Thoughts On Rail Capacity Between London And The North

This is just a rough calculation to see how many trains can be run between London and the North.

I shall do the calculation by station.

Euston

Trains are.

  • Avanti – Birmingham – 1 tph (trains per hour)
  • Avanti – Blackpool North – 1 tpd (trains per day)
  • Avanti – Blackpool North via Birmingham – 2 tpd
  • Avanti – Edinburgh via Birmingham – 1 tp2h – (trains per two hours)
  • Avanti – Glasgow – 1 tph
  • Avanti – Glasgow via Birmingham – 5 tpd
  • Avanti – Holyhead – 8 tpd
  • Avanti – Liverpool – 1 tph
  • Avanti – Manchester – 3 tph
  • WMT – Birmingham – 2 tph
  • WMT – Crewe – 1 tph

This gives totals of  9 tph, 1 tp2h and 16 tpd

King’s Cross

Trains are.

  • Grand Central – Bradford – 4 tpd
  • Grand Central – Sunderland – 6 tpd
  • Hull Trains – Beverley – 2 tpd
  • Hull Trains – Hull – 5 tpd
  • LNER – Bradford- 2 tpd
  • LNER – Edinburgh – 3 tp2h
  • LNER – Harrogate – 1 tp2h
  • LNER – Hull – 1 tpd
  • LNER – Leeds – 3 tp2h
  • LNER – Lincoln – 1 tp2h
  • LNER – Middlesbrough – 1 tpd
  • LNER – Skipton – 1 tpd
  • LNER – Sunderland – 1 tpd
  • LNER – York- 1 tp2h
  • Lumo – Edinburgh – 5 tpd

This gives totals of  9 tp2h and 28 tpd

Marylebone

Trains are.

  • Chiltern – Birmingham – 2 tph

This gives totals of  2 tph

St. Pancras

Trains are.

  • EMR – Corby – two tph
  • EMR – Nottingham – two tph
  • EMR – Sheffield- two tph

This gives totals of  6 tph

Grand Totals

Grand totals are  17 tph, 10 tp2h and 44 tpd

I will assume.

  • 10 tp2h is equivalent to 5 tph.
  • 44 tpd is equivalent to 3 tph if trains start journeys between 0600 and 2100.

This means that currently, there is the equivalent of 25 tph between London and the North.

The Effect Of High Speed Two

The capacity of High Speed Two is 17 tph, so, that appears to be a 68 % increase in paths to the North.

Consider.

  • Assume we need 25 tph between London and the North.
  • 17 tph will be on High Speed Two.
  • 8 tph will be on classic routes like the East Coast Main Line, Midland Main Line and West Coast Main Line.
  • High Speed Two trains are 400 metres long.
  • Current trains are about 240 metres long.

I have done a weighted calculation, which shows that passenger capacity between London and the North, will increase by around 45 %.

High Speed Two will surely release paths between London and the North on the classic routes, that could accommodate somewhere around 17 tph.

These could be used for.

  • Services not suitable for High Speed Two
  • New services
  • Freight services
  • Open access services

There is a lot of capacity that can be reused.

What Will Happen To Classic Routes Between London And The North?

Consider.

  • The East Coast Main Line between London and Doncaster, is being upgraded with full digital signalling to allow running at up to 140 mph and increased train frequencies.
  • Similar upgrades will be surely be applied to the other classic routes between London and the North.
  • Important destinations, that will not be served by High Speed Two, like Coventry, Derby, Leicester, Luton, Milton Keynes and Peterborough could be given high speed connections, to Birmingham, London and Manchester.
  • The East Coast Main Line, Midland Main Line and West Coast Main Line will all be electrified with some sections of quadruple track in a few years.
  • Currently, the East Coast Main Line, Midland Main Line and West Coast Main Line are mainly 125 mph lines and these could be upgraded to 140 mph with digital signalling.

I could envisage the East Coast Main Line, Midland Main Line and West Coast Main Line being developed into a secondary 140 mph network based on the existing  stations lines and services.

Conclusion

High Speed Two is going to have a lot of collateral benefits in Middle England.

 

July 21, 2023 Posted by | Transport/Travel | , , , , , , , , , , , | 3 Comments

Thoughts About Electrification Through Devon And Cornwall

Distances

I’ll start by looking at a few distances.

  • Penzance and Taunton – 162.3 miles
  • Penzance and Exeter St. David’s – 131.5 miles
  • Penzance and Plymouth – 79.5 miles
  • Taunton and Exeter St. David’s – 30.7 miles
  • Plymouth and Exeter St. David’s – 52 miles
  • Taunton and Newbury – 89.6 miles
  • Plymouth and Taunton – 82.8 miles
  • Taunton and Paignton – 59 miles
  • Taunton and Patchway – 51.7 miles

Note.

  1. Patchway and Newbury are already electrified to Cardiff Central and London Paddington respectively.
  2. Bombardier’s engineer told me eight years ago, that the battery-electric Class 379 had a range of sixty miles.
  3. Stadler’s FLIRT Akku has a Guinness world record of 139 miles on one battery charge. See this page on the Stadler web site.
  4. Even Stadler’s Class 777 trains for Merseyrail have a range of 84 miles on battery power. See New Merseyrail Train Runs 135km On Battery.

The rail distances in Devon and Cornwall are getting closer to being within the capability of trains fitted with batteries.

Station Stop Times

These are typical times that trains stop in the more important stations between Taunton and Penzance.

  • Taunton – < 2 mins
  • Tiverton Parkway – < 2 mins
  • Exeter St. Davids – 2 mins
  • Newton Abbot – < 2 mins
  • Totnes – < 2 mins
  • Plymouth – 11 minutes
  • Devonport – < 2 mins
  • Saltash – < 2 mins
  • Menheniot – < 2 mins
  • Liskeard – < 3 mins
  • Bodmin Parkway – 2 mins
  • Lostwithiel – 2 mins
  • Par – 2 mins
  • St. Austell – 2 mins.
  • Truro – 2 mins
  • Redruth – 2 mins
  • Camborne – 2 mins

Note.

  1. The timings were for today.
  2. The Cardiff and Penzance services were being run by five-car Class 802 trains.
  3. Most station stops are around two minutes or less, but Plymouth on this train was eleven minutes.

I find it interesting that the Plymouth stop takes so much longer.

Train Stops At Plymouth

I looked at about twenty trains stopping at Plymouth, that included these services.

  • London Paddington and Penzance
  • Penzance and London Paddington
  • Cardiff Central and Penzance
  • Penzance and Cardiff Central

Note.

