Alstom Hydrogen Aventras And Extension Of The Birmingham Cross-City Line

In Alstom And Eversholt Rail Sign An Agreement For The UK’s First Ever Brand-New Hydrogen Train Fleet, I give my thoughts on Alstom’s new hydrogen train, which I have called the Alstom Hydrogen Aventra.

In that post, decide that the proposed Alstom Hydrogen Aventras are based on the three-car Class 730/0 trains that have been ordered by West Midlands Trains for Birmingham’s electrified Cross-City Line.

I then go on to say.

There are plans to expand the line in the future and I do wonder if the proposed Alstom Hydrogen Aventras could be the ideal trains for extending the network.

Expansion plans are detailed a section called Future, in the Wikipedia entry for the Cross-City Line, where these plans are indicated.

In addition, the Walsall and Wolverhampton Line is being reopened to passenger trains.

These new and possibly other services will need no new tracks, but more electrification and extra new trains.

In 2015, I wrote Electrification May Be In Trouble Elsewhere, But The Brummies Keep Marching On, which looked at electrification progress in the UK and the Birmingham in particular, where the electrification of the Chase Line seemed to be going well. So unlike in some places, where electrification seems to be accident-prone, Birmingham seems to avoid the sort of problems, that happened in the Preston and Blackpool and GOBlin electrifications.

But the Alstom Hydrogen Aventra gives Birmingham and the West Midlands a unique advantage compared to say Leeds or Manchester.

Birmingham can obtain a unified fleet, which to the passengers and the drivers looks the same, but in fact are two separate classes of three-car trains;  the Class 730/0 electric train and the Alstom Hydrogen Aventra.

  • Where electrification exists, the Class 730/0 trains will be used and where there is no electrification, the Alstom Hydrogen Aventra will work the route on hydrogen.
  • All that is needed is to provide good tracks and signalling and the Alstom Hydrogen Aventras will take you where you want to go.
  • Through the centre of Birmingham, these trains will use the existing electrification.
  • It would be a network, that would be simple to expand.

The only other English city to use a similar technique will be Liverpool, where Merseyrail’s new Class 777 trains will use battery power outside of the electrified core.

Conclusion

If Birmingham uses their disused but still existing railway lines and adds new trains as required, they can create a world-class suburban network, with the Cross-City Line at its centre

 

November 13, 2021 Posted by | Hydrogen, Transport/Travel | , , , , , , , , | 2 Comments

Alstom Hydrogen Aventras And Great Western Branch Lines Between Paddington And Oxford

In Alstom And Eversholt Rail Sign An Agreement For The UK’s First Ever Brand-New Hydrogen Train Fleet, I give my thoughts on Alstom’s new hydrogen train, which I have called the Alstom Hydrogen Aventra.

One reader suggested these lines in a comment, as they are all run by diesel Class 165 trains.

These are the lines, that could be converted to Hydrogen operation.

Greenford Branch

The branch runs between West Ealing and Greenford via Drayton Green, Castle Bar Park and South Greenford.

  • It has a frequency of two trains per hour (tph).
  • The branch is 2.5 miles long.
  • Services take eleven minutes.
  • It needs a single train to run the service.

Note.

  1. In GWR To Test Battery Train On Branch Line, I wrote about Great Western Railway’s plans to test battery-eclectic trains on this line.
  2. The platform at Greenford station may need lengthening to accommodate the Alstom Hydrogen Aventra.
  3. It is my view that the branch needs four tph.
  4. It might also be possible to run Peak hour services to and from Paddington.

I do think that if the train length issue is solved that a single Alstom Hydrogen Aventra could work this branch.

A two-car Class 230 train would certainly fit.

Windsor Branch

The branch runs between Slough and Windsor & Eton Central.

  • It has a frequency of three tph
  • The branch is 2.8 miles long.
  • Services take six minutes.
  • It needs a single train to run the service.

Note.

  1. The extra capacity of the Alstom Hydrogen Aventra could be welcome.
  2. Prince Charles would like it.

I do think that a single Alstom Hydrogen Aventra could work this branch.

Marlow Branch

The branch runs between Maidenhead and Marlow via Furze Platt, Cookham and Bourne End.

  • It has a frequency of one tph
  • The branch is 7.1 miles long.
  • Services take twenty-three minutes.
  • The service reverses at Bourne End.
  • It needs a single train to run the service.

Note that the three-car Alstom Hydrogen Aventra may be too long to execute the reverse at Bourne End.

I do think that if the Bourne End problem can be solved that a single Alstom Hydrogen Aventra could work this branch.

The two-car Class 165 train, that currently works the branch is 46 metres long, so a two-car battery-electric train may be needed for this branch. A two-car Class 230 train would certainly fit.

Regatta Line

The branch runs between Twyford and Henley-on-Thames via Wargrave and Shiplake.

  • It has a frequency of two tph
  • The branch is 4.6 miles long.
  • Services take twelve minutes.
  • It needs a single train to run the service.

Note.

  1. If this line needed more capacity trains could be doubled up, as there are no length issues.
  2. It might also be possible to run Peak hour services to and from Paddington.

I do think that a single Alstom Hydrogen Aventra could work this branch.

North Downs Line

The line runs between Reading and Gatwick Airport via Wokingham, Crowthorne, Sandhurst, Blackwater, Farnborough North, North Camp, Ash, Guildford, Shalford, Chilworth, Gomshall, Dorking West, Dorking Deepdene, Betchworth, Reigate and Redhill

  • It has a frequency of two tph
  • The route is 53.1 miles long.
  • The route is partially-electrified with 750 VDC third-rail electrification.
  • The route has been planned for 100 mph trains.
  • Services take eighty-two minutes.
  • It needs six trains to run the service.

Note.

  1. The route is proposed to be run by four-car Class 769 bi-mode trains.
  2. Would a three-car train be sufficient for this route?
  3. The Alstom Hydrogen Aventras are only 90 mph trains and would they be fast enough?

I do think that Alstom Hydrogen Aventras could work this route, but given the number of trains and possible capacity and speed issues, a four-car battery-electric train could be better suited to the route.

Reading And Basingstoke Line

This line runs between Reading and Basingstoke via Reading West, Mortimer and Bramley

  • It has a frequency of two tph
  • The route is 15.4 miles long.
  • There is 25 KVAC overhead electrification at Reading.
  • There is 750 VDC third-rail electrification at Basingstoke, but the platform used by the service is unelectrified.
  • The route has been planned for 100 mph trains.
  • Services take twenty-eight minutes.
  • It needs two trains to run the service.

Note.

  1. For a battery-electric train to work this route, it might need a charging system at Basingstoke.
  2. The Alstom Hydrogen Aventras are only 90 mph trains and would they be fast enough?

I do think that a pair of Alstom Hydrogen Aventras could work this service.

Oxford Canal Line

This route runs between Didcot Psrkway and Banbury via Appleford, Culham, Radley, Oxford, Tackley, Heyford and Kings Sutton.

  • It is effectively two routes with a combined frequency of two tph between Didcot Junction and Oxford and half that between Oxford and Banbury.
  • The full route is 33 miles long.
  • There is 25 KVAC overhead electrification at Didcot Parkway.
  • Services take forty-one minutes.
  • It probably needs four trains to run the service.

I do think that a small fleet of Alstom Hydrogen Aventras could work this service.

Some General Thoughts

These are a few general points.

Stabling And Hydrogen Fuelling

Reading Train Care Facility is a large depot to the west of Reading.

  • It is ideally placed for all the lines, that I’ve mentioned.
  • It is connected to all the lines by electrified lines.

I am sure that it would be possible to build a hydrogen fuelling facility at the depot.

Two-Car Battery-Electric Trains

It looks like the Greenford and Marlow Branches might need to be served by two-car battery-electric trains.

Four-Car Trains

Some of the services might be run by four-car trains, as these would be more suitable for the number of passengers.

Total Number Of Trains

My rough estimates of numbers of trains are as follows.

  • Greenford Branch – 1 train
  • Windsor Branch – 1 train
  • Marlow Line – 1 train
  • Regatta Line – 1 train
  • North Downs Line – 6 trains
  • Reading And Basingstoke Line – 2 trains
  • Oxford Canal Line – 4 trains

This would be a total of sixteen trains or ten, if the Class 769 trains were used on the North Downs Line.

Additional Routes

There may be other routes, where the trains could be used, that are handy for Reading Train Care Facility.

Hydrogen or battery power may give advantages in opening new routes.

Would Hydrogen Trains Attract Passengers And Tourists?

I think they could, as if nothing there is a curiosity value.

Conclusion

This collection of routes surround Reading Train Care Facility and would be a nice package to run with hydrogen or battery-electric trains.

 

 

November 13, 2021 Posted by | Hydrogen, Transport/Travel | , , , , , , , , , , , , | 9 Comments

Alstom Hydrogen Aventras And The Uckfield Branch

In Alstom And Eversholt Rail Sign An Agreement For The UK’s First Ever Brand-New Hydrogen Train Fleet, I give my thoughts on Alstom’s new hydrogen train, which I have called the Alstom Hydrogen Aventra.

One possible route for the trains could be the Uckfield Branch, which has an hourly service from London Bridge via East Croydon and Oxted stations?

  • The route is forty-six miles long, with the Northernmost twenty-one miles electrified with 750 VDC third-rail electrification.
  • On each trip, the train would need to run for fifty miles without electrification.
  • There are seven stops on the route.
  • The platforms on the Uckfield Branch can handle a 240 metre train.
  • Trains take around three hours for the round trip.
  • Each train probably does around five round trips per day.

So would Alstom Hydrogen Aventras be able to work the route?

  • The length of a three-car Alstom Hydrogen Aventra is probably around 72 metres.
  • Three Alstom Hydrogen Aventras working together would be 216 metres.
  • Aventras can be configured to work on 750 VDC third rail electrification.
  • The capacity of a nine-car formation of Alstom Hydrogen Aventra would be similar to that of a ten-car Electrostar, which has shorter cars.

Three Alstom Hydrogen Aventra trains working together could seem to be a possible solution for the route.

