The Anonymous Widower

Calais – Mediterranean Rail Motorway Bids Called

This title of this post, is the same as that of this article on Railway Gazette.

This is the introductory paragraph.

The government has called for expressions of interest to operate a lorry trailer carrying service between the English Channel port of Calais and the Mediterranean port of Sète south of Montpellier. Submissions are required by May 16.

Further details include.

  • It is aimed to start the service in 2022.
  • Government financial help  ight be available.
  • In French it is called an autoroute ferroviaire.
  • There is also a similar service between Perpignan and Paris.
  • I would expect the service saves carbon emissions.

This certainly seems like a good idea.

I do wonder if we will eventually see trains carrying trucks running between Barking and Sete through the Channel Tunnel.

  • The loading gauge will probably allow it.
  • It would be electrically hauled all the way.
  • Other destinations in Europe would be possible.
  • It might need less drivers, who would only work in the UK or Europe.
  • Would it help with Covid-19 bio-security?

If not Barking, what about to the Freeport being developed at Dagenham by the Thames?

It would

 

 

April 9, 2021 Posted by | Transport/Travel | , , , | 3 Comments

Ashington Targets 2023 Opening

The title of this post, is the same as that of an article in the April 2021 Edition of Modern Railways.

This is the sub-title.

A half-hourly service to Newcastle is planned.

The two trains per hour (tph) service and the opening date sounds just what is needed. Not just on the Northumberland Line, but in many places in the UK.

I would suggest some of the following.

There are also some much-needed stations, that could be added.

If we can create and manufacture a vaccine in a year, we can surely do a lot on a rail project in two years. And a lot of them! How many construction firms and workers would it keep employed?

The Modern Railways article gives a few more details.

How, Not If

This is the title of the first sub-section and sounds good to me!

It looks like Network Rail and others intend to apply good project management to deliver the project, fast and at a good price.

They haven’t been the best in the past, is all I’ll say!

Six Stations

This is said.

In summary, six new stations are proposed, at Northumberland Park (interchange with the Tyne and Wear Metro), Seaton Delaval, Newsham, Blyth Bebside, Bedlington and Ashington. An extension at the Northern end to Woodhorn is possible at a later stage.

Other points made include.

  • Ashington is envisaged as the terminus.
  • There are level crossing issues between Ashington and Woodhorn
  • There will be a cycleway connecting Blyth Bebside with the town centre. With all those B’s, they need an Geordie equivalent to Boris bikes!

It sounds well-thought out to me.

Butterwell Freight Line

This is said.

Also for consideration at a later stage is conversion of the currently freight-only Butterwell Line to passenger use, permitting a service from Berwick-on-Tweed and Morpeth to Newcastle via Bedlington.

This Google Map shows the railway lines North of Ashington.

Note.

  1. The big grey building at the bottom of the map is Asda’s Ashington superstore.
  2. There is a rail junction to the West of the superstore.
  3. The line going South leds to Bedlington and Newcastle.
  4. The line going North-East goes to Woodhorn, Lynemouth Power station and the Alcan Smelter.
  5. The Line going North West through the trees is the Butterwell Line, which goes to the Butterwell Opencast coal mine, Widdrington station and up the East Coast Main Line to Berwick-on-Tweed.

This second Google Map shows to the North of the first one.

Note the Butterwell Line runs from the South East corner of the map through the woods and to the East of the Ellington landfill site.

This third Google Map shows the route of the line to the East Coast Main Line.

Note.

  1. The electrified East Coast Main Line runs North-South down the Western site of the map.
  2. The large fields may indicate that coal has been removed and they have been restored.
  3. The Butterwell Line meanders its way across the map.
  4. Trains would appear to be able to enter and leave the Butterwell Line to or from the East Coast Main Line to and from the South only.
  5. The next station to the South is Pegswood and to the North is Widdrington.
  6. At the East of the map, the line connects to the line to Ashington through the woods.
  7. The Butterwell Line appears to be a mix of single and double track.

I wonder if Network Rail and train companies have a cunning plan for train services on this section of the East Coast Main Line.

Current services on the East Coast Main Line, that use the section of the line between Newcastle and Berwick-upon-Tweed include.

  • CrossCountry – 1 tph – Newcastle and Edinburgh/Glasgow – Stops irregularly at Alnmouth and Berwick-upon-Tweed.
  • East Coast Trains – 5 trains per day (tpd) – Stops at Morpeth
  • LNER – 1 tph – Newcastle and Edinburgh – Stops at Berwick-on-Tweed
  • Northern Trains – 1 tph – Newcastle and Morpeth – Stops at Manors and Cramlington
  • Northern Trains – 2 tpd – Newcastle and Chathill – Stops at Manors, Cramlington, Morpeth, Pegswood, Widdrington, Acklington and Alnmouth
  • TransPennine Express – 1 tph – Newcastle and Edinburgh – Stops at Morpeth

Note.

