The Anonymous Widower

Starmer Appoints Octopus Energy Tycoon As Cabinet Adviser

The title of this post, is the same as that of this article on The Telegraph.

This is the sub-heading.

Greg Jackson Will Help Modernise Whitehall In PM’s Efficiency Drive

These are the three introductory paragraphs.

The founder of Octopus Energy has been appointed to an influential role advising the Government, weeks after Ed Miliband rejected his recommendations on energy pricing.

Greg Jackson will become one of three non-executive members of the Cabinet Office board, providing him with a platform from which to challenge the thinking of ministers and officials.

The entrepreneur said he intended to press departments to embrace the kinds of technology central to Octopus’s success in order to implement policies more rapidly and efficiently.

I certainly, agree with the last paragraph, but I feel that steering the supertanker of government, might need quieter rules on the tiller.

September 1, 2025 Posted by | World | , , , , | Leave a comment

Direct Rail Service Plan Supported By PM

The title of this post, is the same as that of this article on the BBC.

This is the sub-heading.

Plans for a new passenger rail service running direct trains between north Wales, the West Midlands and London have received support from the prime minister.

These three paragraphs add detail to the story.

A new open-access rail operator, external, called the Wrexham, Shropshire and Midlands Railway (WSMR), has been formed, offering passengers in Wrexham, as well as Gobowen, Shrewsbury, Walsall and Coleshill, a direct link with the capital.

Speaking in the Commons, Shrewsbury’s Labour MP Julia Buckley asked Sir Keir Starmer if he would support the provider’s application.

The prime minister responded, saying he would be “delighted to make sure the MP and other interested MPs meet with the rail minister to put their case forward”.

He didn’t actually say he supported the application, but then lawyers are careful with words, as every syllable costs money.

I have a few thoughts on this service.

The North Wales Metro

The North Wales Metro was announced today and I wrote about it in £2.1bn North Wales Rail Overhaul Plans Unveiled.

The Wrexham, Shropshire and Midlands Railway connects the North Wales Metro to Gobowen, Shrewsbury, Wolverhampton, Coleshill and London Euston.

Will The Trains Be Hydrogen Powered

In Alstom And Eversholt Rail Sign An Agreement For The UK’s First Ever Brand-New Hydrogen Train Fleet, I reported how Alstom could be going to build a fleet of hydrogen trains in Derby.

I just wonder, if Alstom are going to create a hydrogen train with this specification.

  • Five cars
  • 125 mph top speed
  • Ability to use electrification, where it exists.
  • Sufficient range on hydrogen to cover the non-electrified section of the route between Wrexham General and Wolverhampton.
  • Wrexham General and Wolverhampton is just under sixty miles and takes an hour and six minutes.

As the fastest trains between London Euston and Walverhampton take one hour and forty-nine minutes, trains would take just under three hours between London Euston and Wrexham General.

I rode  an Alstom hydrogen-powered train in Germany in March 2019 and wrote My First Ride In An Alstom Coradia iLint.

I took this picture at the time.

Alstom certainly have all the technology to build a 125 mph hydrogen-powered train, that can use electrification.

Where Would A Hydrogen Train Be Refuelled?

I suspect, that as the train would probably have a range of around a thousand kilometres, it could fill up overnight at Wrexham.

The hydrogen could be sourced from Runcorn or it might even be generated at the depot.

Would A Hydrogen Train Attract Passengers?

If the hydrogen-powered train were to be mouse-quiet like Wrightbus’s hydrogen buses, I believe it would.

May 22, 2025 Posted by | Hydrogen, Transport/Travel | , , , , , , , , , , , , | 2 Comments

Fourteen New Trains To Drive First Rail Open Access Growth

The title of this post, is the same as that of this press release from First Group.

These four bullet points are sub-headings.

