The Anonymous Widower

Could Hull Station Be Electrified?

I took these pictures, as I passed through Hull station yesterday.

It appears that Hull station has a similar Victorian roof to Liverpool Lime Street and London Paddington, so I suspect the answer is yes.

These pictures show the platforms and overhead electrification at Liverpool Lime Street station, since the recent remodelling.

The electrification seems to be very traditional, with lots of steel gantries over the tracks.

These pictures show the platforms and overhead electrification at London Paddington station.

Note.

  1. The roof seems to have extra tie-bars reaching across.
  2. The wires seem to be hung from the roof.
  3. At the end of the platform they are fixed to large arch supports.
  4. Because Liverpool Lime Street’s electrification is newer than Paddington’s, it seems to have much more professional look.

After looking at the electrification in Liverpool Lime Street and Paddington, I believe that Hull station could be successfully electrified.

This map from OpenRailwayMap shows the platform layout at Hull station.

Note.

  1. Yesterday, my trains arrived in and left from Platform 7, which is the Northern-most platform.
  2. Other pictures in this blog show Hull Trains’s London service in Platform 7.
  3. Yesterday all Class 802 trains to and from London run by Hull Trains and LNER used Platform 7.
  4. I have been told by station staff, that Platform 7 can take a nine-car LNER Azuma.
  5. In Ten-Car Hull Trains, I talk about ten-car Class 802 trains running to and from Hull.
  6. Platform 7 or another platform at Hull station must be able to handle a ten-car train, which means that Hull station can handle a train, that is 260 metres long.

Looking at the station map, I believe that Hull station’s capacity for long express trains, is on a par with that of Liverpool Lime Street station.

I could see both stations handling two trains per hour (tph) across the Pennines and to and from London, with if necessary trains being formed of a pair of five-car trains.

How Many Services From Hull Station Can Be Run With Battery Trains?

Hull Trains service between London and Beverley travels for 44.5 miles on unelectrified track between Temple Hirst junction and Beverley.

Typically Hull Trains services wait in Hull station for the following times.

  • Going between London King’s Cross and Beverley – Between ten and fifteen minutes.
  • Returning to London King’s Cross – Upwards of twenty-five minutes.

I believe these waits in Hull station would mean that.

  • A train going North to Beverley will have a battery containing enough electricity to get the train to Beverley and back, which is a distance of 16.7 miles.
  • A train going South from Hull  will have a battery containing enough electricity to get the train to Temple Hirst junction, which is a distance of 36.1 miles.

I believe that Hull Trains are currently working a timetable, that has been designed for operation by trains with a range on batteries of around fifty miles, provided there is electrification in at least one platform at Hull station to charge the trains.

It is also interesting to look at LNER’s two services that serve Hull.

  • The 0700 to London, is scheduled to arrive at Hull station at 0635 from stabling at Doncaster and waits up to twenty-five minutes before leaving for London.
  • The 2004 from London, is scheduled to arrive at Hull station at 2004 and waits up to twenty-five minutes before going South to overnight stabling in Doncaster.

It looks like LNER’s two trains follow Hull Trains rules.

  • They use Platform 7 in Hull station.
  • Trains going South have up to twenty-five minutes in the station.

It appears to me, that both Hull Trains and LNER are running a timetable, that would allow their services to be run using trains with a battery that had a range of around fifty miles, that could be fully-charged at Hull station before going South.

TransPennine Express run an hourly service to Liverpool Lime Street via Leeds and Manchester Victoria.

According to OpenRailwayMap’s map of electrification, when the TransPennine Upgrade is complete, the only section of the route without electrification will be the 42.1 miles between Hull and Micklefield.

As TransPennineExpress have some of the same Class 802 trains as Hull Trains, if there were at least two electrified platforms in Hull station, then Hull and Liverpool services could be run by battery-electric trains, with a similar specification to those of Hull Trains.

Northern Trains run an hourly service to Halifax via Leeds.

According to OpenRailwayMap’s map of electrification, , the only sections of the route without electrification will be the 42.1 miles between Hull and Micklefield and the 17.5 miles between Leeds and Halifax.

As Leeds and Micklefield is timetabled for seventeen minutes, I suspect this would be enough time to fully charge a battery-electric version of CAF’s Class 331 train and with charging in Hull station, then this route could be electrified.

Northern Trains also run other services, but because the Goole swing bridge is closed, I can’t get all the distances without electrification from Hull.

Ones I can find are.

  • Beverley – 16.7 miles for return trip.
  • Bridlington – 31.1 miles
  • Doncaster – 40.8 miles
  • Micklefield – 42.1 miles
  • Scarborough – 53.8 miles
  • Sheffield – 59.4 miles
  • Temple Hirst – 36.1 miles
  • York – 41.1 miles – Hull and Church Fenton

Note.

  1. York and Doncaster are electrified.
  2. Bridlington and Scarborough have suitable platforms where 25 KVAC overhead electrification could be installed to charge trains.
  3. Sheffield and Doncaster is only 18.6 miles and this may be the way to electrify between Sheffield and Hull.
  4. In The Data Sheet For Hitachi Battery Electric Trains, I state that Hitachi’s battery-electric trains have a range of 43.5 miles

It looks if enough platforms are electrified at Hull, all current services from the city could be run by battery-electric trains.

Conclusion

I believe that by electrifying Hull station, that Hull could have a station consistent with the HumberZero philosophy, with battery-electric trains running hither and thither, handling all rail traffic to and from the City.

 

June 7, 2023 Posted by | Transport/Travel | , , , , , , , , , , , , , , | 2 Comments

Thoughts On High Speed Two

These are a few thoughts about High Speed Two, after the reports of major changes today.

This article on the BBC is entitled HS2 Line Between Birmingham And Crewe Delayed By Two Years.

This is the sub-heading.

The Birmingham to Crewe leg of high speed railway HS2 will be delayed by two years to cut costs.

These are the three opening paragraphs.

Some of the design teams working on the Euston end of the line are also understood to be affected.

Transport secretary Mark Harper blamed soaring prices and said it was “committed” to the line linking London, the Midlands and North of England.

HS2 has been beset by delays and cost rises. In 2010, it was expected to cost £33bn but is now expected to be £71bn.

Delivering The Benefits Of High Speed Two Early

It is my belief that with a large project taking a decade or more , it is not a bad idea to deliver some worthwhile benefits early on.

The Elizabeth Line opened in stages.

  • The new Class 345 trains started replacing scrapyard specials in 2017.
  • The rebuilt Abbey Wood station opened in 2017.
  • Paddington local services were transferred to the Elizabeth Line in 2019.
  • Outer stations reopened regularly after  refurbishment from 2018.
  • The through line opened in May 2022.

There’s still more to come.

Some projects wait until everything is ready and everybody gets fed up and annoyed.

Are there any parts of High Speed Two, that could be completed early, so that existing services will benefit?