  1. Morpeth and Berwick-upon-Tweed get at least one fast tph to both Newcastle and Edinburgh.
  2. Stations between Morpeth and Berwick-upon-Tweed get only a two tpd service.
  3. Stations between Newcastle and Morpeth get a 1 tph service.
  4. The East Coast Main Line is only two tracks and I suspect that Northern’s slow diesel multiple units are not ideal trains for the route.

The obvious improvement would surely be to run an hourly train between Newcastle and Berwick-upon-Tweed, via Bedlington.

  • It would stop at Northumberland Park, Seaton Delaval, Newsham, Blyth Bebside, Bedlington, Ashington, Pegswood, Morpeth, Pegswood, Widdrington, Acklington and Alnmouth.
  • There would be a reverse at Morpeth.
  • It would join the East Coast Main Line between Pegswood and Widdrington stations.
  • Trains could be timed, so that passengers between Cramlington and Alnmouth only waited a couple of minutes during change at Morpeth.
  • Faster trains would be used to ease train pathing on the East Coast Main Line.

Current fastest times between Newcastle, Morpeth and Berwick-upon-Tweed are as follows.

  • Berwick-on-Tweed and Newcastle – LNER – 67 miles – 46 minutes – 87 mph
  • Berwick-on-Tweed and Morpeth – LNER – 50.2 miles – 30 minutes – 100.4 mph
  • Morpeth and Newcastle – TransPennine Express- 17.5 miles – 26 minutes – 40.4 mph

It looks to me that because of the times North of Morpeth, that a high performance train or some cunning signalling will be needed.

Britishvolt’s Gigaplant

BritishVolt are building a factory to produce lithium-ion batteries at Blyth.

The Modern Railways article says this.

Recent news concerning Blyth is that it has been selected as the site for Britain’s first ‘gigaplant’ for electric car battery production, with a planning application for the 95-hectare site on the north of the river Blyth (the location of the former Blyth power station) submitted by Britishvolt in February. The £2.6billion scheme is expected to generate about 3000 jobs; if all goes well, lithium-ion batteries could be produced on the site by the end of 2023. The new factory will be about 2.5 miles from Bebside station and there has been talk of linking to the site with a shuttle bus.

I looked at Britishvolt’s web site and if I was graduating soon, I don’t think it would fire me up, unlike others in similar sectors.

We live in exciting times, so don’t have a boring web site, as it will not attract exciting and enthusiastic people.

This Google Map shows the Port of Blyth.

Note.

  1. The red arrow at the top of the map labelled as a former power station, which must be Blyth power station.
  2. There is certainly a large cleared site to the South of the arrow.
  3. The Port of Blyth is to the East.
  4. Because of the power station and the port the site could be rail connected fairly easily.

Britishvolt seem to be planning to use rail freight to bring in raw materials and take out finished product.

The Modern Railways article says this.

The new factory will be about 2.5 miles from Bebside station and there has been talk of linking to the site with a shuttle bus.

As there is a rail connection, at some point in the future could a shuttle train be used? Or perhaps a few trains per day between the factory and Newcastle.

A Bridge For The A1061 At Newsham

The Modern Railways article says this.

A new road bridge will be built on the A1061 to replace Newsham level crossing.

This Google Map shows where the Northumberland Line crosses the A1061 at the level crossing at Newsham.

Note.

  1. The railway is double-track through the level crossing.
  2. It doesn’t appear to be a challenging project.
  3. A bridge could either be built along the existing route or a few metres to the South.

But as it looks like there could be more housing development in the area, would a bold design, that would allow a station to be added later be better?

Two Footbridges

The Modern Railways article says this.

In addition, there will be two new footbridges; Palmersville Dairy (replacing Palmersville foot crossing) and Chase Meadows (replacing Chase Meadows foot crossing).

This Google Map shows the Palmersville foot crossing to the West of Palmersville station on the Tyne and Wear Metro.

Note.

  1. The Northern pair of tracks are the Tyne and Wear Metro.
  2. The Southern pair of Tracks are the Northumberland Line.
  3. Palmersville and Northumberland Park stations are to the East.
  4. The current foot crossing is shown over the Northumberland Line.

It would appear that there is plenty of space for a footbridge.

Two Trains Per Hour

The Modern Railways article says this about infrastructure improvements to enable two trains per hour.

An extension of the double-track south from Newsham, for about 1 km in the direction of Seaton Delaval, along with a new 2.4 km passing loop between Holywell and Seghill, are in place in order to permit a half-hourly service in both directions.