These are my thoughts.

The Required Range

If each train has to do five round trips, with each needing fifty miles on hydrogen, the trains would need a range in excess of 250 miles, whilst running on hydrogen.

Refuelling With Hydrogen

This would probably be done at a depot setup to service the hydrogen trains, where they would be stabled at night.

I doubt that London Bridge or Uckfield stations would be suitable places to refuel

The Number Of Trains

In Battery Electrostars And The Uckfield Branch, I estimated that three ten- or twelve-car trains would be needed to run an hourly service. Running half-hourly would need six trains.

As each nine-car train would need three Alstom Hydrogen Aventras, an hourly service would need a total of nine and a half-hourly service would need eighteen individual trains.

I suspect that this would not be a cost effective way of using the trains, as a lot of trains would need to refuelled every day.

Conclusion

I am not saying that Alstom Hydrogen Aventras couldn’t work the Uckfield Branch, but I’m sure there are are better ways to decarbonise the route.

November 12, 2021 Posted by | Hydrogen | , , , , , | 11 Comments

Alstom And Eversholt Rail Sign An Agreement For The UK’s First Ever Brand-New Hydrogen Train Fleet

The title of this post, is the same as that of this press release from Alstom.

This is the first two paragraphs.

Alstom, Britain’s leading train manufacturer and maintenance provider, and Eversholt Rail, leading British train owner and financier, have today announced a Memorandum of Understanding aimed at delivering the UK’s first ever brand-new hydrogen train fleet.

The two companies have agreed to work together, sharing technical and commercial information necessary for Alstom to design, build, commission and support a fleet of ten three-car hydrogen multiple units (HMUs). These will be built by Alstom in Britain. The new HMU fleet will be based on the latest evolution of the Alstom Aventra platform and the intention is that final contracts for the fleet will be signed in early 2022.

This is an Alstom visualisation of the train.

The first thing I notice is that the train doesn’t have the same aerodynamic nose as this current Class 710 train, which is one of the London Overground’s Aventras.

 

Note how the lights, coupler position and the front-end structure are all different.

These are my further thoughts on the design.

The Aventra’s Traction System

In this article in Global Rail News from 2011, which is entitled Bombardier’s AVENTRA – A new era in train performance, gives some details of the Aventra’s electrical systems. This is said.

AVENTRA can run on both 25kV AC and 750V DC power – the high-efficiency transformers being another area where a heavier component was chosen because, in the long term, it’s cheaper to run. Pairs of cars will run off a common power bus with a converter on one car powering both. The other car can be fitted with power storage devices such as super-capacitors or Lithium-ion batteries if required. The intention is that every car will be powered although trailer cars will be available.

Unlike today’s commuter trains, AVENTRA will also shut down fully at night. It will be ‘woken up’ by remote control before the driver arrives for the first shift

This was published over ten years ago, so I suspect Bombardier (or now Alstom) have refined the concept.

Bombardier have not announced that any of their trains have energy storage, but I have my suspicions, that both the Class 345 and Class 710 Aventra trains use super-capacitors or lithium-ion batteries, as part of their traction system design.

  • I was told by a Bombardier driver-trainer that the Class 345 trains have an emergency power supply. When I said “Batteries?”, He gave a knowing smile.
  • From the feel of riding on Class 710 trains, as a Control Engineer, I suspect there is a battery or supercapacitor in the drive system to give a smoother ride.

I also feel that the Aventra has been designed, so that it can accept power from a large variety of sources, which charge the battery, that ultimately drives the train.

The Formation Of A Three-Car Aventra

The only three-car Aventra is the Class 730/0 train.

I have not seen one of one of these trains in the metal and the formation can’t be found on the Internet. But Wikipedia does show the pantograph on the middle car.

In The Formation Of A Class 710 Train, I said this.

Here is the formation of the train.

DMS+PMS(W)+MS1+DMS

The plates on the individual cars are as follows.

DMS – Driving Motored Standard

    • Weight – 43.5 tonnes
    • Length – 21.45 metres
    • Width 2.78 metres
    • Seats – 43

The two DMS cars would appear to be identical.

PMS (W) -Pantograph Motored Standard

    • Weight – 38.5 tonnes
    • Length – 19.99 metres
    • Width 2.78 metres
    • Seats – 51

The (W) signifies a wheelchair space.

MS1 – Motored Standard

    • Weight – 32.3 tonnes
    • Length – 19.99 metres
    • Width 2.78 metres
    • Seats – 52

It is similar in size to the PMS car, but has an extra seat.

So could the formation of a three-car Aventra be?

DMS+PMS(W)+DMS

I have just removed the MS1 car.

This would mean that a three-car Aventra has the following dimensions and capacity.

  • Weight – 125.5 tonnes
  • Length – 62.89 metres
  • Seats – 137

There will probably be a difference between these figures and those of a three-car Class 730 train, as those trains have end-gangways.

Could All The Hydrogen Gubbins Fit Underneath The Train?

These pictures show the space underneath a Class 710 train.

If you also look at Alstom’s visualisation of their Hydrogen Aventra on this post, there would appear to be lots of space under the train.

It should also be noted  that Birmingham University’s engineers have managed to put all of the hydrogen gubbins underneath the floor of Porterbrook’s Class 799 train.

Looking at my pictures, you can see the following.

  • The two DMS (Driving Motored Standard) cars have large boxes underneath
  • The MS1(Motored Standard) car is fairly clear underneath. But this will probably not be there in a three-car train.
  • The PMS (Pantograph Motored Standard) car has some space underneath.

If more space needs to be created, I suspect that the cars can be lengthened, between the bogies. The Class 710 trains have twenty metre intermediate cars, whereas some versions have twenty-four metre cars.

I believe that Aventras have been designed, so that various power sources could be installed under the floor.

When the Aventra was designed, over ten years ago, these could have included.

  • A diesel generator and all the fuel tanks and cooling systems.
  • A battery or other energy storage system.

Since then two other suitable power sources have been developed.

  • Rolls-Royce, Honeywell and others have developed small and powerful gas-turbine generators.
  • Ballard Power Systems and others have developed hydrogen fuel cell generators.

If you look at the proportions of the Alstom hydrogen train and the pictures of Class 710 trains, I feel that the Alstom train could have the longer twenty-four metre cars.

It may be a tight fit compared to creating the Alstom Coradia iLint hydrogen train, but I would feel it is possible to install a fuel cell or cells, the required cooling and the hydrogen tanks, having seen cutaway drawings of hydrogen-powered double-deck buses on the Wrightbus web site.

Interestingly, the Alstom press release doesn’t mention fuel cells, so could the train be powered by a small gas turbine?

I think it is unlikely, but it is technically feasible.

Does The Alstom Hydrogen Aventra Have Longer Cars?

I have been looking at pictures of Aventras on Wikipedia and in my own archive.

It appears that only Aventras with twenty-four metre carriages have five windows between the pair of double-doors in the intermediate carriages.

This picture shows the PMS car from a Class 710 train.

The PMS car is to the right and has four windows between the doors.

This is the side view of one of Greater Anglia’s Class 720 trains.

It has twenty-four metre intermediate cars and five windows.

It looks to me that the Alstom Hydrogen Aventra will have twenty-four metre cars.

This will give an extra four x 2.78 metres space under the train compared to a Class 710 train.

It would also appear that the Aventras with twenty-four metre cars also have an extra window in the driving cars, between the doors.

Does the four metre stretch make it possible to position tubular hydrogen tanks across the train to store a practical amount of hydrogen?

Is The Alstom Hydrogen Train Based On A Three-Car Class 730/0 Train?

I have just found this video of a three-car Class 730/0 under test.

And guess what! It has five windows between the doors.

But then it is a train with twenty-four metre cars.

It looks to me, that Alstom have looked at the current Aventra range and decided that the three-car Class 730/0 could be the one to convert into a useful train powered by hydrogen.

So if it is a Class 730/0 train with hydrogen gubbins under the floor, what other characteristics would carry over.

  • I suspect Aventras are agnostic about power and so long as they get the right quantity of volts, amps and watts, the train will roll along happily.
  • But it means that the train can probably use 25 KVAC overhead electrification, 750 VDC third-rail electrification, hydrogen or battery power.
  • I wouldn’t be surprised if if could use 15 KVAC and 3KVDC overhead electrification for operation in other countries, with perhaps a change of power electronics or transformer.
  • The interior layout of the trains can probably be the same as that of the Class 730/0 trains.
  • The Class 730/0 trains have an operating speed of 90 mph and this could be good enough for hydrogen.

This could be a very capable train, that could find a lot of applications.

Could The Proposed Alstom Hydrogen Aventra Be Considered To Be A Class 730/0 Train With A Hydrogen Extender?

It appears that the only difference between the two trains is that the proposed Alstom Hydrogen Aventra has a hydrogen propulsion system, that can be used when the electrification runs out.

The hydrogen fuel cell will convert hydrogen into electricity, which will either be used immediately or stored in a battery on the train.

The Class 730/0 trains have already been ordered to run services on Birmingham’s electrified Cross-City Line.

There are plans to expand the line in the future and I do wonder if the proposed Alstom Hydrogen Aventras could be the ideal trains for extending the network.

How Does The Alstom Hydrogen Aventra Compare With The Class 600 Breeze Train?

The Class 600 train, which is based on the British Rail-era Class 321 train seems to have gone cold.

If it was a boxing match, it would have been stopped after the fourth round, if not before.

This Alstom visualisation shows the Class 600 train, which is also known as the Breeze.

I have a feeling that Alstom have done their marketing and everybody has said that the Class 600 train wouldn’t stand up to a modern train.

  • When you consider that each end of the train is a hydrogen tank, I wonder if possible passenger and driver reaction has not been overwhelmingly positive.
  • The project was announced in January 2021 and in the intervening time, hydrogen technology has improved at a fast pace.
  • There could even be a battery-electric version of the proposed Alstom Hydrogen Aventra.
  • The modern train could possibly be lengthened to a four or five car train.

