It’s Time To Detopsify Stratford Station

Stratford Station has grown like Topsy for too long and has several problems and possible future expansions.

Not least of these include.

  • The final arrival of Crossrail.
  • A direct connection to Chingford.
  • A Stansted Express service.
  • Massive housing developments in the area.
  • More hotels
  • New cultural developments like the branch of the Victoria and Albert Museum.
  • A new campus for University College London.

This article on IanVisits is entitled Stratford Station Set For Massive Transformation.

This is his opening paragraph.

Stratford station could be radically redeveloped under plans being worked on by the rail companies and local council.

That is rather understated!

The station will become several times busier and needs a complete rethink, many more services and deTopsification.

These are my thoughts.

The Development Of The High Meads Loop

The High Meads Loop exists and is a double-track loop that can turn trains arriving at Stratford station via Lea Bridge station.

  • It is underneath the Eastfield Shopping Centre – Westfield is in the West of London.
  • Each track of the loop has its own long platform in the station. – Platform 11 is for clockwise trains and Platform 12 is for anti-clockwise.
  • It has been used in the past for a Stansted Express service.

The Wirral Line in Liverpool like the High Meads Loop is now a modern loop for turning trains.

  • The Wirral Loop is only single-track.
  • It gives connections for over thirty stations on the Wirral and in Cheshire and North Wales to Liverpool City Centre.
  • It is run by fifty-year-old Class 507 and Class 508 trains.
  • The loop has now been improved and can handle upwards of the fourteen trains per hour (tph) it currently does.

Merseyrail will soon be introducing new Class 777 trains on the Wirral Line in the near future and will be increasing services and the number of destinations.

British Rail’s vision for Liverpool, that was cruelly cut-short by Liverpool MP; Harold Wilson, is finally coming to fruition.

Newcastle also got its British Rail tunnel which is now being used by the Metro, but what would have happened in Manchester if British Rail had been allowed to build the Picc-Vic Tunnel?

I have a strong belief, that a Lea Valley Metro can be developed on the West Anglia Main Line.

  • It would have two Southern terminals – Liverpool Street station and the High Meads Loop at Stratford.
  • When it opens, Crossrail will mean that Liverpool Street and Stratford stations will be seven or eight minutes apart with a frequency of at least 12 tph.
  • Northern terminals would include Broxbourne, Cheshunt, Chingford, Enfield Town and Hertford East.
  • Crossrail 2 was planned to have a frequency of 10 and 15 tph between Tottenham Hale and Broxbourne stations.

I believe that if services in East London are thoroughly reorganised, that all the benefits of Crossrail 2 can be brought to East London by the use of the High Meads Loop and the upgrading of existing lines.

Stansted Express Services

Go to Stratford station and there is an out-of-date sign at the end of Platform 1 and 2, where the Overground trains terminate.

It directs passengers to Platform 12 for Stansted Airport.

The picture was taken in 2017, but there is still a walk-through to Platform 12, that I use regularly, if I’m changing between London Overground and Greater Anglia or TfL Rail services to destinations on both the West Anglia or Great Eastern Main Lines.

I believe that there is still a need for a Stansted Express services from Stratford, as for some people, including myself, it is easier to get to Stratford, than Liverpool Street.

From some places the connections to and from Stansted are not very good. Try going between London Bridge, Canterbury, Euston, Victoria or Waterloo and Stansted with a few mobility issues like a heavy suitcase and/or a baby, without a degree in Ducking-and-Diving!

An additional Stansted Express service from Stratford would make things a lot easier to get to the airport for many travellers, because of Stratford’s connections to the Central, Jubilee and North London Lines and SouthEastern’s Highspeed services.

Better Connection Between High Speed One And The High Meads Loop For Passengers

Some passenger connections are missing at Stratford.

This is indicated in the IanVisits article.

This map from cartometro.com shows the Topsy-like nature of the platforms at Stratford.

Note.

  1. The Docklands Light Railway is shown in turquoise.
  2. The DLR platforms in the North-West corner of the map are those of Stratford International station.
  3. High Speed One and the four platforms of Stratford International station are shown in black.
  4. The North London Line of the London Overground is shown in orange.
  5. The North London Line terminates in Platforms 1 and 2, which have a level link to Platform 12.
  6. Platform 12 is on the anti-clockwise platform for the High Meads Loop and has step-free access to the subway system underneath the station.
  7. Platform 11 is on the clockwise platform for the High Meads Loop and has level access to Platform 10a and full step-free access,
  8. Platform 10a is used by some services to East Anglia.
  9. Crossrail is shown in blue.
  10. The Central Line is shown in red.
  11. The Jubilee Line is shown in silver.

It is not the best passenger-friendly station layout.

  • Inevitability, you often find yourself trudging a long way at Stratford station.
  • Changing to or from any high speed services is supremely difficult.
  • Often you have to walk through the busy Eastfield Shopping Centre.

Particularly annoying for me is coming back from Kent on High Speed One and needing to take the North London Line, as I do several times a year.

As it involves a long walk through the Shopping Centre, I now take the easy way out and carry on to St. Pancras and get a taxi home.

As Stratford International is one of the draughtiest stations in England, the station is a real Design Crime and it needs a serious makeover.

Conclusion

Sort it!

 

 

 

 

 

 

 

May 16, 2021 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , , | 11 Comments

Would A Mutant Many-Parent Child Help To Solve London’s Transport Problems?

London needs to increase the capacity of its public transport system, as the City continues to get larger and larger.

Current Major Projects

There are only three major rail projects ongoing in London at the present time.

The Bank Station Upgrade

The Bank Station Upgrade appears to be progressing well, albeit perhaps it’s a bit late due to the pandemic.

It is a complex project and from what I have heard and observed, it has been well designed and planned.

The Barking Riverside Extension

As with the Bank Station Upgrade the Overground extension to the new Barking Riverside station, appears to be going reasonably well.

But compared to that project, it is a relatively simple project, built mainly in the open air, with no tunneling.

Crossrail

Crossrail is in trouble, after what many believe was a very good tunnelling phase of the project.

But then tunnels under London usually seem to go well. I can remember the Victoria Line tunnelling and many other under London since the 1960s and all of these tunnels seem to have been dug without trouble. As I write, there don’t seem to be any tunneling problems with the Thames Tideway Tunnel.

Crossrail now has been reduced to a series of station builds and rebuilds, some of which are as large as the Bank Station Upgrade, with other ongoing projects like the testing of trains and systems.

So why are some of these stations running late in their delivery?

If you walk along the route of Crossrail in the City of London and through Clerkenwell and the West End, it is one massive building side as developers raise massive clusters of new developments around and above the Crossrail stations.

The picture shows Farrington station’s Eastern entrance, with a new development on top.

This one wasn’t a big one, but it went up in record time.

These buildings are often funded by Sovereign Wealth Funds, who want their buildings finished ASAP and as they have bottomless pockets, they are prepared to pay more to get the builders and tradesmen they need.

And where did they get the workers from? Other projects, including Crossrail.