From the maps, it looks like about half the route between Northumberland Park station and Seghill will be double-track.

It may even be possible to extend the double-track further South towards Northumberland Park station, if there became a need to run more trains on the Northumberland Line.

Operations

The Modern Railways article says this.

It is assumed that Class 158 DMUs will be the rolling stock for the first couple of years of service to Ashington, with three or four units required. Conversion of these trains (or replacement with new) to allow battery-electric operation is envisaged for the later years of this decade. There will be provision for two-car services at the outset with passive provision for extension to four-cars in the infrastructure works.

In Trains: £34m For Revival Of 50-Year-Old North-East Railway Line, I felt that the Hitachi Regional Battery Trains would be ideal for this route.

I said this.

I’m drawn inextricably to the conclusion, that the trains should be 100 mph battery-electric trains.

Hitachi, who have a factory in the North-East, have announced their Regional Battery Train in July 2020, which is described in this Hitachi infographic.

These trains can be based on Class 385 trains.

    • They are 100 mph trains.
    • They come in three- and four-cars lengths.
    • The three-car trains have 206 seats.
    • They can work in pairs.
    • They can use 25 KVAC overhead electrification.
    • They have a range of 90 kilometres or 56 miles on battery power.
    • The batteries would be charged on the ECML between Benton North junction and Newcastle station.
    • The battery packs will be designed and manufactured by Hyperdrive Innovation in Sunderland.
    • They have big windows for the views.

I’m sure Hitachi, Hyperdrive and Britishvolt would like a fleet in service, just up the road from their factories.

Now that the extension to between Ashington and Berwick-upon-Tweed via Morpeth is being talked about, I suspect that battery-electric trains, will be ideal for this route.

Distances without electrification of the two routes are as follows.

  • Benton North Junction and Ashington – 19 miles – 38 miles round trip
  • Benton North Junction and Widdrington – 27 miles

These distances are well within the planned range of the Hitachi Regional Battery Trains and they would even be capable of working a round trip to Ashington without charging at the Northern end of the route.

Batteries can be charged on the East Coast Main Line on the following sections of the route.

  • Between Benton North Junction and Newcastle.
  • Between Morpeth and Berwick-upon-Tweed stations.

Their fast acceleration and 100 mph operating speed mean that it could keep out of the way of the 140 mph Hitachi trains North of Morpeth.

Calling At Manors Station

The Modern Railways article says that because the East Coast Main Line is so busy, some peak services may have to omit the call at Manors station in the suburbs of Newcastle that is envisaged for the off-peak services.

I wonder with their faster acceleration, if the Hitachi Regional Battery Trains would be able to handle the stop at Manors station for all services.

Development At Ashington

The Modern Railways article gives this quote from Network Rail’s manager for the reopening project.

For instance in the centre of Ashington there’s a rather grim 1960s tower block that is owned by the county council that could be replaced by something more appropriate to today’s needs. This is Wansbeck Square in the centre of the town; the square is in line to be remodelled to make it more attractive. The integrated station and development need to be delivered at the same time for maximum impact.

This Google Map shows the Northerland Line going through the centre of the town of Ashington.

Note.

  1. Station Road running East-West .across the top of the map.
  2. The 1960s block could be to the West of the railway, especially as the Southern part is labelled Northumberland County Council.
  3. The site to the West of the railway does appear to be quite large.

The new station and the Wansbeck Square site does look look to have strong development potential.

 

 

 

April 9, 2021 Posted by | Transport/Travel | , , , , , , , | 2 Comments

€190m Order To Bring Hydrogen Trains To Regions In France

The title of this post, is the same as that of this article on H2 View.

This is the introductory paragraph.

What is believed to be the first order of dual mode electric-hydrogen trains has been made today (8th April) for the Auvergne-Rhône-Alpes, Bourgogne-Franche-Comté, Grand Est and Occitanie regions of France.

I very much hope that Alstom’s Class 600 trains for the UK are dual mode, as that surely is the best design option.

 

April 9, 2021 Posted by | Hydrogen, Transport/Travel | , , , | 4 Comments

Plans Announced For ‘Low Carbon’ Power Stations In Lincolnshire

The title of this post, is the same as that of this article on the BBC.

This is the introductory paragraph.

Hundreds of jobs could be created after plans were announced to build two “low carbon” power stations in North Lincolnshire.

Last year, I only had one night away from home and that was in Doncaster, from where I explored North East Lincolnshire and wrote Energy In North-East Lincolnshire, where I made a few predictions.

These are my thoughts on my predictions and other points made in the BBC article.

Keadby 1

Keadby 1 is a 734 MW gas-fired power station, that was commissioned in 1996.