In 2020, the refurbishment of Liverpool Lime Street station and the tracks leading to the station was completed and I wrote about the station in It’s A Privilege To Work Here!, where this was my conclusion.

Wikipedia says this about Liverpool Lime Street station.

Opened in August 1836, it is the oldest still-operating grand terminus mainline station in the world.

I’ve used Lime Street station for fifty-five years and finally, it is the station, the city needs and deserves.

I’ve been to grand termini all over the world and Lime Street may be the oldest, but now it is one of the best.

Are there any stations, that will be served by High Speed Two, that should be upgraded as soon as possible to give early benefits to passengers, staff and operators?

Avanti West Cost have solved the problem of the short platforms at Liverpool South Parkway station, by ordering shorter Class 807 trains. Will High Speed Two lengthen the platforms at this station?

A good project manager will need to get all the smaller sub-projects in a row and work out what is the best time to do each.

Digital Signalling

I would assume, as this will be needed for High Speed Two services in the West Coast Main Line to the North of Crewe, this is surely a must for installing as early as possible.

If the existing trains could run for a hundred miles at 140 mph, rather than the current 125 mph, that would save five worthwhile minutes.

Trains could run closer together and there is the possibility of organising services in flights, where a number of trains run together a safe number of minutes apart.

Remove Bottlenecks On Classic Lines, That Could Be Used By High Speed Two

I don’t know the bottlenecks on the West Coast Main Line, but there are two on the East Coast Main Line, that I have talked about in the past.

Could ERTMS And ETCS Solve The Newark Crossing Problem?

Improving The North Throat Of York Station Including Skelton Bridge Junction

Hopefully, the digital signalling will solve them.

Any bottlenecks on lines that will be part of High Speed Two, should be upgraded as soon as possible.

Birmingham And Crewe

I will start by looking at the leg between Birmingham and Crewe.

 

This section of the HS2 map shows High Speed Two between Birmingham and Lichfield.

Note.

  1. The blue circle on the left at the bottom of the map is Birmingham Curzon Street station.
  2. The blue circle on the right at the bottom of the map is Birmingham Interchange station.
  3. The High Speed Two to and from London passes through Birmingham Interchange station.
  4. The branch to Birmingham Curzon Street station connects to the main High Speed Two at a triangular junction.
  5. North of the triangular junction, High Speed Two splits.
  6. The Eastern branch goes to East Midlands Parkway station.
  7. The Northern branch goes to Crewe, Liverpool Lime Street, Manchester Piccadilly, Preston and Scotland.

At the top of the map, the Northern branch splits and lines are shown on this map.

Note.

  1. The junction where the Northern and Eastern branches divide is in the South-East corner of the map.
  2. To the North of Lichfield, the route divides again.
  3. The Northern purple line is the direct line to Crewe.
  4. The shorter Southern branch is a spur that connects High Speed Two to the Trent Valley Line, which is the current route taken by trains between London Euston and Crewe, Liverpool Lime Street, Manchester Piccadilly, Preston and Scotland.
  5. Crewe station is in the North-West corner of the map.

The route between the junction to the North of Lichfield and Crewe is essentially two double-track railways.

  • High Speed Two with a routine operating speed of 205 mph.
  • The Trent Valley Line with a routine operating speed of 140 mph.
  • High Speed Two Classic-Compatible trains can run on all tracks.
  • High Speed Two Full-Size trains may be able to run on the Trent Valley Line at reduced speed.
  • Eighteen trains per hour (tph) is the maximum frequency of High Speed Two.

I feel in an emergency, trains will be able to use the other route.

Will This Track Layout Allow An Innovative Build?

Suppose the link to the Trent Valley Line was built first, so that High Speed Two trains from London for Crewe, Liverpool Lime Street, Manchester Piccadilly, Preston and Scotland, could transfer to the Trent Valley Line as they do now.

  • All lines used by High Speed Two services North of the junction, where High Speed Two joins the Trent Valley Line would be updated with digital signalling and 140 mph running. This will benefit current services on the line. For instance Euston and Liverpool/Manchester services could be under two hours.
  • The current services would be replaced by High Speed Two services run by High Speed Two Classic-Compatible trains.
  • The direct High Speed Two route between Lichfield and Crewe would now be built.
  • When this section of High Speed Two is complete, High Speed Two services would use it between Lichfield and Crewe.
  • As the direct route would be built later, this would delay the building of the Birmingham and Crewe high-speed route.

Currently, trains run the  41.8 miles between Lichfield and Crewe in 28 minutes, which is an average speed of 89.6 mph.

I can build a table of average speeds and times for Lichfield and Crewe.

  • 100 mph – 25.1 minutes – 2.9 minutes saving
  • 110 mph – 22.8 minutes – 5.2 minutes saving
  • 120 mph – 20.9 minutes – 7.1 minutes saving
  • 125 mph – 20.1 minutes – 7.9 minutes saving
  • 130 mph – 19.3 minutes  – 8.7 minutes saving
  • 140 mph – 17.9 minutes – 10.1 minutes saving
  • 160 mph – 15.7 minutes – 12.3 minutes saving
  • 180 mph – 13.9 minutes – 14.1 minutes saving
  • 200 mph – 12.5 minutes – 15.5 minutes saving

Note.

  1. Even a slight increase in average speed creates several minutes saving.
  2. Times apply for both routes.

I believe that a 125 mph average should be possible on the Trent Valley route, which may be enough for Euston and Liverpool/Manchester services to be under two hours.

Improving Classic Lines Used By High Speed Two North Of Lichfield

Real Time Trains shows these figures for a Glasgow Central to Euston service.

  • Glasgow and Lichfield Trent Valley is 298.2 miles.
  • Glasgow and Lichfield Trent Valley takes five hours.

This is an average speed of 59.6 mph.

Note.

  1. The average speed is low considering the trains are capable of cruising at 125 mph and 140 mph with digital signalling.
  2. High Speed Two services between Euston and Glasgow will use the classic network, to the North of Lichfield.

I can build a table of average speeds and times for Glasgow and Lichfield.

  • 100 mph – 179 minutes – 121 minutes saving
  • 110 mph – 163 minutes – 157 minutes saving
  • 120 mph – 149 minutes – 151 minutes saving
  • 125 mph – 143 minutes – 157 minutes saving
  • 130 mph – 138 minutes  – 162 minutes saving
  • 140 mph – 128 minutes – 172 minutes saving

This table illustrates why it is important to improve all or as many as possible of classic lines used by High Speed Two to enable 140 mph running, with full digital signalling. Obviously, if 140 mph is not feasible, the speed should be increased to the highest possible.

Routes that could be updated include.

  • London Euston and Glasgow Central
  • London Euston and Liverpool Lime Street
  • London Euston and Manchester Piccadilly (all routes)
  • London Euston and Blackpool
  • London Euston and Holyhead
  • London Euston and Shrewsbury

Not all these routes will be served by High Speed Two, but they could be served by 140 mph trains.