  1. I found an average time of eight minutes.
  2. Eleven minutes was a common stop.
  3. Eight minutes could be enough time for the rail equivalent of a Formula One splash and dash.
  4. CrossCountry services were going through the station in three minutes.

I am led to believe that the timetable used by the GWR trains would allow a quick battery charge at Plymouth station.

This OpenRailwayMap shows the platforms at Plymouth station.

Note.

  1. London is to the East and Penzance is to the West.
  2. Platform numbers increase from South to North.
  3. The two East-facing bay platforms are Platforms 1 and 2.
  4. The West-facing bay platform in the South-West corner is Platform 3.
  5. Platform 4 shares the island with the bay platforms 1, 2 and 3.
  6. Most trains going to Penzance use Platform 4.
  7. Platforms 5 and 6 share the centre island platform.
  8. Platforms 7 and 8 share the Northernmost island platform.
  9. Most trains going towards London use Platform 7.
  10. Wikipedia indicates that the track layout is comprehensive and allows a lot of operational flexibility.

Although the station was completed around forty years ago, it could have been designed for handling modern battery-electric trains.

  • There are three bay platforms numbered 1 to 3, to charge local services and send them on their way.
  • Trains can arrive and depart in the five through platforms, numbered 4 to 8, from either direction.
  • Two days ago, a nine-car London Paddington to Plymouth train terminated in Platform 7. After waiting an hour it returned to London. An hour would be enough time to fully-charge a train.
  • As many platforms as needed could be electrified.

I am fairly sure, that most battery-electric trains could be timetabled to leave Plymouth station with full batteries.

Turnround At Penzance

I have found these turnrounds.

  • 802113 arrived from Paddington at 1142 and left for London at 1215
  • 802022 arrived from Paddington at 1307 and left for London at 1415
  • 802103 arrived from Paddington at 1500 and left for London at 1615

This OpenRailwayMap shows the platforms at Penzance station.

Note.

  1. The three example trains used Platform 1.
  2. Platform 1 is the long platform on the landward side of the station.
  3. Platforms are numbered 1 to 4 from left to right.
  4. An appropriate number of platforms would be electrified to charge trains terminating at Penzance.

Trains would appear to have plenty enough time to recharge, so they would start their return journey with full batteries.

Engineering Ambition

Several times in my life, I’ve got fired up about engineering or software projects and I like to think, I’ve produced the best and fastest solution.

For this reason, I believe that Hyperdrive Innovation, who are now part of Turntide Technologies, and Hitachi will set themselves three objectives with the design of the the battery packs for the Class 802 train.

  • The battery-electric Class 802 will outperform the Stadler FLIRT Akku in terms of speed and distance.
  • The battery packs will be plug-compatible with the diesel engines, so there will only be minor software modification to the trains.
  • The train will be able to be handle all Great Western Railway’s routes without using diesel.
  • I wouldn’t be surprised that on many routes the train will cruise at over 110 mph on batteries.

I also suspect they want the Akku’s Guinness world record, which will mean the range will be in excess of 139 miles.

Battery Range Needed For Routes

These are routes that need to be covered by battery-electric Class 802 trains or similar.

  • Avanti West Coast – Crewe and Chester – 22.2 miles
  • Avanti West Coast – Crewe and Holyhead – 105.5 miles
  • Avanti West Coast – Crewe and Llandudno Junction – 65.5 miles
  • Avanti West Coast – Crewe and Wrexham – 34.4 miles
  • Avanti West Coast – Shrewsbury and Wolverhampton – 29.7 miles
  • Great Western Railway – Penzance and Plymouth – 79.5 miles
  • Great Western Railway – Plymouth and Taunton – 82.8 miles
  • Great Western Railway – Taunton and Patchway – 51.7 miles
  • Great Western Railway – Newbury and Taunton – 89.6 miles
  • Great Western Railway – Taunton and Paignton – 59.0 miles
  • Great Western Railway – Weston-super-Mare and Chippenham – 43.5 miles
  • Great Western Railway – Oxford and Great Malvern – 65.6 miles
  • Great Western Railway – Oxford and Hereford – 86.3 miles
  • Great Western Railway – Oxford and Worcester Foregate Street – 57.6 miles
  • Great Western Railway – Oxford and Worcester Shrub Hill – 57.2 miles
  • Great Western Railway – Cheltenham Spa and Swindon – 43.2 miles
  • Great Western Railway – Cardiff Central and Carmarthen – 77.4 miles
  • Great Western Railway – Cardiff Central and Pembroke Dock – 118.9 miles
  • Great Western Railway – Cardiff Central and Swansea – 45.7 miles
  • Hull Trains – Beverley and Temple Hirst Junction – 44.3 miles
  • Hull Trains – Hull and Temple Hirst Junction – 36.1 miles
  • LNER – Hull and Temple Hirst Junction – 36.1 miles
  • LNER – Middlesbrough and Longlands Junction – 22.2 miles
  • LNER – Sunderland and Longlands Junction – 48.5 miles
  • LNER – Lincoln Central and Newark Northgate – 16.6 miles
  • LNER – Leeds and Bradford – 13 miles
  • LNER – Leeds and Harrogate – 18 miles
  • LNER – Leeds and Huddersfield – 17 miles
  • LNER – Stirling and Inverness – 146 miles
  • LNER – Edinburgh Haymarket and Aberdeen – 130 miles
  • LNER – Peterborough and Doncaster via Great Northern and Great Eastern Joint Line – 93.7 miles
  • South Western Railway – Basingstoke and Exeter St. David’s – 124.5 miles
  • TransPennine – Hull and Micklefield – 42 miles
  • TransPennine – Longlands Junction and Saltburn – 34.7 miles
  • TransPennine – York and Scarborough – 42 miles
  • TransPennine – Doncaster and Cleethorpes – 52.1 miles
  • TransPennine – Stockport and Doncaster – 55.4 miles
  • TransPennine – Stockport and Cleethorpes – 107.5 miles

Note.

  1. Stirling and Inverness and Edinburgh Haymarket and Aberdeen could be shortened by up to thirty miles, by planned electrification in Scotland.
  2. I have assumed that the TransPennine Upgrade has been completed.
  3. It looks like a battery-electric Class 802 train could use the Great Northern and Great Eastern Joint Line diversion via Lincoln.
  4. I am slightly surprised, that the longest stretch of line without electrification and with a passenger service is Basingstoke and Exeter St. David’s.

Charging will be needed at some places to charge the battery-electric trains. Stations fitted with chargers could include Aberdeen, Carmarthen, Cleethorpes, Exeter St. David’s, Hereford, Holyhead, Hull, Inverness, Paignton, Penzance, Pembroke Dock, Plymouth, Swansea, Taunton, Weston-super-Mare, Worcester.