  • The Group has signed an agreement with Angel Trains and Hitachi to lease 14 new five-car class 80X Hitachi electric, battery electric or bi-mode trains (70 cars in total) at a cost of c.£500m including maintenance, over a ten year lease period
  • The trains will be manufactured by Hitachi in County Durham, securing the skills base and jobs in the local area
  • The new trains will enable FirstGroup to significantly expand its open access portfolio and will be used on the newly announced London-Carmarthen route and to increase the number of cars on the existing Lumo and Hull Trains services
  • The agreement also contains an option for FirstGroup to lease up to an additional 13 trains on the same terms if the Group’s open access applications are granted by the Office of Rail and Road (‘ORR’)

These first three paragraphs add a bit more detail.

Prime Minister Sir Keir Starmer is visiting Newton Aycliffe, County Durham, today to celebrate a significant agreement for the Hitachi factory which has secured an order to manufacture 70 new rail cars for FirstGroup’s growing open access business, creating certainty for the manufacturing skills base, and the factory’s future.

The Lease Agreement will deliver 14 new trains, which will not only give the Group a homogenous fleet across its open access operations, ensuring flexibility and reliability for customers, but also facilitates the Group’s strategic objective of materially increasing its open access capacity. Delivery of the new trains is expected to commence in late 2027. The lease will be financed by Angel Trains, adding to their portfolio of Hitachi assets. The trains will be maintained by Hitachi at their facilities around the country.

The trains will be used on the Group’s open access rail services, including the Carmarthen-London route announced on 5 December, and the existing Hull Trains and Lumo services on the East Coast Mainline.

Note.

  1. Does the presence of Keir Starmer indicate any approval for open access?
  2. Trains could be electric, battery electric or bi-mode.
  3. Bi-mode trains should only be purchased these days, if they are convertible to battery-electric trains. Hitachi’s can.
  4. Delivery is expected to commence in late 2027.
  5. The first fourteen trains will be deployed on the London to Carmarthen, Edinburgh and Hull routes.

This table shows the trains needed initially  for each route.

  • Carmarthen – Class 802 trains – 5 tpd – 5 trains – 75.3 miles unelectrified
  • Edinburgh – Class 803 trains – 5 tpd – 5 trains – electrified
  • Hull – Class 802 trains – 5 tpd – 5 trains – 44.3 miles unelectrified

Note.

  1. tpd is trains per day.
  2. I’m assuming that as unelectrified distances to Carmarthen and Hull are not that far apart, the number of trains needed is the same.
  3. Class 802 trains are bi-mode.
  4. Class 803 trains are electric.

After the fourteen new trains are delivered, there will be a combined fleet of 29 trains.

Consider.

  • Hull Trains have started running some services as pairs of trains. I wrote about this in Ten-Car Hull Trains.
  • Lumo has been a success and perhaps needs more capacity.

The Wikipedia entry for Grand Union says this.

Grand Union proposed to operate with ex-LNER Class 91s and Rail Operations Group Class 93s hauling nine-car Mark 4s and a Driving Van Trailer.

So perhaps the Carmarthen service needs ten-car trains.

That would mean that the number of routes needed for the three routes would be as follows.

  • Carmarthen – Class 802 trains – 5 tpd -10 trains
  • Edinburgh – Class 803 trains – 5 tpd -10 trains
  • Hull – Class 802 trains – 7 tpd – 10 trains

It would appear that we’re a train short with 29 in the combined fleet against a need of 30 trains.

But then it would also appear that Hull Trains can provide the required five/ten car service with only four trains.

I would assume that the extra train, goes to make up the numbers for  Lumo’s Carmarthen service.

 

December 6, 2024 Posted by | Transport/Travel | , , , , , , , , , , , | 2 Comments

Energy In – Hydrogen And Carbon Dioxide Out

This article was inspired by this article in the Sunday Times, which is entitled ‘It’s A Slog’: Life Inside Britain’s Last Coal Power Station.

The article is about Ratcliffe-on-Soar power station, which is next to East Midlands Parkway station.

This is the first paragraph of the station’s Wikipedia entry.

Ratcliffe-on-Soar Power Station is a coal-fired power station owned and operated by Uniper at Ratcliffe-on-Soar in Nottinghamshire, England. Commissioned in 1968 by the Central Electricity Generating Board, the station has a capacity of 2,000 MW. It is the last remaining operational coal-fired power station in the UK, and is scheduled to close in September 2024.

I took these pictures of the power station in 2019.