What Times Would Be Possible?

The InterCity 225 was British Rail’s ultimate electric train and these two paragraphs from its Wikipedia entry, describe its performance.

The InterCity 225 was designed to achieve a peak service speed of 140 mph (225 km/h); during a test run in 1989 on Stoke Bank between Peterborough and Grantham, an InterCity 225 was recorded at a speed of 162 mph (260.7 km/h). Its high speed capabilities were again demonstrated via a 3hr 29mins non-stop run between London and Edinburgh on 26 September 1991. British regulations have since required in-cab signalling on any train running at speeds above 125 mph (201 km/h) preventing such speeds from being legally attained in regular service. Thus, except on High Speed 1, which is equipped with cab signalling, British signalling does not allow any train, including the InterCity 225, to exceed 125 mph (201 km/h) in regular service, due to the impracticality of correctly observing lineside signals at high speed.

The InterCity 225 has also operated on the West Coast Main Line (WCML). In April 1992, one trainset achieved a new speed record of two hours, eight minutes between Manchester and London Euston, shaving 11 minutes off the 1966 record. During 1993, trials were operated to Liverpool and Manchester in connection with the InterCity 250 project.

  • The fastest London Euston and Manchester Piccadilly services appear to be two hours and six minutes tomorrow, with stops at Nuneaton and Stoke-on-Trent.
  • The fastest London King’s Cross and Edinburgh service is four hours seventeen minutes tomorrow.

It does appear that British Rail’s 1980s-vintage InterCity 225 train did very well.

Trains that would be able to run at 140 mph with updated signalling include.

  • Alstom Class 390
  • Hitachi Class 800, 801, 802, 803, 805, 807 and 810
  • British Rail InterCity 225
  • High Speed Two Classic-Compatible.

All are electric trains.

Could High Speed Two, West Coast Main Line and East Coast Main Line Services Be Run By  High Speed Two Classic-Compatible Trains?

I don’t see why not!

  • They would be able to use short stretches of High Speed Line like Lichfield and Crewe.
  • LNER and CrossCountry could also use the trains.
  • High Speed Two is providing the framework and it’s there to be used, provided the paths are available.

This graphic shows the preliminary schedule.

It only shows ten trains going through Crewe, so there could be up to eight spare high speed paths between Birmingham and Crewe.

Could High Speed Two Classic-Compatible Trains Be Used To Advantage On The East Coast Main Line?

I published this extract from the Wikipedia entry for the InterCity 225 earlier.

The InterCity 225 was designed to achieve a peak service speed of 140 mph (225 km/h); during a test run in 1989 on Stoke Bank between Peterborough and Grantham, an InterCity 225 was recorded at a speed of 162 mph (260.7 km/h). Its high speed capabilities were again demonstrated via a 3hr 29mins non-stop run between London and Edinburgh on 26 September 1991.

The London and Edinburgh run was at an average speed of around 112 mph.

I wonder what time, one of LNER’s Class 801 trains, that are all-electric could do, once the new digital signalling has been fully installed on the route? I suspect it would be close to three hours, but it would depend on how long the trains could run at 140 mph.

It should be noted that the Selby Diversion was designed for 160 mph, when it was built by British Rail in the 1980s.

In Are Short Lengths Of High Speed Line A Good Idea?, I look at the mathematics of putting in short lengths of new railway, which have higher speeds, where this was part of my conclusion.

I very much feel there is scope to create some new high speed sections on the current UK network, with only building very little outside of the current land used by the network.

I would love to know what some of Network Rail’s track experts feel is the fastest time possible between London and Edinburgh that can be achieved, by selective upgrading of the route.

If some of the trains were High Speed Two Classic-Compatible Trains, with a top speed of 205 mph, provided the track allowed it, there could be some interesting mathematics balancing the costs of track upgrades, new trains with what passengers and operators need in terms of journey times.

Could High Speed Two Classic-Compatible Trains Be Used To Advantage On The West Coast Main Line?

Much of what I said about the East Coast Main Line would apply to the West Coast Main Line.

But in addition, the West Coast Main Line will be a superb place to test the new High Speed Two Classic-Compatible Trains.

I believe, that before High Speed Two opens, we’ll see High Speed Two Classic-Compatible Trains, carrying passengers between Euston and Avanti West Coast’s destinations.

Could High Speed Two Be Split Into Two?

Consider.

  • Under earlier plans, the East Coast Main Line to the North of York, will be used by High Speed Two.
  • With digital signalling the East Coast Main Line will support continuous running at 140 mph for long sections of the route.
  • The East Coast Main Line has a recently-rebuilt large Southern terminal at King’s Cross with eleven platforms and good suburban services and excellent connections to the London Underground.
  • The East Coast Main Line has a very large Northern terminal at Edinburgh Waverley with twenty platforms and good local train connections.
  • There are large intermediate stations on the East Coast Main Line at Doncaster, Leeds, Newcastle, Peterborough and York. All these stations have good local train connections.
  • The East Coast Main Line has important branches to Cambridge, Harrogate, Huddersfield, Hull King’s Lynn, Lincoln, Middlesbrough, Nottingham, Scarborough, Sheffield, Skegness and Sunderland.

We are talking about an asset, that needs improving rather than sidelining.

 

Could High Speed Two Be A One-Nation Project?

Over three years ago, I wrote Could High Speed Two Be A One-Nation Project? and tried to answer the question in the title.

But now the core network is better defined, perhaps it is time to look at extending the High Speed network again.

The next few sections look at possible extensions.

Serving Chester And North Wales

I looked at this in Could High Speed Two Trains Serve Chester And North Wales?, which I have updated recently.

This was my conclusion.

It looks to me, that when High Speed Two, think about adding extra destinations, Chester and Holyhead could be on the list.

I also suspect that even without electrification and High Speed Two services, but with the new Class 805 trains, the route could be a valuable one for Avanti West Coast.

These are current and promised times for the two legs to Holyhead.

  • Euston and Crewe – 90 minutes – Fastest Class 390 train
  • Euston and Crewe – 55 minutes – High Speed Two Classic-Compatible train from Wikipedia
  • Crewe and Holyhead – 131 minutes – Fastest Class 221 train
  • Crewe and Holyhead – 70 minutes – 90 mph average speed
  • Crewe and Holyhead – 63 minutes – 100 mph average speed
  • Crewe and Holyhead – 57 minutes – 110 mph average speed
  • Crewe and Holyhead – 53 minutes – 120 mph average speed
  • Crewe and Holyhead – 45 minutes – 140 mph average speed

Note.

  1. I have assumed that Crewe and Holyhead is 105.5 miles.
  2. The operating speed of the North Wales Coast Line is 90 mph.
  3. In the following estimates,  I have assumed a change of train at Crewe, takes 6 minutes.