It does strike me, that if Alstom are going to succeed with hydrogen trains, that to carry on with the Class 600 train without an order into the future is not a good idea.

How Does The Alstom Hydrogen Aventra Compare With The Alstom Coradia iLint?

The Alstom Coradia iLint is the world’s first hydrogen train.

It is successfully in service in Germany.

These are some characteristics of the Coradia iLint from the Internet.

  • Seats – 180
  • Length – 54.27 metres
  • Width – 2.75 metres
  • Height – 4.31 metres
  • Operating Speed – 87 mph
  • Range – 370-500 miles
  • Electrification Use – No

The same figures for the Alstom Hydrogen Aventra are as follows.

  • Seats – 164
  • Length – 72 metres
  • Width – 2.78 metres
  • Height – 3.76 metres
  • Operating Speed – 90 mph
  • Range – Unknown
  • Electrification Use – Unknown, but I would expect it is possible.

Note.

  1. I have taken figures for the Alstom Hydrogen Aventra from the Class 730/0 train and other Aventras.
  2. The number of seats is my best estimate from using the seat density of a Class 710 train in a 24 metre long car.
  3. The width and height seem to be standard for most Aventras.
  4. Alstom have said nothing about the range on hydrogen.
  5. I am surprised that the Aventra is the wider train.

But what surprises me most, is how similar the two specifications are. Had the designer of the original Lint hoped to sell some in the UK?

What Is The Range Of The Alstom Hydrogen Aventra?

When they launched the Breeze, Alstom were talking about a range of a thousand kilometres or just over 620 miles.

I have talked to someone, who manages a large bus fleet and they feel with a hydrogen bus, you need a long range, as you might have to position the bus before it does a full day’s work.

Would similar positioning mean a hydrogen train needs a long range?

I suspect it would in some applications, but if the train could use electrification, as I suspect the Alstom Hydrogen Aventra can, this must help with positioning and reduce the range needed and the amount of hydrogen used.

Would Alstom aim to make the range similar to the Coradia iLint? It’s probably a fair assumption.

Could the Alstom Hydrogen Aventra Be Extended To Four Or Five Cars?

I don’t see why not, as Aventras are designed to be lengthened or shortened, by just adding or removing cars, just like their predecessors the Electrostars were.

I can certainly see routes, where a longer Alstom Hydrogen Aventra could be needed and if Alstom have also decided that such a train could be needed, they will surely have investigated how to lengthen the train.

Applications In The UK

These are links to a few thoughts on applications of the trains in the UK.

There are probably a lot more and I will add to this list.

Applications Elsewhere

If the Coradia iLint has problems, they are these.

  • It can’t use overhead electrification, where it exists
  • It has a noisy mechanical transmission, as it is a converted diesel multiple unit design.

The Alstom Hydrogen Aventra can probably be modified to use electrification of any flavour and I can’t see why the train would be more noisy that say a Class 710 train.

I suspect Alstom will be putting the train forward for partially-electrified networks in countries other than the UK.

Conclusion

This modern hydrogen train from Alstom is what is needed.

It might also gain an initial order for Birmingham’s Cross-City Line, as it is a hydrogen version of the line’s Class 730/0 trains.

But having a hydrogen and an electric version, that are identical except for the hydrogen extender, could mean that the trains would be ideal for a partially-electrified network.

There could even be a compatible battery-electric version.

All trains would be identical to the passenger and probably the driver too. This would mean that mixed fleets could be run by an operator, with hydrogen or battery versions used on lines without electrification as appropriate.

 

 

 

 

November 11, 2021 Posted by | Hydrogen, Transport/Travel | , , , , , , , , , , , , , , , | 22 Comments

Alstom’s Widnes Factory

I took these pictures as the train to Liverpool passed Alstom’s Widnes factory, soon after crossing the River Mersey.

There has still been few announcements lately on the progress of the Class 321 trains being converted to hydrogen-powered Class 600 trains.

Perhaps, they are too busy updating Avanti West Coast’s Class 390 trains.

October 15, 2021 Posted by | Transport/Travel | , , , , , , | 6 Comments

On-Train Hydrogen Storage Development Agreement

The title of this post, is the same as that of this article on Railway Gazette.

This is the first paragraph.

Alstom and automotive technology company Plastic Omnium have signed a memorandum of understanding to collaborate on ‘high-end’ hydrogen storage systems for on-train applications, with a dedicated team established to manage the technical and commercial development of ‘innovative and competitive’ equipment.

This sounds like hydrogen tanks will be efficiently designed and produced for trains and locomotives.

The designs for these important areas will probably lead to better hydrogen tanks for any application that needs one.

September 30, 2021 Posted by | Design, Hydrogen | , , , | 2 Comments

Electrification Between Clay Cross North Junction And Sheffield Station

Long term readers of this blog, will have noticed that I make regular references to this proposed electrification, that is part of High Speed Two’s proposals to connect Sheffield to the new high speed railway.

So I thought I would bring all my thoughts together in this post.

Connecting Sheffield To High Speed Two

Sheffield is to be accessed from a branch off the Main High Speed Two route to Leeds.

This map clipped from High Speed Two’s interactive map, shows the route of the Sheffield Branch, from where it branches North West from the main Eastern Leg of High Speed Two.

Note.

  1. Orange indicates new High Speed Two track.
  2. Blue indicates track that High Speed Two will share with other services.
  3. The orange route goes North to Leeds, along the M1
  4. The blue route goes North to Chesterfield and Sheffield, after skirting to the East of Clay Cross.
  5. The orange route goes South to East Midlands Hub station.

This second map, shows where the Erewash Valley Line joins the Sheffield Branch near the village of Stonebroom.

Note.

  1. Red is an embankment.
  2. Yellow is a cutting.
  3. The Sheffield Branch goes North-West to Clay Cross, Chesterfield and Sheffield
  4. The Sheffield Branch goes South-East to East Midlands Hub station.
  5. The Sheffield Branch goes through Doe Hill Country Park.
  6. The Sheffield Branch runs alongside the existing Erewash Valley Line, which goes South to Langley Mill, Ilkeston and the Derby-Nottingham area.

The Sheffield Branch and the Erewash Valley Line appear to share a route, which continues round Clay Cross and is shown in this third map.

Note

  1. Doe Hill Country Park is in the South-East corner of the map.
  2. The dark line running North-South is the A61.
  3. Running to the West of the A61 is the Midland Main Line, which currently joins the Erewash Valley Line at Clay Cross North junction.

High Speed Two and the Midland Main Line will share a route and/or tracks from Clay Cross North junction to Sheffield.

This fourth map, shows where the combined route joins the Hope Valley Line to Manchester to the South West of Sheffield.

Note.

  1. Sheffield is to the North East.
  2. Chesterfield is to the South East,
  3. Totley junction is a large triangular junction, that connects to the Hope Valley Line.

These are some timings for various sections of the route.

  • Clay Cross North Junction and Chesterfield (current) – 4 minutes
  • Clay Cross North Junction and Sheffield (current) – 17 minutes
  • Chesterfield and Sheffield (current) – 13 minutes
  • Chesterfield and Sheffield (High Speed Two) – 13 minutes
  • East Midlands Hub and Chesterfield (High Speed Two) – 16 minutes
  • East Midlands Hub and Sheffield (High Speed Two) – 27 minutes

As Class Cross North Junction and Sheffield are 15.5 miles, this means the section is run at an average speed of 53 mph.

Can I draw any conclusions from the maps and timings?

  • There would appear to be similar current and High Speed Two timings between Chesterfield and Sheffield.
  • The various junctions appear to be built for speed.

The Midland Main Line will be electrified between Clay Cross North Junction and Sheffield, so that High Speed Two trains can use the route.

What will be the characteristics of the tracks between Clay Cross North Junction and Sheffield?

  • Will it be just two tracks as it mainly is now or will it be a multi-track railway to separate the freight trains from the high speed trains?
  • Will it have a high enough maximum speed, so that East Midland Railway’s new Class 810 trains can go at their maximum speed of 140 mph?
  • Will it be capable of handling a frequency of 18 tph, which is the maximum frequency of High Speed Two?

Surely, it will be built to a full High Speed Two standard to future-proof the line.

Current Passenger Services Between Clay Cross North Junction And Sheffield Station

These trains use all or part of the route between Cross North Junction And Sheffield stations.

  • CrossCountry – Plymouth and Edinburgh via Derby, Chesterfield, Sheffield and Leeds – 1 tph
  • East Midlands Railway – London St. Pancras and Sheffield via Derby and Chesterfield – 2 tph
  • East Midlands Railway – Liverpool Lime Street and Norwich via Stockport, The Hope Valley Line, Sheffield and Chesterfield – 1 tph
  • Northern Trains – Manchester Piccadilly and Sheffield via the Hope Valley Line – 1 tph
  • Northern Trains – Leeds and Nottingham via Meadowhall, Sheffield and Chesterfield – 1 tph
  • TransPennine Express – Manchester Airport and Cleethorpes via Stockport, the Hope Valley Line and Sheffield – 1 tph

Note.

  1. tph is trains per hour.
  2. High Speed Two is currently planning to run two tph to Sheffield, which will run between Cross North junction and Sheffield stations.
  3. The services on the Hope Valley Line run on electrified tracks at the Manchester end.

These services can be aggregated to show the number of trains on each section of track.

  • Hope Valley Line between Manchester and Totley junction – 3 tph
  • Totley junction and Sheffield station – 7 tph
  • Totley junction and Clay Cross North junction via Chesterfield – 4 tph

Adding in the High Speed Two services gives these numbers.

  • Hope Valley Line between Manchester and Totley junction – 3 tph
  • Totley junction and Sheffield station – 9 tph
  • Totley junction and Clay Cross North junction via Chesterfield – 6 tph

This report on the Transport for the North web site, is entitled At A Glance – Northern Powerhouse Rail. It states that Transport for the North’s aspirations for Manchester and Sheffield are four tph with a journey time of forty minutes.

Adding in the extra train gives these numbers.

