph, if both lines can handle Victoria Line frequencies.

It looks to me, that making the Northern Line step-free at Euston is the best short-term alternative to building Crossrail 2.

Euston Station

Euston station is the third station, where the Bank and Charing Cross Lines connect.

This map from cartmetro.com shows the Northern Line through Euston station.

Note.

  1. The Northern Line is shown in black.
  2. The Victoria Line is shown in blue
  3. The Sub-Surface Lines are shown in purple and yellow.

In the map, the platforms are as follows going from top to bottom.

  • Platform 1 – Northbound – Northern – Charing Cross to Camden Town
  • Platform 2 – Southbound – Northern – Camden Town to Charing Cross
  • Platform 6 – Southbound – Northern – Camden Town to Bank
  • Platform 5 – Northbound – Victoria – Victoria to Walthamstow
  • Platform 4 – Southbound – Victoria -Walthamstow to Victoria
  • Platform 3 – Northbound – Northern – Bank to Camden Town

It  is a bit unusual as the cross-platform interchange between Bank and Victoria Lines involves a change of direction.

With the development of Euston station for High Speed Two, I am sure interchange between the two branches of the Northern Line and the other lines at Euston will be made step-free.

Plans have already been published that will connect Euston Square station and Euston station. I wrote about it in The New Step-Free Entrance At Euston Square Station.

These pictures are of Euston station.

I feel the wide Platform 6 could give scope for innovation.

Level Access Between Train And Platform

I believe that many platforms on the Northern Line can be modified to give level access between train and platform.

In Could Access Between Platform And Train Be Improved At Kennington Station?. I outlined how it could be achieved at Kennington station.

At Kennington station, all platforms are straight and this is a prerequisite to making the access level.

I also feel that any straight platform with a Harrington Hump could effectively be given a full length hump.

I suspect that a lot of stations could be converted to level access between train and platform

Conclusion

I believe that splitting the Northern Line would be very worthwhile.

 

 

 

 

 

 

 

September 27, 2021 Posted by | Transport/Travel | , , , , , , , , , , , , , , , | Leave a comment

Prioritising Patients

Homerton hospital is hoping to remove my gallstones on Thursday by endoscopy, so it’s just a fairly small procedure.

I do wonder if there is a shortage of nurses, doctors and other staff at the hospital caused by either the Covids or the fuel crisis, if some operations will be cancelled.

At no time, in the diagnostic process was I asked if I was in pain. Which I am not!

Surely, in the Age of Covid-19, where there is great uncertainty about predicting hospital capacity just a few weeks in the future, I should have been asked a few questions, so that urgent cases could be given priority if necessary.

As they must have been there for a few months causing me no trouble, surely a few extra weeks won’t make much difference to me.

September 27, 2021 Posted by | Health | , , , , , | 1 Comment

Is There Anybody Out There, Who’d Like To Share a Beef Bourguignon?

Recently, Marks and Spencer introduced a range of meat dishes, one of which was Beef Bourguignon.

So I bought one today.

  • There is a range of about six dishes.
  • All of the range seems to be gluten-free and is marked as such.
  • As they don’t look gluten-free from the picture, they would be ideal for serving at a mixed meal, where some diners were gluten-free and others were not!
  • They seem to be simple to cook.
  • The Use-By date is the 27th October.

If I have a quibble, it is that they are only for two and they also say Do Not Reheat on the box, which means that coeliacs like me, who live alone have a problem.

Perhaps they need a single portion.

But to solve my problem, if there is anybody reading this, who is close to Dalston and would like to test the Beef Bourguignon, then get in touch before the 27th!

 

September 27, 2021 Posted by | Food | , , | 1 Comment

Would A North-East And South West Sleeper Service Be A Good Idea?

I ask this question as in the October 2021, there is an article entitled A New Sleeper, which has this explanatory sub-title.

Des Bradley describes his concept for a North-East to South-West Overnight Service

Paraphrasing his resume from the article, Des Bradley is probably best described as a rail enthusiast, who has travelled all over Europe by train, especially on sleeper trains. He has also worked recently with ScotRail, where he led their integrated travel activities.