Most chargers would be a length of electrification in the platform, where the battery-electric trains terminated or passed through.

More On LNER’s Ten New Bi-Modes

I wrote about these trains in LNER Seeks 10 More Bi-Modes.

This was my conclusion.

There is a lot of scope to develop LNER’s services.

I think it is likely that the order will go to Hitachi.

But as I indicated, I do believe that there is scope for a manufacturer to design a zero-carbon train, that was able to serve Aberdeen and Inverness.

    • I suspect a fleet of ten trains would be sufficient.
    • Trains would use the 25 KVAC overhead electrification, where it exists and hydrogen or battery power North of the wires.

The trains would also be capable of being upgraded to higher speeds, should the East Coast Main Line be turned into a High Speed Line.

I also think, that whatever trains are bought, there will be a large upgrading of the existing Hitachi fleet, which will add batteries to a lot of trains.

In the July 2023 Edition of Modern Railways, there is an article, which is entitled LNER Embraces Pioneering Spirit, which takes the form of an interview with LNER’s Managing Director; David Horne.

In a section, which is entitled ‘225’ Replacement, this is said.

Meanwhile, Mr Horne is looking to what might replace the InterCity 225 fleet, now smartly repainted in a scheme which pays homage to the original ‘Swallow’ livery. While there were fears this fleet may be withdrawn as an economy measure, the ‘225s’ are now on lease until at least next summer.

But Mr Horne says obsolescence issues are a real challenge and LNER will struggle to maintain the fleet beyond 2025, and from the May 2023 timetable change the number of daily diagrams was reduced from five to four to conserve the fleet’s mileage. Much of the heavy maintenance work had previously been carried out at Wabtec’s Doncaster site, but this facility is no longer available, and while a recent reliability improvement programme is bearing fruit, the challenges remain. The crunch point comes with the transition to ETCS at the southern end of the ECML as part of the East Coast Digital Programme – Mr Horne says LNER does not want to fit cab signalling on the ‘225s’.

The solution to this  issue is to procure additional trains to run alongside the 65 Azumas, and LNER went out to tender in October 2020 for a fleet of 10 trains with self-power capability.

While a preferred bidder has been identified, the business case to proceed with the procurement is awaiting approval, but Mr Horne is still hopeful this project can be progressed.

The current plan envisages the new trains broadly replacing the ‘225s’ on Leeds and York diagrams, but a major benefit with the new fleet would be during engineering work – at present LNER has to withdraw services to places such as Harrogate and Hull to concentrate its bi-mode Azumas on services using non-electrified diversionary routes, and having more stock with self-power capability would ease the issue.

Currently, LNER has these Azumas and InterCity 225s in its fleet.

  • Five-car bi-mode Class 800 trains – 10
  • Nine-car bi-mode Class 800 trains – 13
  • Five-car electric Class 801 trains – 12
  • Nine-car electric Class 801 trains – 30
  • Nine-car electric ImterCity 225 trains – 8

Note.

  1. There are 23 bi-mode trains and 50 electric trains.
  2. There are 167 bi-mode carriages and 302 electric carriages.
  3. Currently 31.5 % of the trains are bi-mode.
  4. With ten new bi-mode trains and no InterCity 225 trains, 44 % of the fleet will be bi-mode.

Is this increase in the percentage of the fleet, that are bi-mode acceptable?

I wonder, if there is a more affordable and flexible way to increase the fleet size.

In the Wikipedia entry for the Class 800 train, there is a section, which is entitled Traction And Generator Units, where this is said.

The Class 800 and Class 802 bi-mode are equipped with three GU per five-car set and five GU per nine-car set; a five-car set has a GU situated under vehicles 2/3/4 and a nine-car set has a GU situated under vehicles 2/3/5/7/8. In comparison, the electric-orientated Class 801 features a single GU for a five to nine-car set, which provides emergency power for limited traction and auxiliaries if the power supply from the overhead line fails. By adding or removing GUs, a Class 800 can be converted into a Class 801 and vice versa.

Let’s look at LNER’s needs, which are actually two separate sub-needs.

  • There is a need for ten new trains to replace the InterCity 225 trains.
  • There is a need to increase the size of the bi-mode fleet to be able to use the Great Northern and Great Eastern Joint Line and other non-electrified routes to by-pass engineering works.

Note.

  1. I suspect that as Mr Horne explained, there are only five or possibly four InterCity 225s diagrammed on a particular day, then perhaps ten five-car bi-mode Class 800 trains, might be able to cover for the retirement of the InterCity 225s.
  2. These trains would work as pairs to Leeds and York to replace the InterCity 225 capacity.
  3. If required they could split and join at Leeds and York to serve other destinations.
  4. The diversion route of the Great Eastern Joint Line has an unelectrified distance of 93.7 miles and the route is electrified at both ends.
  5. Would a battery-electric Class 800 train handle this distance? I suspect if Stadler can do it, then Hitachi and Turntide Technology will be able to do it too!

LNER will have replaced the InterCity 225s and acquired ten new five-car blockade runners.

As an order for ten new five-car battery-electric trains, is not to be sneezed at, I suspect Hitachi will make sure that their new battery-electric variants have enough range.

So this would mean that the range of a five cat battery-electric Class 800 train, should be in excess of 93.7 miles.

It should be noted that the five-car Class 800 and Class 802 trains have specific advantages when it comes to converting them to battery-electric trains.

  • They are modern trains, that are still in production, every bit of information about the train is known down to the last nut, bolt and plastic clip.
  • Like most modern trains, hey have a sophisticated computer system controlling the train.
  • They have spaces for three, four or maybe even five diesel engines under the floor, which could be used for a battery-pack in every car designed to hold a diesel engine.
  • The train has an electric bus between nose and tail.
  • As is shown, when the trains change between diesel and electric, the pantograph can go up and down with all the alacrity of a whore’s drawers.
  • The trains can be converted between bi-mode and electric, by adding or removing diesel packs. I doubt this feature will be removed, as batteries replace diesels.

With my Electrical and Control Engineer’s hard hat on, I doubt there is anything to stop a Class 800 or Class 802 train being fitted with three or more batteries to create a 125 mph train, with a range approaching two hundred miles on battery power.

The initial name of these Hitachi trains was the Hitachi Super Express. Is this train the Hitachi Super Battery Express?

But it would appear, that for their initial needs, LNER, just need a range to handle the near hundred miles of the Great Northern and Great Eastern Joint Line.

Inverness and Aberdeen will come later.

Hull Trains

This page on the Lumo web site is entitled Greener Travel Between Edinburgh And London.