Ratcliffe-on-Soar is the last of a number of large coal-fired power stations, that were built in the area, mainly along the River Trent.

  • Rugeley – 600 MW – 1961
  • Drakelow – 1630 MW – 1964
  • Willington – 800 MW – 1962
  • Castle Donington – 600 MW – 1958
  • Ratcliffe-on-Soar – 2000 MW – 1968
  • High Marnham – 1000 MW – 1959
  • Cottam – 2000 MW – 1968
  • West Burton – 2000 MW – 1968

Note.

  1. The date is the commissioning date.
  2. That is 10,630 MW of electricity.
  3. There are also a few large gas-fired power stations along the river, that are still operating.
  4. Both coal and gas-fired stations use the water from the River Trent for cooling.

At the mouth of the river, there is the Keadby cluster of gas-fired power stations.

  • Keadby 1 – 734 MW – 1996
  • Keadby 2 – 849 MW – 2023
  • Keadby 3 – 910 MW – 2027
  • Keadby Hydrogen – 900 MW – 2030

Note.

  1. The date is the commissioning date.
  2. That is 3,393 MW of electricity.
  3. Keadby 2 is the most efficient CCGT in the world.
  4. Keadby 3 will be fitted with carbon capture.
  5. Keadby 2 has been designed to be retrofitted with carbon capture.
  6. Keadby Hydrogen will be fuelled by zero-carbon hydrogen.

As the years progress, I can see the Keadby cluster of power stations becoming a large zero-carbon power station to back-up wind farms in the North Sea.

  • Hydrogen power stations will emit no carbon dioxide.
  • Carbon dioxide from all gas-fired stations will be captured.
  • Some carbon dioxide will be sold on, to companies who can use it, in industries like construction, agriculture and chemical manufacture.
  • The remaining carbon dioxide will be stored in depleted gas fields.

As technology improves, more carbon dioxide will be used rather than stored.

Other Power Sources In The Humberside Area

In the next few sub-sections, I will list the other major power sources in the Humberside area.

Drax Power Station

Drax power station is a shadow of its former self, when it was one of the power stations fed by the newly discovered Selby coalfield.

These days it is a 2,595 MW biomass-fired power station.

Eastern Green Link 2

Eastern Green Link 2 will be a 2 GW interconnector between Peterhead in Scotland and Drax.

It is shown in this map.

Note.

  1. Most of the route is underwater.
  2. It is funded by National Grid.
  3. Contracts have been signed, as I talk about in Contracts Signed For Eastern Green Link 2 Cable And Converter Stations.
  4. It is scheduled to be completed by 2029.

This interconnector will bring up to 2 GW of Scottish wind-generated electricity to Drax and Humberside.

Drax has the substations and other electrical gubbins to distribute the electricity efficiently to where it is needed.

2 GW could also reduce the amount of biomass used at Drax.

In the long term, if the concept of the four Eastern Green Links is successful, I could see another Eastern Green Link to Drax to replace imported biomass at Drax.

I also, don’t see why a smaller Drax can’t be run on locally-sourced biomass.

Solar Farms And Batteries Along The River Trent

As the coal-fired power stations along the River Trent are demolished, solar farm developers have moved in to develop large solar farms.

Salt End Power Station And Chemical Works

These two paragraphs from the Wikipedia entry for Salt End describes the hamlet and its power station and chemical works.

Salt End or Saltend is a hamlet in the East Riding of Yorkshire, England, in an area known as Holderness. It is situated on the north bank of the Humber Estuary just outside the Hull eastern boundary on the A1033 road. It forms part of the civil parish of Preston.

Salt End is dominated by a chemical park owned by PX group, and a gas-fired power station owned by Triton Power. Chemicals produced at Salt End include acetic acid, acetic anhydride, ammonia, bio-butanol, bio-ethanol, ethyl acetate (ETAC) and ethylene-vinyl alcohol copolymer (EVOH) with animal feed also being produced on site.

I wonder, if running the complex on hydrogen would give cost and marketing advantages.

Aldbrough Hydrogen Storage Facility

This page on the SSE Thermal web site is entitled Plans For World-Leading Hydrogen Storage Facility At Aldbrough.