This problem happened in Aberdeen at the height of the oil boom in the last century.

I also think that Brexit worsened the problem, as workers from mainland EU moved to large projects closer to home, like Stuttgart 21 and the new Berlin Brandenburg airport, that were both very much in trouble and could have been offering premium salaries as well!

The solution would have been to phase developments so that the limited pool of workers was not exhausted.

But that probably wouldn’t have suited the developers and politicians for all sorts of reasons.

  • An uncompleted building doesn’t bring in money and jobs.
  • Early completion must improve chances of letting the building.
  • Delaying the building would probably have meant fewer holidays for politicians in exotic locations.

Hopefully, a comprehensive enquiry into the lateness of Crossrail will provide answers.

High Speed Two

High Speed Two is to my mind a London local project. But only in a secondary way!

  • Rebuilding Euston station will improve Underground connections and interchange at Euston and Euston Square stations.
  • It is claimed by High Speed Two, that the rebuilt Euston station will create 16000 jobs and 2200 homes.
  • High Speed Two will enable massive development at Old Oak Common, with tens of thousands of homes and jobs.
  • Old Oak Common station will be a very important rail hub in North-West London.

With seventeen trains per hour (tph) between Euston and Old Oak Common will High Speed Two attract local traffic?

  • I suspect High Speed Two between Manchester Airport and Manchester Piccadilly and between Birmingham Interchange and Birmingham Curzon Street will also attract local traffic.
  • I’ve used TGVs between Nice and Antibes.
  • Tourists might visit, just like they did and still do at the Olympic Park.
  • Many Londoners will join High Speed Two at Old Oak Common.

Some wag will suggest putting it on the Tube Map. But is it such a stupid idea?

Where Does London Need More Rail Services?

Having lived in London on and off for over seventy years, I feel the worst areas for rail links are probably.

  • North West London
  • South East London
  • South Central London between Wimbledon and Croydon.
  • South West London

Note.

  1. Over the years, there is no doubt that East and North London have improved considerably, with the development of the East London, North London and Gospel Oak to Barking Lines.
  2. Thameslink has been improved in North London and now it is being supported with improvements to the Northern City Line. Both routes now have new Siemens trains, which give a whole new dimension to using ironing-boards as seats.
  3. Crossrail will produce major improvements in West, East and South East London.
  4. Building of a new Penge Interchange station, which I wrote about in Penge Interchange could improve routes to and from South East London.
  5. Hopefully the work in recent years at Waterloo will improve suburban services out of Waterloo. In An Analysis Of Waterloo Suburban Services Proposed To Move To Crossrail 2, I showed that four tph could be run to Chessington South, Epsom, Hampton Court and Shepperton stations.

It looks like North West and South Central London are missing out.

How Can Services Be Improved In North West London?

There are radial routes from the centre of London to the suburbs.

Starting from the North and going to the West, there are the following lines.

When I used to live at Cockfosters as a child,  to visit my many cousins in North West London, there was no alternative but to use a bus and take well over an hour each way.

There are now some circular rail routes in London but nothing in the North West of the capital.

The Dudding Hill Line And The West London Orbital Railway

But there is the little-used freight route called Dudding Hill Line.

  • It runs between Cricklewood on the Midland Main Line and Acton Central on the North London Line.
  • It is four miles of double-track railway.

This YouTube video shows a cab ride from Acton to Cricklewood.

Plans exist to turn it into the West London Orbital Railway, which will run two services.

  • West Hampstead and Hounslow via Cricklewood, Neasden, Harlesden, Old Oak Common Lane, Acton Central, South Acton, Lionel Road, Brentford, Syon Lane and Isleworth
  • Hendon and Kew Bridge via Brent Cross West, Neasden, Harlesden, Old Oak Common Lane, Acton Central, South Acton

Note.

  1. The proposed frequency of both services is four tph.
  2. There would be some stations to be built, but the track exists.
  3. There would be no new tunnels.
  4. The route is technically feasible.
  5. The route would connect West London to High Speed Two.
  6. There would be little disruption whilst it was built.
  7. The services could be run by dual-voltage battery-electric trains charged on the electrification at both ends of the route.
  8. The scheme represents a high value for money, with a benefit-cost ratio (BCR) of 2.2.

On the other hand, the scheme has two serious problems, as far as the current London Mayor is concerned.

  • Transport for London has no money, partly because of London’s Fare Freeze.
  • The project is not in South London.

This important and value-for-money project will not be built, whilst Sadiq Khan is still Mayor of London.

Harlesden Interchange

I believe that if we get the interchanges right on the West London Orbital Railway correct we can do things like.

  • Increase the benefit cost ratio.
  • Link the route to South London to make the Mayor a bit happier about the North London Scheme.

This Google Map shows Harlesden station.

Note.

  1. The Bakerloo Line/Watford DC Line running North-West/South-East through Harlesden station.
  2. The West Coast Main Line in the Southern section of the map.
  3. The Dudding Hill Line running North-South across the map.

Platforms will be built on the Dudding Hill Line to connect that would probably be new or extended platforms in the current Harlesden station to enable interchange between the West London Orbital and the Watford DC Lines.

I also think there is a possibility that platforms could be added to the slow tracks of the West Coast Main Line, so that suburban services into London Euston can also connect to the West London Orbital Line.

It would also enable a connection between Southern’s Clapham Junction and Milton Keynes service and the West London Orbital Railway.

Looking at this from various angles, I think that an architect good at designing three-dimensional structures could develop a quality Harlesden Interchange station.

Neasden Interchange

Like Harlesden, Neasden is another possibility for a comprehensive interchange.

This Google Map shows Neasden station.

Note.

  1. There are a lot of lines going through Neasden station.
  2. The Dudding Hill Line goes across the South-East corner of the map.
  3. There is plenty of space in the area.

This map from cartometro.com shows the lines in the area.

Note.

  1. The Dudding Hill Line is indicated by the former Dudding Hill station.
  2. The red tracks are Metropolitan Line tracks.
  3. The silver tracks are Jubilee Line tracks.
  4. The Southerly pair of lines through Neasden and Dollis Hill stations are Chiltern’s lines into Marylebone.
  5. The Chiltern tracks divide to the West of Neasden station, with the Aylesbury line following the other tracks and the Chiltern Main Line diverging to the West.
  6. London’s largest Underground Depot at Neasden, lies to the North-West in an area of London noted for few merits with the North Circular Road passing through.

I wonder, if the station and the depot offers a unique opportunity to offer large scale additions to London’s housing stock over the top of a rebuilt station and depot.

This Google Map shows the wider area.

Note.

  1. Much of the depot appears to be open-air stabling for trains.
  2. The North Circular Road passes North-South between the depot and Neasden station.
  3. The Dudding Hill Line cuts across the South-East corner of the map.
  4. This corner of the map is labelled as Dudden Hill.
  5. According to Wikipedia, Dudding Hill is considered a more genteel spelling of Dudden Hill and could be as old as 1544.