These are the first three paragraphs.

A new, 100% electric rail service is to start running between London and Edinburgh with fares for as little as £14.90 in a bid to encourage greener and more affordable travel between the capitals.

Called Lumo, it will provide low-carbon, affordable long-distance travel for over 1 million passengers per year. Over 74,500 passengers currently fly between Edinburgh and London each month3.

And with single tickets between the capitals starting from just £14.90, Lumo will be a comfortable, convenient alternative to flying that is affordable for all. Some 60% of all single fares will be available at a cost of £30 or less.

I’m sure Hull Trains, who are owned by First Group like Lumo would like to position themselves in the 100 % electric low-carbon box too!

Currently, Hull Trains’s five-car Class 802 trains, run 88.6 and 72.2 miles using diesel on round-trips to Beverley and Hull respectively from London.

If batteries were fitted to their trains to give a battery range of around a hundred miles, Hull Trains could call themselves 100 % electric.

No new infrastructure would be required, but a short length of overhead electrification in a convenient platform at Hull station would ensure the train left for London and Beverley with a full battery.

The pictures show Hull Trains’s Class 802 train in Platform 7 at Hull station.

Penzance And Taunton

This to me is the key section as if you can run a battery-electric train between these two stations it allows so many of the services to be run using zero-carbon traction.

These are distances from Taunton.

  • Exeter St. David’s – 30.7 miles
  • Newbury – 89.6 miles
  • Okehampton – 55.3 miles
  • Paignton – 59.0 miles
  • Patchway – 51.7 miles
  • Plymouth – 82.8 miles

Note.

  1. I’ve added Okehampton, as I feel that if Dawlish had another encounter with Poseidon, Okehampton with its proposed Parkway station on the A30 could be the terminus for coaches to and from Cornwall.
  2. All would be possible with a battery-electric train, with a hundred-mile range, leaving Taunton with a full battery.
  3. Charging could be needed at Okehampton and Paignton.

What is needed is some form of charging in the Taunton area.

This OpenRailwayMap shows Taunton station.

Note.

  1. The station has four through platforms.
  2. All Great Western Railway services to and from Devon and Cornwall stop in the station.
  3. I feel it would be possible to electrify the station, so that all stopping trains could charge the batteries.

But the problem would be, that as typically trains only stop for a couple of minutes at Taunton, there may not be enough time to take enough charge on board.

This OpenRailwayMap shows the track between Wellington and Collumpton, between Taunton and Exeter.

Note.

  1. The black line is the railway between Taunton and Exeter.
  2. The blue arrow in the North-East corner of the map indicates the position of the proposed Wellington station.
  3. Collumpton is in the South-West corner of the map and has also been put forward for a new Collumpton station.
  4. I talked about the reopening of these two stations in Reopening Of Wellington and Cullompton Stations.
  5. The M5 to the North of Collumpton runs closely alongside the railway.
  6. According to Real Time Trains, it takes just under ten minutes to go the thirteen miles between Wellington and Collumpton.

This Google Map shows a section of the M5 North of Collumpton.

And this Google Map shows Tiverton Parkway station.

Note how the railway runs alongside the M5 to the West.

I feel that if the two new stations of Wellington and Collumpton are built between Taunton and Exeter St. David’s, then why not partially electrify the route, so that all trains would leave or pass through Taunton and Collumpton stations with full batteries.

  • Going West the trains would reach Exeter St. David’s, Okehampton or Plymouth.
  • Going East trains would reach Newbury for Reading and Paddington, and Patchway for Cardiff.

I believe that a battery-electric solution is possible, that would enable the decarbonisation of the Great Western Main Line all the way to Penzance.

 

 

 

 

 

 

 

 

June 25, 2023 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , , , , | 8 Comments

Could Hull Station Be Electrified?

I took these pictures, as I passed through Hull station yesterday.

It appears that Hull station has a similar Victorian roof to Liverpool Lime Street and London Paddington, so I suspect the answer is yes.

These pictures show the platforms and overhead electrification at Liverpool Lime Street station, since the recent remodelling.

The electrification seems to be very traditional, with lots of steel gantries over the tracks.

These pictures show the platforms and overhead electrification at London Paddington station.

Note.

  1. The roof seems to have extra tie-bars reaching across.
  2. The wires seem to be hung from the roof.
  3. At the end of the platform they are fixed to large arch supports.
  4. Because Liverpool Lime Street’s electrification is newer than Paddington’s, it seems to have much more professional look.

After looking at the electrification in Liverpool Lime Street and Paddington, I believe that Hull station could be successfully electrified.

This map from OpenRailwayMap shows the platform layout at Hull station.

Note.

  1. Yesterday, my trains arrived in and left from Platform 7, which is the Northern-most platform.
  2. Other pictures in this blog show Hull Trains’s London service in Platform 7.
  3. Yesterday all Class 802 trains to and from London run by Hull Trains and LNER used Platform 7.
  4. I have been told by station staff, that Platform 7 can take a nine-car LNER Azuma.
  5. In Ten-Car Hull Trains, I talk about ten-car Class 802 trains running to and from Hull.
  6. Platform 7 or another platform at Hull station must be able to handle a ten-car train, which means that Hull station can handle a train, that is 260 metres long.

Looking at the station map, I believe that Hull station’s capacity for long express trains, is on a par with that of Liverpool Lime Street station.

I could see both stations handling two trains per hour (tph) across the Pennines and to and from London, with if necessary trains being formed of a pair of five-car trains.

How Many Services From Hull Station Can Be Run With Battery Trains?

Hull Trains service between London and Beverley travels for 44.5 miles on unelectrified track between Temple Hirst junction and Beverley.

Typically Hull Trains services wait in Hull station for the following times.

  • Going between London King’s Cross and Beverley – Between ten and fifteen minutes.
  • Returning to London King’s Cross – Upwards of twenty-five minutes.

I believe these waits in Hull station would mean that.

  • A train going North to Beverley will have a battery containing enough electricity to get the train to Beverley and back, which is a distance of 16.7 miles.
  • A train going South from Hull  will have a battery containing enough electricity to get the train to Temple Hirst junction, which is a distance of 36.1 miles.

I believe that Hull Trains are currently working a timetable, that has been designed for operation by trains with a range on batteries of around fifty miles, provided there is electrification in at least one platform at Hull station to charge the trains.

It is also interesting to look at LNER’s two services that serve Hull.

  • The 0700 to London, is scheduled to arrive at Hull station at 0635 from stabling at Doncaster and waits up to twenty-five minutes before leaving for London.
  • The 2004 from London, is scheduled to arrive at Hull station at 2004 and waits up to twenty-five minutes before going South to overnight stabling in Doncaster.