This is the most significant paragraph of the page, that is definitely a must-read.

With an initial expected capacity of at least 320GWh, Aldbrough Hydrogen Storage would be significantly larger than any hydrogen storage facility in operation in the world today. The Aldbrough site is ideally located to store the low-carbon hydrogen set to be produced and used in the Humber region.

This is a hydrogen storage facility for a much wider area than Humberside.

Rough Gas Storage Facility

This is the first paragraph of the Wikipedia entry for the Rough Gas Storage Facility.

Rough is a natural gas storage facility under the North Sea off the east coast of England. It is capable of storing 100 billion cubic feet of gas, nearly double the storage capacities in operation in Great Britain in 2021.

In Wood To Optimise Hydrogen Storage For Centrica’s Rough Field, I describe Centrica’s plans to convert the Rough gas storage into a massive hydrogen storage.

The Location Of Aldbrough Gas Storage, Rough Gas Storage, Salt End And Easington Gas Terminal

This Google Map shows between Salt End and the coast.

Note.

  1. The river crossing the South-West corner of the map is the Humber.
  2. Salt End with its power station and chemical works is on the North Bank of the Humber, where the river leaves the map.
  3. Aldbrough Gas Storage is marked by the red arrow at the top of the map.
  4. Easington Gas Terminal is in the South-East corner of the map.
  5. According to Wikipedia, gas flows into and out of the Rough Gas Storage are managed from Easington.

Looking at the map, I feel that the following should be possible.

  • The two gas storage sites could be run together.
  • Salt End power station and the related chemical works could run on hydrogen.
  • Salt End will always have a reliable source of hydrogen.
  • This hydrogen could be green if required.

All the chemical works at Salt End, could be run on a zero-carbon basis. Would this mean premium product prices? Just like organic does?

Enter The Germans

The Germans have a huge decarbonisation problem, with all their coal-fired power stations and other industry.

Three massive projects will convert much of the country and industry to hydrogen.

These would appear to be three of Europe’s largest hydrogen projects, that few have ever heard of.

AquaVentus And The UK

This video shows the structure of AquaVentus.

I clipped this map from the video.

Note.

  1. The thick white line running North-West/South-East is the spine of AquaVentus, that delivers hydrogen to Germany.
  2. There is a link to Denmark.
  3. There appears to be an undeveloped link to Norway.
  4. There appears to be an undeveloped  link to Peterhead in Scotland.
  5. There appears to be a link to just North of the Humber in England.
  6. Just North of the Humber are the two massive gas storage sites of Aldbrough owned by SSE and Brough owned by Centrica.
  7. There appear to be small ships sailing up and down the East Coast of the UK. Are these small coastal tankers, that are distributing the hydrogen to where it is needed?

In the last century, the oil industry, built a substantial oil and gas network in the North Sea.

It appears now the Germans are leading the building of a substantial hydrogen network in the North Sea.

These are my thoughts about development of the AquaVentus network.

Hydrogen Production And AquaVentus

This RWE graphic shows the layout of the wind farms feeding AquaVentus.

Note.

  1. There is a total of 10.3 GW.
  2. Is one of the 2 GW web sites on the UK-side of AquaVentus, the 3 GW Dogger Bank South wind farm, which is being developed by RWE?
  3. Is the 0.3 GW wind farm, RWE’s Norfolk wind farm cluster, which is also being developed by RWE?

Connecting wind farms using hydrogen pipelines to Europe, must surely mitigate the pylon opposition problem from Nimbys in the East of England.

As the AquaVentus spine pipeline could eventually connect to Peterhead, there will be other opportunities to add more hydrogen to AquaVentus.

Hydrogen Storage And AquaVentus

For AquaVentus to work efficiently and supply a large continuous flow of hydrogen to all users, there would need to be storage built into the system.

As AquaVentus is around 200 kilometres in length and natural gas pipelines can be up to 150 centimetres in diameter, don’t underestimate how much hydrogen can be stored in the pipeline system itself.

This page on the Uniper web site is entitled Green Wilhelmshaven: To New Horizons.