Keadby 2

  • Keadby 2 will be a 840 MW gas-fired power station.
  • It will be possible to add Carbon Capture and Storage technology to Keadby 2 to make the plant net-zero carbon.
  • Keadby 2 will be able to run on hydrogen.

Keadby 2 is under construction.

Keadby 3 And Keadby 4

I predicted that two new power stations would be added to the Keadby cluster.

  • When I wrote the other post, SSE were still designing Keadby 3, but had said it would be a 910 MW station.
  • This would mean that Keadby 1, Keadby 2 and Keadby 3 would have a combined capacity of 2484 MW of electricity.
  • Adding a fourth station, which I called Keadby 4, which I proposed to be the same size as Keadby 3 would give a combined capacity of 3394 MW.

This will be more than the planned capacity of the under-construction Hinckley Point C nuclear power station will be able to generate 3200 MW.

The BBC article says this about the plans for Keadby.

One plant would burn natural gas and use carbon capture technology to remove the CO2 from its emissions. The CO2 would then be transported along pipelines before being securely stored in rocks under the North Sea.

The hydrogen power station would produce “zero emissions at the point of combustion”, its developers claimed.

It looks like Keadby will have the power of a Hinckley Point nuclear station, but running on gas.

Carbon Capture And Storage

From what I read on the sseThermal web site and published in Energy In North-East Lincolnshire, it looks like Keadby 2 and Keadby 3 will use carbon capture and storage and Keadby 4 will use hydrogen.

There are plenty of depleted gas fields connected to the Easington terminal that can be used for carbon-dioxide storage.

The Zero Carbon Humber Network

The Zero Carbon Humber is going to be a gas network along the Humber, that will distribute hydrogen to large industrial users and return carbon dioxide for storage under the North Sea.

This map shows the Zero Carbon Humber pipeline layout.

Note.

  1. The orange line is a proposed carbon dioxide pipeline
  2. The black line alongside it, is a proposed hydrogen pipeline.
  3. Drax, Keadby and Saltend are power stations.
  4. Easington gas terminal is connected to around twenty gas fields in the North Sea.
  5. The terminal imports natural gas from Norway using the Langeled pipeline.
  6. The Rough field has been converted to gas storage and can hold four days supply of natural gas for the UK.

I can see this network being extended, with some of the depleted gas fields being converted into storage for natural gas, hydrogen or carbon dioxide.

Enter The Vikings

This article on The Times is entitled SSE and Equinor’s ‘Blue Hydrogen’ Power Plant Set To Be World First.

This is the introductory paragraph.

The world’s first large-scale power station to burn pure hydrogen could be built in Britain this decade by SSE and Equinor to generate enough low-carbon energy to supply more than a million homes.

This second paragraph explains the working of the production of the blue hydrogen.

The proposed power station near Scunthorpe would burn “blue hydrogen”, produced by processing natural gas and capturing and disposing of waste CO2 in a process that has low but not zero emissions. Equinor is already working on plans for a blue hydrogen production facility at Saltend in the Humber.

This may seem to some to be a wasteful process in that you use energy to produce blue hydrogen from natural gas and then use the hydrogen to generate power, but I suspect there are good reasons for the indirect route.

I believe that green hydrogen will become available from the North Sea from combined wind-turbine electrolysers being developed by Orsted and ITM Power, before the end of the decade.

Green hydrogen because it is produced by electrolysis will have less impurities than blue hydrogen.

Both will be zero-carbon fuels.

According to this document on the TNO web site, green hydrogen will be used for fuel cell applications and blue hydrogen for industrial processes.

Blue hydrogen would be able to power Keadby 2, 3 and 4.

I can see a scenario where Equinor’s blue hydrogen will reduce the price of hydrogen steelmaking and other industrial processes. It will also allow the purer and more costly green hydrogen to be reserved for transport and other fuel cell applications.

Using The Carbon Instead Of Storing

The document on the TNO web site has this surprising paragraph.

Hydrogen produced from natural gas using the so-called molten metal pyrolysis technology is called ‘turquoise hydrogen’ or ‘low carbon hydrogen’. Natural gas is passed through a molten metal that releases hydrogen gas as well as solid carbon. The latter can find a useful application in, for example, car tyres. This technology is still in the laboratory phase and it will take at least ten years for the first pilot plant to be realised.

This technical paper is entitled Methane Pyrolysis In A Molten Gallium Bubble Column Reactor For Sustainable Hydrogen Production: Proof Of Concept & Techno-Economic Assessment.

This may be a few years away, but just imagine using the carbon dioxide from power stations and industrial processes to create a synthetic rubber.

But I believe there is a better use for the carbon dioxide in the interim to cut down the amount that goes into long-term storage, which in some ways is the energy equivalent of landfill except that it isn’t in the least way toxic, as carbon-dioxide is one of the most benign substances on the planet.