It looks as if it would be relatively easy to develop over the top of the depot to create housing, industrial or commercial properties.

But why stop there and cover both the North Circular Road and the six tracks through Neasden station?

Neasden station could be rebuilt into a station with platforms on the following lines.

  • Metropolitan Line
  • Jubilee Line
  • Chiltern Lines
  • Dudding Hill Lines

Note.

  1. I estimate that Chiltern has a train about every six minutes, so some could stop.
  2. There might be space for a bay platform for Chiltern.

Neasden could be a major housing and transport hub.

  • There could be large amounts of parking.
  • Road access would be good.
  • It would have good rail connections.
  • It could have a bus interchange.
  • London needs housing.

It might even be an alternative to Chiltern’s plan for a West Hampstead Interchange.

The Mayor of London, Transport for London and the Borough of Brent need to be bold!

Improvements To Chiltern’s Routes

Chiltern Railways have some plans that could improve services in North West London.

Using The Acton-Northolt Line

Wikipedia says this about using the Acton-Northolt Line to access new platforms at Old Oak Common station.

Upgrading the Acton–Northolt line (formerly the “New North Main Line”) to new platforms at Old Oak Common. This upgrade will also extend to London Paddington to increase capacity on the Chiltern Main Line as there is no room to expand the station at Marylebone.

This scheme has merit.

  • The platforms would be connected to the Chiltern Main Line along the route of a partly-disused railway.
  • The route could be double-tracked.
  • There must be space for at least two new platforms.
  • The new platforms could easily handle four tph.
  • There may be a case for some new stations.

The scheme could add valuable extra capacity for Chiltern.

A Chiltern Metro

Wikipedia says this about a  proposed metro service between Marylebone and West Ruislip stations.

  • The Metro would have a frequency of four tph.
  • It would call at Wembley Stadium, Sudbury & Harrow Road, Sudbury Hill Harrow, Northolt Park and South Ruislip.
  • The service would require a reversing facility at West Ruislip.
  • There would need to be passing loops at Sudbury Hill Harrow, and  Wembley Stadium.

Given that the Chiltern Metro was first proposed over a decade ago, perhaps the concept could be increased in scope.

  • Housing and other developments along the route may suggest that a station further out like High Wycombe might be a better terminal.
  • ERTMS in-cab digital signalling is likely to be installed at some time, which would decrease headways between trains and allow more services.
  • Electrification is likely in some form before 2040 and this will improve train performance.
  • If Neasden station were to be rebuilt, as a comprehensive transport and residential development, I believe that this Metro service should also call at Neasden, as it would complement the West London Orbital Railway.

I believe that a review of the Chiltern Metro may mean, that an improved version is worth building.

Improvements To The Milton Keynes And Clapham Junction Service

I feel that this service could be key in improving services between North London and South London via the West London Line and High Speed Two’s station at Old Oak Common.

Currently, this service is as follows.

  • It runs between Milton Keynes and Clapham Junction stations.
  • It has a frequency of one tph.
  • It calls at Bletchley, Leighton Buzzard, Tring, Berkhamsted, Hemel Hempstead, Watford Junction, Harrow & Wealdstone, Wembley Central, Shepherd’s Bush, Kensington (Olympia), West Brompton and Imperial Wharf stations.
  • The service used to extend to South Croydon via Wandsworth Common, Balham, Streatham Common, Norbury, Thornton Heath, Selhurst and East Croydon.
  • It uses Class 377 trains.
  • It shares parts of the route with the London Overground.

I also think it has various issues and questions with respect to the future.

  • The Class 377 trains are only 100 mph units, whereas the outer suburban trains on the West Coast Main Line are 110 mph Class 350 trains, which will soon be replaced by 110 mph Class 730 trains. Do the slower trains cause timetabling problems?
  • Is one tph enough?
  • The route doesn’t serve High Speed Two at Old Oak Common station.
  • Is the service run by the right operator?
  • What is the ideal Southern terminal?

These are my thoughts on the various issues.

The Service As A North-South Link

A friend, who lives in South London has told me, that if you go to an event at Wembley stadium the route is busy.

On the other hand, I’ve used it at midday on a Tuesday and found the trains empty.

But developed properly it could connect the following.

  • Milton Keynes Central
  • Bletchley for the East West Rail Link
  • Watford for the West Coast Main Line to the North
  • Wembley Central for Wembley Stadium and other entertainments
  • Willesden Junction for the North London Line
  • Hythe Road for High Speed Two, Crossrail and the Great Western Railway
  • Shepherd’s Bush for the shopping.
  • Clapham Junction for most of South London and the South of England

It would be a very useful cross-London route to complement Thameslink and the East London Line.

The Frequency

The current Milton Keynes and Clapham Junction has a frequency of one tph.

This may be enough for some parts of the route, as other services also provide services.

But many would argue, that perhaps South of Watford Junction, the service needs to be increased to connect the area to Old Oak Common and Clapham Junction.

I feel that High Speed Two, Crossrail and the Great Western Railway give so much connectivity, that between Clapham Junction and Willesden Junction needs a frequency of at least eight tph.

As the North London Line and the Watford DC Line are working at a frequency of four tph, this could indicate that a four tph direct service Watford Junction and Clapham Junction be ideal. Perhaps, it could continue North to Milton Keynes with a frequency of two tph.

The Trains

I am absolutely certain, that the full service needs to be operated by dual voltage trains, that are capable of running at 110 mph.

The Class 350/1 trains of West Midlands Trains would probably be ideal for the full service.

  • They are dual voltage trains.
  • They are 110 mph trains.
  • They have a long distance interior.

They are being replaced with new Class 730 trains, so would be available.

If some services were running only as far North as Watford Junction, these could be either Class 378 or Class 710 trains of the London Overground.

The Connection To The West London Line And High Speed Two

This map from Wikipedia by Cnbrb shows the latest iteration of the lines at Old Oak Common station.

Note.

  1. The green route is taken by the Milton Keynes and Clapham Junction trains.
  2. The bright blue is High Speed Two.
  3. The purple is Crossrail.
  4. The orange is the Overground
  5. Hythe Road station is proposed for the West London Line to connect to Old Oak Common station for High Speed Two.
  6. Hythe Road station will have a bay platform to turn trains from the South.
  7. Old Oak Common Lane station is proposed for the North London Line to connect to Old Oak Common station for High Speed Two.

But where is the connection between the Milton Keynes and Clapham Junction service and Old Oak Common station for High Speed Two?

  • Access from the South is not a problem as the Overground can be used to Hythe Road station.
  • Extra services from the South can be run to and from the bay platform at Hythe Road station.
  • Access from the East is not a problem as the Overground can be used to Hythe Road station.
  • How do passengers go between say Wembley Central and Heathrow?

In addition for access from the West is the Overground can be used to Old Oak Common Lane station.

But as things stand at the moment the Milton Keynes and Clapham Junction service bypasses Hythe Road station and the only ways to go from Milton Keynes to Old Oak Common station for either High Speed Two, Crossrail or the Great Western is to do one of the following.