It looks like LNER’s two trains follow Hull Trains rules.

  • They use Platform 7 in Hull station.
  • Trains going South have up to twenty-five minutes in the station.

It appears to me, that both Hull Trains and LNER are running a timetable, that would allow their services to be run using trains with a battery that had a range of around fifty miles, that could be fully-charged at Hull station before going South.

TransPennine Express run an hourly service to Liverpool Lime Street via Leeds and Manchester Victoria.

According to OpenRailwayMap’s map of electrification, when the TransPennine Upgrade is complete, the only section of the route without electrification will be the 42.1 miles between Hull and Micklefield.

As TransPennineExpress have some of the same Class 802 trains as Hull Trains, if there were at least two electrified platforms in Hull station, then Hull and Liverpool services could be run by battery-electric trains, with a similar specification to those of Hull Trains.

Northern Trains run an hourly service to Halifax via Leeds.

According to OpenRailwayMap’s map of electrification, , the only sections of the route without electrification will be the 42.1 miles between Hull and Micklefield and the 17.5 miles between Leeds and Halifax.

As Leeds and Micklefield is timetabled for seventeen minutes, I suspect this would be enough time to fully charge a battery-electric version of CAF’s Class 331 train and with charging in Hull station, then this route could be electrified.

Northern Trains also run other services, but because the Goole swing bridge is closed, I can’t get all the distances without electrification from Hull.

Ones I can find are.

  • Beverley – 16.7 miles for return trip.
  • Bridlington – 31.1 miles
  • Doncaster – 40.8 miles
  • Micklefield – 42.1 miles
  • Scarborough – 53.8 miles
  • Sheffield – 59.4 miles
  • Temple Hirst – 36.1 miles
  • York – 41.1 miles – Hull and Church Fenton

Note.

  1. York and Doncaster are electrified.
  2. Bridlington and Scarborough have suitable platforms where 25 KVAC overhead electrification could be installed to charge trains.
  3. Sheffield and Doncaster is only 18.6 miles and this may be the way to electrify between Sheffield and Hull.
  4. In The Data Sheet For Hitachi Battery Electric Trains, I state that Hitachi’s battery-electric trains have a range of 43.5 miles

It looks if enough platforms are electrified at Hull, all current services from the city could be run by battery-electric trains.

Conclusion

I believe that by electrifying Hull station, that Hull could have a station consistent with the HumberZero philosophy, with battery-electric trains running hither and thither, handling all rail traffic to and from the City.

 

June 7, 2023 Posted by | Transport/Travel | , , , , , , , , , , , , , , | 2 Comments

Did I See The UK’s Hydrogen-Powered Future In Hull Today?

I went from London to Hull today on Hull Trains for £50.80 return (with my Senior Railcard) to see SSE’s presentation for their Aldbrough Pathfinder Hydrogen project, which will feature a 35 MW green hydrogen electrolyser and 320 GWh of hydrogen storage in the thick layers of salt under East Yorkshire.

  • Green electricity would come mainly from the part-SSE owned 8 GW Dogger Bank wind farm complex.
  • According to their web site, Meld Energy are planning a 100 MW electrolyser, which would produce 13,400 tonnes of hydrogen per year.

Every large helps!

  • It should be noted that the thick layers of salt stretch all the way to Germany, and as drilling and storage technology improves, the amount of hydrogen storage available will increase.
  • I was also impressed by the ambition, competence and enthusiasm, of the SSE engineers that I met.
  • As has been pointed out, HiiROC, who have backing from Centrica, Hyundai, Kia and others, are also in Hull!

I believe, that I saw our hydrogen-powered future in Hull today!

We need more hydrogen mega-projects like these! Perhaps in Aberdeen, Clydeside, Freeport East, Isle of Grain, Merseyside, Milford Haven and Teesside?

June 6, 2023 Posted by | Energy, Energy Storage, Hydrogen, Transport/Travel | , , , , , , , , , , , , , , | 3 Comments

Ten-Car Hull Trains

On Friday, about eleven in the morning, I was standing on the platform at Finsbury Park station, when unusually I saw a pair of Hull Trains’s Class 802 trains go through as a ten-car train.

A few minutes later, I took a train to King’s Cross, where I took these pictures.

Note.

  1. The four platforms are numbered from 1 to 4 from the right.
  2. The Hull Train is in platform 3.
  3. The fourth picture clearly shows the 11:18 Hull Trains service has ten carriages.

Hull Trains were also selling tickets on the train.

Hull Trains Timetable On April 29th 2023

These trains ran South.

  • Beverley-Kings Cross – 0557 – 5 cars
  • Hull-Kings Cross – 0824 – 10 cars
  • Hull-Kings Cross – 1033 – 5 cars
  • Hull-Kings Cross – 1330 – 5 cars
  • Hull-Kings Cross – 1531 – 5 cars
  • Hull-Kings Cross – 1836 – 5 cars

And these trains ran North

  • Kings Cross – 0727-Hull – 5 cars
  • Kings Cross – 0948-Hull – 5 cars
  • Kings Cross – 1148-Hull – 10 cars
  • Kings Cross – 1448-Hull – 5 cars
  • Kings Cross – 1748-Beverley – 5 cars
  • Kings Cross – 1948-Hull – 5 cars

Note.

  1. The ten-car trains only run to Hull.
  2. The daily number of seats between Hull and London has been increased by 16.7 %.
  3. Four trains are needed to run 5 x five-car and 1 x ten-car trains in each direction.

I can see this timetable being used on other busy days.

April 29, 2023 Posted by | Transport/Travel | , , , , | 12 Comments

TransPennine Express Explores Further Fleet And Capacity Expansion Options

The title of this post, is the same as that of this article on Railway Gazette.

This is the first paragraph.

First TransPennine Express is hopeful that it will be able to issue a call for expressions of interest in the provision of additional bi-mode trains before the end of March. This follows ‘a healthy level of interest’ in its existing call for expressions of interest in the supply of bi-mode locomotives to replace the Class 68s which work with its MkVa coaches.

I wrote about the expressions of interest to replace the Class 68 locomotives with new bi-mode locomotives in Suppliers Sought For New Bi-Mode Locomotives For TransPennine Express And Great Western Railway.

This was my conclusion in the related post.

When I saw First Group’s proposals, I thought that they were over ambitious.

But after doing a few simple calculations, I think they can decarbonise some, but not all of the TransPennine Express services and the Night Riviera.

So do First Group want to complete the decarbonisation of  TransPennine Express services?

These are my thoughts.

The Train Fleet Specification

The Railway Gazette article makes these points about the new bi-mode trains.