This is a sentence on the page.

Access to local hydrogen underground storage at the Etzel salt cavern site.

An Internet search gives the information, that Etzel gas storage could be developed to hold 1 TWh of hydrogen.

That would be enough hydrogen to supply 10 GW for a hundred hours.

Note that the UK branch of AquaVentus reaches the UK, just to the South of the massive hydrogen storage facilities at Aldbrough and Rough.

It would appear that both Germany and the UK are connected to AquaVentus through substantial storage.

I am certain, that all country connections to AquaVentus will have substantial storage at the country’s hydrogen terminal.

AquaDuctus

This would appear to be the first part of the AquaVentus network and has its own web site.

The web site is entitled Nucleus Of A Offshore Hydrogen Backbone.

These are the first two paragraphs.

The project partners are focusing on a scalable, demand-driven infrastructure: By 2030, AquaDuctus will connect the first large hydrogen wind farm site, SEN-1, with a generation capacity of approximately one gigawatt. SEN-1 is located in the German EEZ in the northwest of Helgoland. The pipeline will transport at a length of approx. 200 km green hydrogen produced from offshore wind to the German mainland and from there to European consumers via the onshore hydrogen infrastructure.

In the next project stage, AquaDuctus will be extended to the remote areas of the German exclusive economic zone towards the tip of the so-called duck’s bill. By that, additional future hydrogen wind farm sites will be connected. Along its way AquaDuctus will provide interconnection points with the opportunity for linking of adjacent national offshore hydrogen infrastructures originating from Denmark, Norway, the Netherlands, Belgium and United Kingdom which opens the door for Europe-wide offshore hydrogen transport by pipeline.

There is also an interactive map, that gives more details.

This paragraph explains, why the Germans have chosen to bring the energy ashore using hydrogen, rather than traditional cables.

Recent studies show that offshore hydrogen production and transport via pipelines is faster, cheaper, and more environmentally friendly than onshore electrolysis with a corresponding connection of offshore wind turbines via power cables. The German federal government has also recognized this advantage and has clearly expressed its intention to promote offshore hydrogen production in the North Sea.

I suspect, that some UK offshore wind farms will use the same techniques.

Hydrogen Production For The UK

Electrolysers will probably be built along the East Coast between Peterhead and Humberside and these will feed hydrogen into the network.

  • Some electrolysers will be offshore and others onshore.
  • Turning off windfarms will become a thing of the past, as all surplus electricity will be used to make hydrogen for the UK or export to Europe.
  • Until needed the hydrogen will be stored in Albrough and Rough.

Backup for wind farms, will be provided using hydrogen-fired power stations like Keadby Hydrogen power station.

Financial Implications

I reported on Rishi Sunak’s Manifesto Speech, which he made on June 11th. This is an extract

This document on the Policy Mogul web site is entitled Rishi Sunak – Conservative Party Manifesto Speech – Jun 11.

These are three paragraphs from the speech.

We don’t just need military and border security. As Putin’s invasion of Ukraine has shown, we need energy security too. It is only by having reliable, home-grown sources of energy that we can deny dictators the ability to send our bills soaring. So, in our approach to energy policy we will put security and your family finances ahead of unaffordable eco zealotry.

Unlike Labour we don’t believe that we will achieve that energy security via a state-controlled energy company that doesn’t in fact produce any energy. That will only increase costs, and as Penny said on Friday there’s only one thing that GB in Starmer and Miliband’s GB Energy stands for, and that’s giant bills.

Our clear plan is to achieve energy security through new gas-powered stations, trebling our offshore wind capacity and by having new fleets of small modular reactors. These will make the UK a net exporter of electricity, giving us greater energy independence and security from the aggressive actions of dictators . Now let me just reiterate that, with our plan, we will produce enough electricity to both meet our domestic needs and export to our neighbours. Look at that. A clear, Conservative plan not only generating security, but also prosperity for our country.

I can’t remember any reports about an energy security policy, which he outlined in the last paragraph of my extract from his speech.

He also said we would have sufficient electricity to export to our neighbours. As I said earlier some of this energy will be in the form of hydrogen, which has been created by offshore electrolysers.