  • Hope Valley Line between Manchester and Totley junction – 4 tph
  • Totley junction and Sheffield station – 10 tph
  • Totley junction and Clay Cross North junction via Chesterfield – 6 tph

This level of services can be accommodated on a twin-track railway designed to the right high speed standards.

Freight Services Between Clay Cross North Junction And Sheffield Station

The route is used by freight trains, with up to two tph on each of the three routes from Totley junction.

And these are likely to increase.

Tracks Between Clay Cross North Junction And Sheffield Station

I am absolutely certain, that two tracks between Clay Cross North junction And Sheffield station will not be enough, even if they are built to High Speed Two standards to allow at least 140 mph running under digital signalling.

Battery Electric Trains

The only battery-electric train with a partly-revealed specification is Hitachi’s Regional Battery Train, which is described in this Hitachi infographic.

Note.

  1. The train is a 100 mph unit.
  2. Ninety kilometres is fifty-six miles.

I would expect that battery-electric trains from other manufacturers like Alstom, CAF and Siemens would have similar performance on battery power.

In Thoughts On CAF’s Battery-Electric Class 331 Trains, I concluded CAF’s approach could give the following ranges.

  • Three-car battery-electric train with one battery pack – 46.7 miles
  • Four-car battery-electric train with one battery pack – 35 miles
  • Four-car battery-electric train with two battery packs – 70 miles

I was impressed.

These are my thoughts on battery-electric trains on the routes from an electrified Sheffield.

Adwick

Sheffield  and Adwick is 22.7 miles without electrification

I am sure that battery-electric trains can handle this route.

If the battery range is sufficient, there may not need to be charging at Adwick.

Bridlington

Sheffield and Bridlington is 90.5 miles without electrification, except for a short section through Doncaster, where trains could top up batteries.

I am sure that battery-electric trains can handle this route.

But there would need to be a charging system at Hull, where the trains reverse.

An alternative would be to electrify Hull and Brough, which is just 10.4 miles and takes about twelve minutes.

Derby Via The Midland Main Line

Clay Cross North junction and Derby is 20.9 miles without electrification.

I am sure that battery-electric trains can handle this route.

Gainsborough Central

Sheffield  and Gainsborough Central is 33.6 miles without electrification

I am sure that battery-electric trains can handle this route.

But there will need to be a charging system at Gainsborough Central.

Huddersfield Via The Penistone Line

This is a distance of 36.4 miles with electrification at both ends, after the electrification between Huddersfield and Westtown is completed.

I am sure that battery-electric trains can handle this route.

Hull

Sheffield and Hull is 59.4 miles without electrification, except for a short section through Doncaster, where trains could top up batteries.

I am sure that battery-electric trains can handle this route.

But there will probably need to be a charging system at Hull.

An alternative would be to electrify Hull and Brough, which is just 10.4 miles and takes about twelve minutes.

Leeds Via The Hallam Or Wakefield Lines

This is a distance of 40-45 miles with electrification at both ends.

I am sure that battery-electric trains can handle this route.

Lincoln

Sheffield and Lincoln Central is 48.5 miles without electrification

I am sure that battery-electric trains can handle this route.

But there will probably need to be a charging system at Lincoln Central.

Manchester Via The Hope Valley Line

This is a distance of forty-two miles with electrification at both ends.

I am sure that battery-electric trains can handle this route.

Nottingham

Clay Cross North junction and Nottingham is 25.1 miles without electrification

I am sure that battery-electric trains can handle this route.

But there may need to be a charging system at Nottingham.

York

This is a distance of 46.4 miles with electrification at both ends.

I am sure that battery-electric trains can handle this route.

Is London St. Pancras And Sheffield Within Range Of Battery-Electric Trains?

In the previous section, I showed that it would be possible to easily reach Derby, as Clay Cross North junction and Derby is 20.9 miles without electrification.

  • Current plans include electrifying the Midland Main Line as far North as Market Harborough.
  • Market Harborough is 82.8 miles from London St. Pancras
  • Derby is 128.3 miles from London St. Pancras

So what would be the best way to cover the 45.5 miles in the middle?

One of the best ways would surely be to electrify between Derby and East Midlands Parkway stations.

  • Derby and East Midlands Parkway stations are just 10.2 miles apart.
  • Current services take around twelve-fourteen minutes to travel between the two stations, so it would be more than enough time to charge a battery-electric train.
  • Power for the electrification should not be a problem, as Radcliffe-on-Soar power station is by East Midlands Parkway station. Although the coal-fired power station will soon be closed, it must have a high class connection to the electricity grid.
  • The East Midlands Hub station of High Speed Two will be built at Toton between Derby and Nottingham and will have connections to the Midland Main Line.
  • An electrified spur could connect to Nottingham station.

I have flown my virtual helicopter along the route and found the following.

  • Three overbridges that are not modern and built for large containers and electrification.
  • Two level crossings.
  • One short tunnel.
  • Two intermediate stations.
  • Perhaps half-a-dozen modern footbridges designed to clear electrification.

I’ve certainly seen routes that would be much more challenging to electrify.

I wonder if gauge clearance has already been performed on this key section of the Midland Main Line.

If this section were to be electrified, the sections of the Midland Main Line between London St. Pancras and Sheffield would be as follows.

  • London St. Pancras and Market Harborough – Electrified – 82.8 miles
  • Market Harborough and East Midlands Parkway – Not Electrified – 35.3 miles
  • East Midlands Parkway and Derby – Electrified – 10.2 miles
  • Derby and Clay Cross North junction – Not Electrified – 20.9 miles
  • Clay Cross North junction and Sheffield – Electrified – 15.5 miles

Note.

  1. The World Heritage Site of the Derwent Valley Mills is not electrified, which could ease the planning.
  2. Leicester station with its low bridge, which could be difficult to electrify, has not been electrified.
  3. Under thirty miles of electrification will allow battery-electric trains to run between London St. Pancras and Sheffield, provided they had a range on batteries of around forty miles.

Probably, the best way to electrify between East Midlands Parkway and Derby might be to develop a joint project with High Speed Two, that combines all the power and other early works for East Midlands Hub station, with the electrification between the two stations.

Will The Class 810 Trains Be Converted To Battery-Electric Operation?

Hitachi’s Class 8xx trains tend to be different, when it comes to power. These figures relate to five-car trains.

  • Class 800 train – 3 x 560 kW diesel engines
  • Class 801 train – 1 x 560 kW diesel engine
  • Class 802 train – 3 x 700 kW diesel engines
  • Class 803 train – All electric – No diesel and an emergency battery
  • Class 805 train – 3 x 700 kW diesel engines (?)
  • Class 807 train – All electric – No diesel or emergency battery
  • Class 810 train – 4 x 700 kW diesel engines (?)

Note.

  1. These figures relate to five-car trains.
  2. Class 807 train are seven-car trains.
  3. Where there is a question mark (?), the power has not been disclosed.
  4. Hitachi use two sizes of diesel engine; 560 kW and 700 kW.

It was generally thought with the Class 810 train to be used on the Midland Main Line, will be fitted with four engines to be able to run at 125 mph on diesel.

But are they 560 kW or 700 kW engines?

  • A Class 802 train has an operating speed of 110 mph on diesel, with 2100 kW of installed power.
  • To increase speed, the power will probably be related to something like the square of the speed.

So crudely the power required for 125 mph would be 2100*125*125/110/110, which works out at 2712 kW.

Could this explain why four engines are fitted? And why they are 700 kW versions?

Interestingly, I suspect, Hitachi’s five-car trains have two more or less identical driver cars, except for the passenger interiors, for the efficiency of manufacturing and servicing.

So does that mean, that a fifth engine could be fitted if required?

There probably wouldn’t be a need for five diesel engines, but as I also believe that the Hyperdrive Innovation battery packs for these trains are plug-compatible with the diesel engines, does that mean that Hitachi’s trains can be fitted with five batteries?

Suppose you wanted to run a Class 810 train at 125 mph to clear an electrification gap of forty miles would mean the following.

  • It would take 0.32 hours or 19.2 minutes to cross the gap.
  • In that time 2800 kW of diesel engines would generate 896 kWh.
  • So to do the same on batteries would need a total battery capacity of 896 kWh.
  • If all diesel engines were replaced, each battery would need to be 224 kWh

A battery of this size is not impractical and probably weighs less than the at least four tonnes of the diesel engine it replaces.

Conclusions

Electrification between Clay Cross North Junction and Sheffield station is an important project that enables the following.

  • A high proportion of diesel services to and from Sheffield to be converted to battery-electric power.
  • With electrification between Derby and East Midlands Parkway, it enables 125 mph battery-electric trains to run between London St. Pancras and Sheffield.
  • It prepares Sheffield for High Speed Two.

It should be carried out as soon as possible.

 

 

 

 

 

 

 

 

 

 

September 5, 2021 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , | 2 Comments

Solving The Electrification Conundrum

The title of this post, is the same as an article in the July 2021 Edition of Modern Railways.

This is the introductory sub-heading.

Regional and rural railways poses a huge problem for the railway to decarbonise.

Lorna McDonald of Hitachi Rail and Jay Mehta of Hitachi ABB Power Grids tell Andy Roden why they believe they have the answer.

These are my thoughts on what is said.

Battery-Electric Trains

The article starts by giving a review of battery-electric trains and their use on routes of moderate but important length.

  • Some short routes can be handled with just a charge on an electrified main line.
  • Some will need a recharge at the termini.
  • Other routes might need a recharge at some intermediate stations, with a possible increase in dwell times.

It was in February 2015, that I wrote Is The Battery Electric Multiple Unit (BEMU) A Big Innovation In Train Design?, after a ride in public service on Bombardier’s test battery-electric train based on a Class 379 train.

I also wrote this in the related post.

Returning from Harwich, I travelled with the train’s on-board test engineer, who was monitoring the train performance in battery mode on a laptop. He told me that acceleration in this mode was the same as a standard train, that the range was up to sixty miles and that only minimal instruction was needed to convert a driver familiar to the Class 379 to this battery variant.