  • Change to the Watford DC Line at Watford Junction, Harrow & Wealdstone or Wembley Central and then change to the Overground at Willesden Junction for either Old Oak Common Lane or Hythe Road station.
  • Continue South to Shepherd’s Bush station, cross over to the other platform and then come back to Hythe Road station.
  • Go via Euston station. OK for High Speed Two, but not for Crossrail or the Great Western.

They cannot be serious!

I hope that there is a cunning plan to enable the Milton Keynes and Clapham Junction service to connect.

Whilst on the subject of connections at Old Oak Common, where is the promised connection of Crossrail to the West Coast Main Line?

Were all these connections just kicked into the long grass and quietly forgotten, as they were deemed too difficult and/or expensive?

I think serious questions need to be asked about the design of Crossrail and High Speed Two at Old Oak Common.

Why weren’t Crossrail and High Speed Two designed to connect directly to the London Overground at Willesden Junction station perhaps by the use of a North South people mover serving the following lines?

  • Bakerloo, Watford DC, West Coast Main and West London Orbital Lines at a rebuilt Harlesden station.
  • London Overground at the high-level Willesden Junction station.
  • High Speed Two
  • Crossrail and the Great Western Railway
  • The new Chiltern platforms.
  • Central Line at East Acton station.

Note.

  1. Hythe Road and Old Oak Common stations would not be needed.
  2. The Milton Keynes and Clapham Junction service would call additionally at the rebuilt Harlesden station.

The current design of Old Oak Common stinks like a horse designed by a committee!

The Northern Terminal

I suggested earlier that some trains use Watford Junction and others use Milton Keynes Central.

Both stations have the capacity and the connectivity.

The Southern Terminal

In the last ten years, South Croydon, East Croydon and Clapham Junction have been used as the Southern terminal.

Thameslink seems to have chosen its various terminals to satisfaction of the travelling public, so perhaps the same method or personnel should be used.

The Operator

The Gibb Report said that this service should be transferred to the London Overground and I wrote about this proposal in Gibb Report – East Croydon – Milton Keynes Route Should Be Transferred To London Overground.

This is one suggestion, but I do wonder, if it should be transferred to West Midlands Trains and run in conjunction with their West Coast Main Line services.

  • The service needs 110 mph trains.
  • Timetabling and operation should be easier.
  • London Overground trains don’t have a long-distance interior.

On the other hand, trains running between Watford Junction and Clapham Junction would probably be better if they were London Overground trains.

Conclusion

I believe that by using the current network and some modern trains and signalling, the passenger services to the West of the capital can be substantially improved.

 

 

 

 

May 1, 2021 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | 12 Comments

A Class 93 Locomotive Hauling A Train Between The Port Of Felixstowe And Wentloog

I am looking at this trip in detail, to see how a Class 93 locomotive could change this journey.

Where Is Wentloog?

Wentloog is a Rail Freight Interchange, run by Freightliner, a few miles to the East of Cardiff.

This Google Map shows the interchange.

Note the electrified Great Western Main Line between London and Cardiff giving rail access to freight trains.

Sections Of The Route

The route can be divided into these sections.

  • Port of Felixstowe and Trimley – 2.3 miles – 7 minutes – 19.7 mph –  Not Electrified
  • Trimley and Ipswich – 14 miles – 60 minutes -14 mph – Not Electrified
  • Ipswich and Stratford – 64.6 miles – 77 minutes – 50.3 mph – Electrified
  • Stratford and Acton Wells Junction – 12.5 miles – 72 minutes – 10.4 mph – Electrified
  • Acton Wells Junction and Acton Main Line – 0.7 miles – 3 minutes -14 mph – Possibly Electrified
  • Acton Main Line and Wentloog – 134.3 miles – 249 minutes -32.4 mph – Electrified

Note.

  1. Nearly, all the route is electrified.
  2. I am not sure if between Acton Wells Junction and Acton Main Line is electrified.

The journey takes nearly eight hours.

These are my thoughts on how the various sections would be handled.

Port of Felixstowe And Trimley

As I stated in Rail Access To The Port Of Felixstowe, I would electrify the short section between the Port of Felixstowe And Trimley. This would do the following.

  • Charge the batteries on trains entering the Port, so they could operate in the Port without using diesel.
  • Charge batteries on trains leaving the Port, so that they could have a power boost to Ipswich.
  • The trains could be accelerated to operating speed using the electrification.

There would also be no use of diesel to the East of Trimley, which I’m sure the residents of Felixstowe would like.

Trimley and Ipswich

This section would be on diesel, with any energy left in the battery used to cut diesel running through Ipswich.

Ipswich And Stratford

Consider

  • Ipswich and Stratford is a 100 mph fully-electrified line.
  • A passenger train can do the route in an hour.

There must be savings to be made! Especially, if all trains between Ipswich and Liverpool Street are 100 mph electrically-hauled trains.

Stratford and Acton Wells Junction

The North London Line is getting increasingly busy and as it goes through the middle of residential areas, there will be increasing pressure for all trains to be electric, to cut noise and pollution.

In A North London Line With Digital Signalling, I wrote about the benefits of adding digital signalling on the North London Line.

I suspect in a few years time all freight trains using the North London Line will be electrically-hauled and will use digital ERTMS signalling, so that more trains can be squeezed onto the North London Line, so that increasing numbers of freight trains can travel between Felixstowe, London Gateway and Tilbury in the East and Birmingham, Cardiff, Liverpool, Manchester, Scotland and other destinations in the North and West.

Locomotives like the Class 93 locomotive will become an increasingly common sight on the line.

Acton Wells Junction and Acton Main Line

This connection between the North London Line and the Great Western Main Line will surely, be electrified, if it has not been done already, so that electric freight trains can go between the two routes.

Acton Main Line and Wentloog

Consider

  • Acton Main Line and Wentloog is a fully-electrified line.
  • The operating speed is up to 125 mph
  • A passenger train can do the route in just under 100 minutes.

There must be savings to be made! Especially, if all trains between London and Cardiff are electrically-hauled trains, capable of upwards of 100 mph.

Conclusion

There would be very worthwhile time and diesel savings, by running the Felixstowe and Wentloog service using a Class 93 locomotive.

How many other services to and from Felixstowe, London Gateway and Tilbury would be improved by being hauled by a Class 93 locomotive?

I suspect, it’s not a small number, that can be counted on your fingers and toes.

January 19, 2021 Posted by | Transport/Travel | , , , , , , | 2 Comments

A Massive Increase In Train Capacity In Ten Years

The Class 378 trains, were introduced as three-car trains on the North London Line in July 2009.

The original service was three trains per hour (tph) between Stratford and both Clapham Junction and Richmond stations.

This meant there were six tph between Stratford and Willesden Junction stations.

Or a capacity of eighteen carriages per hour!

This article on Railway Gazette is entitled UK Railway News Round-Up.

This is an extract.

From December 15 services between Willesden Junction and Clapham Junction, and between Willesden Junction and Richmond, will increase from four to five trains/h, giving a 10 trains/h service between Willesden Junction and Stratford.

