Abellio’s Plans For Norwich And Liverpool

This page on the Department for Transport web site is an interactive map of the Abellio’s promises for East Midlands Railway.

These are mentioned for services between Norwich and Liverpool.

Splitting Of The Service

Early in the new franchise the Liverpool – Nottingham section will transfer to another operator, which will enable the two halves of the service to better meet the needs of customers.

This has been said for some time by the Department of Transport.

It is also said that limited services will continue to operate via Stamford and Loughborough.

Looking at trains between Nottingham and Norwich., they take these routes.

  • Grantham, Peterborough, Ely, Thetford
  • East Midlands Parkway, Loughborough, Melton Mowbray, Oakham, Peterborough, Ely, Thetford

The service will be extended from Nottingham to Long Eaton and Derby.

Refurbished Modern Trains

It is proposed that the service will be run by refurbished modern trains.

Features include.

  • More reliable service
  • Improved comfort
  • Passenger information system displays
  • free on-board Wi-Fi
  • at-seat power sockets
  • USB points
  • Air conditioning
  • Tables at all seats
  • Increased luggage space.
  • No date for introduction is given.

This all sounds fine to me.

The Current Trains On The Route

Before discussing the possible new trains, I will look at the current service, that I have used many times.

Class 158 trains are used,

Normally, a pair of two-car trains run together to make a four-car formation.

  • At times, these trains are very overcrowded.
  • I don’t think, the trains have a universal access toilet.
  • The trains are thirty years old and some detailing is not very good or very last century.
  • The air-conditioning may be a bit dodgy.
  • Nottingham and Norwich is probably about the maximum comfortable range for passenger on these trainss.

I suspect too, that they have operational problems.

  • They are only 90 mph trains and they will share tracks with faster trains.
  • As part of this route could be on the East Coast Main Line, scheduling trains would be easier, if the trains were capable of 125 mph.
  • On board catering is provided by a trolley. Can it be pushed between the two trains?

Abellio are obviously quite right to promise a better train for both passengers, staff and their bottom line.

An Ideal Train For The Route

An ideal train would have a specification something like this.

  • Modern train, built since 2000.
  • Five or six cars
  • 125 mph operating speed.
  • An onboard cafe-bar.
  • Universal-access toilet.

It sounds to me, like a Class 222 train with a high-class refurbishment.

Currently, there are these  Class 222 trains available to the franchise.

  • Four by four-car
  • Seventeen by five-cars
  • Six by seven-cars.

Many of the Class 222 trains, will be replaced in 2022, when the new bi-mode trains are delivered.

The New Trains For The Route

It does look to me, that East Midlands Trains could do a lot worse, than use refurbished Class 222 trains between Norwich and Derby.

  • Their engineers and drivers know the trains well.
  • They could be arranged as four or five coaches for the route.
  • Tory are 125 mph trains, which must bring journey time savings, especially on the East Coast Main Line.
  • Bombardier have proposed, that they could be fitted with batteries to reduce the need to run the engines in stations.

Refurbishing something you know, is probably one of the cheaper options.

How Many Trains Are Needed For An Hourly Service Between Nowich And Derby?

I suspect that running to a well defined timetable that times of around three hours could be achieved between Norwich and Derby.

This would probably mean that a train could go from Norwich to Derby and back in under seven hours.

This would mean that seven trains would be needed for an hourly service running all day.

If the 125 mph trains could use their speed on the East Coast Main Line and perhaps on the Breckland Line, it might be possible to do the round trip in six hours and therefor need a train less.

Would Finding Seven Class 222 Trains Be Possible?

Obviously, once the Midland Main Line routes have been replaced by new bi-mode trains in 2022, there will be a lot of Class 222 trains available and seven trains to run  the Norwich and Derby service will not be a problem.

Some other factors will help.

Trains Will Be Released By The London And Corby Electric Service

In December 2020, when the London and Corby service receives electric trains, the current Class 222 trains on this route will become available.

I think that this service currently needs three trains.

More Mark 4 Coach/Class 43 locomotive Sets Could Be Created

In Abellio’s Plans For The Midland Main Line, I described how interim sets could be built by replacing the non-compliant Mark 3 coaches in an InterCity 125, with the compliant Mark 4 coaches from an InterCity 225.

These trains would be used to release some of the Class 222 trains on the Midland Main Line.

Another five Mark 4 Coach/Class 43 Locomotive sets would probably release the same number of Class 222 trains.