It was an impressive demonstration, of how a full-size train could be run in normal service without connection to a power supply. I also suspect that the partners in the project must be very confident about the train and its technology to allow paying passengers to travel on their only test train.

A couple of years later, I met a lady on another train, who’d used the test train virtually every day during the trial and she and her fellow travellers felt that it was as good if not better than the normal service from a Class 360 train or a Class 321 train.

So why if the engineering, customer acceptance and reliability were proven six years ago, do we not have several battery electric trains in service?

  • There is a proven need for battery-electric trains on the Marshlink Line and the Uckfield Branch in Sussex.
  • The current Class 171 trains are needed elsewhere, so why are no plans in place for replacement trains?
  • The government is pushing electric cars and buses, but why is there such little political support for battery-electric trains?

It’s almost as if, an important civil servant in the decision process has the naive belief that battery-electric trains won’t work and if they do, they will be phenomenally expensive. So the answer is an inevitable no!

Only in the South Wales Metro, are battery-electric trains considered to be part of the solution to create a more efficient and affordable electric railway.

But as I have constantly pointed out since February 2015 in this blog, battery-electric trains should be one of the innovations we use to build a better railway.

Hydrogen Powered Trains

The article says this about hydrogen powered trains.

Hybrid hydrogen fuel cells can potentially solve the range problem, but at the cost of the fuel eating up internal capacity that would ideally be used for passengers. (and as Industry and Technology Editor Roger Ford points out, at present hydrogen is a rather dirty fuel). By contrast, there is no loss of seating or capacity in a Hitachi battery train.

I suspect the article is referring to the Alstom train, which is based on the technology of the Alstom Coradia iLint.

I have ridden this train.

  • It works reliably.
  • It runs on a 100 km route.
  • The route is partially electrified, but the train doesn’t have a pantograph.
  • It has a very noisy mechanical transmission.

Having spoken to passengers at length, no-one seemed bothered by the Hindenburg possibilities.

It is certainly doing some things right, as nearly fifty trains have been ordered for train operating companies in Germany.

Alstom’s train for the UK is the Class 600 train, which will be converted from a four-car Class 321 train.

Note.

  1. Half of both driver cars is taken up by a hydrogen tank.
  2. Trains will be three-cars.
  3. Trains will be able to carry as many passengers as a two-car Class 156 train.

It is an inefficient design that can be improved upon.

Porterbrook and Birmingham University appear to have done that with their Class 799 train.

  • It can use 25 KVAC overhead or 750 VDC third-rail electrification.
  • The hydrogen tanks, fuel cell and other hydrogen gubbins are under the floor.

This picture from Network Rail shows how the train will appear at COP26 in Glasgow in November.

Now that’s what I call a train! Let alone a hydrogen train!

Without doubt, Porterbrook and their academic friends in Birmingham will be laying down a strong marker for hydrogen at COP26!

I know my hydrogen, as my first job on leaving Liverpool University with my Control Engineering degree in 1968 was for ICI at Runcorn, where I worked in a plant that electrolysed brine into hydrogen, sodium hydroxide and chlorine.

My life went full circle last week, when I rode this hydrogen powered bus in London.

The hydrogen is currently supplied from the same chemical works in Runcorn, where I worked. But plans have been made at Runcorn, to produce the hydrogen from renewable energy, which would make the hydrogen as green hydrogen of the highest standard. So sorry Roger, but totally carbon-free hydrogen is available.

The bus is a Wightbus Hydroliner FCEV and this page on the Wrightbus web site gives the specification. The specification also gives a series of cutaway drawings, which show how they fit 86 passengers, all the hydrogen gubbins and a driver into a standard size double-deck bus.

I believe that Alstom’s current proposal is not a viable design, but I wouldn’t say that about the Porterbrook/Birmingham University design.

Any Alternative To Full Electrification Must Meet Operator And Customer Expectations

This is a paragraph from the article.

It’s essential that an alternative traction solution offers the same levels of performance and frequency, while providing an increase in capacity and being economically viable.

In performance, I would include reliability. As the on-board engineer indicated on the Bombardier  test train on the Harwich branch, overhead electrification is not totally reliable, when there are winds and/or criminals about.

Easy Wins

Hitachi’s five-car Class 800 trains and Class 802 trains each have three diesel engines and run the following short routes.

  • Kings Cross and Middlesbrough- 21 miles not electrified – Changeover in Northallerton station
  • Kings Cross and Lincoln – 16.6 miles not electrified – Changeover in Newark Northgate station
  • Paddington and Bedwyn – 13.3 miles not electrified – Changeover in Newbury station
  • Paddington and Oxford – 10.3 miles not electrified – Changeover in Didcot Parkway station

Some of these routes could surely be run with a train, where one diesel engine was replaced by a battery-pack.

As I’m someone, who was designing, building and testing plug-compatible transistorised electronics in the 1960s to replace  older valve-based equipment in a heavy engineering factory, I suspect that creating a plug-compatible battery-pack that does what a diesel engine does in terms of power and performance is not impossible.

What would be the reaction to passengers, once they had been told, they had run all the way to or from London without using any diesel?

Hopefully, they’d come again and tell their friends, which is what a train operator wants and needs.

Solving The Electrification Conundrum

This section is from the article.

Where electrification isn’t likely to be a viable proposition, this presents a real conundrum to train operators and rolling stock leasing companies.

This is why Hitachi Rail and Hitachi ABB Power Grids are joining together to present a combined battery train and charging solution to solve this conundrum. In 2020, Hitachi and ABB’s Power Grids business, came together in a joint venture, and an early outcome of this is confidence that bringing together their expertise in rail, power and grid management, they can work together to make electrification simpler cheaper and quicker.

I agree strongly with the second paragraph, as several times, I’ve been the mathematician and simulation expert in a large multi-disciplinary engineering project, that went on to be very successful.

The Heart Of The Proposition

This is a paragraph from the article.

The proposition is conceptually simple. Rather than have extended dwell times at stations for battery-powered trains, why not have a short stretch of 25 KVAC overhead catenary (the exact length will depend on the types of train and the route) which can charge trains at linespeed on the move via a conventional pantograph?

The article also mentions ABB’s related expertise.

  • Charging buses all over Europe.
  • Creating the power grid for the Great Western Electrification to Cardiff.

I like the concept, but then it’s very similar to what I wrote in The Concept Of Electrification Islands in April 2020.

But as they are electrical power engineers and I’m not, they’d know how to create the system.

Collaboration With Hyperdrive Innovation

The article has nothing negative to say about the the collaboration with Hyperdrive Innovation to produce the battery-packs.

Route Modelling

Hitachi appear to have developed a sophisticated route modelling system, so that routes and charging positions can be planned.

I would be very surprised if they hadn’t developed such a system.

Modular And Scalable

This is a paragraph from the article.

In the heart of the system is a containerised modular solution containing everything needed to power a stretch of overhead catenary to charge trains. A three-car battery train might need one of these, but the great advantage is that it is scalable to capacity and speed requirements.

This all sounds very sensible and can surely cope with a variety of lines and traffic levels.

It also has the great advantage , that if a line is eventually electrified, the equipment can be moved on to another line.

Financing Trains And Chargers

The article talks about the flexibility of the system from an operator’s point of view with respect to finance.

I’ve had some good mentors in the area of finance and I know innovative finance contributed to the success of Metier Management Systems, the project management company I started with three others in 1977.

After selling Metier, I formed an innovative finance company, which would certainly have liked the proposition put forward in the article.

No Compromise, Little Risk

I would agree with this heading of the penultimate section of the article.

In February 2015, when I rode that Class 379 train between Manningtree and Harwich, no compromise had been made by Bombardier and it charged in the electrified bay platform at Manningtree.

But why was that train not put through an extensive route-proving exercise in the UK after the successful trial at Manningtree?

  • Was it the financial state of Bombardier?
  • Was it a lack of belief on the part of politicians, who were too preoccupied with Brexit?
  • Was it that an unnamed civil servant didn’t like the concept and stopped the project?

Whatever the reason, we have wasted several years in getting electric trains accepted on UK railways.

If no compromise needs to be made to create a battery-electric train, that is equivalent to the best-in-class diesel or electric multiple units, then what about the risk?

The beauty of Hitachi’s battery-electric train project is that it can be done in phases designed to minimise risk.

Phase 1 – Initial Battery Testing 

Obviously, there will be a lot of bench testing in a laboratory.

But I also believe that if the Class 803 trains are fitted with a similar battery from Hyperdrive Innovation, then this small fleet of five trains can be used to test a lot of the functionality of the batteries initially in a test environment and later in a real service environment.

The picture shows a Class 803 train under test through Oakleigh Park station.

This phase would be very low risk, especially where passengers are concerned.

Phase 2 – Battery Traction Testing And Route Proving

I am a devious bastard, when it comes to software development. The next set of features would always be available for me to test earlier, than anybody else knew.

I doubt that the engineers at Hyperdrive Innovation will be any different.

So I wouldn’t be surprised to find out that the batteries in the Class 803 trains can also be used for traction, if you have the right authority.

We might even see Class 803 trains turning up in some unusual places to test the traction abilities of the batteries.

As East Coast Trains, Great Western Railway and Hull Trains are all First Group companies, I can’t see any problems.

I’m also sure that Hitachi could convert some Class 800 or Class 802 trains and add these to the test fleet, if East Coast Trains need their Class 803 trains to start service.

This phase would be very low risk, especially where passengers are concerned.

Possibly, the worse thing, that could happen would be a battery failure, which would need the train to be rescued.

Phase 3 – Service Testing On Short Routes

As I indicated earlier, there are some easy routes between London and places like Bedwyn, Lincoln, Middlesbrough and Oxford, that should be possible with a Class 800 or Class 802 train fitted with the appropriate number of batteries.

Once the trains have shown, the required level of performance and reliability, I can see converted Class 800, 801 and Class 802 trains entering services on these and other routes.

Another low risk phase, although passengers are involved, but they are probably subject to the same risks, as on an unmodified train.

Various combinations of diesel generators and batteries could be used to find out, what is the optimum combination for the typical diagrams that train operators use.

