The Anonymous Widower

A Thought On Broughton Station

This Google Map shows Hawarden Airport to the West of Chester.

Note.

  1. Airbus make wings for their aircraft at their Broughton factory on this airport.
  2. The wings are flown to Europe for final assembly.
  3. The North Wales Coast Line passes the Northern end of the runway.

When I bought my return ticket between Chester and Holyhead, which was good value at £25.25 with my Senior Railcard, I got chatting with the clerk about Airbus and their Broughton factory.

He felt it needed a station and afterwards I checked and found that the Welsh Government had been trying to build one for some time.

Thinking back, I wonder if he keeps getting asked about getting to the Airbus factory and wishes that the government and Airbus would make his job easier by building a  Broughton station.

A station at Broughton might also cut the factory’s carbon footprint, by allowing more staff to go to work by train.

A Merseyrail Extension To Shotton

Shotton is already served by the Borderlands Line which connects Wrexham and Bidston.

This line is shown on the West side of this map, which shows how the Merseyrail network might look in the future.

Note.

  1. Chester could have services that terminate in the East at Crewe and Runcorn East stations.
  2. Chester already has electric services from Liverpool, which will receive new Class 777 trains in the next few months.
  3. The new trains can be fitted with a battery electric capability.

I just wonder, if a Cross-Chester Metro could be built.

  • Eastern termini would be Runcorn East or possibly Warrington Bank Quay and Crewe.
  • Shotton is only 7.9 miles from Chester.
  • Shotton low-level station used to have four tracks.
  • I suspect that Shotton or even Flint could be the Western terminus.
  • Extra stations could be added as required.

Note.

It would probably be best, if the trains were battery-electric that could use 25 KVAC overhead electrification, as this would allow them to charge at the Eastern termini.

I also feel that Crewe and Chester should be electrified, so that Chester could be reached by the new Class 805 trains running under electric power.

This would also allow Chester to become a High Speed Two destination, that was served by High Speed Two Classic-Compatible trains.

I believe that a Cross-Chester Metro is a possibility.

October 12, 2022 Posted by | Transport/Travel | , , , , , , , , , , , | 2 Comments

Should Hospitals Be The Power Backup Locations?

I was reading an article in The Times about how protestors were blocking roads in Central London and they’re inadvertently stopped an ambulance.

So this question occurred to me. Why I don’t know, but my mind has always jumped about and put thoughts together?

Consider.

  • The latest generation of energy storage that could be used to back up the grid are coming down in physical size.
  • Hospitals have complex power systems, as they use a lot of electricity.
  • Hospitals need emergency power backup.
  • Because of their high electrical use, hospitals will have a high capacity connection to the National Grid.
  • Some modern treatments need a lot of electricity.
  • Will ambulances be battery-powered and will need to be charged up, whilst delivering patients?
  • Many bus routes terminate at the local hospital, so if the buses are battery-powered, these could be charged as well.

As an Electrical and Control Engineer, I feel that to put a town, city or are’s back-up battery at the hospital would be a sensible idea.

Hospitals should be designed to be health, energy and transport hubs for their communities.

October 11, 2022 Posted by | Energy, Energy Storage, Health, Transport/Travel | , , , | Leave a comment

Carbon-Neutral Concrete Prototype Wins €100k Architecture Prize For UK Scientists

The title of this post, is the same as that of this article on the Architect’s Journal.

Under a picture of two white-coated scientists with their protective boots on concrete samples, the story and their invention is outlined.

A pair of PhD students at Imperial College London have won a global architecture prize for devising a groundbreaking method of creating carbon-neutral concrete

Material scientists Sam Draper and Barney Shanks landed the €100,000 2022 Obel Award with their ‘simple way’ to capture carbon from industrial production processes and create an end product that can eliminate the CO₂ footprint of concrete.

The prototype technology, dubbed Seratech, takes industrial CO₂ emissions directly from flues and produces a carbon-negative cement replacement material (silica). According to the scientists, when this is used in combination with Portland cement, the carbon capture associated with producing the silica means the concrete products can be zero carbon.

One of the products, we will need in the world is concrete and if we can make it in a carbon-neutral manner, then that will surely reduce worldwide carbon emissions.

The Technology Explained

This page on the Seratech website is entitled Our Technology.

It gives this description of the technology.

Seratech has developed a process that consumes olivine and waste CO₂ from flue gases and produces two products which both have significant value in construction.