I think there are several options to run fast services to Chester and North Wales.

Pre-HS2 – Class 805 all the way

I believe this train will match the following.

  • The fastest Class 390 train between Euston and Crewe.
  • The fastest Class 221 train between Crewe and Holyhead.

This would give a time of 3 hours 41 minutes.

Pre-HS2 – Class 805 all the way, but with perhaps less stops and some track improvement

I believe this train will match the following.

  • The fastest Class 390 train between Euston and Crewe.
  • 110 mph train Crewe and Holyhead.

This would give a time of 2 hours 27 minutes.

Pre-HS2 – Class 805 all the way, but with perhaps less stops and Crewe and Holyhead uprated largely to 125 mph

I believe this train will match the following.

  • The fastest Class 390 train between Euston and Crewe.
  • 120 mph train Crewe and Holyhead.

This would give a time of 2 hours 23 minutes.

Pre-HS2 – Class 805 all the way, but with perhaps less stops and Crewe and Holyhead Crewe and Holyhead electrified and uprated to 140 mph

I believe this train will match the following.

  • The fastest Class 390 train between Euston and Crewe.
  • 140 mph train Crewe and Holyhead.

This would give a time of 2 hours 15 minutes.

After-HS2 – High Speed Two Classic-Compatible train to Crewe, the Class 805 train to Holyhead

I believe this train will match the following.

  • The fastest High Speed Two Classic-Compatible train between Euston and Crewe.
  • The fastest Class 221 train between Crewe and Holyhead.

This would give a time of 3 hours 12 minutes.

After-HS2 – High Speed Two Classic-Compatible train to Crewe, the Class 805 train to Holyhead, but with perhaps less stops and some track improvement

I believe this train will match the following.

  • The fastest High Speed Two Classic-Compatible train between Euston and Crewe.
  • 110 mph train Crewe and Holyhead.

This would give a time of 1 hours 58 minutes.

After-HS2 – High Speed Two Classic-Compatible train to Crewe, the Class 805 train to Holyhead, but with perhaps less stops and Crewe and Holyhead uprated largely to 125 mph

I believe this train will match the following.

  • The fastest High Speed Two Classic-Compatible train between Euston and Crewe.
  • 120 mph train Crewe and Holyhead.

This would give a time of 1 hours 54 minutes.

After-HS2 – High Speed Two Classic-Compatible train to Crewe, Class 805 train to Holyhead, but with perhaps less stops and Crewe and Holyhead electrified and uprated to 140 mph

I believe this train will match the following.

  • The fastest High Speed Two Classic-Compatible train between Euston and Crewe.
  • 140 mph train Crewe and Holyhead.

This would give a time of 1 hours 46 minutes.

After-HS2 – High Speed Two Classic-Compatible train all the way, but with perhaps less stops and Crewe and Holyhead electrified and uprated to 140 mph

I believe this train will match the following.

  • The fastest High Speed Two Classic-Compatible train between Euston and Crewe.
  • 140 mph train Crewe and Holyhead.

This would give a time of 1 hours 40 minutes.

From these estimates, I have come to these conclusions.

  • A sub-two and a half-hour service can be attained with the new Class 805 trains and some improvements to the tracks along the North Wales Coast Line.
  • A sub-two hour service can be attained with a High Speed Two Classic-Compatible train to Crewe and a Class 805 train to Hplyhead along a 140 mph electrified North Wales Coast Line.
  • If the North Wales Coast Line is electrified, the journey from London Euston, Birmingham Interchange, Crewe, Chester, Liverpool and Manchester would be zero-carbon.

We should be looking to building a zero-carbon fast passenger ferry for sailing between Holyhead and Dublin.

  • The current fastest ferries appear to take three hours and 15 minutes, which means that a six-hour low-carbon journey between London Euston and Dublin, should be possible with the new Class 805 trains, prior to the opening of High Speed Two.
  • A five-hour journey after the opening of High Speed Two to Crewe and electrification of the North Wales Coast Line should be possible.

If the advanced zero-carbon ferry could knock an hour off the journey, four hours between London and Dublin along a spectacular coastal railway with a fast sea voyage, would be a route that would attract passengers.

  • High Speed Two would need to be opened to Crewe.
  • The North Wales Coast Line would need to be upgraded to a 140 mph digitally-signalled line.
  • The North Wales Coast Line would need to be electrified.
  • Full electrification may not be needed, as discontinuous electrification will have advanced to provide zero-carbon running, in a more affordable and less disruptive manner.
  • Trains could either be High Speed Two Classic-Compatible trains all the way from London or there could be a change at Crewe to Class 805 trains.
  • The ferry would use the best zero-carbon and operational technology.

The improvement and electrification of the North Wales Coast Line could be planned to take place in a relaxed manner, so that journey times continuously got quicker.

I would start the improvement of the North Wales Coast Line, as soon as possible, as all these improvement will be used to advantage by the new Class 805 trains.

Serving West And South West England And South Wales

Suppose you want to go between Glasgow and Cardiff by train, after High Speed Two has opened.

  • You will take one of the half-hourly High Speed Two Classic-Compatible trains between Glasgow Central and London.
  • Three and a half-hours later, you will get off the train in one of the below ground platforms at Old Oak Common station.
  • A short ride in an escalator or lift and you will be in the Great Western Railway station at ground level.
  • From here, fifty minutes later, you will be in Cardiff.

The journey will have taken four hours and twenty minutes.

This may seem a long time but currently Glasgow and Cardiff by train takes over seven hours by train.

  • Glasgow and Bristol Temple Meads takes eight hours, but using High Speed Two and GWR will take 5 hours.
  • Glasgow and Cheltenham Spa takes six hours, but using High Speed Two and GWR will take 5 hours and 30 minutes.
  • Glasgow and Penzance takes twelve hours, but using High Speed Two and GWR will take 8 hours and 33 minutes.
  • Glasgow and Swansea takes nearly nine hours, but using High Speed Two and GWR will take 6 hours and 9 minutes.

The High Speed Two route only has one simple change, whereas some routes now have up to four changes.

 

 

 

 

 

 

 

 

 

Conclusion

March 10, 2023 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , , , , , | 97 Comments

Liverpool Lime Street Station And St. George’s Hall

When you arrive in a town or city by train, I believe that you should be welcomed by a wide spacious area, where you can get your bearings and meet friends.

I took these pictures outside Liverpool Lime Street station.

Note.

  1. The three main buildings on the pictures, are one Grade I and two Grade II Listed buildings.
  2. St. George’s Hall is a Grade I neoclassical building.
  3. A liver bird told me, that the magnificent floor with its 30,000 Minton tiles, will be open this summer.
  4. Lime Street station is now one of the best terminal stations in the world, both in terms of architecture and operation.
  5. The hotel on the left of the station, is now a Radisson Red hotel, after a very chequered history during the last ninety years.
  6. Not many stations welcome you to a city like Liverpool does.