If we are exporting electricity and hydrogen to Europe, this is likely to have three effects.

  • An improvement in Europe’s energy security.
  • H2ercules will improve and decarbonise German industry, using UK hydrogen.
  • The finances of UK plc will improve.

It looks like there would be winners all round.

Rishi Sunak had the cards and he played them very badly.

It is now up to Keir Starmer, Great British Energy and Jürgen Maier to play those cards to link the energy systems of the UK and Germany to ensure security and prosperity for Europe.

 

August 5, 2024 Posted by | Energy, Finance, Hydrogen | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | 2 Comments

Jurgen Maier To Chair Great British Energy

This article in The Times is entitled Pylons Are The Price Of Lower Bills, Keir Starmer Tells Rural Britain.

 These are two paragraphs from the article.

Starmer confirmed that Jürgen Maier, the former UK chief executive of the Siemens conglomerate, would chair the energy company.

Maier has advised Labour on rail and transport since December. He was openly critical of the party’s decision to drop a pledge to spend £28 billion a year on green investment, saying the figure was an “absolute minimum” and that scrapping the promise was “not good for climate change or for the growth of our economy”.

Note.

  1. His Wikipedia entry is impressive.
  2. He has dual Austrian and British citizenship.
  3. He went to school in Leeds and is a graduate of Nottingham Trent University.
  4. He rose to be Chief Executive of Siemens UK and retired in 2019 at 55.
  5. I have heard him several times on the radio and he seems to talk a lot of sense.

In my view he could be an excellent choice as Chair of Great British Energy.

I also have some further thoughts.

Jürgen Maier And Peter Hendy

Jürgen Maier and Peter Hendy, who is Starmer’s Rail Minister, have remarkably similar backgrounds and I wouldn’t be surprised if they know each other well, through dealings around Siemens’ contract for Transport for London’s new trains for the Piccadilly Line.

When last, were two technological heavyweights, so close to the heart of a UK government?

RWE

German energy company; RWE are the UK’s largest power generator.

  • RWE have five gas-fired power stations with a total output of 6.56 GW.
  • RWE have two onshore wind farms in operation with a total output of 67 MW.
  • RWE have four offshore wind farms in operation with a total output of 1.88 GW.
  • RWE have eight offshore wind farms under development with a total output of 9.90 GW.
  • RWE also has other electrical gubbins, like an electrolyser in South Wales.

Would Jürgen Maier be an ideal person, to persuade RWE to keep investing in the UK?

When he was with Siemens, he certainly invested heavily in the UK.

The German Problem

Germany’s problem is how they generate electricity.

Sources are as follows for Germany and the UK.

  • Coal – 26 % – 1 %
  • Natural Gas – 10.5 % – 32 %
  • Wind – 32 % – 29.4 %
  • Solar 12.2 % – 4.9 %
  • Biomass – 9.7 % – 12.3 %
  • Nuclear – 1.5 % – 14.2 %
  • Hydro – 4.5 % – 1.8 %
  • Oil – 0.7 % – 0 %
  • Other – 2.9 % – 0 %
  • Storage – 0 % – 1 %
  • Imports – 0 % – 10.7 %

Note.

  1. Figures are for 2023.
  2. Germany is the first percentage.
  3. UK is the second percentage.
  4. Germany has pledged to end coal-fired electricity production by 2030.
  5. Both countries seem to generate similar amounts of electricity from wind, biomass and hydro.

To replace the coal and make up for lack of nuclear, Germany needs to find a new power source.

The German Solution

The Germans are going for hydrogen in a big way.

The title of this page of the RWE web site is Welcome To The Age Of Hydrogen.

The page starts with this paragraph.

RWE is actively involved in the development of innovative hydrogen projects. The H2 molecule is considered to be an important future building block of a successful energy transition. RWE is a partner in over 30 H2 projects and is working on solutions for decarbonising the industry with associations and corporations like Shell, BASF and OGE. Hydrogen projects are comprehensively supported in the separate Hydrogen department of the subsidiary RWE Generation.

I also suggest, that you read this page on the RWE web site called AquaVentus.

The page starts with this RWE graphic.