  • The trains could be existing or new bi-modes.
  • It would be desirable for the trains to have a long-term electric-only option.
  • Options for this would include removing the diesel engines or converting the trains to battery-electric operation.
  • Hydrogen is not mentioned.
  • A fleet size of twenty-five trains is mentioned.
  • The possibility of electric-only trains in the future is mentioned..
  • Five-cars, with the ability to lengthen to six- or seven-cars.
  • 200 km/h operation.

There is nothing unusual in the specification.

Will They Be Existing Or New Trains?

I doubt that there are any existing 200 km/h bi-modes in the UK, that are not wanted by their current operators.

I am very certain they will be new trains.

Could The Trains Be Hitachi Class 802 Trains?

The trains sound very much like Hitachi Class 802 trains, that are in service with TransPennine Express, Great Western Railway and Hull Trains, all of whom are First Group companies.

  • Long-term, the diesel engines can be removed or replaced with batteries.
  • The battery option is under development and should be on test this year.
  • The trains can be lengthened to as long as twelve cars, so six- and seven-car trains would be possible.

Hitachi will obviously show interest in this possible order.

Will These Trains Replace the Class 185 Trains?

Consider.

  • TransPennine Express have 51 three-car Class 185 trains.
  • This is a total of 153 cars.
  • On some routes they work singly and on others they work in pairs.
  • A three-car Class 185 train has 167 Standard Class and 15 First Class seats or 60.7 seats per car.
  • A pair of Class 185 trains have 334 Standard Class and 30 First Class seats.
  • A five-car TransPennine Express Class 802 train has 318 Standard Class and 24 First Class seats or 68.4 seats per car.
  • It would appear that a Class 802 train is not that far short of the capacity of a pair of Class 185 trains.
  • Some of the TransPennine services are very crowded.

I suspect that twenty-five five-car trains be able to handle the the workload of the Class 185 trains.

If a small amount of extra capacity were needed, some of the new trains could be six-cars.

In this section, I have assumed the new trains will be Class 802 trains, but any train manufacturer pitching for this order would adjust the capacity to the needs of TransPennine Express.

The Railway Gazette article says this.

TPE continues to explore opportunities for new services in the north of England, and the move could also feed into government plans for the removal of older and more costly to operate diesel trains elsewhere on the network, should any rolling stock become surplus to requirements at TPE.

So where could the Class 185 trains be used in the future?

Recently, MTU Hybrid PowerPacks have replaced the transmission on a Class 168 train, which reduces carbon emissions and fuel consumption and makes the train quieter and more passenger-friendly, as it doesn’t use diesel in stations.

The Class 185 trains are only fifteen years old and I suspect that MTU have designed the Hybrid PowerPack, so that it can replace the Cummins engine in trains like these.

The conversion could be done as a rolling program, so that any future operator would start with diesel and go hybrid a train at a time.

There has been speculation, that the trains may end up on the East West Railway and I wrote about this in East West Railway Company To Start Second Phase Of Rolling Stock Procurement.

But the East West Railway may prefer to use zero-carbon trains on a route, where there is electrification in places on the route.

Alternatively, South Western Railway run 10 two-car Class 158 trains and 30 three-car Class 159 trains between London Waterloo and Exeter.

  • South Western Railway is another First Group company.
  • The Class 185 trains could provide a capacity increase.
  • The Class 185 trains are 100 mph trains, whereas the Class 158/159 trains are only capable of 90 mph.

The London Waterloo and Exeter Route could be electrified in the future and I am pretty sure, that the Class 185 trains with a hybrid transmission could be a good stand-in until this happens.

Other Train Manufacturers

I believe that Hitachi are in pole position for this order, just because they are an established supplier to both TransPennine Express and First Group.

But twenty-five five-car trains would be a very worthwhile order, so I suspect that companies like Alstom, CAF, Siemens, Stadler and Talgo will also express interest.

Conclusion

Buying extra bi-mode trains will take TransPennine Express further along the route to full decarbonisation.

 

 

 

 

March 15, 2022 Posted by | Transport/Travel | , , , , , , , , , , , | 5 Comments

Are First Group Moving Towards Zero-Carbon?

My post, which was entitled Suppliers Sought For New Bi-Mode Locomotives For TransPennine Express And Great Western Railway, prompted me to ask the question in the title of this post.

This factsheet for First Bus says that all their buses will be zero-carbon by 2035.

This factsheet for First Rail says this about Decarbonising Rail Travel.

FirstGroup’s ambition is to be the partner of choice for low or zero emission transport. We recently became the first UK rail and bus operator to formally commit to setting an ambitious science-based target for reaching net zero emissions by 2050 or earlier.

First Rail leads the sector in decarbonisation, including the introduction of bi-mode diesel and electric powered trains which allow us to make best use of electrified networks. We have signed up to the Government’s challenge to take all diesel-only trains out of service by 2040.

GWR has recently taken delivery of the UK’s first tri-mode train which can use overhead wires, third rail or diesel power. Sustainability is at the heart of the NRCs and both SWR and TPE will develop a decarbonisation policy and roadmap towards net zero emissions in accordance with this goal. New all-electric and bi-mode trains will be introduced by Avanti to replace diesel only trains in the current fleet.

Both these factsheets appear to have been written in 2021.

The zero-carbon status of each of First Group’s rail companies is as follows.

Avanti West Coast

The mainstay of Avanti West Coast are fifty-six Class 390 electric trains.

Twenty Class 221 diesel trains are being replaced by ten new Class 807 electric trains and thirteen new Class 805 bi-mode trains.

Great Western Railway

The mainstay of Great Western Railway are a mixture of ninety-three Class 800 and Class 802 bi-mode trains.

They also have thirty-three Class 387 electric trains working London commuter routes.

There are a large assortment of ninety-four diesel trains of various classes working rural routes and local services in Bristol, Exeter, Oxford and Plymouth. There are a lot of these trains in the UK and I suspect that a nationwide solution will be developed.

There are thirty-five Class 43 diesel locomotives, that power the shortened InterCity 125 trains in the South-West. I wrote about converting these to hydrogen in Will We See Class 43 Power Cars Converted To Hydrogen?

Four Class 57 diesel locomotives that haul the Night Riviera are covered by the request for suppliers, that prompted me to write this post.

South Western Railway

The mainstay of South Western Railway are a mixture of around  three hundred electric trains.

There are also ten Class 158 diesel trains and thirty Class 159 diesel trains. There are a lot of these trains in the UK and I suspect that a nationwide solution will be developed.

TransPennine Express

The mainstay of TransPennine Express are nineteen Class 802 bi-mode trains and twelve Class 397 electric trains.