Silica is produced which can be used as a supplementary cementitious material (SCM) in concrete meaning the amount of Portland cement in the concrete can be reduced by up to 40%. As the silica comes from a process that captures CO₂ it is “carbon negative” and the concrete can become carbon neutral.

Magnesium carbonate is produced that can be used to make a range of zero carbon construction materials and consumer products, including alternatives to building blocks and plasterboard.

The aim is for humanity to be able to continue building robust cities and infrastructure, but without the climate cost of traditional cement mixes and with the Seratech technology this goal is achievable!

Note that olivine in Europe is generally mined in Norway.

Replacement Of Steel By Concrete

Could we also replace steel in some applications with concrete?

In UK Cleantech Consortium Awarded Funding For Energy Storage Technology Integrated With Floating Wind, I talked about some of ground-breaking methods used by a company called RCAM Technologies to create infrastructure using 3D printing of concrete.

If Imperial’s concrete, which is called Seratech can be 3D printed, I can see lots of applications for the technology.

So you could kill two sources of large carbon emissions with one technology.

Conclusion

I have said on this blog before, that we will have to keep or even build more gas-fired power stations, as they can be an efficient source of pure carbon dioxide, that will be needed as a feedstock to create an increasing number of agricultural and building products.

October 10, 2022 Posted by | World | , , , , , , , , , , , , , | 4 Comments

Improving The Wood Green And Moorgate Public Transport Corridor

This morning I went for coffee with an old school friend from Minchenden Grammar School at Southgate station.

Southgate is not a bad place to meet someone.

  • There are a couple of good coffee shops.
  • There are plenty of buses.
  • It has a couple of the better chain restaurants including a Pizza Express.
  • The area also has a lot of memories for me.

It also has one of London’s most iconic Underground stations.

It may look familiar, as it regularly crops up in film and television dramas.

  • One station guy told me, that the ticket barriers have been designed to be easy to remove, so filming of an historic drama is possible.
  • It was used in The End Of The Affair to portray a Central London station.
  • As the escalators have the same bronze fittings as Moscow, they could be used in a story set in Russia.

As the Piccadilly Line doesn’t go anywhere near my house, to get to Southgate, I take a 141 bus to and from a convenient Piccadilly Line station.

  • Going North, I changed at Manor House station.
  • Coming South, I changed at Turnpike Lane station.
  • I could have also have changed at Wood Green station.

The journey home had four major problems.

  • The bus stop at Turnpike Lane station, is a few hundred yards from the station.
  • I waited fifteen minutes for a 141 bus.
  • When it did arrive, it was so packed, it didn’t have space for a miniature dachshund to squeeze in between the feet of the standing passengers.
  • The traffic was very heavy, so the journey was slow.

How can this bus route cope in the Peak, if it can’t cope on a Sunday morning?

Various issues and actions and will make these capacity issues worse.

The Victoria Line Has No Direct Connection With The Elizabeth Line

In my view, this was a mistake, although not that serious, as the young or energetic can probably walk between Oxford Circus and the Hanover Square entrance to Bond Street station on the Elizabeth Line.

Will this connection develop with coffee and snack shops to ease passenger interchanges?

When and if Oxford Circus station is ever made step-free, I can imagine a tunnel, perhaps with a moving walkway being built between  Oxford Circus station and he Hanover Square entrance to Bond Street station.

There is also the cross-platform interchange at Highbury & Islington station with the Northern City Line that links with Moorgate and the City of London.

The Piccadilly Line Has No Direct Connection With The Elizabeth Line

To get between the Northern stations on the Piccadilly Line and the Elizabeth Line is either a double-change at Finsbury Park and Highbury & Islington stations or a ride on the 141 bus.

I wrote about these issues in Extending The Elizabeth Line – Improving The Northern City Line.

The Elizabeth Line Will Attract Travellers To Moorgate

I notice that my own travelling patterns have changed from using the Central, Circle, District, Hammersmith & City and Metropolitan Lines to using the Elizabeth Line since it opened and I suspect, when the Elizabeth Line is fully joined up, that more passengers will travel to Moorgate to access the Elizabeth Line.

Transport for London and the Mayor Are Rerouting The 21 Bus

The 21 bus duplicates the 141 bus between Newington Green and Moorgate station.

But it is being rerouted next year, which will increase the loading on the 141 bus.

The 141 Bus Used To Be The 641 Trolleybus

When I was a child, London’s trolleybus network was extensive and to get between Wood Green and Moorgate, you would have used the 641 trolleybus.