It appears that 10.3 GW of hydrogen will be created by wind farms and piped to North-West Germany.

These two paragraphs outline the AquaVentus initiative .

Hydrogen is considered the great hope of decarbonisation in all sectors that cannot be electrified, e.g. industrial manufacturing, aviation and shipping. Massive investments in the expansion of renewable energy are needed to enable carbon-neutral hydrogen production. After all, wind, solar and hydroelectric power form the basis of climate-friendly hydrogen.

In its quest for climate-friendly hydrogen production, the AquaVentus initiative has set its sights on one renewable energy generation technology: offshore wind. The initiative aims to use electricity from offshore wind farms to operate electrolysers also installed at sea on an industrial scale. Plans envisage setting up electrolysis units in the North Sea with a total capacity of 10 gigawatts, enough to produce 1 million metric tons of green hydrogen.

The page also gives these numbers.

  • Total Capacity – 10 GW
  • Tonnes Of Green Hydrogen – 1 million
  • Members – 100 +

The web site says this about commissioning.

Commissioning is currently scheduled for early/mid 2030s.

The Germans can’t be accused of lacking ambition.

AquaVentus And The UK

This video shows the structure of AquaVentus.

I clipped this map from the video.

Note.

  1. There is a link to Denmark.
  2. There appears to be a undeveloped link to Norway.
  3. There appears to be a  link to Peterhead in Scotland.
  4. There appears to be a link to just North of the Humber in England.
  5. Just North of the Humber are the two massive gas storage sites of Aldbrough owned by SSE and Brough owned by Centrica.
  6. There appear to be small ships sailing up and down the East Coast of the UK. Are these small coastal tankers distributing the hydrogen to where it is needed?

In the last century, the oil industry, built a substantial oil and gas network in the North Sea. It appears now the Germans are leading the building of a substantial hydrogen network.

AquaVentus And Aldbrough And Rough Gas Storage

Consider.

It looks like the East Riding Hydrogen Bank, will be playing a large part in ensuring the continuity and reliability of AquaVentus.

Dogger Bank South And AquaVentus

This Google Map shows the North Sea South of Sunderland and the Danish/German border.

Note.

  1. Sunderland is in the top-left hand corner of the map.
  2. A white line in the top-right corner of the map is the Danish/German border.
  3. Hamburg and Bremen are in the bottom-right hand corner of the map.

If you lay the AquaVentus map over this map, I believe that RWE’s Dogger Bank South wind farm could be one of the three 2 GW wind farms on the South-Western side of the AquaVentus main pipeline.

  • Two GW would be converted to hydrogen and fed into the AquaVentus main pipeline.
  • Two GW of hydrogen will be a nice little earner for UK plc.
  • One GW of electricity would be sent to the UK.

But this is only one of many possibilities.

Conclusion

Could Jürgen Maier, be the man to develop British links to AquaVentus for the benefit of both the UK and Germany?

  • The UK’s wind farms could provide a lot of hydrogen for AquaVentus.
  • Aldbrough And Rough Gas Storage are conveniently places to add the hydrogen storage, that AquaVentus needs.
  • AquaVentus can certainly be expanded to Norway, and possibly Orkney and Shetland.

He certainly has a lot of relevant experience.

 

 

 

July 30, 2024 Posted by | Energy, Hydrogen | , , , , , , , , , , , , , | Leave a comment

HS2 Manchester Route Not Sold Off Yet As Labour Weighs Up Rail Options

The title of this post, is the same as that of this article on i.

This is the sub-heading.

The Government has a looming dilemma with climbing costs and pressure from supporters to bring back the Birmingham to Manchester line

These first three paragraphs explain the problems.

Labour faces a £500m decision on what to do with HS2 land which was not sold despite promises by Rishi Sunak, as Sir Keir Starmer braces for new calls to resurrect the cancelled Birmingham to Manchester line.

The £50bn rail line is likely to cause the new Labour government a headache as supporters push for the party to support the project which was initially launched by former Prime Minister Gordon Brown in 2009.

Within Whitehall, civil servants are currently thought to be calculating the value for money of Mr Sunak’s HS2 plan in comparison to the previous HS2 plan to Manchester, with the result expected to favour the longer route.