I regularly use the Caledonian Sleeper on my trips to Scotland,  often taking a sleeper one way and a day time train the other. Towards the end of next month, I have tickets booked for a low-cost Lumo train to Edinburgh and a sleeper back to London in the evening.

In this blog, I have regularly written about the sleeper trains being introduced across Europe and this summer I had intended to go via Eurostar and NightJet to Vienna. But the pandemic has kept me in England for two years.

An Edinburgh And Plymouth Sleeper

Des Bradley is proposing a sleeper train between Edinburgh and Plymouth.

  • A typical daytime trip on this route takes eight hours and forty-five minutes.
  • Intermediate stops would be Berwick-upon-Tweed, Newcastle, Durham, Darlington, York, Leeds, Sheffield, Derby, Birmingham New Street, Cheltenham Spa, Bristol Parkway, Bristol Temple Meads, Taunton, Exeter St. David’s and Newton Abbot.
  • Journey time would be just over twelve hours.
  • By comparison a sleeper between London and Edinburgh takes about seven hours and thirty minutes.

He calls the service the NESW Sleeper.

I have some thoughts on the proposal.

A Spine Route Between Edinburgh And Penzance

The route is effectively a spine between Edinburgh and Plymouth on which other services can be built.

Unlike the Caledonian Sleeper, Des Bradley doesn’t feel the train should split and join as it travels up and down the country.

But I do think that the NESW Sleeper can be timed to fit in with high-quality connecting services to extend the coverage.

An Innovative Timetable

Des Bradley’s timetable is innovative.

  • Trains leave Edinburgh and Plymouth around 21:00.
  • Trains arrive at their destination around 09:00.
  • Trains stop for about two hours at Derby.
  • After resting at Derby, the trains are effectively early morning trains.

Note.

  1. The wait at Derby, adds extra time, that can be used to make up for engineering diversions, which often happen at night!
  2. The trains could be used by non-sleeper passengers to get to Plymouth or Edinburgh early.

The consequence of the second point, is that the trains will have to offer some Standard Class seats.

Should The Train Serve Penzance?

The Great Western Railway’s Night Riviera sleeper train calls at Liskeard, Bodmin Parkway, Lostwithiel, St.Austell, Truro, Redruth, Cambourne, Hoyle and St. Erth between Plymouth and Penzance.

According to a proposed NESW timetable, the Night Riviera has long gone, before the NESW Sleeper arrives in Plymouth at 08:58.

But I’m sure Great Western Railway could arrange for a convenient service between Plymouth and Penzance to pick up passengers in the morning and deliver them in the evening. This picture taken at Plymouth, indicates that cross-platform interchange may be possible.

This picture shows a pair of GWR Castles, which regularly work additional services between Plymouth and Penzance.

What About Wales?

I suspect that Cardiff, Swansea and other towns and cities in South Wales, can be served in a similar way, by connecting with GWR services at Bristol Parkway station.

Other Connecting Services

Birmingham New Street, Derby, Leeds and Newcastle are important interchange stations and I can see services being timed to bring passengers to and from the NESW Sleeper.

Rolling Stock

The author offers choices for the trains, based on what is used currently in the UK and adding multiple units. But he is definitely tending towards fixed formations.

I feel that the trains should meet the following criteria.

They should be of similar standard as the Caledonian Sleeper.

They would need an independently-powered capability for sections without electrification.

They should be zero-carbon.

They should offer a range of accommodation including Standard Class seats to cater the early birds and budget travellers.

The possibility to run at 100 mph or faster might be useful to catch up time on some sections of the route.

I think that two trains could be possible.

  • A rake of coaches hauled by a hydrogen-electric locomotive.
  • A battery-electric Sleeper Multiple-Unit with a range of perhaps eighty miles on batteries.

This is a sentence from the article.