Trolleybus Ascending Jolly Butchers Hill in Wood Green

Many like me, look back on trolleybuses with affection.

Does this historical connection encourage passengers to use the 141 bus, which is the 641 trolleybus’s successor on the route?

My parents certainly had lots of trolleybus stories.

So What Could Be Done?

There are a variety of actions that could be taken to strengthen public transport between Moorgate and Wood Green stations.

Improve The 141 Bus Route

In Does London Need High Capacity Bus Routes To Extend Crossrail?, I put forward ideas for using buses to link to the Elizabeth Line.

This was my suggestion.

I suspect any route seen as an extension of Crossrail needs to have the following characteristics.

  • High frequency of perhaps a bus every ten minutes.
  • Interior finish on a par with the Class 345 trains.
  • Wi-fi and phone charging.

I would also hope the buses were carbon-free. Given that some of these routes could be quite long, I would suspect hydrogen with its longer range could be better.

I feel that a high-quality 141 bus running every ten minutes between London Bridge station and Palmers Green, would be just what the passengers would order.

  • Palmers Green bus garage is at the Northern end of the route, so could be used for refuelling or recharging.
  • London Bridge station is at the Southern end of the route and was designed with an efficient bus station.
  • The 141 route connects London Bridge, Bank, Moorgate and Old Street stations in the City of London.

With the right buses, this could be a route with real quality and usefulness.

Increase The Frequency On The Northern City Line

The Northern City Line may have new Class 717 trains, but it still has a pathetic frequency of eight trains per hour (tph)

  • I am sure it could be increased to at least 12 tph between Moorgate and Alexandra Palace stations.
  • Something like six tph would go to Welwyn Garden City, four tph to Hertford East station and two to Stevenage.
  • Large areas of the Northern suburbs would get a much better connection to the Elizabeth Line.

Once the digital signalling is installed and commissioned, no new infrastructure will be needed.

I am sure, that this would be the easiest way to improve public transport in North London.

Add Step-Free Access To As Many Stations As Possible

Moorgate, Finsbury Park, Oakwood and Cockfosters are step-free with lifts.

As many stations as budgetary constraints allow, should be made step-free.

October 9, 2022 Posted by | Food, Hydrogen, Transport/Travel | , , , , , , , , , , , , , , , , , , , , , | 1 Comment

How Did The Ukrainians Attack The Crimea Bridge?

No-one seems to know what happened on the Crimea Bridge, which appeared to catch fire.

  • Was it the Ukranians?
  • Was it some of Putin’s enemies in Russia?
  • Was it an accident?
  • Did a battery in an electric car explode?
  • Was it a suicide bomber?
  • Was it a drone strike?
  • Was it a drunken lorry-driver, who hit something?

We just get more and more questions.

But here’s two questions, that can be answered.

Was the train going from Russia? For my theory to be feasible, it must have been going from Russia into Crimea.

Did more than one part of the train catch fire? Someone said it did.

The Track Layout

I have been looking at the track layout over the bridge on OpenRailwayMap, which shows everything. It appears a couple of kilometres. to the South (Russian) side of the bridge there is a set of sidings and/or freight loops.

This OpenRailwayMap shows the sidings in relation to the bridge.

Note.

  1. The main line is shown in orange.
  2. The bridge is in the North-West corner of the map.
  3. The sidings are shown in black alongside the main line in the South-East corner of the map.

This second map shows the loops and sidings in more detail.

Note.

  1. Trains in Russia run on the right track, whereas the UK runs on the left.
  2. There are actually two sets of loops; one has extra sidings and the other doesn’t.
  3. Both loops can be accessed from both tracks and directions.

Unfortunately, the Google Map of the area shows the construction phase.

Did the freight train stop overnight in these sidings and proceed at first light? After all it might be going a long way and drivers needed time for sleep, some food, vodka and a few ciggies.

Whilst it was stopped did Ukrainian saboteurs sneak in and fix bombs with timers to the train? After all kids sneak into our sidings at night and graffiti the trains.

The timers could even have been fitted with GPS, so they went off on the most vulnerable part of the bridge.

This could explain the timing and how the train appeared to have been hit more than once!

For a raid, it would be much easier than say what the Norwegians did in WW2 to blow up the heavy water plant at Telemark, where they didn’t lose a man.

A Picture Of The Train Fire

This picture shows the train fire.

Note.