As the trains are now five-cars, that is a capacity of fifty carriages per hour.

That is an increase of a hundred and eighty percent over ten years.

I suspect, they’ll still be full in the Peak!

December 6, 2019 Posted by | Transport/Travel | , | Leave a comment

More Frequent Trains And A New Station For The London Overground

The title of this post, is the same as that of this article on IanVisits.

This is said.

In a statement, the government agreed to requests for £80.8 million from the GLA to support transport upgrades so that 14,000 homes can be built along the East London Line.

Upgrades include.

  • New Bermondsey station, which was originally to be called Surrey Canal Road, will be built.
  • A second entrance will be built at Surrey Quays station.
  • Frequency between Dalston Junction and Clapham Junction stations will be increased from four trains per hour (tph) to six tph.
  • Frequency between Highbury & Islington and Crystal Palace stations will be increased from four tph to six tph.

The frequency upgrades will mean twenty tph between Dalston Junction and Surrey Quays stations, or a train every three minutes as opposed to the  current three minutes and forty-five seconds.

A few thoughts follow.

Surrey Quays Station Upgrade

Ian’s article says this about the new entrance at Surrey Quays station.

The very cramped Surrey Quays station gets a second entrance, which will run under the main road and be based on the north side, where the shopping centre car park is today. That avoids crossing two busy roads, which can take some time if you’re waiting for the lights to change.

This Google Map shows the station and the car park of the Shopping Centre.

These are my pictures, taken at and around the station.

Traffic is bad and the subway suggested by Ian’s wording will be very welcome.

Collateral Benefits At New Cross Gate

New Cross Gate station will be one of several stations along the East London Line to see benefits in service frequency and quality.

The train frequency on East London Line services will rise from eight tph to ten tph.

But this is not all that should or could happen.

  • The service between Highbury & Islington and West Croydon stations could rise from four tph to six tph.
  • This would mean that New Cross Gate would have a twelve tph service to and from Whitechapel, which in a year or so, will have Crossrail connections to Canary Wharf, Bond Street, Paddington and Heathrow.
  • Southeastern should be getting new higher-capacity, higher-performance and possibly longer trains to replace their elderly trains into London Bridge.
  • Charing Cross station is redeveloped into a higher-capacity, cross-river station, to allow more trains.
  • Digital signalling, as used on Thameslink will be extended to cover all trains through New Cross and New Cross Gate.
  • The Docklands Light Railway to Lewisham will get new and higher-capacity trains.
  • Southeastern Metro services could go to the London Overground.

Could this all mean that the East London Line, Southeastern and Crossrail will more than hold the fort until it is decided to build the Bakerloo Line Extension?

The Bakerloo Line Extension

This map from TfL shows the route of the Bakerloo Line Extension.

If and when the Bakerloo Line Extension is built, New Cross Gate will surely become a major transport hub.

If you look at the current and proposed stations on the Southern section of an extended Bakerloo Line, you can say the following.

  • Paddington will get a step-free pedestrian link between Crossrail and the Bakerloo Line.
  • Charing Cross will benefit from more Southeastern Metro services into the main line station.
  • Waterloo will benefit from more Southeastern Metro services through the attached Waterloo East station.
  • Elephant & Castle station will benefit from more Thameslink services through the attached main line station.
  • New Cross Gate will benefit from more Southeastern Metro and East London Line services through the station.
  • Lewisham will benefit from more Southeastern Metro services through the station.

But there are no interim benefits for the blue-mauve area, that will be served by the proposed Old Kent Road 1 and Old Kent Road 2 stations.

In addition, is there a need to add capacity between  the New Cross area and Lewisham? Southeastern improvements will help, but the Bakerloo Line Extension will do a lot more!

Except for these two stations, is there a reason to build an extension to the Bakerloo Line, as train services between Charing Cross, Waterloo East and New Cross and Lewisham will be significantly increased in frequency, reach and quality?

A Bakerloo Line Extension Redesign

Whatever happens to the Bakerloo Line, the following should be done.

  • New walk-through trains running at a higher-frequency on the current route.
  • Major access improvements and better connection to main line services at Elephant & Castle, Waterloo East, Charing Cross and Willesden Junction stations.
  • A radical reorganisation North of Queen’s Park station, in conjunction with the Watford DC Line and the proposed West London Orbital Railway.

This would improve the current line, but it would do nothing for those living where the extension will go!

So why not do what is happening to the Northern Line at Battersea and create a short extension to the Bakerloo Line that serves the areas that need it and one that can be extended in the future?

  • You could argue, that the extension to Lewisham is short and it could be extended to Hayes and other places.
  • I also think, that the route goes via New Cross Gate, as that is one of the few sites in the area, from where a large tunnel could be built.

Ideally, what could be needed is a high-capacity public transport link from Elephant & Castle and Greenwich and/or Lewisham via the Old Kent Road, New Cross Gate and New Cross.

The Germans, the Dutch and others wouldn’t mess about and would run trams along the road, but that would go down with the locals like a lead West London Tram.

So it looks like some form of extension of the Bakerloo Line is the only way to go.

Consider.

  • Two-platform terminal stations at Brixton and Walthamstow Central handle up to thirty-six tph on the Victoria Line.
  • New Cross Gate and New Cross stations are about five hundred metres apart.
  • Double-ended stations like Knightsbridge on the Piccadilly Line and Kings Cross on the Victoria Line work very well.

I would look at building a double-ended Bakerloo Line station deep underneath New Cross Road.

  • It would be connected by escalators and lifts to the existing stations at New Cross Gate in the West and New Cross in the East.
  • Provision would be made to extend the line further to either Greenwich or Lewisham.
  • New Cross and Lewisham already have a high-frequency connection of six tph.
  • The whole extension could be built from the single tunnelling location on the Sainsbury’s site at New Cross Gate.
  • There would be no necessity for any works at Lewisham station.

It would probably need more services to be run between New Cross and Lewisham.

Current Services Between New Cross And Lewisham

Southeastern currently runs these services  between New Cross and Lewisham.

  • London Cannon Street and Slade Green via Sidcup
  • London Cannon Street and Orpington via Grove Park
  • London Cannon Street and Hayes

All services are two tph.

Extending The East London Line Service South From New Cross

New Cross is served by the only short service on the London Overground; the four tph between Dalston Junction and New Cross stations.

So could this East London Line service be extended South to serve Lewisham to increase services between New Cross and Lewisham?

This map from carto.metro.free.fr shows the lines at New Cross station.

Note how the double-track East London Line, shown in orange, arrives from Surrey Quays station arrives in the North-Western corner of the map, becomes a single-track and then goes under the main lines before going into the bay platform D.

This Google Map shows the same area.

The London Overground track is clearly visible.

Could extra track be added, to enable the following?

  • Southbound trains could join the main line and stop in Platform C
  • Northbound trains could leave the main line after stopping in Platform A and go towards Surrey Quays station.