In London, King’s Cross and Liverpool Street make an effort, but some stations like Paddington just deliver you to crowded, anonymous, dingy streets.

February 24, 2023 Posted by | Transport/Travel, World | , , | Leave a comment

Proposed High-Speed Two Services Are Not Complete

This diagram shows High Speed Two services.

Note.

  1. Trains to the left of the vertical black line are Phase 1 and those to the right are Phase 2.
  2. Full-Size trains are shown in blue.
  3. Classic-Compatible trains are shown in yellow.
  4. The dotted circles are where trains split and join.
  5. In the red boxes routes alternate every hour.

Click on the diagram to enlarge it.

Are The Services Incomplete Or Has Someone Left Something Out?

Look at trains 4, 5 and 6.

  • Train 4 is a pair of Classic-Compatible trains, which split at Crewe, with one going to Liverpool Lime Street and the other to Lancaster.
  • Train 5 is a single Classic-Compatible train, that goes to Liverpool Lime Street.
  • Train 6 is a single Classic-Compatible train, that goes to Macclesfield.

As an example, Train 5 could be a pair of Classic-Compatible trains, which split at Crewe, with one going to Liverpool Lime Street and the other to Chester, Llandudno, Bangor and Holyhead. I actually believe that this would be a way of creating a low-carbon route to Dublin, with a zero-carbon high-speed ferry from Holyhead.

What to do with Train 6 is more difficult.

  • Stafford and Stoke need to be served by High Speed Two.
  • Stafford, Stoke and Macclesfield are not stations with long platforms, so may not be suitable places to split a pair of Classic-Compatible trains.
  • Places North of Macclesfield to terminate trains are not numerous and probably only Manchester and Huddersfield may be suitable.

The alternative might be to split a pair of Classic-Compatible trains forming Train 6 at Birmingham Interchange, one going to Stafford, Stoke and Macclesfield and the other going to Blackburn, Blackpool, Crewe, Lancaster, Liverpool or Preston

 

February 18, 2023 Posted by | Transport/Travel | , , , , , , , , , , , , | 1 Comment

Is Liverpool Going To Get High Speed One-Point-Five?

Some of the best train journeys, I’ve ever had were not on high speed trains on specially-built tracks.

The connection between these stories, was that all had a superb biological control system in the cab, who with help from the signallers was able to keep to a difficult schedule or make up time.

Last year, I made several journeys between Euston and Liverpool Lime Street. A couple of the journeys were unusual in that we arrived at our destination around six or more minutes early.

I suspect, that Avanti West Coast were experimenting to make sure that they get the new two trains per hour (tph) for the route perfect.

In Avanti West Coast Looks To Recover, I said this about Euston and Liverpool Lime Street services.

A paragraph talks about the second hourly service between London and Liverpool.

Avanti still has ambitions to introduce a second hourly service between Euston and Liverpool, but when this will come in will depend on demand recovery.

Consider.

  • If would be desirable if some or all trains running on the route could achieve a timing of two hours between London and Liverpool.
  • It is felt that the second service should stop at Liverpool South Parkway station, where the platforms are too short for eleven-car Class 390 trains.
  • Avanti have stated they would like more stops in the Trent Valley, especially at Nuneaton, where they would connect to services to the East Midlands.
  • Nuneaton is almost exactly halfway between London and Liverpool.
  • Running two tph with Class 807 trains would need nine trains and Avanti have only ordered ten in total.

I believe that a practical timetable like this could work.

  • Class 390 train – one tph – Non-stop or perhaps a single stop in the Midlands – Under two hours
  • Class 807 train – one tph – Stopping at Nuneaton, Stafford, Crewe, Runcorn and Liverpool South Parkway – Current time or better

An hourly service between London and Liverpool in under two hours would surely be a passenger magnet.

So what is possible?

I found this service on Real Time Trains, which ran on the 16th February 2023.

  • Scheduled to leave Liverpool Lime Street at 0943, but left at 1012 or 29 minutes late.
  • Train did a ninety second unadvertised stop at Liverpool South Parkway. Now running 26 minutes late.
  • There was a two minute stop at Runcorn and a four-minute stop at Crewe. Now running 25 minutes late
  • There was a one-minute stop at Milton Keynes. Now running 20 minutes late.
  • The train arrived in London Euston at 1220 or 16 minutes late.

Note.

  1. Liverpool Lime Street and London Euston took 2 hours and 8 minutes.
  2. As Liverpool Lime Street and London Euston is a distance of 193.6, a 128 minute journey is an average speed of 90.7 mph
  3. Liverpool Lime Street and Crewe took 32 minutes with two stops.
  4. Crewe and London Euston took 1 hour and 32 minutes with one stop.
  5. In West Coast Main Line Electro-Diesels On Test, I found that a Glasgow and London train took 1 hour and 28 minutes between Crewe and London Euston.
  6. All services last week had the unadvertised stop at Liverpool South Parkway

What can be deduced from these figures?

  • If the Crewe stop were to be cut out, two hours and four minutes could certainly be possible between Liverpool Lime Street and London Euston with a Class 390 train.
  • I also suspect that if the train were to be run non-stop, that the other four minutes could be saved.

So will Avanti West Coast run the current service using new Class 807 trains, with the extra stop at Liverpool South Parkway and perhaps other stations and the additional hourly train with a non-stop nine-car Class 390 train?

This way of delivering a two tph service would mean.

  • Runcorn, Crewe and Milton Keynes would not lose any of their current fast services to and from Liverpool Lime Street and London Euston.
  • Liverpool South Parkway station is probably a more convenient location for some passengers going to and from the South. It would gain an hourly service to London Euston.
  • There will be an additional 77% of seats between Liverpool Lime Street and London Euston.
  • Passengers who don’t like tilting trains could use the Class 807 trains.
  • One tph would be timed for two hours or under and would be a marketing man’s dream.

No train would be slower than the current services.

Improvements To The Non-Stop Class 390 Train Service

I earlier said.

As Liverpool Lime Street and London Euston is a distance of 193.6, a 128 minute journey is an average speed of 90.7 mph.

An average speed of 90.7 mph, doesn’t seem fast for a Class 390 train with an operating speed of 125 mph or 140 mph under full ERTMS digital signalling.

These are some times for a selection of average speeds between Liverpool Lime Street and London Euston.

  • 90 mph – 2 hours 9 minutes
  • 100 mph – 1 hour 56 minutes
  • 110 mph – 1 hour 46 minutes
  • 120 mph – 1 hour 37 minutes
  • 125 mph – 1 hour 33 minutes
  • 130 mph – 1 hour 29 minutes
  • 135 mph – 1 hour 26 minutes
  • 140 mph – 1 hour 23 minutes

Note.