  1. It appears that the carriageway nearest to the camera has collapsed.
  2. If we assume, the break point is now lying on the seabed, it points to the pier with the light-coloured rectangle on top being the failure point of the road bridge.
  3. According to OpenRailwayMap, who handily show carriageway directions, that is the carriageway to Crimea.
  4. The rail bridge is double-track and appears to be reasonably intact.
  5. The train also appears to be intact, except for some fire damage.
  6. If the train was going to Crimea, it would be on the track nearest to the camera.

I do think, that if it was explosions on the train that caused the bridge collapse, there would be more damage on the other carriageway and on the railway.

The Collapse Of The Crimea-Bound Carriageway

This reminds me very much of the collapse of the Cleddau Bridge in Wales, during construction in 1970.

Wikipedia says this about that collapse.

Errors in the box girder design caused the collapse during construction in 1970. The bridge became operational during 1975.

If I remember correctly, during construction, the bridge was effectively overloaded. I can certainly remember lots of discussion about the failure in the office, where I worked in ICI at Runcorn.

I am not suggesting, that there were errors in the Russian calculations, but that something happened to take the bridge outside of its safety limits.

Suppose, there was a large explosion near the pier, where the break occurred, could it have caused the bolts holding the sections of the bridge to shear and allow the bridge to fall, as the pictures show.

It is certainly looking that a major truck bomb, is the cause.

CCTV pictures have been shown, that purport to see a truck exploding.

Was It A Suicide Attack?

I don’t think that the type of traditional suicide attacks, as practiced by the Islamic State and others would be carried out by either Ukraine or Russia. Although Chechens did use suicide attacks in their war against Russia.

But I do think it would be possible for a driver to stop a truck, put out warning triangles or whatever is the law in Russia and then be picked up by a friendly driver.

Alternatively, they could wait until the truck exploded and then make a getaway under cover of the fire. They could even jump into the water and be picked up by a boat.

If the Russians were behind it, they would have the ability to use a hired driver from perhaps a local agency.

Suppose, a hired driver were to be told to take a truck load of watermelons to Sebastopol and bring the truck back. A quick look would confirm the watermelons, but I doubt, the driver would find the bomb underneath.

If the driver was killed would the Russians mind.

The Ukrainians might not either, but they’d have the problem of getting the truck deep into Russian territory, without being detected.

The Truck On The Bridge According To The BBC

This article on the BBC is entitled Crimean Bridge: Who – Or What – Caused The Explosion?.

The article says this about the truck.

Security camera footage released on social media showed a truck – allegedly from the Russian city of Krasnodar, an hour’s drive from the crossing – moving west across the bridge at the time of the explosion.

Russian officials named a 25-year old Krasnodar man, Samir Yusubov, as the owner of the truck, and said an older relative, Makhir Yusubov, was the driver.

But close examination of the footage seems to show that the truck had nothing to do with the explosion.

Note.

  1. If the truck was going West it was going from Russia to Crimea, this meant it was on the carriageway furthest from the railway.
  2. The truck was on the carriageway that collapsed.

Does that rule out a truck bomb?

The View Of A British Army Explosives Expert

The BBC article also says this.

“I’ve seen plenty of large vehicle-borne IEDs [improvised explosive devices] in my time,” a former British army explosives expert told me. “This does not look like one.”

A more plausible explanation, he said, is a massive explosion below the bridge – probably delivered using some kind of clandestine maritime drone.

“Bridges are generally designed to resist downwards loads on the deck and a certain amount of side loading from the wind,” he said. “They are not generally engineered to resist upward loads. I think this fact was exploited in the Ukrainian attack.”

That sounds feasible to me, but the BBC article also has this paragraph.

If this is how Ukraine managed to attack the Kerch Bridge, hundreds of miles from Ukrainian-controlled territory, then it’s one of Kyiv’s most ambitious operations so far.

If that is true, it certainly is an ambitious operation, that ranks alongside the St Nazaire Raid in World War II.

A Structural Engineer’s Thoughts

This article on New Civil Engineer is entitled How The Crimean Bridge Explosion Caused Multiple Spans To Collapse.

It is the thoughts of Andrew Barr at the University of Sheffield and it well worth a read.

Conclusion

We’re still a long way from the truth.

 

 

October 8, 2022 Posted by | Transport/Travel, World | , , , , , | 5 Comments

Is There A Virtuous Circle In The Installation Of Wind Farms?