If this is possible, then  it would give a four tph service between Dalston Junction and Lewisham, with an important stop at Whitechapel to connect to Crossrail.

Lewisham doesn’t have the space for a terminal platform, but there would appear two possible terminals South of Lewisham.

  • Hayes – Journey time to and from Dalston Junction would take around 53 minutes.
  • Orpington – Journey time to and from Dalston Junction would take around 50 minutes.

Both stations would make ideal terminals.

  • They have bay platforms for terminating the trains.
  • Round trips would be a convenient two hours.
  • Eight trains would be needed for the service.
  • New Cross will have the same four tph to and from Dalston Junction as it does now!
  • Lewisham and Dalston Junction would have a four tph service that would take 27 minutes.

The service could even be split with two tph to each terminal.

Will the Extended Services Need To Replace Other Services?

Currently Hayes has these current Off Peak services.

  • Two tph to Cannon Street via London Bridge
  • Two tph to Charing Cross via London Bridge

I would expect that if digital signalling is applied through the area, that the extra services could be added to Hayes and Orpington as decided.

An Improved Hayes Line

Transport for London and various commentators always assume that the Bakerloo Line will eventually take over the Hayes Line.

This will or could mean the following.

  • Passengers used to a full-size train looking out on the countryside and back gardens through big windows, will have to get used to a more restricted view.
  • Platforms on the Hayes Line will need to be rebuilt, so that two different size of train will be step-free between train and platform.
  • The service could be slower.
  • The ability to walk through an increasingly pedestrianised Central London to and from Cannon Street, Charing Cross and London Bridge will be lost.
  • Loss of First Class seats. which will happen anyway!

I think that passengers could want to stick with the current service.

The only reason to allow the Bakerloo Line Extension to take over the Hayes Line, is that it would allow another four tph to run between Lewisham and London Bridge. But digital signalling could give the same benefit!

But what if the Overground muscled in?

The Hayes Line could take up to four tph between Dalston Junction and Hayes, via Lewisham and New Cross, which would give these benefits.

  • Increased capacity on the Hayes Line.
  • An excellent connection to Crossrail, which would give a better connection to the West End, Liverpool Street and Heathrow.
  • Better connection to the Eastern side of the City of London and Canary Wharf.
  • It could free up four tph between New Cross and London Bridge.
  • Same-platform interchange between Southeastern and East London Line services at Lewisham and New Cross.

There would need to be these changes to the infrastructure.

  • A new track layout at New Cross.
  • Installation of digital signalling.

The latter will happen anyway.

Times To And From Crossrail

Times to and from Whitechapel, with its Crossrail connection are.

  • Lewisham – 17 minutes
  • Hayes – 44 minutes
  • Orpington – 41 minutes

The current service between Orpington and Farrington, which also will connect to Crossrail, takes 52 minutes.

Penge Interchange

Although, this has not been funded, I think that this new interchange could be very much in Transport for London’s plans.

I discuss the possible Penge Interchange station in Penge Interchange.

It’s certainly something to watch out for, as it could improve connectivity by a large amount.

The View From The Dalston Omnibus

For decades, Dalston had a terrible reputation and then came the Overground, which changed everything.

There are now these combined devices from the two Dalston stations.

  • Eight tph to Stratford
  • Four tph to Richmond via Willesden Junction
  • Four tph to Clapham Junction via Willesden Junction
  • Four tph to Clapham Junction via Surrey Quays
  • Four tph to Crystal Palace via Surrey Quays
  • Four tph to New Cross via Surrey Quays
  • Four tph to West Croydon via Surrey Quays

There is also a useful eight tph connecting service between Dalston Junction and Highbury & Islington.

In the next couple of years, these developments should happen.

  • Services on the East London Line will be increased with an extra two tph to Clapham Junction and Crystal Palace.
  • Services on the North London Line will be increased to cope with overcrowding. As the Dalston Junction and Highbury & Islington connecting service will be going to ten tph, it would seem logical that the North London Line service should match this frequency.
  • Crossrail will open and Dalston will have a twenty tph connection to its services at Whitechapel.

Dalston needs better connections to either main line terminal stations or their interchanges a  few miles out.

Currently, Dalston has very useful connections to the following main interchanges.

  • Stratford for the Great Eastern Main Line.
  • Clapham Junction for the South Western Railway and Southern services.
  • Richmond for Windsor and Reading services.
  • Whitechapel will provide a link to Crossrail.
  • In addition the planned update at Norwood Junction will give better connection to services to Gatwick, Brighton and other services to the South of Croydon.

Better interchanges are needed with services to the North and the South East of London.

Extending the Dalston Junction and New Cross service to Hayes or Orpington via Lewisham could greater improve the train service from Dalston, by providing interchange to services fanning out into and beyond South East London.

Conclusion

I am drawn to these two conclusions.

  • The Bakerloo Line should be extended via two new Old Kent Road stations to a double-ended terminal station in New Cross with interchange to both New Cross Gate and New Cross stations.
  • The New Cross branch of the London Overground should be extended through Lewisham to Orpington and/or Hayes.

My preferred destination for the London Overground service could be Hayes, as this would surely help to free up paths through Lewisham and London Bridge.

September 12, 2019 Posted by | Transport/Travel | , , , , , , , , , , , , , | 2 Comments

A London Overground Replacement For Southern’s East Croydon And Milton Keynes Service

In July 2017, I discussed this suggestion by Chris Gibb in Gibb Report – East Croydon – Milton Keynes Route Should Be Transferred To London Overground.

In an article, in the July 2019 Edition of Modern Railways, , which was entitled ‘710s’ Debut On Goblin, this was this last paragraph.

On the West London Line, TfL is curremtly working with the Department for Transport on options for the devolution of services originally suggested in Chris Gibb’s report on the Govia Thameslink Railway franchise, which could lead to ‘710s’ being deployed here.

It made me think, that further investigation was called for.

An Apology

I apologise, if you think I’m repeating myself.

What The Gibb Report Says

The Gibb Report, says this about the current service between East Croydon and Milton Keynes Central stations.

I believe there is an option to transfer the East Croydon – Milton Keynes operation to TfL and it’s London Overground concession in 2018.

TfL may decide to change the service, for example by not running it north of Watford Junction, or running it to an alternative southern destination other than East Croydon. They could also develop the combined West London line service to better match available capacity to demand.

They would have a number of crewing and rolling stock options, but should be able to operate the service more efficiently than GTR in the longer term, without the involvement of Selhurst.

Selhurst TMD is the depot in South London, where the current Class 377 trains are based.

A few of my thoughts.

The Trains

Using Class 710 trains  as suggested in the Modern Railways article, would surely offer a suitable  crewing and rolling stock option for the route, if they were based at the convenient Willesden TMD, where the fleet of up to twenty-five dual-voltage Class 710/2 trains are stabled.

The Northern Terminus

Chris Gibb suggested the service might not go past Watford Junction.

I think that could be difficult.

  • The longitudinal seating of the Class 710 train, is probably not suitable for outer suburban services North of Watford.
  • East Croydon to Watford Junction takes 69 minutes, which is not a good journey time to create an efficient service.