These are my thoughts.

The Appointment Of Lord Peter Hendy As Rail Minister

Two of the more unusual ministerial appointments by Sir Keir Starmer were the appointment of James Timpson as Minister of State for Prisons, Parole and Probatio, and Lord Peter Hendy as Minister of State in the Department of Transport.

But if you read their Wikipedia entries, they both have great knowledge of the area to where they have been appointed.

This picking of Ministers outside of elected MPs has happened before, with the most recent being Rishi Sunak’s appointment of David Cameron as Foreign Secretary.

This is a paragraph from the article in the i, gives some views about Lord Hendy and High Speed Two.

The appointment of Lord Peter Hendy as rail minister has been received positively by many supporters of the high speed rail line, given his previous work around the project and Euston’s redevelopment, where he pushed for a more ambitious project. One industry source told i that Lord Hendy was “one of the most respected figures in the UK rail industry”, and a “definite supporter of HS2 to Manchester”.

As the current Chairman of Network Rail, I suspect Lord Hendy has had endless thoughts on how he can get High Speed Two to Manchester, within an acceptable budget.

I also believe that since being appointed to be Chairman of Network Rail, the performance of that company has improved.

Has Lord Hendy improved the quality of the workforce or imposed better top down project management?

The Euston Station Problem

The article in the i has several paragraphs on the Euston station problem.

Lord Hendy has probably, the best directory of contacts of property developers, architects and engineers in the UK and with his background of economics, he probably know how to sort the wheat from the dross.

So could Lord Hendy somehow conjure a solution for Euston station out of the speculation?

I wonder if he could find someone to develop a multi-billion commercial complex over the station, that this could generate the cash to pay for Birmingham and Manchester section of High Speed Two.

Like Baldrick, I suspect Lord Hendy could have a cunning plan, but based on sound economic sense.

For instance, I believe, that the best way to serve Leeds by High Speed Two could be via Manchester.

  • Leeds would have a choice of routes from London; King’s Cross and Euston.
  • It could possibly have three, if St. Pancras and Leeds via Derby and Sheffield were to be improved.
  • Birmingham and Leeds services would be greatly improved if High Speed Two to Leeds, went via Manchester.

I would suspect every idea will be on the table.

July 13, 2024 Posted by | Transport/Travel | , , , , , , , , , , , | 9 Comments

Sunak’s Terrible Decision To Call The Election

As a control engineer and mathematical modeller, whose software planned many of the world’s major projects in the last thirty years of the last century, I feel that Rishi Sunak’s decision to call the election, when he did, was one of the worst political decisions of a UK Prime Minister in the last century.

Consider.

  • Inflation was coming down and it was likely interest rates could fall soon.
  • The Rwanda plan could have started to work.
  • A new round of wind farm Contracts for Difference for wind farms are due to be announced soon and signs, that there could be a large amount of wind to add to the future pipeline could be a record. I wrote about it in UK Can Secure Record Number Of Offshore Wind Farms In This Year’s Auction For New Projects.
  • There is 4 GW of new offshore wind to be commissioned in the next eighteen months.

When, he called the election, I believed Sunak had a very large rabbit to pull out of a hat. But there was none!

I wrote Where’s The Plan, Rishi?, because I felt these must be something more to come.

Conclusion

Now Starmer and the Labour Party, will reap all the benefits of selling Europe and principally, the Germans, the electricity and hydrogen they need.

July 5, 2024 Posted by | Energy, Hydrogen, World | , , , , , | 1 Comment

Tube Strikes: Passengers Warned Of Widespread Disruption

The title of this post, is the same as that of this article on the BBC.

I can see a scenario, where the Tories put something in their next General Election manifesto to bring a little bit of sense to the RMT and there is a total National rail strike during the election.

It would be Starmer’s worst nightmare!

As it is this morning, I’ll probably have difficulty getting to Moorgate for my gluten-free full English breakfast and do my food shopping for the weekend in Marks and Spencer.

November 26, 2021 Posted by | Transport/Travel | , , , , , , | 2 Comments