Because we are developing so much offshore wind turbine capacity, this will result in two things.

  • A big demand for steel for the foundations and floats for wind turbines.
  • A large amount of electricity at a good price.

In my view the UK would be the ideal country to develop an integrated steel and wind turbine foundation/float capability.

There will also be a strong demand for deep water ports and sea lochs to assemble the floating turbines.

Our geography helps in this one. We also have Milford Haven, which is just around the corner from Port Talbot. Scunthorpe is on the River Trent, so could we assemble floats and foundations and take them by barge for assembly or installation.

We probably need an integrated capability in Scotland.

Conclusion

It looks to me, that there is a virtuous circle.

  • The more offshore wind turbine capacity we install, the more affordable electricity we will have.
  • This will in turn allow us to make more steel.
  • If this steel was produced in an integrated factory producing foundations and floats for wind farms, this would complete the circle.
  • It would also be inefficient to make the foundations thousands of miles away and tow them to UK waters.

Any improvements in costs and methods, would make the system more efficient and we would have more wind turbines installed.

It looks to be a good idea.

October 8, 2022 Posted by | Energy | , , , , , , , | 1 Comment

The Monster In The Mountains That Could Save Europe’s Winter

 

Ulla-Førre is a complex of five hydroelectric power stations and a massive lake in the Norwegian mountains to the East of Stavanger.

  • The power stations have a total generating capacity of 2.1 GW.
  • Lake Blåsjø is able to hold enough water to generate 7800 GWh of electricity.
  • The complex is at the Norwegian end of the North Sea Link to Blyth in England.

This YouTube video from Statkraft, explains how Ulla-Førre was built.

I have some further explanation and thoughts.

What Is The Operating Philosophy Of The North Sea Link?

This press release from National Grid says this.

The Norwegian power generation is sourced from hydropower plants connected to large reservoirs, which can respond faster to fluctuations in demand compared to other major generation technologies. However, as the water level in reservoirs is subject to weather conditions, production varies throughout seasons and years.

When wind generation is high and electricity demand low in Britain, NSL will enable renewable power to be exported from the UK, conserving water in Norway’s reservoirs. When demand is high in Britain and there is low wind generation, hydro power can be imported from Norway, helping to ensure secure, affordable and sustainable electricity supplies for UK consumers.

It almost seems to me, that the North Sea Link is part of a massive pumped-storage system, where we can bank some of our wind-generated electricity in Norway and draw it out when we need it.

Suppose There Is No Wind In The UK And Norway’s Giant Reservoirs Need Filling?

We could always throw on a substitute, which is the 1,185 MW Hartlepool nuclear power station.

But over the next few years these wind farms will be connected to the North-East.

  • Sofia wind farm should commission the 1.4 GW Phase 1, which connects to Teesside in 2023.
  • Dogger Bank wind farm should commission 3.6 GW, which connects to Teesside and Humberside in 2025.
  • The 4.1 GW Berwick Bank wind farm will have a second connection to Blyth by 2030. Say 2 GW!

There’s more than enough wind there to fill up Norway’s reservoirs and replace Hartlepool nuclear station.

Will Ulla-Førre Be Expanded?

It does sound to me that the video does imply that Ulla-Førre could be expanded.

 

October 8, 2022 Posted by | Energy, Energy Storage | , , , , , | 3 Comments

The Development of Liverpool Street And Paddington Stations

This article in The Telegraph is entitled Row Over ‘Grotesque’ £1.5bn Liverpool Street Revamp.

There is no doubt that Liverpool Street and Paddington stations will need a higher number of trains per hour and this will probably mean more platforms. But there is no space in either station.

Suppose a long-distance version of the current nine-car Alstom/Bombardier trains were to be built with toilets, a 110 mph top speed, but dimensionally identical to the existing Class 345 trains.

The Central Tunnel of the Elizabeth Line could probably handle more trains, than it currently does, given that Dear Old Vicky handles 36 trains per hour.

So services like Southend and Oxford or Beaulieu and Newbury could be run through the Central Tunnel, replacing the current Greater Anglia and GWR services.

This would relieve platform space in the current terminals and the high-speed Elizabeth Line trains, would just be more trains going through the Central Tunnel at 80 mph.

The important Oxford and Cambridge route would be one change at either Farringdon or Liverpool Street, Or with some track modifications, it might be possible to run direct via the Central Tunnel, Stratford and the West Anglia Main Line.