The concept of ‘Sleeper Multiple-Units’ has also emerged in recent years, and this idea could be attractive; although it has some inherent inflexibility, it could in the future allow multi-portion or experimental new routes to be tagged onto the core service.

Sleeper Multiple Units might enable a South Wales and Edinburgh service, that used the same train path between Edinburgh and Bristol Parkway, where the two trains would split and join.

Conclusion

I like this proposal and definitely think it is a good idea.

 

 

 

September 26, 2021 Posted by | Transport/Travel | , , , , , , , , , , | 6 Comments

Moroccan Solar-Plus-Wind To Be Linked To GB In ‘Ground-Breaking’ Xlinks Project

The title of this post, is the same as that of this article on Current News.

This is the first paragraph.

New solar and wind under development in Morocco is to be linked with Britain, with developer Xlinks also seeking to develop a cable manufacturing industry.

It looks to be a very challenging project.

  • The HVDC cable will be 3,800 km long.
  • The plan envisages 10.5 GW of electricity being generated.
  • There will be a 5GW/20GWh battery in Morocco.
  • They will export 3.6 GW of electricity to the UK for at least twenty hours per day.
  • The electricity will be exported to the UK by a cable that skirts to the West of Spain, Portugal and France.
  • The UK end of the cable will be at Alverdiscott in Devon.

All except the last are pushing current technology to the limit.

There is more information on the Morocco-UK Power Project page on the Xlinks web site.

  • The company claims, that it can supply renewable energy, that acts like baseload power.
  • When complete, it could supply eight percent of the UK’s energy needs.

These are my thoughts.

The 3,800 km. HVDC Link

This paragraph on the project web page describes the HVDC link.

Four cables, each 3,800km long form the twin 1.8GW HVDC subsea cable systems that will follow the shallow water route from the Moroccan site to a grid location in Great Britain, passing Spain, Portugal, and France.

It appears that would be 15200 kilometres of cable.

The longest HVDC link in the world is 2375 km. It’s overland and it’s in Brazil.

I can’t think otherwise, than that this will be a very challenging part of the project.

This Google map shows the area of Morocco, where the energy will be generated.

Note.

  1. Guelmim Oued Noun is outlined in red.
  2. The Canary Islands are just off the map to the West.

At least the project will be able to have convenient access to the sea.

This second Google Map shows the <Moroccan, Portuguese and Spanish coasts from Guelmim Oued Noun to the Bay of Biscay.

Note.

  1. The light blue of the Continental Shelf
  2. The darker blue of deeper water.
  3. Guelmim Oued Noun is outlined in red.
  4. The Canary Islands in the Atlantic Ocean to the West of Guelmim Oued Noun.
  5. Could the cable bring power to Gibraltar?
  6. There are other large cities on the route in Morocco, Portugal and Spain.

This third Google Map shows the Bay of Biscay.

Note.

  1. The light blue of the Continental Shelf
  2. The darker blue of deeper water.
  3. There are a series of islands off the Spanish and French coasts.
  4. Could these islands be used as stepping stones for the cable?

This fourth Google Map shows the Western Approaches to the UK.

Note that the prominent red arrow indicates Alverdiscott, where cable connects to the UK National Grid.

This fifth Google Map shows Alverdiscott to Lundy Island.

 

Alverdiscott substation is indicated by the red arrow.

 

This sixth Google Map shows the Alverdiscott substation in relation to the town of Bideford.

Note.

  1. Bideford is in the North-West corner of the map.
  2. The red arrow indicates the Alverdiscott substation.
  3. The River Torridge runs through the town of Bideford.

Could the river be used to bring the cables from Morocco to the substation?

This seventh Google Map shows the Alverdiscott substation

Note the solar farm to the South of the substation.

HVDC Cable

The article also says that they may be building their own cable-manufacturing facility. Does this indicate that there is a shortage of HVDC cable?

Judging by the number of proposed interconnectors proposed for UK waters, it might be a prudent move to improve cable-manufacturing capacity.

10.5 GW Of Zero-Carbon Electricity

This sentence on the project web page describes the power generation.

