A Class 93 Locomotive Hauling A Train Between The Port Of Felixstowe And Wentloog
I am looking at this trip in detail, to see how a Class 93 locomotive could change this journey.
Where Is Wentloog?
Wentloog is a Rail Freight Interchange, run by Freightliner, a few miles to the East of Cardiff.
This Google Map shows the interchange.
Note the electrified Great Western Main Line between London and Cardiff giving rail access to freight trains.
Sections Of The Route
The route can be divided into these sections.
- Port of Felixstowe and Trimley – 2.3 miles – 7 minutes – 19.7 mph – Not Electrified
- Trimley and Ipswich – 14 miles – 60 minutes -14 mph – Not Electrified
- Ipswich and Stratford – 64.6 miles – 77 minutes – 50.3 mph – Electrified
- Stratford and Acton Wells Junction – 12.5 miles – 72 minutes – 10.4 mph – Electrified
- Acton Wells Junction and Acton Main Line – 0.7 miles – 3 minutes -14 mph – Possibly Electrified
- Acton Main Line and Wentloog – 134.3 miles – 249 minutes -32.4 mph – Electrified
Note.
- Nearly, all the route is electrified.
- I am not sure if between Acton Wells Junction and Acton Main Line is electrified.
The journey takes nearly eight hours.
These are my thoughts on how the various sections would be handled.
Port of Felixstowe And Trimley
As I stated in Rail Access To The Port Of Felixstowe, I would electrify the short section between the Port of Felixstowe And Trimley. This would do the following.
- Charge the batteries on trains entering the Port, so they could operate in the Port without using diesel.
- Charge batteries on trains leaving the Port, so that they could have a power boost to Ipswich.
- The trains could be accelerated to operating speed using the electrification.
There would also be no use of diesel to the East of Trimley, which I’m sure the residents of Felixstowe would like.
Trimley and Ipswich
This section would be on diesel, with any energy left in the battery used to cut diesel running through Ipswich.
Ipswich And Stratford
Consider
- Ipswich and Stratford is a 100 mph fully-electrified line.
- A passenger train can do the route in an hour.
There must be savings to be made! Especially, if all trains between Ipswich and Liverpool Street are 100 mph electrically-hauled trains.
Stratford and Acton Wells Junction
The North London Line is getting increasingly busy and as it goes through the middle of residential areas, there will be increasing pressure for all trains to be electric, to cut noise and pollution.
In A North London Line With Digital Signalling, I wrote about the benefits of adding digital signalling on the North London Line.
I suspect in a few years time all freight trains using the North London Line will be electrically-hauled and will use digital ERTMS signalling, so that more trains can be squeezed onto the North London Line, so that increasing numbers of freight trains can travel between Felixstowe, London Gateway and Tilbury in the East and Birmingham, Cardiff, Liverpool, Manchester, Scotland and other destinations in the North and West.
Locomotives like the Class 93 locomotive will become an increasingly common sight on the line.
Acton Wells Junction and Acton Main Line
This connection between the North London Line and the Great Western Main Line will surely, be electrified, if it has not been done already, so that electric freight trains can go between the two routes.
Acton Main Line and Wentloog
Consider
- Acton Main Line and Wentloog is a fully-electrified line.
- The operating speed is up to 125 mph
- A passenger train can do the route in just under 100 minutes.
There must be savings to be made! Especially, if all trains between London and Cardiff are electrically-hauled trains, capable of upwards of 100 mph.
Conclusion
There would be very worthwhile time and diesel savings, by running the Felixstowe and Wentloog service using a Class 93 locomotive.
How many other services to and from Felixstowe, London Gateway and Tilbury would be improved by being hauled by a Class 93 locomotive?
I suspect, it’s not a small number, that can be counted on your fingers and toes.
The section between Acton wells Jn and Acton Main Line station is not electrified. There’s a short but interesting thread on this on Rail Forums from 2014.
https://www.railforums.co.uk/threads/acton-aggregate-yards.110128/
Comment by James Allen | January 19, 2021 |
[…] A Class 93 Locomotive Hauling A Train Between The Port Of Felixstowe And Wentloog, I wrote about running freight trains between Felixstowe and Wentloog using a Class 93 […]
Pingback by Movable Overhead Electrification To Decarbonise Freight « The Anonymous Widower | March 19, 2022 |