There are also fifty-one Class 185 diesel trains.

Fourteen Class 68 diesel locomotives that haul coaches are covered by the request for suppliers, that prompted me to write this post.

Hull Trains

Hull Trains have a fleet of five Class 802 bi-mode trains.

Lumo

Lumo have a fleet of five Class 803 electric trains.

The service is also sold on the basis of its low-carbon footprint.

Conclusion

First Group would appear top have a fair way to go towards full decarbonisation.

  • They have around a hundred-and-thirty Hitachi bi-mode trains. Research is ongoing to replace some diesel engines with batteries.
  • They have a lot of diesel trains and locomotives, that are still in front-line service.
  • They have the tricky problem of the Class 43 locomotives, which I suspect will result in a nationwide solution.

But at least they have started by requesting proposals to replace the other diesel locomotives.

January 23, 2022 Posted by | Transport/Travel | , , , , , , , , | 5 Comments

More Train Companies Are Advertising Now

At the end of October, I posted Hull Trains Are Mounting A Big Advertising Campaign.

Today LNER are also advertising in The Times and these follow other companies like Avanti West Coast, East Midlands Railway, Grand Central and Great Western Railway.

It looks like the Hull Trains campaign must have been successful.

January 2, 2022 Posted by | Transport/Travel | , , , , , , , | Leave a comment

Would A Lumo-Style Service Work Between King’s Cross And Norfolk?

This is a bit of a fantasy and you’ll never know the real reason why I have written it!

With the upgrade of the East Coast Main Line to full digital signalling, there will be a problem South of Hitchin with 140 mph Azumas and Hitachi Class 802 trains and similar from Grand Central , Hull Trains and Lumo hogging the fast lines to and from King’s Cross. I first wrote about it in Call For ETCS On King’s Lynn Route.

One solution would be to replace the current Class 387 trains with a 140 mph train , such as a Hitachi Class 802 variant. This would enable these fast King’s Lynn and Cambridge trains to join the 140 mph trains on a fast run to and from King’s Cross.

The Future Of Cambridge

Cambridge is one of the UK’s four world cities, with its heritage and lately its high position in any technology league table.

The Current Rail Service Between London And Cambridge

Currently, it has a good service into King’s Cross, Liverpool Street and St. Pancras.

  • Great Northern – two tph to King’s Cross – A stopping train using Class 700 or Class 387 trains.
  • Great Northern – one tph between Ely and King’s Cross – A fast train using Class 387 trains.
  • Great Northern – one tph between King’s Lynn and King’s Cross – A fast train using Class 387 trains.
  • Thameslink  – two tph to Brighton – A semi-fast train using Class 700 trains.
  • Greater Anglia – two tph to Liverpool Street – A semi-fast train using Class 720 or Class 379 trains.

Note.

  1. tph means trains per hour.
  2. The similar Class 387 and Class 379 trains are both late-model Bombardier Electrostars with sensible seats and a large number of tables. Both train types can or could be modified to run at 110 mph.
  3. The Class 700 trains are unsuitable for the route, as they have ironing-board seats and no tables. These are only 100 mph trains.
  4. The Queen’s bottom doesn’t like the Class 700 trains.

A large proportion of the passengers and commuters between to and from Cambridge work in high-tech or information-rich businesses and I believe if the trains were more geared to this market they would attract passengers away from the roads.

The Cambridge Employment Problem

Fast-growing Cambridge is taking over the region and it is always looking for towns and villages to develop as places for dormitories and to build premises for the hundreds of high-tech businesses.

This is one of the reasons why Greater Anglia acquired new Stadler Class 755 trains to run services from Cambridge to Bury St. Edmunds, Ipswich, Norwich, Peterborough and Stansted Airport.

If you’re going to lure Cambridge’s well-paid high-tech commuters out of their cars, you must give them an equivalent seat to their car. The Class 379, 387 and 755 trains do this.

Living In Norfolk And Suffolk And Working In Cambridge

This has always been the choice of many who work in Cambridge, but using rail into Cambridge didn’t really take-off seriously until modern three-car Class 170 trains replaced the single-car Class 153 trains.

Greater Anglia have followed the upward trend in passenger numbers, by running hourly  four-car Class 755 trains from Cambridge to both Ipswich and Norwich.

Before the pandemic, it was starting to look like Norwich and Cambridge would soon need a second service, especially with the planned opening of the new Cambridge South station in 2025.

Addenbrooke’s Hospital And The Cambridge Biomedical Campus

Cambridge South station is being built to serve Addenbrooke’s Hospital and Cambridge Biomedical Campus, which intend to be create the foremost medical research cluster in the world.

Staycations And Holiday Homes In East Anglia

Life is changing because of the covids and more people are taking staycations or buying holiday homes.

And many are following the example of the Queen and going to Norfolk for their relaxation.

The Undoubted Need To Improve Rail Services Between London King’s Cross And Norfolk Via Cambridge

These factors convince me that there is a need for a new or repurposed rail service  between London King’s Cross and Norfolk via Cambridge.

  • The need to provide a high-class commuter service between London and Cambridge.
  • The need to bring workers into Cambridge from Norfolk.
  • The need to provide a fast high-class rail link to Cambridge South station with all its medical research.
  • The need to provide a comprehensive working environment on the trains.
  • The need to cater for all those people relaxing in Norfolk after a hard week in London.

It is my view, that a radical design of train is needed for this route.

  • It would need to have a high-class interior.
  • It would need at least a 125 mph capability, so that it can use the fast lines between Hitchin and King’s Cross.
  • The train may need the ability to split and join.
  • It would need an independent power capability for running on the Breckland Line between Ely and Norwich.
  • Because of Cambridge and because East Anglia is easy country for cycling, it would need a sensible capacity for cycles.

I also believe that because of the need to decarbonise, the train should be zero-carbon.

These are my thoughts.

Operating Speed

Because of running on the fast lines between Hitchin and King’s Cross with the 140 mph trains from the North, I suspect that an operating speed of at least 125 mph is needed. But if the Hitachi trains of LNER, Hull Trains, Lumo and in the future possibly other operators like Grand Central, will be capable of 140 mph, this speed could be desirable.

Speed limits once the trains have left the East Coast Main Line at Hitchin North junction are as follows.

  • Hitchin and Cambridge – 90 mph
  • Cambridge and King’s Lynn – 90 mph
  • Ely and Norwich – 75-90 mph

I can see Network Rail using their expertise to raise the speed limit on sections of these lines.

Flighting Of Trains On The East Coast Main Line

To increase capacity on the East Coast Main Line, I believe that at some point in the not too distant future that trains will be flighted. This will involve two or more trains leaving King’s Cross in a sequence and proceeding with all trains at a safe distance from each other.