This “first of a kind” project will generate 10.5GW of zero carbon electricity from the sun and wind to deliver 3.6GW of reliable energy for an average of 20+ hours a day.

It appears that they will be providing a baseload of 3.6 GW to the UK for over twenty hours per day.

Consider.

  • Hinckley Point C has an output of 3.2 GW.
  • As I write this around midnight, the UK is generating 22.2 GW of electricity.

This paragraph from their web site describes the advantages of Morocco.

Most importantly, Morocco benefits from ideal solar and wind resources, required to develop renewable projects that could guarantee suitable power production throughout the year. It has the third highest Global Horizontal Irradiance (GHI) in North Africa, which is 20% greater than Spain’s GHI and over twice that of the UK. Furthermore, the shortest winter day still offers more than 10 hours of sunlight. This helps in providing production profiles that address the needs of the UK power market, especially during periods of low offshore wind production.

It is not a small power station in the wrong place.

The 5GW/20GWh Battery

That is a massive battery.

The world’s largest lithium-ion battery is Gateway Energy Storage in California. It has a capacity of 250 megawatts for one hour.

The proposed battery in Morocco is eighty times as large.

If I was choosing a battery for this application, I believe the only one that has been demonstrated and might work is Highview Power’s CRYOBattery.

I wrote about Highview’s similar type of application to Morocco in Chile in The Power Of Solar With A Large Battery.

But that installation only will only have storage of half a GWh.

But I believe Highview and their partner; MAN Energy Solutions can do it.

Conclusion

I wish the company well, but I have a feeling that there’s a chance, that this will join the large pile of dead mega-projects.

But I do feel that the solar and wind power station in Morocco will be developed.

And like the project in Chile it will have a large Highview CRYOBattery.

 

 

 

September 26, 2021 Posted by | Energy, Energy Storage | , , , , , , , , | 45 Comments

Cummins Accelerates Work On Hydrogen-Fueled Internal Combustion Engines

The title of this post, is the same as that of this article on CSR Wire.

This is the first paragraph.

Global power leader Cummins Inc. is accelerating its work on internal combustion engines fueled by low-carbon hydrogen.

Cummins aren’t the only company going this route, as JCB have also developed a hydrogen-powered internal combustion engine.

In some ways it makes sense, as in a truck, railway locomotive or specialist machine, the conversion of the current diesel version to a hydrogen one could be easier.

From my experience of selling software to Cummins, they see themselves as specialists in providing customised diesel engines for anybody who wants them.

So could they supply customised hydrogen engines which are a direct replacement for a diesel engine?

It could be a very profitable market for Cummins, good for the environment and a quick way to decarbonise a lot of applications.

September 26, 2021 Posted by | Hydrogen | , , , , | Leave a comment

Between Camden Road And Camden Town Stations Along The Canal

This walk is preferable to walking along the busy Camden Road with its heavy traffic and narrow pavements.

Note.

  1. The entrance is at the side of a Costa Coffee on the Camden Road.
  2. The canal seems to have more than its share of green algae.
  3. Hawley School in Buck Street will be the site of the new entrance to Camden Town station.
  4. Kentish Town Road could do with some decent buildings.
  5. It is not an area, that is short on graffiti.
  6. But is short on signage compared to some parts of the Regent’s Canal.
  7. It took me seven minutes walking along the canal and another seven minutes on Kentish Town Road. But I wasn’t walking fast.

The route is also an easy way to get to Camden Lock from Camden Road station, which avoids the chaos at Camden Town station.

September 25, 2021 Posted by | Transport/Travel | , , , | 1 Comment

Should We Stun Animals With Carbon Dioxide?

This post has been prompted by a text from a cardiologist. He said.

Current CO2 crisis reminds me that I think we should be using nitrogen to stun animals before slaughter, not CO2.

I heard a project on Farming Today a few months ago about CO2 stunning and thought it a great mistake as it can stimulate breathing and cause distress in some.

Have you seen anything on using nitrogen?