Lincolnshire used to be famous for flowers. On a BBC Countryfile program a couple of weeks ago, there was a feature on the automated growing and harvesting of tulips in greenhouses.

There are references on the Internet to  of carbon dioxide being fed to flowers in greenhouses to make them better flowers.

So will be see extensive building of greenhouses on the flat lands of Lincolnshire growing not just flowers, but soft fruits and salad vegetables.

Conclusion

The plans of SSE and Equinor as laid out in The Times and the BBC could create a massive power station cluster.

  • It would be powered by natural gas and hydrogen.
  • Blue hydrogen will be produced by an efficient chemical process.
  • Green hydrogen will be produced offshore in massive farms of wind-turbine/electrolysers.
  • It would generate as much electricity as a big nuclear power station.
  • All carbon-dioxide produced would be either stored or used to create useful industrial products and food or flowers in greenhouses.

Do power stations like this hasten the end of big nuclear power stations?

Probably, until someone finds a way to turn nuclear waste into something useful.

 

April 9, 2021 Posted by | Energy, Hydrogen | , , , , , , , , , , , , | Leave a comment

Massless Energy Storage: The Next Step In Battery Technology

The title of this post, is the same as that of this article on AZOCleanTech.

This is the introductory paragraph.

In this environmentally conscious world, fossil fuels are being shunned in favor of renewables for electricity generation and transportation. Due to their periodic nature, excess energy generated by renewables is frequently stored in batteries. However, these often add extra weight to the cars and consumer electronics they power.

To solve the problem, researchers in Sweden have developed a structural battery.

Sounds like a good idea to me!

April 9, 2021 Posted by | Design, Energy, Energy Storage | , | Leave a comment

Turkey Blames EU In ‘Sofagate’ Diplomatic Spat

The title of this post, is the same as that on this article on the BBC.

These are the first two paragraphs.

What began as an attempt to repair tense EU-Turkey relations has turned into a diplomatic spat that has been dubbed “sofagate”.

When European Commission President Ursula von der Leyen was left standing because of a lack of chairs in Ankara, she reacted with an audible “Ahem”.

I suspect Mrs. T and Mrs. M would have done more than say “Ahem”

You certainly see better courtesy on the buses on the multi-ethnic route between Dalston and Stamford Hill.

Three times now, I’ve seen the classic friendly argument between an elderly male Orthodox Jew and a very much younger lady, about who should get on the bus last.

If only all problems could be solved with a smile, as these usually are in the end!

April 8, 2021 Posted by | World | , , , , , | Leave a comment

Khan Pledges To Name London Overground Lines If Re-Elected

The title of this post is the same as that of this article on News Shopper.

If this is Khan’s big policy for people who use the Overground, then it is very small thinking.

It is also another pointless waste of money.

The Overground needs expansion not a rebranding exercise.

It is successful and every user has their own names for the various lines.

I shall be voting for someone who has an expansive vision for London.

April 8, 2021 Posted by | Transport/Travel, World | , , , | 6 Comments

Mayor Sadiq Khan Plans to Ban London Underground Gambling Ads

The title of this post is the same as that of this article on Gambling News.

It’s probably the right thing to do, but as fast food ads have been banned and others are probably to be banned as well, where does the Mayor think he is going to get the money to run Transport for London from?

As he is going to have an enquiry into the legalisation of cannabis, which I am against, as it ruins your immune system, I shall be voting for someone else.

April 8, 2021 Posted by | Health, Transport/Travel, World | , , , , , , | 3 Comments

Thoughts On The Class 360 Trains On The London St. Pancras And Corby Route

In May the Class 360 electric trains will be introduced by East Midlands Railway on the service between St. Pancras and Corby stations.

The Class 360 train is on the left.

The following data has come from Real Time Trains.

  • St. Pancras and Corby are 79.3 miles apart.
  • The current service stops at Kettering, Wellingborough, Bedford and Luton.
  • The new electric service stops at Kettering, Wellingborough, Bedford and Luton and Luton Airport Parkway.
  • Current services take between 67 and 73 minutes
  • The new electric services take between 71 minutes
  • Services leave St. Pancras at XX:15 and XX:45
  • Services leave Corby at XX:11 and XX:40
  • Turnround at St. Pancras appears to be about 23-25 minutes
  • Turnround at Corby appears to be about 12-16 minutes.
  • St. Albans and St. Pancras takes 14 minutes.

Note.

  1. The Class 222 train has a top speed of 125 mph and a maximum acceleration: of 0.80 ms-2
  2. The Class 360 train has a top speed of 110 mph and a maximum acceleration: of 0.98 ms-2

Looks like a case of swings and roundabouts to me!

I can deduce the following.

Average Speed

Consider.