Hitachi didn’t commit to any dates, but I can see battery-electric trains running on the Great Western Railway earlier than anybody thinks.

Phase 4 – Service Testing On Medium Routes With A Terminal Charger System

It is my view that the ideal test route for battery-electric trains with a terminal charger system would be the Hull Trains service between London Kings Cross and Hull and Beverley.

The route is effectively in three sections.

  • London Kings Cross and Temple Hirst junction – 169.2 miles – Full Electrification
  • Temple Hirst junction and Hull station – 36.1 miles – No Electrification
  • Hull station and Beverley station – 8.3 miles – No Electrification

Two things would be needed to run zero-carbon electric trains on this route.

  • Sufficient battery capacity in Hull Trains’s Class 802 trains to reliably handle the 36.1 miles between Temple Hirst junction and Hull station.
  • A charging system in Hull station.

As Hull station also handles other Class 800 and Class 802 trains, there will probably be a need to put a charging system in more than one platform.

Note.

  1. Hull station has plenty of space.
  2. No other infrastructure work would be needed.
  3. There is a large bus interchange next door, so I suspect the power supply to Hull station is good.

Hull would be a very good first destination for a battery-electric InterCity train.

Others would include Bristol, Cheltenham, Chester, Scarborough, Sunderland and Swansea.

The risk would be very low, if the trains still had some diesel generator capacity.

Phase 5 – Service Testing On Long Routes With Multiple Charger Systems

Once the performance and reliability of the charger systems have been proven in single installations like perhaps Hull and Swansea stations, longer routes can be prepared for electric trains.

This press release from Hitachi is entitled Hitachi And Eversholt Rail To Develop GWR Intercity Battery Hybrid Train – Offering Fuel Savings Of More Than 20%.

The press release talks about Penzance and London, so would that be a suitable route for discontinuous electrification using multiple chargers?

These are the distances between major points on the route between Penzance and London Paddington.

  • Penzance and Truro – 35.8 miles
  • Truro and Bodmin Parkway – 26.8 miles
  • Bodmin Parkway and Plymouth – 26.9 miles
  • Plymouth and Newton Abbot – 31,9 miles
  • Newton Abbot and Exeter – 20.2 miles
  • Exeter and Taunton – 30.8 miles
  • Taunton and Westbury – 47.2 miles
  • Westbury and Newbury – 42.5 miles
  • Newbury and Paddington – 53 miles

Note.

  1. Only Newbury and Paddington is electrified.
  2. Trains generally stop at Plymouth, Newton Abbott, Exeter and Taunton.
  3. Services between Paddington and Exeter, Okehampton, Paignton, Penzance, Plymouth and Torquay wouldn’t use diesel.
  4. Okehampton would be served by a reverse at Exeter.
  5. As Paignton is just 8.1 miles from Newton Abbot, it probably wouldn’t need a charger.
  6. Bodmin is another possible destination, as Great Western Railway have helped to finance a new platform at Bodmin General station.

It would certainly be good marketing to run zero-carbon electric trains to Devon and Cornwall.

I would class this route as medium risk, but with a high reward for the operator.

In this brief analysis, it does look that Hitachi’s proposed system is of a lower risk.

A Few Questions

I do have a few questions.

Are The Class 803 Trains Fitted With Hyperdrive Innovation Batteries?

East Coast Trains‘s new Class 803 trains are undergoing testing between London Kings Cross and Edinburgh and they can be picked up on Real Time Trains.

Wikipedia says this about the traction system for the trains.

While sharing a bodyshell with the previous UK A-train variants, the Class 803 differs in that it has no diesel engines fitted. They will however be fitted with batteries to enable the train’s on-board services to be maintained, in case the primary electrical supplies have failed.

Will these emergency batteries be made by Hyperdrive Innovation?

My experience of similar systems in other industries, points me to the conclusion, that all Class 80x trains can be fitted with similar, if not identical batteries.

This would give the big advantage of allowing battery testing to be performed on Class 803 trains under test, up and down the East Coast Main Line.

Nothing finds faults in the design and manufacture of something used in transport, than to run it up and down in real conditions.

Failure of the catenary can be simulated to check out emergency modes.

Can A Class 801 Train Be Converted Into A Class 803 Train?

If I’d designed the trains, this conversion would be possible.

Currently, the electric Class 801 trains have a single diesel generator. This is said in the Wikipedia entry for the Class 800 train about the Class 801 train.

These provide emergency power for limited traction and auxiliaries if the power supply from the overhead line fails.

So it looks like the difference between the powertrain of a Class 801 train and a Class 803 train, is that the Class 801 train has a diesel generator and the Class 803 train has batteries. But the diesel generator and batteries, would appear to serve the same purpose.

Surely removing diesel from a Class 801 train would ease the maintenance of the train!

Will The System Work With Third-Rail Electrification?

There are three routes that if they were electrified would probably be electrified with 750 DC third-rail electrification, as they have this electrification at one or both ends.

  • Basingstoke and Exeter
  • Marshlink Line
  • Uckfield branch

Note.

  1. Basingstoke and Exeter would need a couple of charging systems.
  2. The Marshlink line would need a charging system at Rye station.
  3. The Uckfield branch would need a charging system at Uckfield station.

I am fairly certain as an Electrical Engineer, that the third-rails would only need to be switched on, when a train is connected and needs a charge.

I also feel that on some scenic and other routes, 750 VDC third-rail electrification may be more acceptable , than 25 KVAC  overhead electrification. For example, would the heritage lobby accept overhead wires through a World Heritage Site or on top of a Grade I Listed viaduct?

I do feel that the ability to use third-rail 750 VDC third-rail electrification strategically could be a useful tool in the system.

Will The System Work With Lightweight Catenary?

I like the design of this 25 KVAC overhead electrification, that uses lightweight gantries, which use laminated wood for the overhead structure.

There is also a video.

Electrification doesn’t have to be ugly and out-of-character with the surroundings.

Isuspect that both systems could work together.

 

Would Less Bridges Need To Be Rebuilt For Electrification?

This is always a contentious issue with electrification, as rebuilding bridges causes disruption to both rail and road.

I do wonder though by the use of careful design, that it might be possible to arrange that the sections of electrification and the contentious bridges were kept apart, with the bridges arranged to be in sections, where the trains ran on batteries.

I suspect that over the years as surveyors and engineers get more experienced, better techniques will evolve to satisfy all parties.

Get this right and it could reduce the cost of electrification on some lines, that will be difficult to electrify.

How Secure Are The Containerised Systems?

Consider.

  • I was delayed in East Anglia two years ago, because someone stole the overhead wires at two in the morning.
  • Apparently, overhead wire stealing is getting increasingly common in France and other parts of Europe.

I suspect the containerised systems will need to be more secure than those used for buses, which are not in isolated locations.

Will The Containerised Charging Systems Use Energy Storage?

Consider.

  • I’ve lived in rural locations and the power grids are not as good as in urban areas.
  • Increasingly, batteries of one sort or another are being installed in rural locations to beef up local power supplies.
  • A new generation of small-footprint eco-friendly energy storage systems are being developed.

In some locations, it might be prudent for a containerised charging system to share a battery with the local area.

Will The Containerised Charging Systems Accept Electricity From Local Sources Like Solar Farms?

I ask the question, as I know at least one place on the UK network, where a line without electrification runs through a succession of solar farms.

I also know of an area, where a locally-owned co-operative is planning a solar farm, which they propose would be used to power the local main line.

Will The System Work With Class 385 Trains?

Hitachi’s Class 385 trains are closely related to the Class 80x trains, as they are all members of Hitachi’s A-Train family.

Will the Charging Systems Charge Other Manufacturers Trains?

CAF and Stadler are both proposing to introduce battery-electric trains in the UK.

I also suspect that the new breed of electric parcel trains will include a battery electric variant.

As these trains will be able to use 25 KVAC overhead electrification, I would expect, that they would be able to charge their batteries on the Hitachi ABB  charging systems.

Will The System Work With Freight Trains?

I believe that freight services will split into two.

Heavy freight will probably use powerful hydrogen-electric locomotives.

In Freightliner Secures Government Funding For Dual-Fuel Project, which is based on a Freightliner press release, I detail Freightliner’s decarbonisation strategy, which indicates that in the future they will use hydrogen-powered locomotives.

But not all freight is long and extremely heavy and I believe that a battery-electric freight locomotive will emerge for lighter duties.

There is no reason it could not be designed to be compatible with Hitachi’s charging system.

In Is This The Shape Of Freight To Come?, I talked about the plans for 100 mph parcel services based on redundant electric multiple units. Eversholt Rail Group have said they want a Last-Mile capability for their version of these trains.

Perhaps they need a battery-electric capability, so they can deliver parcels and shop supplies to the remoter parts of these islands?

Where Could Hitachi’s System Be Deployed?

This is the final paragraph from the article.

Hitachi is not committing to any routes yet, but a glance at the railway map shows clear potential for the battery/OLE-technology to be deployed on relatively lightly used rural and regional routes where it will be hard to make a case for electrification. The Cambrian Coast and Central Wales Lines would appear to be worthy candidates, and in Scotland, the West Highland Line and Far North routes are also logical areas for the system to be deployed.

In England, while shorter branch lines could simply be operated by battery trains, longer routes need an alternative. Network Rail’s Traction Decarbonisation Network Strategy interim business case recommends hydrogen trains for branch lines in Norfolk, as well as Par to Newquay and Exeter to Barnstaple. However, it is also entirely feasible to use the system on routes likely to be electrified much later in the programme, such as the Great Western main line West of Exeter, Swansea to Fishguard and parts of the Cumbrian Coast Line.

Everyone is entitled to their own opinion and mine would be driven by high collateral benefits and practicality.

These are my thoughts.

Long Rural Lines

The Cambrian, Central Wales (Heart Of Wales), Far North and West Highland Lines may not be connected to each other, but they form a group of rail routes with a lot of shared characteristics.