  1. Average speeds of upwards of 130 mph are unlikely, but I’ve added them to show that the train speed is less important than the speed of the track.
  2. High Speed Two’s planned time between Liverpool Lime Street and London Euston is 1 hour and 32 minutes.

But I do think times of around 1 hour and 35 minutes should be possible for non-stop Class 390 trains between Liverpool Lime Street and London Euston with an improved track and full ERTMS digital signalling.

Improvements To The Stopping Class 807 Train Service

As the track of the West Coast Main Line is improved with better track and full ERTMS digital signalling, this will also benefit the times of the stopping service run by the new Class 807 trains.

The Class 807 train with its lighter weight will have better acceleration than the current Class 390 trains. This will mean, that they will not be slowed as much, when they stop.

It may be possible to add extra stops at places like Watford Junction, Nuneaton and Stafford and still time the train for a few minutes over two hours.

Avanti West Coast Looks To Recover, is a post, that I wrote based on an interview in Modern Railways with Phil Whittingham, who is MD of Avanti West Coast.

There is a lot of talk in the article about.

  • Using Nuneaton to connect the North West and the East Midlands.
  • The acceleration of the Class 807 trains.
  • Improving the Customer Service.

I think that Liverpool will find it is connected to more of the country on services with just a single change.

Conclusion

Liverpool is getting greater connectivity to the Midlands and the South-East of England, with times, that could be improved to be comparable with High Speed Two.

February 18, 2023 Posted by | Transport/Travel | , , , , , , , , , , , | 8 Comments

Riding In A Train Designed To Run On Battery Power

Today, I had my first ride in a train, that has been designed to be able to run on battery power.

  • Merseyrail’s Class 777 trains run normally using third-rail electrification.
  • But they are also designed to run on battery power.
  • I took these pictures of the train as it went from Liverpool Central station to Kirkby station and back to Moorfields station, from where I took a train back to Liverpool Lime Street station.

I took these pictures on the route.

Note.

  1. Every seat has access to a power and USB socket.
  2. Every head-rest has leather facings.
  3. The end lights change from white for front, to red for back, when the train changes direction.
  4. Door lights are green when it is safe to enter.
  5. There is a lot of attention to detail in the design.

If there is a better suburban train in Europe, I’ve yet to see or ride in it.

Noise And Vibration

Consider.

  • I have ridden in two trains converted to battery-electric operation and both were very quiet.
  • This train was also very quiet, but it has been designed for battery operation.
  • I suspect that the train is very frugal with electricity.
  • I wonder, if the small battery, that is carried on the train for depot movements, is also used for regenerative braking.
  • It might not be a traditional battery, but a supercapacitor, some of which are made from curved graphene.

This train certainly sets new standards in noise and vibration.

February 7, 2023 Posted by | Design, Transport/Travel | , , , , , , , | 2 Comments

New Merseyrail Train Runs 135km On Battery

The title of this post, is the same as that of this article on Liverpool Business News.

This paragraph gives the details.

Posting on social media site Linked In, Joaquim Font Canyelles, project leader at Stadler Rail, said: “Our new Merseytravel class 777 IPEMU (Independent Powered Electrical Multiple Unit) proved its strength after running 135 km fully loaded and without external current supply, which is much longer than we expected.

Note that 135 km is 83.9 miles.

These are possible routes, where the battery-electric trains could be deployed.

  • Bidston and Wrexham Central – 27.5 miles
  • Canada Dock Branch – 4.6 miles
  • Chester and Crewe – 21.2 miles
  • Chester and Runcorn East – 13 miles
  • Ellesmere Port and Runcorn East – 10.8 miles
  • Ormskirk and Preston – 15.3 miles
  • Hunts Cross and Manchester Oxford Road – 27.1 miles
  • Kirkby and Manchester Victoria – 30 miles
  • Kirkby and Wigan Wallgate – 12 miles
  • Liverpool Lime Street and Chester via Runcorn  – 27 miles
  • Liverpool Lime Street and Manchester Oxford Road – 31.5 miles
  • Southport and Manchester Oxford Road – 37.8 miles
  • Southport and Stalybridge – 45.5 miles
  • Southport and Wigan Wallgate – 17.4 miles

Note.

  1. All routes could be done both ways with the exception of Southport and Stalybridge and possibly Southport and Manchester Oxford Road.
  2. Southport trains to Wigan and Manchester would charge their batteries at Southport.
  3. Central Liverpool and Wrexham Central would not need the change at Bidston.
  4. Hunts Cross and Preston via Central Liverpool would not need the change at Ormskirk.
  5. A Liverpool Lime Street and Manchester Oxford Road service would be possible.

Batteries can add a lot of range to a city’s railway system.

Conclusion

If Merseyrail can get hold of the routes to Crewe, Manchester, Preston and Wrexham, the Liverpool City Region will have one of the best metros for a city of its size.

 

 

 

 

January 16, 2023 Posted by | Transport/Travel | , , , , , , , , , , | 37 Comments

Avanti West Coast Applies For Second Hourly Euston And Liverpool Service

Tucked away beside the Grand Union Sets Out Stirling Ambitions article in the December 2022 Edition of Modern Railways is a report on Avanti West Coast’s application for a second service between Euston and Liverpool.

This is said.

Avanti West Coast has applied for access rights for its second hourly Euston to Liverpool service, starting from December 2023, although a phased introduction of the new service is likely. This would make use of Avanti’s new fleet of 10×7-car Class 807 Hitachi EMUs, which are expected to enter service from Autumn 2023. The ‘807s’ would be deployed on the current hourly Liverpool service, on which a call at Liverpool South Parkway would be added. (provision is made for this in the December 2022 timetable.).

Pendelinos would then operate the second service each hour, calling at Lichfield Trent Valley and Tamworth.

A linespeed project is in progress to raise the permissible speed for non-tilting trains on the West Coast Main Line, and Avanti’s new Hitachi trains will take advantage of this.

In Will Avanti West Coast’s New Trains Be Able To Achieve London Euston and Liverpool Lime Street In Two Hours?, I laid out my reasoning for a two-hour journey between Euston and Liverpool Lime Street.

I’m not sure, if they will reduce the time to two hours, but I wouldn’t be surprised if they do.

November 25, 2022 Posted by | Transport/Travel | , , , | 1 Comment

Man Dies After Being Hit By Train As Services Out Of Lime Street Cancelled

The title of this post, is the same as that of this article on the Liverpool Echo.

These paragraphs describe the incident.

Cheshire Police were called to Hartford station in Northwich at around 4pm on Monday, May 23, following reports of a man being hit by a train. Once officers and paramedics arrived at the scene the station was closed to all trains and British Transport Police were called.

British Transport Police have confirmed when emergency services arrived at the scene the man was already dead. Officers are currently working to identify the man and inform their next of kin.