  • Assuming a trip time of seventy minutes for the Class 222 train, gives an average speed of 68 mph including stops.
  • Assuming a trip time of seventy-one minutes for the Class 360 train, gives an average speed of 62 mph including stops.

These speeds don’t seem to be too difficult to achieve. Especially, as the Midland Main Line is a series of straight line between a number of stations., which are ideal for a quick dash in between.

It’s A Three Hour Round Trip

Add up the two 71 minute trips and the turnaround times and it looks to be a comfortable three hour round trip.

So for a two trains per hour (tph) service, you will need six formations of Class 360 trains.

As it looks like each formation will be twelve cars long, that will mean that eighteen of the current twenty-one trains will be needed.

The three spare trains will be very useful, whilst the trains are refurbished with new liveries and interiors.

Route Capacity

This picture shows a five-car Class 222 train at Corby station.

Consider.

  • The current five-car Class 222 trains have a capacity of 50 First Class and 192 Standard Class seats
  • Four-car Class 222 trains have a capacity of 33 First Class and 132 Standard Class seats.
  • A four-car Class 360 train has a capacity of 16 First Class and 264 Standard Class seats.

I can do a simple calculation.

  • The current one tph service, if run by a five-car Class 222 trains would have an hourly capacity of 50 First Class and 192 Standard Class seats.
  • The planned two tph service if run by twelve-car 360 trains has an hourly capacity of 96 First Class and 1584 Standard Class seats.

First Class capacity on the route has doubled and Standard Class accommodation has gone up by a massive 8.25 times.

The latter figure will probably be reduced as some of the seats are to be removed for a more spacious interior with tables.

Serving Luton Airport

It looks like these trains will enable a quick journey to Luton Airport.

  • The St. Pancras and Corby train will take 22 minutes between St. Pancras and Luton Airport Parkway stations.
  • There will be the Luton DART connecting Luton Airport Parkway to the Airport from 2022.
  • I suspect Luton Airport will be aiming for a thirty minute journey between St. Pancras and the Airport.
  • The fast service will have a frequency of two tph.

It will not compare badly with rail times from London to Gatwick of 35 minutes and to Stansted of 50 minutes.

Services To Oakham And Melton Mowbray

Consider.

  • Oakham and Melton Mowbray stations are on the route between Corby station and the Midland Main Line North of Leicester.
  • Oakham and Melton Mowbray stations have a one train per day (tpd) in both directions to London via Corby.
  • In Beeching Reversal – Increased Services To Nottingham And Leicester, via Syston And Loughborough From Melton Mowbray. I wrote about how the local MP wants better services at Melton Mowbray.
  • Oakham is 11.5 miles from Corby.
  • Melton Mowbray is 25.8 miles from Corby.
  • Leicester is just over forty miles from Corby and could be covered in under an hour.
  • A pair of Class 810 trains are the same length as a trio of Class 360 trains, so both trains would fit all platforms.

I think that there are a lot of possibilities for services through Corby.

  • Class 810 trains could use Corby as a diversion, when the Midland Main Line is closed for engineering works.
  • Class 810 trains could run a service between St. Pancras and Leicester via Corby, Oakham and Melton Mowbray.
  • If the Class 360 trains could be fitted with batteries, they should be able to provide a service from St. Pancras to Melton Mowbray and perhaps Leicester.

It could even provide an alternative route to London, if Leicester station has to be substantially rebuilt for electrification..

Conclusion

This not the longest of electric services, but I can see it carrying a lot of passengers.

It will also give a boost to Luton Airport.

April 7, 2021 Posted by | Transport/Travel | , , , , , , | 12 Comments

Thoughts On Faster Trains On Thameslink

The Class 700 trains used by Thameslink only have an operating speed of 100 mph.

I do wonder, if that is a fast enough operating speed for all Thameslink routes.

Sharing The Midland Main Line With 125 mph Trains

A couple of years ago, I travelled back into St. Pancras with a group of East Midlands drivers in a Class 222 train.

They told me several things about the route including that the bridge at the South of Leicester station would be difficult to electrify, as it was low and the track couldn’t be lowered as one of Leicester’s main sewers was under the tracks at the bridge. Perhaps, this is one place, where discontinuous electrification could be used on the Midland Main Line.

They also told me, that sometimes the Thameslink trains were a nuisance, as because of their 100 mph operating speed, the 125 mph Class 222 trains had to slow to 100 mph.

Upgrading Of The Midland Main Line South Of Bedford

The electrification of the Midland Main Line South of Bedford is being updated, so that it is suitable for 125 mph running.

An Analysis Of Services On The Midland Main Line South Of Bedford

The current Class 222 trains are capable of 125 mph and will be replaced by Class 810 trains capable of the same speed on both diesel and electricity.