Trains Could Be Reorganised With A Better Plan

I have a feeling that by reorganising the Class 222 trains and bringing in more more Mark 4 Coach/Class 43 Locomotive sets, could mean that a better plan on the Midland Main Line could be developed.

As an example, when boarding a train at St. Pancrass, I often notice two trains are in the platform and you have to walk to the far train. This is not efficient and surely slows down the turnround of trains.

Platforms 1 to 4 are reserved for East Midlands services at St. Pancras station.

  • Two trains per hour to Derby, Chesterfield and Sheffield
  • Two trains per hour to Nottingham
  • One train per hour to Corby, which goes to two trains per hour in December 2020.

Surely, it would be easier, if the station was organised as follows.

  • Sheffield, Nottingham and Corby trains all have their own platform, with one spare for luck!
  • All trains are full length, with First Class at the London end
  • One train per platform.

This would make things easier for passengers and reduce turnround times.

No More Two Trains Running Together

I think that the practice of train companies running two or more trains together to increase capacity is a bad idea, unless you have no other way.

Consider two four-car trains running together as an eight-car train.

  • You have two driving cabs in the middle, which serve no purpose and just take up space. and add useless weight.
  • A buffet car in the train can be available to all passengers.
  • The First Class seats could be in two separate places on the train.
  • With trains like the Hitachi Class 800 trains, onboard staff can only move between trains in a station.
  • Walk-through trains allow passengers to position themselves for a convenient and quick exit.

Anybody who procures trains to run in multiple formations all the time, instead of buying longer trains, is generally incompetent.

A Rough Estimate

I have done a very rough estimate and feel that the Midland Main Line services can be run with the following numbers of trains.

  • Sheffield services – Ten trains
  • Nottingham services – Eight trains
  • Corby services – Six trains

As the Corby services will be run by refurbished twelve-car trains, it looks to me that there is a need for eighteen diesel trains for Sheffield and Nottingham services.

I would go for eighteen Mark 4 Coach/Class 43 locomotive sets, with perhaps a couple of spare sets..

Conclusion

The following services should be run with Mark 4 Coach/Class 43 locomotive sets of an appropriate length.

  • London and Nottingham
  • London and Sheffield

This would release the Class 222 trains for other services like those between Norwich and Derby.

 

 

 

 

April 14, 2019 - Posted by | Transport | , , , ,

4 Comments »

  1. […] Abellio’s Plans For Norwich And Liverpool, to see what I […]

    Pingback by Abellio’s Plans For Nottingham And Crewe Via Derby « The Anonymous Widower | April 14, 2019 | Reply

  2. Make a new car in three years even though Bombardier has a backlog of more testing and driver training until you can do?
    Hitachi has orders in the year 2015 is could not guarantee whether or not hold delivery until 2019.
    AT300(class80X) – INTERCITY HIGH SPEED
    http://www.hitachirail-eu.com/products/our-trains/at300-intercity-high-speed
    Technical outline
    Train Configuration: 5 – 12 car
    Speed Range: 125 – 140 mph
    Max Acceleration: 0.75m/s/s
    Nominal Vehicle Length: 26m
    Power Supply: Bi Mode (25kVAC and / or Diesel Operation)
    Door Type / Positions: Sliding Pocket Vehicle / End Doors

    Comment by Yy Hiro | April 14, 2019 | Reply

  3. So one won’t be able to make through journeys anymore – what a retrograde step!
    It is already quicker between say Grantham and Manchester to change at Doncaster than take a direct train, but adding a change at Nottingham will be a complete PITA.

    Comment by R. Mark Clayton | April 15, 2019 | Reply

  4. Living in East Anglia, I’ve never gone the whole way, but I’ve done short sections of it.

    Peterborough-Nottingham
    Liverpool-Sheffield

    It has a very patchy loading and two Class 158s running together are not enough capacity..

    It must be a big logistics problem to for EMT or EMR to have drivers at Liverpool and Norwich for one train per hour.

    EMR will run their Derby-Norwich service from Derby and TPE run Liverpool-Nottingham from Liverpool, where they have a base.

    The two services will add to the services between Derby and Nottingham via Toton for HS2. I would think, that the split increases revenue and reduces costs.

    This May Greater Anglia start their Norwich in Ninety service, which linked to Virgin at Euston will be much quicker between Norwich/Ipswich and Liverpool/Manchester.

    I also think that the 100 mph Class 158s are a bit of a roadblock on the East CoastMain Line.

    Someone appears to have done some sensible modelling.

    Comment by AnonW | April 15, 2019 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.