I haven’t but I must admit, I’ve had the thought myself and have also asked myself, if the gas in food packages is nitrogen, which would be logical to me.

I do have some thoughts.

The Best Beef I Ever Tasted

Over forty years ago, I used to buy beef from a local farmer in Suffolk.

  • It would now be considered organic.
  • All the farmer’s animals got the best care.
  • He used to slaughter the animals himself in the field after giving them a pick of grass, using a captive bolt.

It was certainly, the best beef, I’ve ever tasted. But then the animals suffered no distress.

Medical Uses Of Carbon Dioxide

This is from the Wikipedia entry for carbon dioxide.

In medicine, up to 5% carbon dioxide (130 times atmospheric concentration) is added to oxygen for stimulation of breathing after apnea and to stabilize the O2/CO2 balance in blood.

This would appear to support the cardiologist’s text.

Is Carbon Dioxide Cheaper Than Nitrogen?

I have found these prices for ten litre cylinder of both gases.

  • Carbon Dioxide – £78
  • Nitrogen – £54

On this quick comparison, there would appear to not be a large difference.

Availability Of Nitrogen

Reading the Wikipedia entry for nitrogen, it appears to me, that production of oxygen-free nitrogen is not that difficult and this may explain the price comparison with carbon dioxide.

Nitrogen And The Death Penalty In The United States

This is a section called Euthanasia in the Wikipedia entry for nitrogen.

Nitrogen gas has become the inert gas of choice for inert gas asphyxiation, and is under consideration as a replacement for lethal injection in Oklahoma.

As nitrogen is an asphyxiant gas, some jurisdictions have considered inert gas asphyxiation by inhalation of pure nitrogen as a means of capital punishment (as a substitute for lethal injection).

I have been totally against the death penalty since meeting Jimmy O’Connor in the 1970s.

Conclusion

It strikes me that nitrogen could be used to stun animals as a more humane alternative to carbon dioxide.

September 24, 2021 Posted by | Food | , , , | 4 Comments

Wrightbus Presents Electric & Fuel Cell Single-Decker Buses

The title of this post, is the same as that as this article on Electrive.

This is the first paragraph.

The Northern Irish bus manufacturer Wrightbus is introducing a new single-deck bus with battery and fuel cell propulsion. The new models of the GB Kite series in the Hydroliner FCEV and Electroliner BEV variants can each accommodate up to 90 passengers and are scheduled to go into series production in 2022.

This means that Wrightbus now have single and double-deck zero emission buses with both battery and fuel cell propulsion.

These are my thoughts.

High Commonality

There may be four different buses, but they have a surprising amount in common.

In this press release on the Wrightbus web site, which is entitled Wrightbus To Showcase Two New Zero-Emission Buses, there is this paragraph.

Both buses share an 86% parts commonality with their Double Deck sisters which delivers significant benefits to operators in terms of reducing complexity and costs for fleet maintenance.

Vehicle manufacturers have been looking for high commonality for many decades and it is amazing that Wrightbus have achieved such a figure.

We mustn’t forget the advantages, Wrightbus will get from such commonality in terms of production, product support and the supply of parts and sub assemblies.

Passenger Capacity

The passenger capacity of the four buses are as follows.

  • Double-decker – Hydrogen  – 86
  • Double-decker – Battery – 95
  • Single-decker – Hydrogen  – 90
  • Single-decker – Battery – 90

Note.

  1. These figures come from the Wrightbus web site.
  2. The site says that the figures for the single-decker buses depend on bus length and specification.

Does the similar capacity of all the buses give operators more flexibility?

Range

The range of the four buses are as follows.

  • Double-decker – Hydrogen  – 350 miles
  • Double-decker – Battery – 200 miles
  • Single-decker – Hydrogen  – 640 miles
  • Single-decker – Battery – 300 miles

Note.

  1. These figures come from the Wrightbus web site or the press release for the new single-deck buses.
  2. These ranges are claimed by Wrightbus as best-in-class.
  3. But surely the range of 640 miles for a single-deck zero-carbon hydrogen bus opens up some interesting and unusual routes.
  4. Single-deck buses appear to have a longer range than their double-deck sisters.