  • All are rural routes of between 100 and 200 miles.
  • All are mainly single track.
  • They carry occasional freight trains.
  • They carry quite a few tourists, who are there to sample, view or explore the countryside.
  • All trains are diesel.
  • Scotrail have been experimenting with attaching Class 153 trains to the trains on the West Highland Line to act as lounge cars and cycle storage.

Perhaps we need a long-distance rural train with the following characteristics.

  • Four or possibly five cars
  • Battery-electric power
  • Space for a dozen cycles
  • A lounge car
  • Space for a snack trolley
  • Space to provide a parcels service to remote locations.

I should also say, that I’ve used trains on routes in countries like Germany, Poland and Slovenia, where a similar train requirement exists.

Norfolk Branch Lines

Consider.

  • North of the Cambridge and Ipswich, the passenger services on the branch lines and the important commuter routes between Cambridge and Norwich and Ipswich are run by Stadler Class 755 trains, which are designed to be converted to battery-electric trains.
  • Using Hitachi chargers at Beccles, Bury St. Edmunds, Lowestoft, Thetford and Yarmouth and the existing electrification, battery-electric Class 755 trains could provide a zero-carbon train service for Norfolk and Suffolk.
  • With chargers at Dereham and March, two important new branch lines could be added and the Ipswich and Peterborough service could go hourly and zero carbon.
  • Greater Anglia have plans to use the Class 755 trains to run a London and Lowestoft service.
  • Could they be planning a London and Norwich service via Cambridge?
  • Would battery-electric trains running services over Norfolk bring in more visitors by train?

Hitachi may sell a few chargers to Greater Anglia, but I feel they have enough battery-electric trains.

Par And Newquay

The Par and Newquay Line or the Atlantic Coast Line, has been put forward as a Beeching Reversal project, which I wrote about in Beeching Reversal – Transforming The Newquay Line.

In that related post, I said the line needed the following.

  • An improved track layout.
  • An hourly service.
  • An improved Par station.
  • A rebuilt Newquay station with a second platform, so that more through trains can be run.

I do wonder, if after the line were to be improved, that a new three-car battery-electric train shuttling between Par and Newquay stations could be the icing on the cake.

Exeter And Barnstaple

The Tarka Line between Exeter and Barnstaple is one of several local and main lines radiating from Exeter St. David’s station.

  • The Avocet Line to Exmouth
  • The Great Western Main Line to Taunton, Bristol and London
  • The Great Western Main Line to Newton Abbott, Plymouth and Penzance
  • The Riviera Line to Paignton
  • The West of England Line to Salisbury, Basingstoke and London.

Note.

  1. The Dartmoor Line to Okehampton is under development.
  2. Several new stations are planned on the routes.
  3. I have already stated that Exeter could host a charging station between London and Penzance, but it could also be an electrified hub for battery-electric trains running hither and thither.

Exeter could be a city with a battery-electric metro.

Exeter And Penzance

Earlier, I said that I’d trial multiple chargers between Paddington and Penzance to prove the concept worked.

I said this.

I would class this route as medium risk, but with a high reward for the operator.

But it is also an enabling route, as it would enable the following battery-electric services.

  • London and Bodmin
  • London and Okehampton
  • London and Paignton and Torquay

It would also enable the Exeter battery-electric metro.

For these reasons, this route should be electrified using Hitachi’s discontinuous electrification.

Swansea And Fishguard

I mentioned Swansea earlier, as a station, that could be fitted with a charging system, as this would allow battery-electric trains between Paddington and Swansea via Cardiff.

Just as with Exeter, there must be scope at Swansea to add a small number of charging systems to develop a battery-electric metro based on Swansea.

Cumbrian Coast Line

This is a line that needs improvement, mainly for the tourists and employment it could and probably will bring.

These are a few distances.

  • West Coast Main Line (Carnforth) and Barrow-in-Furness – 28.1 miles
  • Barrow-in-Furness and Sellafield – 25 miles
  • Sellafield and Workington – 18 miles
  • Workington and West Coast Main Line (Carlisle) – 33 miles

Note.

  1. The West Coast Main Line is fully-electrified.
  2. I suspect that Barrow-in-Furness, Sellafield and Workington have good enough electricity supplies to support charging systems  for the Cumbrian Coast Line.
  3. The more scenic parts of the line would be left without wires.

It certainly is a line, where a good case for running battery-electric trains can be made.

Crewe And Holyhead

In High-Speed Low-Carbon Transport Between Great Britain And Ireland, I looked at zero-carbon travel between the Great Britain and Ireland.

One of the fastest routes would be a Class 805 train between Euston and Holyhead and then a fast catamaran to either Dublin or a suitable rail-connected port in the North.

  • The Class 805 trains could be made battery-electric.
  • The trains could run between Euston and Crewe at speeds of up to 140 mph under digital signalling.
  • Charging systems would probably be needed at Chester, Llandudno Junction and Holyhead.
  • The North Wales Coast Line looks to my untrained eyes, that it could support at least some 100 mph running.

I believe that a time of under three hours could be regularly achieved between London Euston and Holyhead.

Battery-electric trains on this route, would deliver the following benefits.

  • A fast low-carbon route from Birmingham, London and Manchester to the island of Ireland. if coupled with the latest fast catamarans at Holyhead.
  • Substantial reductions in journey times to and from Anglesey and the North-West corner of Wales.
  • Chester could become a hub for battery-electric trains to and from Birmingham, Crewe, Liverpool, Manchester and Shrewsbury.
  • Battery-electric trains could be used on the Conwy Valley Line.
  • It might even be possible to connect the various railways, heritage railways and tourist attractions in the area with zero-carbon shuttle buses.
  • Opening up of the disused railway across Anglesey.

The economics of this corner of Wales could be transformed.

My Priority Routes

To finish this section, I will list my preferred routes for this method of discontinuous electrification.

  • Exeter and Penzance
  • Swansea and Fishguard
  • Crewe and Holyhead

Note.

  1. Some of the trains needed for these routes have been delivered or are on order.
  2. Local battery-electric services could be developed at Chester, Exeter and Swansea by building on the initial systems.
  3. The collateral benefits could be high for Anglesey, West Wales and Devon and Cornwall.

I suspect too, that very little construction work not concerned with the installation of the charging systems will be needed.

Conclusion

Hitachi have come up with a feasible way to electrify Great Britain’s railways.

I would love to see detailed costings for the following.

  • Adding a battery pack to a Class 800 train.
  • Installing five miles of electrification supported by a containerised charging system.

They could be on the right side for the Treasury.

But whatever the costs, it does appear that the Japanese have gone native, with their version of the Great British Compromise.

 

 

 

 

 

 

 

 

 

 

 

July 9, 2021 Posted by | Design, Energy, Hydrogen, Transport/Travel | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | 15 Comments

H2 Green, Eversholt Rail To Jointly Develop Hydrogen Supply Solutions In The UK

The title of this post, is the same as that of this article on H2 View.

Their co-operation will be for the rail industry and based on green hydrogen, produced by electrolysis.

  • H2 Green is a Scottish company, that were recently taken over by Getech,
  • Eversholt Rail Group is a rolling stock leasing company, who are also backing hydrogen trains, that will be manufactured by Alstom.

This could be the kick up the backside, that hydrogen trains need in the UK.

July 6, 2021 Posted by | Hydrogen, Transport/Travel | , , , , , | Leave a comment

These New Sleeper Trains Are Basically Luxury Hotels On Wheels

The title of this post, is the same as that of this article on Time Out.

French startup; Midnight Trains, aims to update sleeper trains for the twenty-first century.

What Routes Are Being Offered?

The Time Out article says this.

Centred around Paris’s Gare du Nord train station, routes will stretch as far as 800km in a star shape across Europe, encompassing major destinations such as Madrid, Lisbon, Porto, Milan, Venice, Florence, Rome, Vienna, Prague, Budapest, Berlin, Hamburg, Copenhagen and even Edinburgh.

A map on the Midnight Trains web site, shows these individual routes.

  • Paris and Barcelona
  • Paris and Edinburgh
  • Paris and Madrid
  • Paris and Porto
  • Paris, Brussels, Hamburg and Copenhagen
  • Paris, Brussels, Hamburg and Berlin
  • Paris, Milan and Venice
  • Paris, Florence and Rome

I’m sure this list will grow.

Some Detailed Looks At Routes

I shall give a few notes about some of the proposed routes.

Paris And Barcelona

Crows would fly 831 kilometres or 516 miles.

I have gone by train between Barcelona and Paris twice. One trip is described in From Barcelona To Paris.

It looks like it takes 06:40 in a TGV without a change.

The service leaves from Barcelona Sants and arrives at Paris Lyon.

Time Out says journeys are centred on Gare Nord, so could the train access that terminal from the South?

An eight or nine hour sleeper journey would probably be convenient for train operators and passengers.

But I suspect that this route may need trains that can take advantage of the high speed nature of much of the route.

Paris And Edinburgh

Crows would fly 873 kilometres or 543 miles.

  • I have gone by train between London and Edinburgh many times and four-and-a half hours would not be an unreasonable time.
  • I have also used  Eurostar between London and Paris many times and two-and-a-quarter-hours would not be an unreasonable time.

An eight or nine hour sleeper journey would probably be convenient for train operators and passengers.

The most efficient way could be for the Paris and Edinburgh service to operate would be with a reverse at St. Pancras.

  • It could be at between one and three in the morning, as sleeper trains run slower than high speed services.
  • It would take about ten-fifteen minutes for the driver to change ends.

Would they be allowed to pick up passengers on the way through London?

  • I doubt they would be able to do this universally, but there must be a market for passengers needing to get to Edinburgh or Paris early in the morning from London.
  • During the Glasgow Commonwealth Games, on one day, I used the Caledonian Sleeper to return to London. It was packed and a sleeper train leaving for Paris and Edinburgh might pick up a substantial number of passengers after sporting or cultural events or business that finished late in the evening.
  • Timings could be arranged, so that both the Edinburgh and Paris legs were sufficient for say four or five hours sleep.

Caledonian Sleeper would probably object. But competition of this nature is often mutually beneficial.