I can envisage a flight like this from King’s Cross.

  • An Edinburgh train with York as the first stop – Leaves at XX.00
  • A Leeds train with Doncaster as the first stop – Leaves at XX.03
  • A Lincoln train with Peterborough as the first stop – Leaves at XX.06
  • A Cambridge train with Stevenage as the first stop – Leaves at XX.09

Note.

  1. The Edinburgh train would set the speed.
  2. Trains would maintain their time behind the lead train.
  3. Everything could be controlled by the digital signalling.
  4. Gaps between the trains would be sufficient for a safe stop.
  5. No train in the flight would make a station stop unless it was the last train in the flight.
  6. The last train in the flight would drop off and go to their destination.

As there are at least two tph to Edinburgh, Leeds and Cambridge, there would be two main flights per hour leaving King’s Cross, with the second flight perhaps incorporating a service to Hull.

Digital signalling and precise driving would enable the flights to be built in the opposite direction into King’s Cross.

The big advantage would be that instead of needing eight paths per hour on the East Coast Main Line, only two would be needed.

All trains would need to have similar performance, so this is another reason why the Cambridge trains need to be at least 125 mph trains.

Train Interiors

Lumo has broken new ground in train interiors.

  • It is one class.
  • Everybody gets a decent seat.
  • Everybody gets good legroom.
  • Everybody gets some form of table.
  • There are decent-sized overhead racks for hand-baggage and coats.
  • There is space for bicycles and heavy luggage appropriate to the route.

This can be built on to provide a good working and playing environment suited to the passengers who would use a fast King’s Cross and Norfolk service via Cambridge.

  • Lots of tables for four, as in the high-class Electrostars.
  • Better bicycle storage.
  • Better alignment of seats with windows.

Hitachi could obviously produce a train to this specification.

But what about other manufacturers.

Stadler’s Class 755 trains are surely a possibility.

  • A senior driver from Greater Anglia told me that the design speed for a Class 755 train is 200 kph or 125 mph.
  • They have good seats.
  • They have flat floors.
  • They have large windows.
  • They have step-free access between train and platform.
  • Like the Hitachi trains, they are in service.

I believe the closely-related Class 745 trains are probably the best commuter trains in the UK and are the only alternative to the Hitachi trains on a125 mph fully-electrified route.

Bridging The Electrification Gap Between Ely And Norwich

Between Norwich and Ely stations is 53.8 miles and this section is not electrified, although both stations have full electrification.

The line is not heavily used with typically only two passenger trains and the occasional freight trains in each direction in an hour.

This Hitachi infographic describes the Hitachi Regional Battery Train.

A 90 km. range could be sufficient to cover the gap between Norwich and Ely.

Could Hitachi build a Class 802 train or similar with a battery range of 90 km or 56 miles?

Certainly, a speed of 100 mph would probably be sufficient to bridge the gap in a decent time.

Improving The Breckland Line

The Breckland Line is the route between Cambridge and Norwich.

  • Cambridge and Norwich is 68.5 miles
  • Only the sixteen miles between Cambridge and Ely North junction is electrified.
  • There are thirteen stops between the two cities.
  • A typical time is 79 minutes
  • This is an average speed of just 52 mph.
  • The operating speed is 75-90 mph.

I am sure that Network Rail can squeeze a few minutes here and there to get the operating speed up to the 100 mph of the Great Eastern Main Line.

But the big problem at Norwich is the Trowse swing bridge.

It is only single track and it is likely that this bridge will be replaced soon.

This Google Map shows Trowse junction, a short distance South of the swing bridge.

Note.

  1. The electrified double-track of the Great Eastern Main Line goes across the map from North East to South West.
  2. The double-track railway to the East of the main line is the unelectrified Breckland Line to Cambridge, which turns West and goes under the main line.
  3. On the West of the main lines are the Victoria sidings that I wrote about in Greater Anglia Completes Directly-Managed Norwich Victoria Sidings Project.

As the replacement of the swing bridge will require some work to be done to the electrification, I wonder if at the same time Network Rail would electrify the Norwich end of the Breckland Line.

There must be a balance point adding electrification or batteries to the trains.

As the Breckland Line has few freight trains, electrification is not needed for freight.

Ticketing

A high-speed high-capacity service as I’m proposing must be easy to use.

It is a classic route, where nothing short of London-style contactless ticketing will do, as I’m certain this encourages people to use the trains.

As East Anglia is self-contained and has few services that don’t terminate in the area or in London, I am certain that this could be achieved.

If you remove First Class as Greater Anglia has done on many services, you actually simplify the ticketing, so a Lumo-style mid-class is ideal.

High Speed Train Services

Currently Great Northern run two tph from King’s Cross to Ely via Cambridge.

  • One service is extended to King’s Lynn.
  • I could see the second service extended to Norwich.

Both services would need to be run by 125 mph trains because of the speed of other trains on the East Coast Main Line.

Conclusion

I think duch a system would be possible.

November 21, 2021 Posted by | Health, Transport/Travel | , , , , , , , , , , , , , , , , , , , | 1 Comment

A Special Weekend Timetable Has Been Put In Place For Lincoln Christmas Market

The title of this post, is the same as that of this article on Rail Advent.

This is the first paragraph.

The timetable has been put in place for Lincoln Christmas Market with direct services from Leeds, Newcastle, Edinburgh, Aberdeen and Inverness.

It looks to be a clever piece of planning, whilst work is carried out on the East Coast Main Line between Doncaster and Peterborough.

  • Services will be diverted onto the Great Northern and Great Eastern Joint Line though Spalding, Sleaford and Lincoln.
  • Will the trains be using the new tracks at the Werrington dive-under.
  • Nine-car Class 800 bi-mode trains will be used.
  • On the Saturday, there will be two trains per hour (tph) in both directions.
  • Of these trains, five trains per day (tpd)  in both directions will stop at Lincoln Central station.

It does appear that LNER are making the best of a difficult situation.

Passengers going to Lincoln for the Christmas Market will not be disappointed.

Grand Central Trains

Grand Central Trains are also using the diversion route.

Hull Trains

Hull Trains are also using the diversion route.

On the Saturday, there will be five tpd in both directions.

These can be doubled up to ten-car trains if the demand is there.

Lumo Trains

Lumo trains don’t appear to be running.

Conclusion

Network Rail seem to have done a cunning piece of timetabling.

There’ll be trainspotters galore in the centre of Lincoln.

November 6, 2021 Posted by | Transport/Travel | , , , , , , , , | 2 Comments