Currently, a Class 222 train is capable of doing the following on a typical non-stop run between St. Pancras and Leicester.

  • Covering the 30 miles between St. Albans and Bedford in 17 minutes at an average speed of 106 mph.
  • Covering the 50.3 miles between Bedford and Leicester in 30 minutes at an average speed of 100.6 mph.
  • Maintaining 125 mph for long stretches of the route, once the trains is North of London commuter traffic at St. Albans

I can estimate the timings on the 79.2 miles between Leicester and St. Albans, by assuming the train runs at a constant speed.

  • 100 mph – 47.5 minutes
  • 110 mph – 43.2 minutes
  • 125 mph – 38 minutes
  • 140 mph – 34 minutes

Note.

  1. I have done the calculation for 140 mph, as that is the maximum operating speed of the Class 810 train with full in-cab digital signalling.
  2. Trains have been running at 125 mph for a couple of decades on the Midland Main Line.
  3. To get a St. Pancras and Leicester time add another 14 minutes, which is the current time between St. Pancras and St. Albans of a Class 222 train.
  4. Some Off Peak trains are timed at 62-63 minutes between St. Pancras and Leicester.
  5. A time of under an hour between St. Pancras and Leicester might be possible and the Marketing Department would like it.
  6. As Thameslink trains between Bedford and St. Albans stop regularly, they are on the slow lines of the four-track railway, to the North of St. Albans.
  7. South of St. Albans, Thameslink trains often run on the fast lines.

I can expect that East Midlands Railway will want to be running their new Class 810 trains as far as far South as they can at 125 mph, to speed up their services. When the signalling allows it, they’ll want to run at 140 mph.

So they won’t want to see Thameslink’s slow trains on the fast lines.

  • But if you look at the Thameslink trains that do run on the fast lines between St. Albans and St. Pancras, they appear to be the four trains per hour (tph) that run to and from Bedford.
  • Of these trains, two tph terminate at Brighton and two tph terminate at Gatwick Airport.
  • The average speed of a Class 222 train between St. Albans and St. Pancras assuming 14 minutes for the 19.7 miles is 84.4 mph.

So it looks to me that a 100 mph Thameslink train could be able to get away without slowing the East Midland Railway expresses.

But then that is not surprising, as for many years, the Class 222 trains worked happily with 100 mph Class 319 trains.

Is There Scope For Extra And Faster Services Into St. Pancras?

I have only done a simple calculation, but I do wonder if there is scope for the following.

  • Increasing the frequency of trains for both Thameslink and East Midlands Railway.
  • Saving a few minutes on East Midlands Railway services.

Consider.

  • The new Class 810 electric trains will probably have better acceleration and deceleration than the current Class 222 diesel trains, when working using electric power.
  • East Midlands Railway is introducing Class 360 trains that were built as 100 mph trains by Siemens, who are now upgrading them to 110 mph trains.
  • Can Siemens do the same for the Class 700 trains and create a sub-fleet capable of 110 mph running?
  • All trains will be running under full in-cab digital signalling with a large degree of automatic train control.

I feel that if the Class 700 trains had the extra speed, they would make the planning of services South of St. Albans easier and allow the Class 810 trains to both run faster and provide more services.

Sharing The East Coast Main Line With 125 mph Trains

The following Thameslink services run up the East Coast Main Line past Stevenage.

  • Cambridge And Brighton – Two tph – Stops at Royston, Ashwell and Morden (1 tph), Baldock, Letchworth Garden City, Hitchin, Stevenage, Finsbury Park, London St Pancras International, Farringdon, City Thameslink, London Blackfriars, London Bridge, East Croydon, Gatwick Airport, Three Bridges, Balcombe, Haywards Heath and Burgess Hill
  • Cambridge and Kings Cross – Two tph – Stops at Foxton, Shepreth, Meldreth, Royston, Ashwell and Morden, Baldock, Letchworth Garden City, Hitchin, Stevenage, Knebworth, Welwyn North, Welwyn Garden City, Hatfield, Potters Bar and Finsbury Park
  • Peterborough and Horsham – Two tph – Stops at Huntingdon, St Neots, Sandy, Biggleswade, Arlesey, Hitchin, Stevenage, Finsbury Park, London St Pancras International, Farringdon, City Thameslink, London Blackfriars, London Bridge, East Croydon, Coulsdon South, Merstham, Redhill, Horley, Gatwick Airport, Three Bridges, Crawley, Ifield, Faygate (limited) and Littlehaven

Note.

  1. Services are generally run by Class 700 trains, although lately the Kings Cross service seems to use Class 387 trains, which have a maximum speed of 110 mph and a more comfortable interior with tables.
  2. It is intended that the Cambridge and Kings Cross service will be extended to Maidstone East by 2021.