There is also a degree of battery size flexibility in the battery-electric buses to suit an operator’s routes.

Single-deck battery-electric buses are available with these battery sizes and charging times.

  • 340kWh – 2 ½ hours @ 150kW
  • 454kWh – 3 hours @ 150kW
  • 567kWh – 3 ½ hours @ 150kW

And these are the figures for the double-deck battery-electric buses.

  • 340kWh – 2 ½ hours @ 150kW
  • 454kWh – 3 hours @ 150kW

Note.

  1. Both single- and double-deck buses can use the two smaller batteries.
  2. I would assume that they are similar and it’s all part of the commonality.
  3. Both buses can also be fitted with a pantograph to charge the batteries, when the routes present an opportunity.

Could the largest battery be fitted to the double-deck bus? Perhaps at some point, but I suspect, that currently, a weight limitation applies.

The Fuel Cell

This sentence from the Electrive article, describes the fuel cell system of the hydrogen bus.

The fuel cell solo bus model is very similar in design. Instead of the pure BEV drive, the GB Kite Hydroliner FCEV has a Ballard FCmove fuel cell with 70 kW or 100 kW and a small supplementary battery with 30 or 45 kWh on board.

It appears, there is flexibility in the power.

Forsee Batteries From France

This paragraph from the Electrive article, talks about the batteries.

Incidentally, Forsee Power is acting as the supplier of the batteries for the BEV buses. The Bamford Group, new parent of Wrightbus, had extended the partnership with the French battery manufacturer in October 2020 with a new contract for several hundred battery systems per year. Forsee Power announced the introduction of extra-thin battery modules earlier this year and directly named Wrightbus as the launch customer for the modules of the new Slim series. Whether these batteries are now already being installed in the two Electroliners is not specified. However, the high storage capacity of the 567-kWh top battery leads us to assume this, at least for the solo bus model.

Forsee’s slimline batteries seem a major advance in the powering of vehicles like buses.

It certainly looks like extra-thin is beautiful, where batteries are concerned.

Conclusion

This is a formidable line-up of four zero-carbon buses, that can be tailored to an operator’s needs.

When linked tom Jo Bamford’s company; FUZE, which I wrote about in New Company Established To Help Transition Bus Fleets To Hydrogen, Bamford’s deck of cards look even stronger.

Will Jo Bamford do for the bus industry, what his grandfather did for diggers? I wouldn’t bet against it!

 

 

September 24, 2021 Posted by | Hydrogen | , , , , | Leave a comment

Hydrogen Trains Planned For Apennine Route

The title of this post, is the same as that of this article on Railway Gazette.

The trains appear to be part of a project to bring a sustainable economic recovery to an area that has been affected by three earthquakes in recent years and suffered badly from depopulation.

There would appear to be four projects.

Refurbishment Of The Sansepolcro And Sulmona Railway

This 300 km railway will also switch from diesel to hydrogen trains.

This railway looks like it could be an interesting route for a railway tourist. In my past experience, Todi and Perugia were certainly worth a visit.

Two Seas Railway

The Railway Gazette article says this about the Two Seas Railway.

This would cross Italy from west to east, connecting Roma’s Fiumicino airport with San Benedetto del Tronto via Rieti, Amatrice and Ascoli Picen.

It has been proposed for a long time and could use hydrogen traction.

Building Back Sustainably

The Railway Gazette article says this about the third and fourth projects.

A third project will assess the potential for diffused green hydrogen manufacturing activity in the region, and a fourth will look at ways to apply new energy and environmental technologies in post-earthquake reconstruction.

It looks to me, that hydrogen will play a large part in restoring this region of Italy.

Conclusion

It sounds a bit like, the Italians are rebuilding their railways like the UK and several other countries are doing.

September 23, 2021 Posted by | Hydrogen, Transport/Travel | , , , | Leave a comment