This Year’s Engineers Christmas Party Is At Highbury And Islington Station

Three year’s ago, I wrote VolkerFitzpatrick Are Having A Christmas Party At South Tottenham.

This year’s Engineers Chrismas Party is at Highbury and Islington station, where they are replacing the bridge on the Holloway Road over the North London Line.

These pictures were taken on the 20th of December.

The first action of the rebuilding of the bridge was the shutting of the Post Office outside the station, which I wrote about in Highbury And Islington Post Office Is Now Shut.

That post dates from July 2014 and signs around the station say the bridge will be replaced by Summer 2018.

Four years to rebuild a bridge. Are Network Rail looking for an entry in the Guinness Book Of Records?

But then Network Rail has form with bridges in North London.

On the Gospel Oak to Barking Line, they forgot to rebuild the bridges at Wightman Road and Crouch Hill.

These pictures were taken on the 22nd of December.

These pictures were taken on the 28th of December.

These pictures were taken on the 31st of December.

The large cranes have gone.

The 8th of January marked the reopening of the roads.

I think the bridge will be fully completed in the Summer.

 

 

December 20, 2017 Posted by | Transport | , , , | Leave a comment