At 15:47, I left Liverpool Lime Street station for London and this was my journey.

  • We stopped at Runcorn and waited there about 15 minutes.
  • We then reversed back to Liverpool and got off the train.
  • We were then told to get back on the train.
  • I actually sat opposite my original seat in coach U, but there was a bit of chaos as Avanti West Coast were combining passengers for the 15:47 and 16:47.
  • We left Liverpool at 17:23.
  • The route was through Manchester and then South from Manchester Piccadilly.
  • We finally arrived in London at 20:18

The journey had taken five hours and thirty-four minutes.

In addition the 17:47, 18:47 and the 19:47 were cancelled, with some passengers taken by bus to Crewe.

May 24, 2022 Posted by | Transport/Travel | , , , | 1 Comment

Avanti West Coast Looks To Recover

The title of this post is the same as an article in the March 2022 Edition of Modern Railways.

These are some points from the article.

Passengers Numbers Are Recovering

This is a paragraph.

Mr. Wittingham says the recovery has been strongest on the Anglo-Scottish and Liverpool corridors, while Manchester have begun to bounce back. Slowest to recover is the London to West Midlands market; ‘there’s several operators here and we were the main carrier of business passengers, and that sector has been recovering more slowly than leisure’ says Mr. Whittingham.

Phil Whittingham is MD of Avanti West Coast.

Train Numbers Are Recovering

Avanti are building up train numbers from Euston after the pandemic.

Frequencies are as follows in trains per hour (tph)

  • Pre-Covid – 9
  • During the pandemic – 4
  • From December 2021 – 7
  • Omicron – 4
  • From February 2022 – 6
  • From May 2022 – 6+

Avanti have reacted to demand.

Three Classes Of Travel

This is a paragraph.

Avanti’s business has historically been driven by leisure travel – before Covid this accounted for broadly 60 % of passengers, with most of the rest travelling for business plus a smaller number of commuters. ‘The demand is there, and we think by next year we’ll be on the way to full recovery’ says Mr. Whittingham. ‘Leisure has been strong, especially at weekends, but the missing bit is the corporate market.’

Avanti have been running a marketing campaign and it appears to have been successful.

This paragraph describes Avanti’s new Standard Premium class.

Last year, Avanti West Coast launched a new class of travel – Standard Premium. This was first introduced in May on an upgrade-only basis before going fully live in September with the option to book online in advance. The new class sits between Standard and First, giving passengers larger seats and greater space but without some of the extras that come with First Class Travel such as complimentary refreshments and lounge access.

These are Mr. Whittingham’s comments on the three classes.

The current split of passengers is 84% Standard, 12 % First and 4 % Standard Premium, but given the latter has been in place for less than a year there is clearly scope for growth. ‘Our research shows people have been upgrading to Standard Premium rather than downgrading from First’.

I have yet to try Standard Premium, but I will next time I use Avanti.

Refreshments

Avanti have decided to serve different refreshments in Standard Premium and First classes.

  • In Standard Premium, they are now offering At Seat Orders.
  • In First, they have updated the menu.

Both seem to have been well-received.

I like this statement from Mr. Whittingham.

We’ve tried to make it a more personalised service with a less rigid structure, so we give customers what they want, when they want it, rather than when we want to give it to them.

A Consistent Offer

This is a paragraph.

Mr. Whittingham says Avanti has not yet confirmed whether t will offer three classes of travel on the new Hitachi trains it has ordered, but says the aim is to provide a more consistent offer. Assisting this will be changes in the ongoing Pendolino refurbishment, where 11-car sets are having Coach G converted from First to Standard accommodation, meaning all Pendolinos, whether nine-car or 11-car, will have three coaches for First and Standard Premium passengers.

My instinct says that the four trains will be something like.

  • Class 390 train – Pendolino – Nine-car – three First/Standard Premium cars – six Standard cars
  • Class 390 train – Pendolino – Eleven-car – three First/Standard Premium cars – eight Standard cars
  • Class 805 train – Hitachi – Five-car – one First/Standard Premium car – four Standard cars
  • Class 807 train – Hitachi – Seven-car – two First/Standard Premium car – five Standard cars

Note.

  1. The Class 805 and Class 807 Hitachi trains are very much plug-and-play and can be lengthened or shortened as required.
  2. A regular passenger between London and Liverpool, who regularly upgrades from Standard to Standard Premium in a Class 390 train could be a bit miffed if he couldn’t, because the service was being run by a Class 807 train.
  3. Hitachi would probably be very happy to add extra cars to the Class 805 and Class 807 trains.

As the Class 390 Pendolino trains are being refurbished, I do wonder if they will be receiving some fittings from the Hitachi trains to make sure the trains are consistent to both on-board staff and passengers.

Pendolino Investment

The Pendolino refurbishment is comprehensive.

  • It is one of the largest such programmes ever undertaken in the UK.
  • Leasing company; Angel Trains are funding the work.
  • Alstom are doing the work at Widnes.
  • There appears to be a smooth plan to refurbish all trains.
  • Coach G will be converted from First to Standard accommodation in eleven-car trains.
  • Mr. Whittingham says that all trains will come out looking like a new train.

The eleven-car trains are being converted first, as the conversion of Coach G gives a capacity benefit of around thirty seats.

The awful seats in Standard Class will be replaced with Lumo-style seats and laptop-friendly fold-down tables.

These seats will be a big improvement!

New Trains Coming

This paragraph introduces the new trains.

The second major fleet investment from Avanti is the £350 million for new trains from Hitachi, financed by Rock Rail. These comprise 13×5-car Class 805 bi-modes, ordered for destinations off the electrified route including North Wales and Shrewsbury and 10×7-car Class 807 electrics. Deployment plans for the latter are still being worked through but are likely to include services to Birmingham and Liverpool, and potentially to Blackpool.

What is not said in this paragraph, is that all trains have a redesigned front end, which I suspect is more aerodynamic.

The all-electric Class 807 trains have no diesel engines or batteries, so have they been put on a diet, to improve the acceleration?

In Will Avanti West Coast’s New Trains Be Able To Achieve London Euston and Liverpool Lime Street In Two Hours?, I came to these conclusions.

  • A two hour service between London Euston and Liverpool Lime Street will be possible with Avanti West Coast’s new Class 807 trains.
  • The current Class 390 trains could go a bit faster and if they cut out a couple of stops could probably break two hours.

I also calculated that a two tph service between London and Liverpool in two hours would need nine trains.

Timetable Changes

This paragraph introduces the article’s section on timetable changes.

The project in turn feeds into a major timetable change planned by Avanti and other West Coast main line operators. This will be the first significant change to West Coast main line schedules since 2008; ‘the world has changed, and we need to think about how we best serve our markets’ says Mr Whittingham.

This paragraph sums up the major changes.