Sorting out the trains, would ease the development of Liverpool Street and Paddington stations.

October 7, 2022 Posted by | Transport/Travel | , , , , , , | 5 Comments

Will Norwegian Pumped Storage Hydro Help Us Through The Winter?

In UK To Norway Sub-Sea Green Power Cable Operational, I discussed the North Sea Link interconnector to Norway.

The North Sea Link is no ordinary interconnector, as it is a lot more than a 1.4 GW cable linking the electricity grids of the UK and Norway.

  • At the UK end, there is an increasing amount of wind power. The UK has added 3.5 GW in 2022.
  • At the Norway end, there is the 2.1 GW Ulla-Førre hydropower complex.
  • The water to generate electricity at Ulla-Førre comes from the artificial Lake Blåsjø, which contains enough water to generate 7.8 TWh of electricity.
  • The storage capacity at Ulla-Førre is 857 times greater than that at the UK’s largest pumped storage hydroelectric power station at Dinorwig in North Wales.
  • The power complex consists of five power stations and some can also be used as a pump powered by UK electricity to fill Lake Blåsjø with water.

Effectively, the North Sea Link, the Ulla-Førre power complex and Lake Blåsjø are a giant pumped storage hydro battery, that can either be filled by Norwegian precipitation and water flows or by using surplus UK electricity, through the North Sea Link, which opened a year ago.

If the Norwegian precipitation goes on strike, the only way to fill Lake Blåsjø is to use surplus UK power, which I suspect will be British wind and nuclear in the middle of the night!

But then I thought we will be short of electricity this winter.

  • I suspect we will be at times, but then at others there will be a surplus.
  • So the surplus will be pumped to Norway to top up the reservoir at Lake Blåsjø.
  • When we are short of electricity, the Norwegians will turn water back into electricity and send it back through the North Sea Link.

It will be more sophisticated than that, but basically, I believe it provides us with the electricity we need, at the times, when we need it.

I wouldn’t be surprised to be told, that we’ve been squirreling away overnight wind energy to Norway over the last few months.

I have written more about Ulla-Førre in The Monster In The Mountains That Could Save Europe’s Winter.

It includes a video about the building of the complex.

 

October 7, 2022 Posted by | Energy, Energy Storage | , , , , , | 6 Comments

The Belgians Go Large

This press release from Elia Group is entitled Elia Presents Its Plans For An Energy Island, Which Will Be Called The Princess Elisabeth Island.

These two paragraphs outline the project.

In the presence of federal ministers Tinne Van der Straeten (Energy) and Vincent Van Quickenborne (North Sea), system operator Elia has presented its draft plans for what will be the world’s first artificial energy island.

The Princess Elisabeth Island will be located almost 45 km off the Belgian coast and will serve as the link between the offshore wind farms in the second offshore wind zone (which will have a maximum capacity of 3.5 GW) and its onshore high-voltage grid. The energy island will also be the first building block of a European offshore electricity grid that will serve as a central hub for new interconnectors with the UK and Denmark. The island is an innovative tour de force that once again puts Belgium on the map as a pioneer in offshore energy.

Note, that Princess Elisabeth is the heir apparent to the Belgian throne.

I have some thoughts.

Will The Wind Turbines Float Or Have Fixed Foundations?

Consider.

  • 3.5 GW of wind farms will probably need around 220 wind turbines.
  • Most of the large wind farms in the seas around the UK, that are below about 50 miles from the shore are on fixed foundations.
  • The seas around East Anglia and Belgium are probably fairly similar.

I suspect that using today’s technology, the turbines will have fixed foundations.

But floats with two or more turbines , that generate more electricity per square kilometre may be developed.

Will Hydrogen Be Generated On The Island?

This could happen and I don’t see why not.

Tankers could even dock on the island to transport the hydrogen.

Could The Island Service Floating Wind Turbines?

All that is needed, is sufficient depth of water and a large crane.

It is a possibility!

Will There Be A UK Interconnector To Princess Elisabeth Island?

The press release says this.

The energy island will also be the first building block of a European offshore electricity grid that will serve as a central hub for new interconnectors with the UK and Denmark.

There could be interconnectors all over the North Sea linking wind farms and energy islands to the UK, France, Belgium, The Netherlands, Germany, Denmark and Norway.

We’d all be in it together.

Conclusion

This is a very ambitious project.

October 7, 2022 Posted by | Energy, Energy Storage, Hydrogen | , , , | Leave a comment