It would also appear to be tricky for a train to transfer between the West London Line and the Watford DC Line.

This map from carto.metro.free.fr shows the complicated track layout in the Willesden Junction area.

Note.

  1. The two Willesden Junction stations, labelled High Level and Low Level.
  2. The Watford DC Line, which is shown in black and orange, passing to the North of Willesden TMD. and through the Low Level station.
  3. The four tracks shown in black are the West Coast Main Line, with Watford to the West and Euston to the East.
  4. The North London Line to Richmond and the West London Line to Clapham Junction splitting at Wilesden High Level Junction.

The current service between East Croydon and Milton Keynes, is only one train per hour (tph) and uses a succession of flat junctions to take the slow lines to and from Watford.

This is not a good operational procedure and I suspect Network Rail and various train operators, would like to see it discontinued.

So if trains in a new London Overground version of the service, don’t go up the Watford DC Line or the West Coast Main Line, where do they turn back?

Note the siding to the East of the High Level platforms, which is labelled Willesden Junction Turnout.

This is regularly used to turnback London Overground services on the West London Line.

I feel that London Overground will be turning their replacement service in Willesden Junction High Level station.

Current train services at the station include.

  • For passengers, who want to go further North, there is a good connection to the Watford DC Line for Wembley Central, Harrow & Wealdstone and Watford Junction stations.
  • The Watford DC Line can also take you to Euston.
  • The Bakerloo Line between Stonebridge Park and Elephant & Castle via Central London.
  • Frequent North London Line services between Stratford and Richmond.

The station has kiosks, coffee stalls, toilets and waiting rooms.

There are certainly worse places to change trains.

The Southern Terminus

Obviously, existing travellers on the route would like to see as few changes as possible.

East Croydon station must be a possibility for the Southern terminus, as it is the currently used.

But East Croydon is a busy station and perhaps it is not a convenient station for trains to wait in the platform.

On the other hand, West Croydon station offers some advantages.

  • The station has a long bay platform, which might be long enough for nine or ten cars.
  • There is a separate turnback siding.
  • It has space to add another bay platform, but this may have been sold to a developer.
  • It already has a four tph London Overground service to Highbury & Islington station.
  • Using West Croydon avoids the crowded lines to the North of East Croydon station.

It is also managed by London Overground, so the landlord would be co-operative.

How Many Trains Would Be Needed For A West Croydon And Willesden Junction Service?

West Croydon station has two possible routes, that trains could take to Willesden Junction.

  • Via Norwood Junction and Clapham Junction in 55 minutes.
  • Via Selhust and Clapham Junction in 45 minutes.

These times mean that a two-hour round trip between West Croydon and Willesden Junction should be possible.

Trains required for various frequencies would be as follows.

  • One tph – Two trains.
  • Two tph = Four trains.
  • Four tph – Eight trains.

They would need to be dual voltage Class 710/2 trains, as are now running on the Gospel Oak to Barking Line.

Compare the figures with those for the current East Croydon and Milton Keynes service, which needs four pairs of four-car trains for an hourly service.

What Would Be The Frequency?

I think one, two and four tph are all possibilities!

One tph

One tph would be a direct replacement for the current service. But is it enough?

Services at West Croydon could probably share the bay platform with the existing Highbury & Islington station service.

Two tph

Two tph could be a compromise frequency.

Two tph could probably still share the current bay platform with the Highbury & Islington service.

Four tph

Four tph would be a full Turn-Up-And-Go service,

  • It would probably be London Overground’s preference.
  • It would give a very passenger-friendly eight tph between Willesden Junction and Clapham Junction stations.
  • The two services would call at opposite sides of Clapham Junction station.
  • It would give a four tph link between Croydon and High Speed Two.
  • Westfield wouldn’t mind all the extra shoppers at Shepherds Bush!

But there could be downsides.

  • The service could need an extra bay platform at West Croydon.
  • Would it be possible to turn four tph at Willesden Junction?
  • Will the train paths be available through South London.

But four tph would probably would be London Overground’s preference.

It will be interesting to see the reasons, why Transport for London choose a particular frequency.

A Trip Between Imperial Wharf And East Croydon Stations

Today, I took a trip between Imperial Wharf and East Croydon stations at around 11:30.

  • The train was  two four-car Class 377 trains working as an eight-car train.
  • After Clapham Junction it wasn’t very busy.
  • I was in the last car, which was empty, except for myself.

I came to the conclusion, that an eight-car train was too much capacity for the Southern section of the journey.

I suspect that Transport for London have detailed passenger estimates for this route, so they should be able to determine the frequency and length of replacement trains required.

The Upgraded Norwood Junction Station

In Major Upgrade Planned For Norwood Junction Railway Station, I talked about a plan to upgrade Norwood Junction station.

The idea behind the upgrade is to improve connectivity and capacity in the crowded Croydon area.

If the West Croydon and Willesden Junction service, was routed via Norwood Junction station, the upgraded station would give easy access to both East and West Croydon stations.

Conclusion

I’ve always liked Chris Gibb’s suggestion of the transfer of the service between East Croydon and Milton Keynes stations to the London Overground and I can now start to see flesh on the bones!

At the present time and until better data is available, I think the replacement service should be as follows.

  • The Northern terminus should be Willesden Junction.
  • The Southern terminus should be West Croydon station, where there are good tram and train connections.
  • The route would be via Shepherds Bush, Kensington Olympia, West Brompton, Imperial Wharf, Clapham Junction, Wandsworth Common, Balham, Streatham Hill, West Norwood, Gipsy Hill, Crystal Palace and Norwood Junction.
  • Going via Gipsy Hill, rather than the current route via Selhurst, would give access to the connectivity at Norwood Junction.
  • The frequency should be four tph.
  • Trains will be four- or five-car Class 710 trains.

The benefits would be as follows.

  • The rail hubs of Clapham Junction, Norwood Junction, West Croydon and Willesden Junction would be connected together by a Turn-Up-And-Go service.
  • The proposed four tph service would need eight Class 710 trains, whereas the current one tph service needs eight Class 377 trains. Would this be better value?

In the future with a connection to High Speed Two in the Old Oak Common area, the benefits would increase.

  • There would be a simple interchange with High Speed Two.
  • South London from Clapham to Croydon, would get a direct service to High Speed Two.
  • There would also be a better connection to Heathrow Airport and other rail services through Old Oak Common.

I think that the connection to High Speed Two trumps everything else.

July 1, 2019 Posted by | Transport/Travel | , , , , , , , , , , , , , , , | 1 Comment

The Hackney Campaign To Bring The North London Line Back From The Brink In The 80s

The title of this post is the same as that of this article on the Hackney Gazette.

It is an interesting insight into life before the London Overground and how the section between Highbury & Islington and Stratford stations was created from a freight line, that hadn’t had passenger services for several decades.

It also talks about Broad Street station.

I used to use this station to travel from Ipswich to Metier’s offices at Stonebridge Park.