Of note are the planned changes to the pattern of London to West Midlands services; the pre-Covid 20-minute interval would be amended to offer faster journey times and greater connectivity. Also featuring in the new timetable aspirations would be additional Trent Valley calls in some Liverpool and Manchester services; Mr Whittingham cites as one benefit of this the potential for improved journey times between the North West and the East Midlands via a change of train at Nuneaton. The Hitachi trains, with their better acceleration, will be particularly useful on services with more frequent stops.

The next three sections will look at some timetable changes in a bit more detail.

London And West Midlands Services

Replacement of twenty diesel Class 221 trains with thirteen bi-mode Class 805 trains will mean a major reorganisation of services to the West Midlands.

  • Some current diesel services will now be electric.
  • All services between Birmingham New Street and Euston will now be electric.
  • No services will run on diesel under live electrification.
  • Avanti have promised to serve Walsall.
  • There will be extra services to Shrewsbury and other places.

The electric services will also speed up some services to the West Midlands.

North West And East Midlands Services

I will look at train times for services between the North West (Liverpool Lime Street and Manchester Piccadilly) and the East Midlands (Leicester, Nottingham and Lincoln), where passengers change at Nuneaton.

These are the current fastest possible times according to the National Rail journey planner.

  • Liverpool Lime Street and Leicester -2:24 with changes at Crewe and Nuneaton,
  • Manchester Piccadilly and Leicester – 2:11 with change at Sheffield
  • Liverpool Lime Street and Nottingham – 2:42 with no changes
  • Manchester Piccadilly and Nottingham – 1:51 with no changes
  • Liverpool Lime Street and Lincoln- 3:42 with changes at Sheffield and Doncaster
  • Manchester Piccadilly and Lincoln – 2:38 with change at Sheffield

Note that times are in hours:minutes.

These are all current times for the various legs if the route is via Nuneaton.

  • Avanti West Coast – Liverpool Lime Street and Nuneaton – 1:18
  • Avanti West Coast – Manchester Piccadilly and Nuneaton – 1:13
  • CrossCountry – Nuneaton and Leicester – 0:27
  • East Midlands Railway – Leicester and Nottingham – 0:48 – Time from Leicester and Lincoln service.
  • East Midlands Railway – Leicester and Nottingham – 0:20 – Time from St. Pancras and Nottingham service.
  • East Midlands Railway – Leicester and Lincoln -1:42 – Time from Leicester and Lincoln service.
  • East Midlands Railway – Nottingham and Lincoln -0:52 – Time from Leicester and Lincoln service.

Note that the two Avanti West Coast times have been estimated by taking the time from Real Time Trains and adding three minutes for the acceleration or deceleration at Nuneaton.

These would be possible times between the North West and the East Midlands via Nuneaton.

  • Liverpool Lime Street and Leicester – 1:47
  • Manchester Piccadilly and Leicester – 1:42
  • Liverpool Lime Street and Nottingham – 2:37
  • Manchester Piccadilly and Nottingham – 2:32
  • Liverpool Lime Street and Lincoln- 3:31
  • Manchester Piccadilly and Lincoln – 3:26

Note that I am assuming changes at Nuneaton and Leicester are cross-platform or same platform changes that take two minutes.

But there is another level of improvement possible.

Suppose that East Midlands Railway’s Lincoln and Leicester service were to be extended to Nuneaton and run by a train with this specification.

  • 125 mph operating speed.
  • Battery-electric power.
  • 100 mph operating speed on battery power.
  • Range of 56 miles on battery
  • Ability to use the Midland Main Line electrification, when it is erected.

Charging stations would be needed at Nuneaton and Lincoln.

These would be possible times between the North West and the East Midlands via Nuneaton with the one change at Nuneaton.

  • Liverpool Lime Street and Leicester – 1:45
  • Manchester Piccadilly and Leicester – 1:40
  • Liverpool Lime Street and Nottingham – 2:05
  • Manchester Piccadilly and Nottingham – 2:00
  • Liverpool Lime Street and Lincoln- 2:57
  • Manchester Piccadilly and Lincoln – 2:52

Note.

I am assuming that the timings for the Nuneaton and Leicester and the Nottingham and Lincoln legs are as for the current trains.

I am assuming the change at Nuneaton is a cross-platform or same platform change that takes two minutes.

Trains run on battery where tracks are not electrified.

I can build a table of current times, times via Nuneaton and savings.

  • Liverpool Lime Street and Leicester -2:24 – 1:45 – 0:39
  • Manchester Piccadilly and Leicester – 2:11 – 1:40 – 0.31
  • Liverpool Lime Street and Nottingham – 2:42 – 2:05 – 0:37
  • Manchester Piccadilly and Nottingham – 1:51 – 2:00 – 0.09 slower
  • Liverpool Lime Street and Lincoln- 3:42 – 2:57 – 0.45
  • Manchester Piccadilly and Lincoln – 2:38 – 2:52 – 0:14 slower

It does appear that by using the 125 mph speed of the West Coast Main Line has a positive effect on some times from the North West to the East Midlands.

But times could be reduced further.

  • Installing full digital signalling, that would enable 140 mph running between Crewe and Nuneaton, could save ten minutes.
  • Improving the Nuneaton and Leicester and the Nottingham and Lincoln legs could allow faster running.

The more I look at changing at Nuneaton, I feel it is a good idea.

  • It improves the connections between East Midlands Parkway and Loughborough and the North West.
  • It improves the connections between Cambridge, Peterborough and Stansted Airport and the North West, if the change at Nuneaton is to CrossCountry’s Stansted Airport and Birmingham New Street service.
  • It improves the connections between Coventry and Leamington Spa and the North West.

Avanti have come up with a cunning plan, worthy of Baldrick at his best.

A Second Hourly Service Between London And Liverpool

A paragraph talks about the second hourly service between London and Liverpool.

Avanti still has ambitions to introduce a second hourly service between Euston and Liverpool, but when this will come in will depend on demand recovery.

Consider.

  • If would be desirable if some or all trains running on the route could achieve a timing of two hours between London and Liverpool.
  • It is felt that the second service should stop at Liverpool South Parkway station, where the platforms are too short for eleven-car Class 390 trains.
  • Avanti have stated they would like more stops in the Trent Valley, especially at Nuneaton, where they would connect to services to the East Midlands.
  • Nuneaton is almost exactly halfway between London and Liverpool.
  • Running two tph with Class 807 trains would need nine trains and Avanti have only ordered ten in total.

I believe that a practical timetable like this could work.

  • Class 390 train – one tph – Non-stop or perhaps a single stop in the Midlands – Under two hours
  • Class 807 train – one tph – Stopping at Nuneaton, Stafford, Crewe, Runcorn and Liverpool South Parkway – Current time or better

An hourly service between London and Liverpool in under two hours would surely be a passenger magnet.

February 23, 2022 Posted by | Transport/Travel | , , , , , , , , , , , , , | 3 Comments