There is also an alternative fully-electrified route that avoids the reverse at St. Pancras.

It winds its way through East London between Barking and Holloway using the North London Line.

It is feasible, but wouldn’t have the commercial advantages of a reverse in St. Pancras.

Would the Paris and Edinburgh services call at other stations?

The Lowland Caledonian Sleeper to Edinburgh and Glasgow calls at the following other stations.

  • Watford Junction – Pick up Northbound – Set down Southbound
  • Carlisle – Pick up Southbound – Set down Northbound
  • Carstairs – Pick up Southbound – Set down Northbound
  • Motherwell – Pick up Southbound – Set down Northbound

Would the Midnight Trains do something similar. Perhaps they would call at the following stations.

  • Stevenage – Pick up Northbound – Set down Southbound
  • York – Pick up Southbound – Set down Northbound
  • Newcastle – Pick up Southbound – Set down Northbound

This would create three extra sleeper services.

  • Paris and Newcastle
  • Paris and York
  • Stevenage and Edinburgh

Commercially this must be attractive, as it would require no extra rolling stock.

I also suspect providing Customs and Immigration for outgoing passengers at York and Newcastle would not be an expense, that made the stops unviable.

Paris And Madrid

Crows would fly 1057 kilometres or 657 miles.

In 2014, I used trains from Madrid to Paris and on to London, which I wrote about in From Madrid To London.

That was a trip that I planned on the move, so it could have been done faster.

Looking at the timetables, I find the following.

  • Paris and Barcelona – 6:41
  • Barcelona and Madrid – 2:45

Note

  1. All times are given in hours:minutes.
  2. A direct service without a change at Barcelona must be possible.
  3. Would this service pick up and set down at Girona, Barcelona, Camp de Tarragona and Zaragoza?

A ten or eleven hour sleeper journey would probably be feasible and convenient for train operators and passengers.

But when I look at the route map on the Midnight Trains web site, their route between Paris and Madrid appears to go further to the West.

I have a strong feeling that they are proposing to use the currently closed route via the iconic Canfranc station.

But then Wikipedia says this about plans for the future of the route and the station.

The government of Aragon has long held various ambitions for the rehabilitation of the station. Plans have been mooted to redevelop the main station building into a hotel, which would involve the construction of a new station beside it to replace it. There have been explorations of options to reopen the through line as the “western trans-Pyrenean line”; this initiative would reportedly involve the assistance of the government of Aquitaine, the adjacent French region. In February 2020, it was announced that funding from the European Union had been made available for the purpose of reopening the through line and relaunching international services.

Note.

  1. A regular rail service between Pau in France and Zaragoza in Spain would tick a lot of boxes.
  2. On the French side the Pau-Canfranc railway is a fifty-eight mile electrified single-track, standard-gauge railway.
  3. On the Spanish side, the railway is Iberian gauge.
  4. It would probably be a useful freight route.
  5. If it could take a TGV, it would enable faster TGV links between France and the Iberian nations.

It looks to me, that if it was properly rebuilt, it could be a useful standard gauge line between the high speed networks of France and Spain.

Looking at the timetables, I find the following.

  • Paris and Pau – 4:24
  • Zaragoza and Madrid – 1:35

If Pau and Zaragoza could be achieved in three hours, times would be as good or better, than the Barcelona route.

Paris And Porto

Crows would fly 1213 kilometres or 753 miles.

This is a challenging one to find the route, but I did find a current time of just over fourteen hours with lots of changes.

But from Zaragoza, there does appear to be a route via Burgos and Vigo.

It could be up to sixteen hours, so would probably be the better part of a day.

Could the Madrid and Porto services, provide a service to and from Canfranc?

Consider.

  • Canfranc station is a spectacular station in the Pyrenees.
  • It has been blessed by St. Michael.
  • I suspect many people would like to visit.
  • The station might be converted into a hotel.

I wouldn’t be surprised to see innovative arrangements in the Madrid and Porto services, so that passengers could have a visit to Canfranc.

Paris, Brussels, Hamburg And Copenhagen

Crows would fly 1027 kilometres or 638 miles.

Looking at the timetables, I find the following.

  • Paris and Brussels – 1:32
  • Brussels and Hamburg- 6:49
  • Hamburg and Copenhagen- 5:06

Note

  1. All times are given in hours:minutes.
  2. When I went between Hamburg and Copenhagen by train, I used the Bird Flight Line which involved a train ferry, where passengers had to get on the ship for the crossing. I described that trip in From Copenhagen To Hamburg By Train.
  3. The ferry is being replaced by a tunnel by 2028.
  4. It looks like it might be possible to go between Hamburg and Copenhagen by a longer route further to the North.

An eleven or twelve hour sleeper journey would probably be feasible and convenient for train operators and passengers.

I was initially surprised that the service didn’t call at Amsterdam.

  • But then there are a lot of big cities between Brussels and Amsterdam; Antwerp, Rotterdam, Schipol Airport and The Hague.
  • There is generally one train per hour (tph) between Brussels and Amsterdam.
  • Paris and Amsterdam are only 3:20 apart by Thalys, so perhaps there wouldn’t be many takers for a sleeper train.
  • It would appear that the best route between Paris and Hamburg is via Brussels and Cologne.

From friends in the area, I also get the impression, that it would take forever for the Belgians and the Dutch to decide on the calling pattern.

Paris, Brussels, Hamburg And Berlin

Crows would fly 876 kilometres or 545 miles.

Looking at the timetables, I find the following.

  • Paris and Brussels – 1:32
  • Brussels and Hamburg- 6:49
  • Hamburg and Berlin – 1:36

Note that all times are given in hours:minutes.

A ten or eleven hour sleeper journey would probably be feasible and convenient for train operators and passengers.

I was initially surprised that the service didn’t call at Cologne.

  • Thalys runs a high speed service between Paris and Cologne.
  • DB runs a high speed service between Cologne and Hamburg.
  • NightJet runs a sleeper service from Brussels and Cologne to Austria.

It could be that the demand isn’t thought to be there.

Paris, Milan And Venice

Crows would fly 845 kilometres or 525 miles.

I have done much of this route before and wrote about it in From Novara To Paris.

Looking at the timetables, I find the following.

  • Paris and Milan – 7:22
  • Milan and Venice – 2:29

Note

  1. All times are given in hours:minutes.
  2. Would this service pick up and set down at Turin and Verona?

A ten or eleven hour sleeper journey would probably be feasible and convenient for train operators and passengers.

Paris, Florence And Rome

Crows would fly 1106 kilometres or 687 miles.

Looking at the timetables, I find the following.

  • Paris and Turin – 5:42
  • Turin and Florence – 3:00
  • Florence and Rome – 1:36

Note

  1. All times are given in hours:minutes.
  2. Would this service pick up and set down at Turin and Verona?

A ten or eleven hour sleeper journey would probably be feasible and convenient for train operators and passengers.

What Rolling Stock Will Be Used?

In recent years sleeper train sets have been ordered as follows.

  • Austrian Railways from Siemens.
  • Caledonian Sleepers from CAF of Spain.

But as Midnight Trains is a French Company, I suspect the train order could go to Alstom.

On the other hand because of European procurement rules and quality, the order could go to CAF.

The CAF Mark 5 Coaches are capable of running at 100 mph and there are pictures in On The Caledonian Sleeper To Glasgow.

I do wonder, though if we’ll see a radical design, which is different to current locomotive-hauled sleeper trains.

  • Electrical multiple unit rather than locomotive hauled.
  • 125 mph capability, which could be useful on some routes.
  • A fleet of identical train sets.
  • Ability to use all the voltages on the routes.
  • Ability to work in pairs or singly dependent on the needs of the route.
  • Ability to split and join automatically in a station.
  • Ability to use the signalling on all routes, including high speed ones.
  • The trains would be built to be suitable for all loading gauges on the routes served.

Note.

  1. Given that French-designed Class 373 trains used by Eurostar, could trundle all over South London into Waterloo, I don’t think it will be difficult to design a train, that fitted the Edinburgh service.
  2. Get the design right and there could be other customers.

They would be true Pan-European trains.

When Will The Trains Start Running?

2024 is the date given by Time Out and the Midnight Trains web site.

Conclusion

I like the proposed service.

These are reasons why.

The Proposed Level Of Service

When travelling for between eight and twelve hours, you need a quality train.

Over the years, I must have used sleeper trains run by Caledonian Sleeper at least twenty times,

When they have been good, they have been very good.

The new trains from CAF don’t need for anything more.

If Midnight Trains can match Caledonian Sleeper for quality on trains, service and food, they’ll attract passengers.

The Service Is Easy To Expand And Extend

Consider, these extra services could surely be added to the  proposed network.

  • Paris and Munich
  • Paris and Switzerland.
  • Paris, Nice and Genoa

If some of the plans to connect the UK and Irish railways come to fruition, there could even be a Paris and Dublin service in the distant future.

Consider, these extensions to the proposed services.

  • Edinburgh and Glasgow 1:12
  • Rome and Naples – 1:10
  • Barcelona and Valencia – 2:40

Note that all times are given in hours:minutes.

The Service Is Very UK-Friendly

Because of Eurostar, with its two-and-a-quarter hour journey between two of Europe’s largest cities, London and Paris can almost be considered twin cities with respect to long-distance transport.

Suppose a resident of Paris wants to go for a weeks holiday birdwatching in the North of Scotland, a late afternoon Eurostar to London and the Caledonian sleeper to Inverness is a very-feasible way to travel.

Suppose, I wanted to go from London to Berlin, in the future, I will be able to get a Eurostar to Paris and a Midnight Train to Berlin.

A Good Food Offering

I would hope that the food is of a quality nature.

I am coeliac and must have gluten-free food, like probably up to one percent of people.

I have found that the higher the quality of the food, the more likely it is, that the chef knows their allergies.

Before the pandemic, the best train food in Europe on a regular service was Great Western Railway’s Pullman Dining. But because of the restrictions, I’ve not tried it lately.

 

 

June 30, 2021 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , , , | 4 Comments