It was just a short walk from Liverpool Street station next door and then a train to Willesden along a very much forgotten North London Line, before taking the Bakerloo Line. It avoided the very crowded route via Baker Street station.

May 9, 2019 Posted by | Transport/Travel | , , , | Leave a comment

Where Do They All Come From?

Not the lonely people in the Beatles, Eleanor Rigby, but although some may be lonely, I am referring to the passengers on the North London Line.

Today on the Saturday morning before the Bank Holiday, the Class 378 train was fairly full, with all seats taken and quite a few standing.

When the refurbished line opened in 2009 with new trains, there were six trains per hour (tph) of three-cars between Stratford and Willesden Junction stations. Now there are eight tph of five-cars. This is an increase in capacity of 2.22.

Travel this route in the Peak and it is difficult to find space to put your feet on the floor.

Passenger loading on this line seems to have got higher, since the train frequency increased from six tph to eight in December 2018.

So where do these passengers all come from?

  • Are passengers avoiding the Gospel Oak To Barking Line, because of the reduced capacity?
  • Has the increased frequency on the Victoria Line and new Class 717 trains on the Northern City Line, encouraged more passengers between Highbury & Islington and Stratford stations.
  • Are passengers fed up with being fried on the Central Line?
  • Is it people living in new developments along the line?
  • Is it just people are fed up with driving in North London’s traffic and using trains as an alternative?
  • Is it passengers using the line as an alternative after the non-appearance of Crossrail?

But whatever it is, action needs to be taken to create more capacity.

So what can be done?

Crossrail Needs To Be Opened

Crossrail’s non-appearance must make a difference, so when it finally opens, I will be very surprised if a proportion of passengers travelling to Highbury & Islington, don’t use Crossrail with its massive capacity as an alternative.

Class 710 Trains Will Finally Arrive On The Gospel Oak To Barking Line

When the Class 710 trains are working well on the Gospel Oak to Barking Line, this will mean that the three Class 378 trains, currently working the line, can go back home to the North, West and East London Lines fleet.

The Gospel Oak to Barking Line may also take passengers from the North London Line, once it is working with four tph and four-car trains.

Class 710 Trains On The Watford DC Line

The six Class 378 trains on the Watford DC Line will be replaced with Class 710 trains, thus adding six trains to the North, West and East London Lines fleet.

Extra Class 710 Trains For The North and West London Lines

Six new five-car Class 710 trains will also be delivered for the North and West London Lines.

As Clsas 710 trains can’t work the East London Line, does this mean that the six Class 378 trains cascaded from the Watford DC Line will go to the East London Line.

I have to ask what frequency of services could be run with an extra six trains.

In Gospel Oak-Barking Fleet Plan Remains Unclear, I calculated how many Class 378 trains were needed to run a full service on the North, East and West London Lines.

I said this about the trains needed for North and West London Lines.

Between Stratford and Richmond, trains take 59-64 minutes to go West and 62 minutes to come East.

Between Stratford and Clapham Junction, trains take 62 minutes to go West and 64 minutes to come East.

The round trip times are very similar and are around two and a half hours.

This means that the current eight tph service would need twenty trains

Extending this calculation gives the following numbers of trains for a combined North and West London Lines service.

  • Eight tph needs twenty trains.
  • Ten tph needs twenty-five trains.
  • Twelve tph needs thirty trains.

Could this mean that the North and West London Line will get these services?

Stratford and Willesden Junction – 10 tph

Willesden Junction and Clapham Junction – 5 tph

Willesden Junction and Richmond – 5 tph

There would be one train spare, to cover for maintenance, software updates and breakdowns.

Six-Car Trains

In Will The East London Line Ever Get Six-Car Trains?, I looked at the possibility of six-car trains on the East London Line.

I came to this conclusion.

I will be very surprised if Network Rail’s original plan on six-car trains on the East London Line happens in the next few years.

There are various reasons.

  • Bombardier don’t make Electrostars any more.
  • Trains need an end-door for tunnel evacuation.
  • Class 710 trains don’t have end doors.
  • Some platforms would probably need difficult and expensive lengthening.

But six-car trains on the North and West London Lines could be a possibility.

In By Overground To High Speed Two, I said this about running six-car trains on the North and West London Lines.

Only a few stations can handle six-car trains without selective door opening and even the rebuilt West Hampstead station still has platforms for five-cars.

Selective door opening would allow six-car trains to use the five-car platforms and passengers have in London have shown they can cope with moving forward to get out at certain stations. Especially, as the walk-through design of the train, makes this a lot easier.

These numbers of trains would be needed to run the following frequencies to Richmond and Clapham Junction stations.

  • Four tph – 20 trains
  • Five tph – 25 trains
  • Six tph – 30 trains

Obtaining these numbers of Class 710 trains would probably not be a big problem, if they were needed and the budget was available.

Conclusion

The new Class 710 trains and the moving around of trains should keep services going for a couple of years.

May 4, 2019 Posted by | Transport/Travel | , , , , , | 5 Comments

The Problem Of Step-Free Access At South Acton Station

South Acton station would be one of two stations on the shared section of the North London Line and the proposed West London Orbital Railway.

It could be handling fourteen passenger trains per hour in both directions.

This Google Map shows the station.

Note how all the land close to the line has been sold to developers and new housing, now means space is very restricted.

This image shows a close-up of the bridge.

With a train stopping at the station every four minutes, a step-free means of crossing the line is essential.

The often-used solution of building a new step-free bridge and keeping the old one is not a solution at South Acton station, due to the space restrictions.

I suspect the current bridge could be replaced with a step-free one, but how do you provide a bridge whilst the new one is installed?

I went back to the station on May the 2nd and took these pictures.

It might just be possible to squeeze a bridge in at the North end of the station.

There is certainly enough space for a bridge tower on the Western side behind the fence and if space can be found on the other, a bridge might be possible.

 

 

May 2, 2019 Posted by | Transport/Travel | , , , , | Leave a comment

What Is Happening At Acton Central Station?

On my way home today, I stopped off at Acton Central station to have a look.

This Google Map shows the station.

Note the level crossing and the partially demolished station building behind the hoarding.

The station could have a few problems in the future and may need partial rebuilding.

  • The level crossing handles four trains per hour (tph) in both directions and there are plans to increase this frequency by two tph.
  • The station is the changeover point between third-rail and overhead electrification.
  • There is no step-free access between the two platforms.

But the biggest cause of future problems could be the West London Orbital Railway.

  • This route will call at Acton Central station and it will have two services, each with four tph in both directions, giving a total of fourteen tph in each direction through the station.
  • It is also likely that some passengers will want to change direction, so they will have to use the subway.
  • The number of trains and passengers, may mean that a second entrance is needed on the Richmond-bound platform.

Could the work at Acton Central station be part of a solution?

Conclusion

It looks like it could be a second entrance is being created.

This might also make it easier for some passengers to change platforms and shut the level crossing.

May 1, 2019 Posted by | Transport/Travel | , , , , , | Leave a comment