In addition there are two Cambridge Express and Fen Line services.

  • Kings Cross and Ely – One tph – Stops at Cambridge and Cambridge North.
  • Kings Cross and King’s Lynn – One tph – Stops at Cambridge, Cambridge North, Waterbeach, Ely, Littleport, Downham Market and Watlington

Note.

  1. These services are generally run by Class 387 trains.
  2. Cambridge and King’s Cross is timetabled at around fifty minutes.

Adding all of this together means that slower services on the East Coast Main Line are comprised of the following in both directions.

  • Three tph – 110 mph – Class 387 trains
  • Four tph – 100 mph – Class 700 trains

These seven trains will have to be fitted in with the 125 mph trains running services on the East Coast Main Line, for LNER, Grand Central, Hull Trains and East Coast Trains.

There are also the following problems.

  • All trains must navigate the double-track section of the East Coast Main Line over the Digswell Viaduct and through Welwyn North station.
  • The King’s Cross and Cambridge service stops in Welwyn North station.
  • Full in-cab digital signalling is being installed on the East Coast Main Line, which could increase the speed of the expresses through the double-track section.

Could the introduction of the Class 387 trains on the Cambridge and King’s Cross service have been made, as it easier to fit in all the services if this one is run by a 110 mph train?

However, the full in-cab digital signalling with a degree of automatic train control could be the solution to this bottleneck on the East Coast Main Line.

  • Trains could be controlled automatically and with great precision between perhaps Hatfield and Stevenage.
  • Some expresses might be slowed to create gaps for the Cambridge and Peterborough services.
  • The Hertford Loop Line is also getting full in-cab digital signalling, so will some services be sent that way?

In Call For ETCS On King’s Lynn Route, I talked about a proposal to improve services on the Fen Line. This was my first three paragraphs.

The title of this post, is the same as that on an article in Edition 849 of Rail Magazine.

The article is based on this document on the Fen Line Users Aoociation web site, which is entitled Joint Response To Draft East Coast Main Line Route Study.

In addition to ETCS, which could improve capacity on the East Coast Main Line, they would also like to see journey time reductions using trains capable of running at 125 mph or faster on the King’s Lynn to Kings Cross route.

My scheduling experience tells me that a better solution will be found, if all resources are similar.

Hence the proposal to run 125 mph trains between King’s Cross and King’s Lynn and probably Ely as well, could be a very good and logical idea.

If the Class 700 trains were increased in speed to 110 mph, the trains through the double-track section of the East Coast Main Line would be.

  • One tph – 110 mph – Class 387 trains
  • Four tph – 110 mph – Class 700 trains
  • Two tph – 125 mph – New trains

Note.

  1. This would probably be an easier mix of trains to digest with the high speed services, through the double-track section.
  2. I like the idea of extending the Ely service to Norwich to give Thetford, Attleborough and Wymondham an improved service to London, Cambridge and Norwich.

The new trains would probably be a version of Hitachi’s Regional Battery Train.

  • It would need to be capable of 125 mph on the East Coast Main Line.
  • If the Ely service were to be extended to Norwich, this section would be on battery power.

There are certainly a lot of possibilities.

But as with on the Midland Main Line, it looks like for efficient operation, the operating speed of the Class 700 trains on the route needs to be increased to at least 110 mph.

Could Faster Class 700 trains Improve Services To Brighton?

These are the Thameslink services that serve Bedford, Cambridge and Peterborough, that I believe could be run more efficiently with trains capable of at running at speeds of at least 110 mph.

  • Bedford and Brighton – Two tph
  • Bedford and Gatwick Airport – Two tph
  • Cambridge and Brighton – Two tph
  • Cambridge and Maidstone East – Two tph
  • Peterborough and Horsham – Two tph

Note.

  1. I have assumed that the Cambridge and King’s Cross service has been extended to Maidstone East as planned.
  2. Eight tph serve Gatwick Airport.
  3. Four tph serve Brighton.

The Gatwick Express services have a frequency of two tph between London Victoria and Brighton calling at Gatwick Airport is already run by 110 mph Class 387 trains.

It would appear that if the Bedford, Cambridge and Peterborough were run by uprated 110 mph Class 700 trains, then this would mean that more 110 mph trains would be running to Gatwick and Brighton and this must surely improve the service to the South Coast.

But it’s not quite as simple as that, as the Cambridge and Maidstone East services will be run by eight-car trains and all the other services by twelve-car trains.

Conclusion

There would appear to be advantages in uprating some or possibly all of the Class 700 trains, so that they can run at 110 mph, as it will increase capacity on the Brighton Main Line, East Coast Main Line and Midland Main Line.

 

 

April 6, 2021 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , | Leave a comment